Proposed Changes by Subject—National Building Code 2020
A hyperlinked number (e.g., Footnote 1) at the end of a proposed change link leads to a supporting document for that proposed change.
List of Supporting Documents
National Building Code 2020 (Proposed changes to 41 provisions)
Accessibility
(Proposed changes to 4 provisions)
Div.B 3.2.7.1. Minimum Lighting Requirements
Div.B 9.5. Design of Areas and Spaces
Div.B 9.9.5.3. Obstructions in Public Corridors
Div.B 9.34.2.7. Public and Service Areas
Airtightness
(Proposed changes to 3 provisions)
Div.B 9.36.6.2. Definitions
Div.B 9.36.6.3. Determination of Airtightness
Div.B 9.36.6.4. Determination of Airtightness Level
Alteration of Existing Buildings
(Proposed changes to 2 provisions)
Div.A 1.3.3. Application of Division B
Div.B 10
Building Envelope - General
(Proposed changes to 2 provisions)
Div.B 9.36.2.5. Continuity of Insulation
Div.B 9.36.2.11. Trade-off Options for Above-ground Building Envelope Components and Assemblies
Building Fire Safety
(Proposed changes to 1 provision)
Div.B 3.1.1. Scope and Definitions
Combustible Construction
(Proposed changes to 1 provision)
Div.B 3.1.7.5. Rating of Supporting Construction
Defined Terms
(Proposed changes to 1 provision)
Div.A 1.4.1.2. Defined Terms
Encapsulated Mass Timber Construction
(Proposed changes to 2 provisions)
Div.B 3.1.6.4. Encapsulation of Mass Timber Elements
Div.B 3.1.6.6. Encapsulation Materials
Environmental Separation Table 5.9.1.1.
(Proposed changes to 3 provisions)
Div.B 5.9.1.1. Compliance with Applicable Standards
Fenestration
(Proposed changes to 3 provisions)
Div.B 9.36.2.7. Thermal Characteristics of Fenestration, Doors and Skylights
Div.B 9.36.5.3. Compliance
Div.B 9.36.7.3. Energy Performance Improvement Compliance Calculations
Greenhouse Gas Emissions
(Proposed changes to 4 provisions)
Div.A 2.1.1.2. Application of Objectives
Div.A 2.2.1.1. Objectives
Div.A 3.1.1.2. Application of Functional Statements
Div.A 3.2.1.1. Functional Statements
HVAC Equipment Efficiency Table
(Proposed changes to 1 provision)
Div.B 9.36.3.10. Equipment Efficiency
Large Farm Buildings (General)
(Proposed changes to 1 provision)
Div.B 2.2.7.6. Width and Height of Exits
Other
(Proposed changes to 3 provisions)
Div.B 3.1.5.13. Gypsum Board
Div.B 3.2.4.16. Manual Stations
Div.B 3.8.2.6. Controls
Penetrations
(Proposed changes to 2 provisions)
Div.B 3.1.7.1. Determination of Ratings
Div.B 3.1.9. Penetrations in Fire Separations and Fire-Rated Assemblies
Prescriptive Trade-off Path
(Proposed changes to 5 provisions)
Div.B 9.36.8. Tiered Energy Performance Compliance: Prescriptive Path
Div.B 9.36.8.6. Energy Conservation Measures for Fenestration and Doors
Div.B 9.36.8.8. Energy Conservation Measures Relating to Airtightness
Div.B 9.36.8.9. Energy Conservation Measures for HVAC Systems
Div.B 9.36.8.10. Energy Conservation Measures for Service Water Heating Equipment
Radon and Soil Gas Mitigation
(Proposed changes to 1 provision)
Div.B 9.18.6.2. Ground Cover in Heated Crawl Spaces
Vegetated Roof Assemblies
(Proposed changes to 1 provision)
Div.B 5.2.2.2. Determination of Wind Load
Windows, Doors and Skylights
(Proposed changes to 1 provision)
Div.B 3.3.1.14. Ramps and Stairways
- Date modified: