Once a code change request becomes a minor or CBHCC approved task, it transitions to a proposed change that follows the path outlined in the code development process.
This proposed change tracking database can be used by code change request proponents to follow the progress of proposed changes for a task linked to their code change request. Information in the database can be accessed using the filter option or toggle arrows to sort by:
- ID number (the number assigned when a code development committee has started its work on the issue and created a proposed change form for potential publication),
- title,
- description,
- code reference,
- status (the progress of the proposed change through the system), and
- code change request (the corresponding code change request number assigned when it was originally submitted by a proponent, see the code change request tracking database).
Please direct any questions related to code change requests to CBHCC code change request.
ID | Title | Description | Code Reference | Status | Code Change Requests |
---|---|---|---|---|---|
2116 | Introducing a New Standard ANSI/CAN/UL/ULC 2152 for Special Purpose Nonmetalic Containers | This request is to add ANSI/CAN/UL/ULC 2152, “Safety for Special Purpose Nonmetallic Containers and Tanks for Specific Combustible or Noncombustible Liquids” standard to allow the use of special purpose nonmetalic containers and tanks for combustible or noncombustible liquids. | NFC20 Div.B 4.3.1.2.(1) | - | 1646 |
2113 | Change Article Title from "HVAC Systems Calculations" to "HVAC Systems" | Editorially revise the title of Article 8.4.2.10. in the NECB from “HVAC Systems Calculations” to “HVAC Systems”. | NECB20 Div.B 8.4.2.10. | SCEE: Review — Editorial Revision/Errata (No Public Review) 2024-12-03 |
1744 |
2112 | Introducing a New Standard ANSI/CAN/UL/ULC 1369 for Aboveground Piping | This request is to add ANSI/CAN/UL/ULC 1369, "Aboveground Piping for Flammable and Combustible Liquids," standard to ensure conformance of non-metallic piping systems used in aboveground installations. | NFC20 Div.B 4.5.2.1.(3) | - | 1541 |
2109 | Fan motor power threshold for application of prescriptive requirements | The proposed change lowers the fan motor power threshold for application of prescriptive requirements | NECB20 Div.B 5.2.3.1. | SCEE: Review — Recommended for Public Review 2024-12-18 |
1437 |
2108 | Revision of Attributions and Intent Statements in Division B of NBC | Revise attributions and intent statements in Division B of the NBC following an assessment of their provisions, intents, relevant objectives and functional statements. | NBC20 Div.B 2.2.1.14.(1) | - | - |
2107 | Revision of Attributions and Intent Statements in Division B of NFC | Revise attributions and intent statements in Division B of the NFC following an assessment of the provisions, intents, relevant objectives and functional statements. | NFC20 Div.B 2.8.2.1.(3), NFC20 Div.B 2.14.1.1.(4), NFC20 Div.B 2.14.2.1.(1), NFC20 Div.B 3.3.2.10.(1), NFC20 Div.B 4.3.7.4.(1), NFC20 Div.B 4.4.1.2.(6), NFC20 Div.B 4.5.6.10.(1), NFC20 Div.B 4.12.1.2.(1), NFC20 Div.B 4.12.1.2.(3), NFC20 Div.B 4.12.1.3.(1), NFC20 Div.B 5.6.3.4.(1), NFC20 Div.B 5.6.4.2.(5) |
- | - |
2105 | Update metric SCOP to "net sensible COP" in Table 5.2.12.1.-H for Computer Room AC | Update metric "sensible coefficient of performance (SCOP)" to "net sensible COP (NSenCOP)" in Table 5.2.12.1.-H for Performance Requirements for Computer Room Air Conditioners, to harmonize with the new metric used in ASHRAE 90.1-2019. | NECB20 Div.B 5.2.12.1. | - | 1873 |
2102 | Removal of a withdrawn ASTM Standard | This proposed change deletes the reference to the standard ASTM C1053, “Standard Specification for Borosilicate Glass Pipe and Fittings for Drain, Waste, and Vent (DWV) Applications,” that was withdrawn. | NPC20 Div.B 2.2.8.1. | SCHP: Review — Withdrawn 2024-12-03 |
- |
2101 | Fibrocement pipe and fittings | This proposed change prohibits the use of fibrocement pipes an fittings to covey sewage. | NPC20 Div.B 2.2.5. | - | - |
2100 | Direct Flush Valves | This proposed change eliminates duplicated requirements for direct flush valves by only keeping the referenced standards. | NPC20 Div.B 2.2.10.8. | - | - |
2097 | Adding FS-OS attribution to the Part 2 of NBC 2025 | This proposed change aims to add FS-OS attribution to Subsection 2.2.2. of NBC 2020, ensuring consistency with other Parts of NBC 2025. | NBC20 Div.B 2.2.2., NBC20 Div.B 3.1.16.1. |
Draft 2024-10-15 |
- |
2096 | Updates to Referenced Documents | - | NBC20 Div.B 1.3.1.2., NFC20 Div.B 1.3.1.2., NPC20 Div.B 1.3.1.2., NECB20 Div.B 1.3.1.2. |
SCHP: Review 2024-06-19 SCES: Review 2024-07-15 SCED: Review 2024-08-12 SCFP: Review 2024-08-15 SCEE: Review 2024-08-21 SCUE: Review 2024-08-21 SCHMA: Review 2024-08-21 SCHSB: Review 2024-09-11 SCSD: Review 2024-09-17 SCDIVAC: Review 2024-09-24 |
2163, 2157, 1878 |
2095 | Explanatory Notes on impact of thermal insulation on fire performance of envelope assemblies and cladding support | This proposed change adds explanatory Notes to raise awareness of the impact of increased thermal insulation on fire resistive performance of envelope assemblies and structural support for cladding. | NBC20 Div.B 9.25.2.1., NBC20 Div.B 9.27.5.1. |
- | - |
2090 | Reference to the CSA-Z32, "Electrical Safety and Essential Electrical Systems in Health Care Facilities" | This proposed change clarifies the application of the referenced standard CSA-Z32, "Electrical Safety and Essential Electrical Systems in Health Care Facilities" in both NBC and NFC. | NBC20 Div.B 3.2.7.5., NBC20 Div.B 3.2.7.6., NFC20 Div.B 6.5.1.1. |
SCUE: Draft 2024-07-05 |
- |
2089 | Clear Floor Space on the Non-Latch Side of Sliding Doors | This proposed change expands the application of a clear floor space to either sides of a sliding door in a barrier-free path of travel. | NBC20 Div.B 3.8.3.6. | SCUE: Draft 2024-07-04 |
1700 |
2088 | Clarify the Intent of "Clear Floor Space" in Barrier-Free Design | This proposed change clarifies the intent behind the reference to "clear floor space" when used in barrier-free design. | NBC20 Div.B 3.3.2.8., NBC20 Div.B 3.8. |
SCUE: Draft 2024-06-26 |
1701 |
2086 | Reference the individual standards within the CSA B108:23 package | Reference individual standards CSA B108.1:23, "Compressed natural gas refuelling stations installation code" and CSA B108.2:23, "Liquefied natural gas refuelling stations installation code" within the CSA B108:23 Package. | NFC20 Div.B 4.6.1.1.(2) | SCHMA: Review 2024-08-21 SCHMA: Review — Recommended for Public Review 2024-10-25 |
- |
2085 | Replace Existing ULC/ORD-C842-84 and CAN/ULC-S651:2016 with ANSI/CAN/UL/ULC 842:2020 | This proposed change replaces the reference to ULC/ORD-C842-84, "Guide for the Investigation of Valves for Flammable and Combustible Liquids," and CAN/ULC-S651:2016, "Standard for Emergency Valves for Flammable and Combustible Liquids," with a reference to ANSI/CAN/UL/ULC 842:2020, “Standard for Valves for Flammable and Combustible Liquids." | NFC20 Div.B 4.5.7.1.(1), NFC20 Div.B 4.5.7.1.(3), NFC20 Div.B 4.6.6.3.(1) |
SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2081 | Replace Existing ULC/ORD C107.21-92 with CAN/ULC S664:2017 | This proposed change replaces the reference to ULC/ORD C107.21-92, “Under Dispenser Sumps," with a reference to CAN/ULC S664:2017, "Standard for Containment Sumps, Sump fittings, and Accessories for Flammable and Combustible Liquids" | NFC20 Div.B 4.6.3.2.(1) | SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2080 | Replace Existing CAN/ULC-S612:2016 with ANSI/CAN/UL 330:2024 | This proposed change replaces the reference to CAN/ULC-S612:2016, “Standard for Hose and Hose Assemblies for Flammable and Combustible Liquids," with a reference to ANSI/CAN/UL 330:2024, “Standard for Hose and Hose Assemblies for Dispensing Flammable and Combustible Liquids." | NFC20 Div.B 4.6.5.1.(1) | SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2079 | "Thermal Bridge" | This proposed change introduces the defined term "thermal bridge" in the NBC and the NECB. | NBC20 Div.A 1.4.1.2., NECB20 Div.A 1.4.1.2. |
SCEE: Draft 2024-07-11 |
- |
2078 | Replace Existing CAN/ULC-S620:2016 with ANSI/CAN/UL/ULC 2586:2022 | This proposed change replaces the reference to CAN/ULC-S620:2016, "Standard for Hose Nozzle Valves for Flammable and Combustible Liquids," with a reference to ANSI/CAN/UL/ULC 2586:2022, “Standard for Hose Nozzle Valves." | NFC20 Div.B 4.5.7.1.(2), NFC20 Div.B 4.6.5.2.(1) |
SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2077 | Replace Existing CAN/ULC-S615-14 with ANSI/CAN/UL/ULC 1316:2018 | This proposed change replaces the reference to CAN/ULC-S615-14, "Standard for Fibre Reinforced Plastic Underground Tanks for Flammable and Combustible Liquids," with a reference to ANSI/CAN/UL/ULC 1316:2018, “Standard for Fibre Reinforced Underground Tanks for Flammable and Combustible Liquids." | NFC20 Div.B 4.3.1.2.(1), NFC20 Div.B 4.3.8.6.(2), NFC20 Div.B 4.4.3.2.(4) |
SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
1523 |
2076 | Replace Existing CAN/ULC-S661-10 and CAN/ULC-S663-11 with ANSI/CAN/UL/ULC 2583:2021 | This proposed change replaces the reference to CAN/ULC-S661-10, “Standard for Overfill Protection Devices for Flammable and Combustible Liquid Storage Tanks," and CAN/ULC-S663-11, "Standard for Spill Containment Devices for Flammable and Combustible Liquid Aboveground Storage Tanks," with a reference to ANSI/CAN/UL/ULC 2583:2021, “Standard for Fuel Tank Accessories for Flammable and Combustible Liquids." | NFC20 Div.B 4.3.1.8.(1), NFC20 Div.B 4.3.1.8.(2), NFC20 Div.B 4.3.6.4.(4) |
SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2073 | Replace Existing CSA B306-M1977 to CSA B306:23 | This proposed change replaces the reference to CSA B306-M1977, "Portable Fuel Tanks for Marine Use," to a reference to CSA B306:23, “Portable engine fueling system for marine use." | NFC20 Div.B 4.2.3.1.(1) | SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2072 | Replace Existing CAN/ULC-S633:2017 with ANSI/CAN/UL/ULC 2039:2023 | This proposed change replaces the reference to CAN/ULC-S633:2017, "Standard for Flexible Connector Piping for Fuels," with a reference to ANSI/CAN/UL/ULC 2039:2023, “Standard for Flexible Connector Piping for Flammable and Combustible Liquids." | NFC20 Div.B 4.5.6.14.(2) | SCHMA: Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2067 | Documentation on Exceptional Calculation Methods | This proposed change establishes requirements for documentation on exceptional calculation methods used when energy modeling software cannot be used. | NECB20 Div.C 2.2.2. | SCEE: Review 2024-06-06 SCHSB: Review 2024-06-20 SCDIVAC: Pre-Public Review — Proceed 2024-07-09 SCCBHCC: Review — Recommended for Public Review 2024-09-12 |
- |
2065 | Replace Existing ULC/ORD-C30-95 to ANSI/CAN/UL/ULC 30:2022 | This proposed change replaces the reference to ULC/ORD-C30-95, "Safety Containers,” to a reference to ANSI/CAN/UL/ULC 30:2022, "Standard for Metallic and Nonmetallic Safety Cans for Flammable and Combustible Liquids." | NFC20 Div.B 4.1.5.8.(2), NFC20 Div.B 4.2.3.1.(1), NFC20 Div.B 4.2.6.4.(1), NFC20 Div.B 5.5.5.2.(2) |
SCHMA: Review — Recommended for Public Review 2024-05-22 |
- |
2064 | Replace Existing ULC/ORD-C1275-84 to ANSI/CAN/UL/ULC 1275:2024 | This proposed change replaces the reference to ULC/ORD-C1275-84, “Guide for the Investigation of Storage Cabinets for Flammable Liquid Containers," to a reference to ANSI/CAN/UL/ULC 1275:2024, “Standard for Flammable Liquid Storage Cabinets." | NFC20 Div.B 4.2.10.5.(1) | SCHMA: Review — Recommended for Public Review 2024-05-22 SCHMA: Review — Recommended for Public Review 2024-08-21 |
- |
2061 | Overheating in New Dwelling Units | This proposed change |
NBC20 Div.B 1.1.3.1., NBC20 Div.B 6.2.1., NBC20 Div.B 9.33.2.1., NBC20 Div.B 9.33.3., NBC20 Div.B 9.33.5. |
SCHSB: TG/WG Development 2024-02-28 SCHSB: TG/WG Development 2024-03-14 SCHSB: TG/WG Development 2024-04-03 SCHSB: Review — Recommended for Public Review 2024-04-09 SCHP: Review — Recommended for Public Review 2024-04-15 SCUE: Review 2024-04-16 SCDIVAC: Pre-Public Review 2024-04-22 SCED: Review 2024-04-23 SCEE: Review 2024-04-24 SCSD: Review 2024-04-24 SCES: Review 2024-04-24 SCFP: Review 2024-04-24 SCHMA: Review 2024-04-29 SCHSB: Review 2024-04-29 SCDIVAC: Review — Recommended for Public Review 2024-04-29 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review 2024-06-06 SCHSB: Review of PR Comments 2024-09-04 SCHSB: Review 2024-09-11 SCHSB: TG/WG Development 2024-09-17 SCUE: Review of PR Comments 2024-09-18 SCHSB: TG/WG Development 2024-09-26 SCHP: Review 2024-10-03 SCHSB: Analysis of PR Comments — Recommend to proceed with technical revisions 2024-10-09 SCHSB: TG/WG Development 2024-10-11 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-10-23 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-10-29 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-10-29 SCHSB: Review of PR Comments 2024-11-13 SCHSB: Review of PR Comments — Resubmit for Public Review 2024-11-21 SCHP: Review of PR Comments — Proceed with technical revisions 2024-11-25 SCCBHCC: Review of PR Comments — Resubmit for Public Review 2024-12-05 |
- |
2058 | Heat/Energy Recovery ventilators | Heat/Energy Recovery ventilators Terminology | - | - | - |
2057 | Energy Modeling Software Requirements | This proposed change updates the ANSI/ASHRAE Standard 140, 'Method of Test for Evaluating Building Performance Simulation Software' to its 2023 edition and adds a new Article on acceptance criteria for energy modeling software. | NBC20 Div.B 9.36.5.4.(8), NBC20 Div.B 9.36.5., NBC20 Div.B 9.36.2.4.(4), NBC20 Div.B 9.36.7.3.(5), NBC20 Div.B 9.36.5.3.(1), NBC20 Div.B 9.36.5.15.(6), NBC20 Div.B 9.36.7.3.(4) |
SCEE: Review 2024-06-06 SCEE: Review — Withdrawn 2024-06-06 |
- |
2056 | Energy Modeling Software Requirements | This proposed change updates the edition year of ANSI/ASHRAE 140, "Method of Test for Evaluating Building Performance Simulation Software," to 2023 and adds new Articles on acceptance criteria for energy modeling software and on exceptional calculation methods. | NECB20 Div.B 3.1.1.5., NECB20 Div.B 3.1.1.7.(4), NECB20 Div.B 8.4.2., NECB20 Div.B 8.4.3.9. |
SCEE: Draft 2024-03-11 SCEE: Review — Recommended for Public Review 2024-06-06 SCCBHCC: Review — Recommended for Public Review 2024-09-12 |
2158 |
2054 | Clarification of Installation Location for Accessible Controls | The proposed change clarifies that all operable components for controls should be installed within the prescribed height range. | NBC20 Div.B 3.8.3.8.(1) | SCUE: Draft 2024-05-10 SCUE: Review — Further Review 2024-06-05 |
- |
2053 | Update to CSA B651 references in NBC (if CSA B651-23 is adopted) | If CSA B651-23 is adopted in the next edition of the NBC, several clause numbers need to be updated. This is an editorial update. | NBC20 Div.B 3.3.1.19., NBC20 Div.B 3.8.3. |
SCUE: Draft 2024-01-10 |
- |
2051 | Explanatory Note 10.9.1.1. for Continuity of the Air Barrier System | This proposed change introduces explanatory Note 10.9.1.1. to clarify requirements for the continuity of air barrier systems that apply to the alteration of existing buildings. | NBC20 Div.B 10.9. | SCHSB: Review — Recommended for Public Review 2024-02-08 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHSB: Review of PR Comments — Proceed with editorial revisions 2024-09-11 |
- |
2050 | Egress Windows or Doors for Bedrooms in Part 3 Residential Buildings | The proposed change requires egress window or door from bedrooms in Group C, Part 3 buildings that are not sprinklered. | NBC20 Div.B 3.3.4. | SCUE: Draft 2023-12-13 |
1591, 2095 |
2049 | Specified Wind and Snow Loads in Part 9 | - | NBC20 Div.B 9.4.2.2. | - | - |
2048 | Specified Wind and Snow Loads in Part 9 | This proposed change aligns Part 9 with the proposed changes in Part 4 to wind and snow loading to account for potential loading changes resulting from climate change. | NBC20 Div.B 9.4.2., NBC20 Div.B 9.6.1.3., NBC20 Div.B 9.23.3.4.(3), NBC20 Div.B 9.23.3.5., NBC20 Div.B 9.23.6.1., NBC20 Div.B 9.23.13.1., NBC20 Div.B 9.23.13.2., NBC20 Div.B 9.23.13.3., NBC20 Div.B 9.23.16.1., NBC20 Div.B 9.23.16.5., NBC20 Div.B 9.27.5.4.(2) |
SCHSB: Review — Recommended for Public Review 2024-01-30 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHSB: Review of PR Comments — Proceed as proposed 2024-09-04 |
- |
2047 | Performance Path | - | NECB20 Div.B 13.8. | - | - |
2046 | Update to Table 3.8.3.1. for CSA B651 reference to signage | Provide an accurate reference in Table 3.8.3.1. to reflect the relocation of some provisions made in the CSA B651-18 standard. | NBC20 Div.B 3.8.3.1. | SCUE: Draft 2023-11-28 SCUE: Review — Editorial Revision/Errata (No Public Review) 2023-12-18 |
- |
2045 | Tier 4 Prescriptive Requirements | This proposed change provides the energy efficiency requirements for compliance with tier 4 of the energy performance compliance prescriptive path. | NBC20 Div.B 9.36. | - | - |
2044 | Tier 3 Prescriptive Requirements | This proposed change provides the energy efficiency requirements for compliance with tier 3 of the energy performance compliance prescriptive path. | NBC20 Div.B 9.36. | - | - |
2043 | Tier 2 Prescriptive Requirements | This proposed change provides the energy efficiency requirements for compliance with tier 2 of the energy performance compliance prescriptive path. | NBC20 Div.B 9.36. | - | - |
2042 | Energy Performance Tier 1 of the Prescriptive Path | This proposed change provides energy-efficiency requirements for compliance with Tier 1 of the energy performance compliance prescriptive path. | NBC20 Div.B 9.36. | SCEE: TG/WG Development 2023-11-27 SCEE: Review — Recommended for Public Review 2023-12-13 SCHSB: Review 2024-01-08 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-08-23 |
- |
2038 | Application of Automatic Sprinkler Systems and NFPA 13R Standard | This proposed change clarifies the application of NFPA 13R, "Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies" for mixed occupancies. | NBC20 Div.B 3.2.5.12. | SCFP: TG/WG Development 2024-07-31 SCFP: Review 2024-09-03 SCFP: TG/WG Development 2024-11-18 SCFP: Review — Recommended for Public Review 2024-11-27 |
892 |
2033 | Ventilation Systems in Existing Buildings Subjected to Alteration | This proposed change introduces requirements for ventilation systems in existing buildings subjected to alteration. | NBC20 Div.B 10.9. | SCEE: Review 2023-09-27 SCHSB: Review 2023-12-06 SCHSB: Review — Recommended for Public Review 2024-02-08 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHSB: Review of PR Comments 2024-09-11 |
- |
2032 | Heat Transfer, Air Leakage and Condensation Control Requirements | This proposed change introduces requirements for the continuity of air barrier systems in existing buildings subjected to alteration. | NBC20 Div.B 10.9. | SCEE: Review 2023-09-27 SCHSB: Review — Recommended for Public Review 2023-12-06 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHSB: Review of PR Comments — Proceed as proposed 2024-09-11 |
- |
2031 | Reinforcing Stud Walls in Washrooms for the Future Installation of Grab Bars: Water Closets | This proposed change prescribes the reinforcement of walls around water closets in dwelling units for the future installation of grab bars. | NBC20 Div.B 3.8. | SCUE: Draft 2023-10-04 SCHSB: Review 2023-10-16 SCUE: TG/WG Development 2023-10-31 SCHSB: Review 2023-11-01 SCHP: Review 2023-11-03 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCUE: Analysis of PR Comments 2024-10-22 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-01 SCHSB: Review of PR Comments 2024-11-01 SCUE: Review of PR Comments 2024-11-04 SCUE: TG/WG Development 2024-11-19 SCHSB: Review of PR Comments 2024-11-22 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-26 |
964, 1429 |
2030 | Reinforcing Stud Walls in Washrooms for the Future Installation of Grab Bars: Structural Strength | This proposed change introduces performance-based requirements and prescriptive pathways for material selection when reinforcing stud walls of washrooms in dwelling units for the future installation of grab bars. | NBC20 Div.B 9.31.2.3. | SCUE: Draft 2023-10-04 SCHSB: Review — Recommended for Public Review 2023-11-01 SCUE: Review 2023-11-09 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCUE: Analysis of PR Comments 2024-09-24 SCUE: Review of PR Comments 2024-10-28 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-11-01 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-11-13 |
964, 1429 |
2029 | Accessible Menstrual Product Dispensers: Control Design | This proposed change requires accessible control designs for menstrual product dispensers where they are provided so that they may be accessed by persons with disabilities related to dexterity. | NBC20 Div.B 3.8.3.16. | SCUE: Draft 2023-09-14 |
1441 |
2028 | Expanding the Scope of the Accessibility Requirements | This proposed change expands the scope of the accessibility requirements in Section 3.8. to include proposed Subsections 3.8.4. and 3.8.5. | NBC20 Div.B 3.8.1. | SCUE: Draft 2023-09-05 SCUE: TG/WG Development 2023-09-12 SCHSB: Review 2023-10-22 SCUE: TG/WG Development 2023-10-31 SCHSB: Review 2023-11-02 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCUE: TG/WG Development 2024-05-21 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-06-04 SCHSB: Review of PR Comments 2024-06-19 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-08-21 |
964, 1429 |
2026 | Operational GHG Emissions: Tiered Prescriptive Requirements in the NBC | This proposed change introduces prescriptive requirements in the NBC to reduce operational GHG emissions. | NBC20 Div.B 9.36. | SCEE: Review — Recommended for Public Review 2023-10-11 SCHSB: Review 2023-11-21 SCEE: Review — Recommended for Public Review 2023-12-13 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Resubmit for Public Review 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCCBHCC: Review of PR Comments — Resubmit for Public Review 2024-09-12 |
- |
2024 | Clarification of Maximum Water Usage for Dual-Flush Water Closets | This proposed change clarifies the maximum water usage requirements for the full and reduced flush cycles of dual-flush water closets. | NPC20 Div.B 2.6.1.6. | SCHP: Review — Recommended for Public Review 2023-10-12 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed as proposed 2024-06-19 |
- |
2023 | *This PCF number is available for new PCF* | The proposed change re-positions the existing accessibility requirements for controls in dwelling units in multi-unit residential buildings to a Subsection focused on dwelling units | - | - | - |
2022 | Clarification of OS Safety Sub-Objective for Firefighter Safety | This proposed change distinguishes firefighters when performing their duties from the "persons" in the definition of sub-objective OS1 Fire Safety. | NPC20 Div.A 2.2.1.1.(1) | - | - |
2021 | Application of Accessibility Requirements to Dwelling Units | This proposed change revises the application of Section 3.8. exempting dwelling units from accessibility requirements. | NBC20 Div.B 3.8.2.1. | SCUE: TG/WG Development 2023-08-25 |
- |
2020 | Reference House Modeling of Service Water Heating equipment not listed in Table 9.36.4.2 | This proposed change closes a loophole where the requirements in Table 9.36.5.16 were not aligned with Table 9.36.4.2 | NBC20 Div.B 9.36.5.16. | SCEE: Draft 2023-08-09 |
- |
2019 | Reference House Modeling of HVAC equipment not addressed in Table 9.36.3.10. | This proposed change closes a loophole where the requirements in Clause 9.36.5.15.(7)(b) were not aligned with Table 9.36.3.10 in NBC 2020. | NBC20 Div.B 9.36.5.15. | SCEE: Draft 2023-08-04 |
- |
2018 | Updated Climatic Data | This proposed change updates Table C-1 to incorporate the effects of climate change. | NECB20 Div.B Appendix C | SCEE: Draft 2023-08-09 SCEE: Review 2024-04-04 SCDIVAC: Review — Recommended for Public Review 2024-04-09 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review of PR Comments 2024-08-23 SCES: Review of PR Comments 2024-08-28 SCED: Review of PR Comments 2024-09-02 SCUE: Review of PR Comments 2024-09-06 SCHP: Review of PR Comments 2024-09-06 SCFP: Review of PR Comments 2024-09-09 SCSD: Review of PR Comments 2024-09-10 SCHSB: Review of PR Comments 2024-09-18 SCDIVAC: Review of PR Comments — Proceed with editorial revisions 2024-09-24 |
- |
2016 | New Abbreviations Related to Operational GHG Emissions | This proposed change updates the list of symbols and abbreviations in the NBC and NECB. | NECB20 Div.A 1.4.2.1.(1), NBC20 Div.A 1.4.2.1.(1) |
SCEE: Draft 2023-08-01 SCEE: TG/WG Development 2023-08-03 SCES: Review 2023-08-29 SCUE: Review 2023-09-05 SCHSB: Review 2023-09-06 SCHP: Review 2023-09-06 SCED: Review 2023-09-06 SCHMA: Review 2023-09-08 SCFP: Review 2023-09-11 SCSD: Review 2023-09-20 SCEE: Review 2023-09-27 SCDIVAC: Review — Recommended for Public Review 2023-10-16 SCHSB: Review 2023-11-01 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-18 SCES: Review of PR Comments 2024-06-25 SCHP: Review of PR Comments 2024-06-25 SCHMA: Review of PR Comments 2024-07-05 SCFP: Review of PR Comments 2024-07-05 SCED: Review of PR Comments 2024-07-12 SCSD: Review of PR Comments 2024-07-12 SCUE: Review of PR Comments 2024-07-15 SCEE: Review of PR Comments 2024-08-23 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-09-24 |
- |
2015 | Defined Term of Distillery | This proposed change suggested to revise the defined term "Distillery" to avoid confusion between the property and the building on the property. | NBC20 Div.A 1.4.1.2.(1) | SCHMA: Draft 2023-07-31 |
- |
2014 | Replacing the Term "Fixture" with "Plumbing Fixture" | This change identified all instances where the term "fixture(s)'' is used in the NPC 2020 and replace it with "plumbing fixture(s)" where necessary. | NPC20 Div.B 2.1.3., NPC20 Div.B 2.1.3.2.(1), NPC20 Div.B 2.2.2., NPC20 Div.B 2.2.3.1.(2), NPC20 Div.B 2.2.3.1.(5), NPC20 Div.B 2.2.10.8.(1), NPC20 Div.B 2.3.3.4.(2), NPC20 Div.B 2.3.3.8., NPC20 Div.B 2.3.3.11.(1), NPC20 Div.B 2.3.3.11.(2), NPC20 Div.B 2.3.4.1.(2), NPC20 Div.B 2.3.4.2.(1), NPC20 Div.B 2.3.6.1.(1), NPC20 Div.B 2.3.6.1.(2), NPC20 Div.B 2.3.7.3.(1), NPC20 Div.B 2.4.2.1.(1), NPC20 Div.B 2.4.2.1.(2), NPC20 Div.B 2.4.2.1.(3), NPC20 Div.B 2.4.2.3.(1), NPC20 Div.B 2.4.2.3.(2), NPC20 Div.B 2.4.2.3.(3), NPC20 Div.B 2.4.3., NPC20 Div.B 2.4.3.4.(1), NPC20 Div.B 2.4.4.1.(1), NPC20 Div.B 2.4.4.2.(1), NPC20 Div.B 2.4.4.3., NPC20 Div.B 2.4.4.4.(1), NPC20 Div.B 2.4.5.1., NPC20 Div.B 2.4.6.4., NPC20 Div.B 2.4.7.4.(5), NPC20 Div.B 2.4.9.3. Table , NPC20 Div.B 2.4.10.1.(1), NPC20 Div.B 2.4.10.2., NPC20 Div.B 2.4.10.3., NPC20 Div.B 2.4.10.12., NPC20 Div.B 2.5.2.1.(1), NPC20 Div.B 2.5.3.1.(1), NPC20 Div.B 2.5.3.1.(2), NPC20 Div.B 2.5.3.1.(3), NPC20 Div.B 2.5.3.1.(5), NPC20 Div.B 2.5.3.1.(6), NPC20 Div.B 2.5.3.1.(11), NPC20 Div.B 2.5.4.2., NPC20 Div.B 2.5.4.3., NPC20 Div.B 2.5.4.5., NPC20 Div.B 2.5.5.5., NPC20 Div.B 2.5.6.3., NPC20 Div.B 2.5.6.4., NPC20 Div.B 2.5.8.1.(2), NPC20 Div.B 2.5.8.1. Table , NPC20 Div.B 2.5.9.2.(1), NPC20 Div.B 2.6.1.1.(1), NPC20 Div.B 2.6.1.3.(6), NPC20 Div.B 2.6.1.6., NPC20 Div.B 2.6.2.2.(1), NPC20 Div.B 2.6.2.3.(1), NPC20 Div.B 2.6.2.10.(2), NPC20 Div.B 2.6.2.10.(3), NPC20 Div.B 2.6.2.10.(4), NPC20 Div.B 2.6.3.2., NPC20 Div.B 2.6.3.3.(1), NPC20 Div.B 2.6.3.4., NPC20 Div.B 2.7.1.1.(5), NPC20 Div.B 2.7.1.4.(1), NPC20 Div.B 2.7.2.4.(5), NPC20 Div.B 2.7.2.4.(10), NPC20 Div.B 2.2.10.6.(2), NPC20 Div.B 2.2.10.7., NPC20 Div.B 2.4.5.1.(3), NPC20 Div.B 2.4.5.1.(5), NPC20 Div.B 2.4.8.2.(1), NPC20 Div.B 2.4.10., NPC20 Div.B 2.5.3.1., NPC20 Div.B 2.5.4.5.(1), NPC20 Div.B 2.5.6.3.(1), NPC20 Div.B 2.5.6.3.(2), NPC20 Div.B 2.6.1.3.(5), NPC20 Div.B 2.6.3.1.(2), NPC20 Div.B 2.6.3.4.(5) |
SCHP: Review — Recommended for Public Review 2023-10-12 SCHP: Review — Withdrawn 2023-10-31 |
- |
2012 | Indoor Design Temperatures for Residential Buildings | - | NBC20 Div.B 6.2.1.1. | SCHP: Review 2023-09-13 SCHP: Review 2023-11-22 |
- |
2011 | Updated Performance Metric for Heat Pump Water Heaters | This proposed change updates the metric used to state the performance requirements for heat pump water heaters by replacing the energy factor (EF) metric with the uniform energy factor (UEF) metric. | NBC20 Div.B 9.36.4.2., NBC20 Div.B 9.36.8.10., NECB20 Div.B 6.2.2.1. |
SCEE: Review — Recommended for Public Review 2023-08-29 SCHP: Review 2023-09-12 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-06 |
- |
2010 | Deletion of Redundant Provisions Pointing to the Fire Safety Plan in the NFC | This proposed change deletes redundant provisions that point to Section 2.8., Emergency Planning, from other Parts of the NFC. | NFC20 Div.B 3.1.2.7., NFC20 Div.B 3.2.2.5., NFC20 Div.B 3.2.7.14., NFC20 Div.B 3.3.2., NFC20 Div.B 5.1., NFC20 Div.B 5.2.3., NFC20 Div.B 5.5.3.1., NFC20 Div.B 5.6.1. |
SCHMA: Draft 2023-07-20 SCHMA: Review — Recommended for Public Review 2023-08-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHMA: Review of PR Comments — Proceed as proposed 2024-05-22 |
- |
2009 | Climatic Data for Energy Model Calculations | This proposed change updates the references to sources of climatic data used in modeling in the explanatory Notes about climatic data. | NECB20 Div.B 8.4.2.3., NBC20 Div.B 9.36.5.5.(1) |
SCEE: Review — Recommended for Public Review 2023-08-29 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-06 |
- |
2007 | Automatic Shutoff of Lavatory Water Flow in Public Washrooms | This proposed change removes Sentence 2.2.10.6.(5) of the NPC to eliminate the conflict with Sentence 3.7.2.3.(4) of the NBC. | NPC20 Div.B 2.2.10.6. | SCHP: Review — Recommended for Public Review 2023-09-13 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHP: Review of PR Comments — Proceed as proposed 2024-06-19 |
- |
2005 | Rooftop Enclosures as a Storey for Determining Elevator Car Dimensions | This proposed change clarifies whether a rooftop enclosure provided for elevator machinery, a stairway or a service room is intended to be considered as a storey for the purposes of Article 3.5.4.1. | NBC20 Div.B 3.5.4.1. | SCUE: TG/WG Development 2023-07-11 SCUE: TG/WG Development 2023-09-07 SCFP: Review 2023-09-14 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-04-29 SCFP: Review of PR Comments 2024-05-28 SCUE: Review of PR Comments — Proceed as proposed 2024-06-04 |
1567, 1209 |
2004 | Operational GHG Emissions: Tiered Performance Requirements in the NBC | This proposed change introduces performance requirements in Section 9.36. of the NBC to reduce operational GHG emissions. | NBC20 Div.B 9.36. | SCEE: Draft 2023-07-11 SCEE: Review — Recommended for Public Review 2023-09-28 SCHSB: Review 2023-11-21 SCEE: Review — Recommended for Public Review 2023-12-13 SCEE: Review — Recommended for Public Review 2024-02-13 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 SCHSB: Review of PR Comments 2024-06-19 |
- |
2003 | Operational GHG Emissions: Tiered Performance Requirements in the NECB | This proposed change introduces performance requirements in the NECB to reduce operational GHG emissions. | NECB20 Div.B 11 | SCEE: Draft 2023-07-11 SCEE: Review — Recommended for Public Review 2023-09-28 SCEE: Review — Recommended for Public Review 2024-02-13 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
2002 | Test | - | - | - | - |
2001 | Energy Conservation Points for Air-Source Heat Pumps | This proposed change assigns energy conservation points to air-source heat pumps for compliance with the Prescriptive Trade-off Path in Section 9.36. | NBC20 Div.B 9.36.8.9. | SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
2000 | Energy Conservation Points for Oil-fired Furnaces | This proposed change assigns energy conservation points to oil-fired furnaces for compliance with the prescriptive trade-off path in Section 9.36. | NBC20 Div.B 9.36.8.9. | SCEE: Review — Recommended for Public Review 2023-08-23 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-05 |
- |
1998 | Introduction of New OS Safety Sub-Objective for Firefighter Safety | This proposed change adds a new sub-objective OS6 Firefighter Safety that clarifies which existing requirements are intended to address firefighter safety by distinguishing firefighters from the "persons" in the definition of sub-objective OS1 Fire Safety. | NBC20 Div.A 2.2.1.1.(1), NFC20 Div.A 2.2.1.1.(1) |
SCCBHCC: Draft 2023-06-27 SCES: Review 2023-08-29 SCEE: Review 2023-09-01 SCED: Review 2023-09-07 SCHMA: Review 2023-09-08 Review 2023-09-08 SCHP: Review 2023-09-11 SCFP: Review 2023-09-14 SCSD: Review 2023-09-20 SCHSB: Review 2023-09-26 SCUE: Review 2023-09-26 SCFP: Review 2023-10-03 SCHSB: Review 2023-10-03 SCHSB: Review 2023-11-01 SCCBHCC: Review 2024-01-24 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCCBHCC: CBHCC Decision 2024-10-03 |
1857, 557 |
1996 | Clarification of Provisions for Structural and Non-Structural Elements Not Part of the SFRS | The proposed change modifies the existing Code provisions for structural and non-structural elements that are not part of the defined seismic force resisting system (SFRS) of a building. | NBC20 Div.B 4.1.8.3. | SCED: Review 2023-09-20 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed with technical revisions 2024-06-03 |
- |
1994 | Exemptions List for Floor Assemblies over Basements | This proposed change adds Sentences 3.2.2.48.(3) and 3.2.2.51.(3) to the list of exceptions to the requirements for floor assemblies over basements in Sentence 3.2.1.4.(1). | NBC20 Div.B 3.2.1.4.(1) | SCFP: Draft 2023-06-05 Draft 2023-07-10 SCFP: Review — Recommended for Public Review 2023-09-14 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-07-31 SCFP: Review of PR Comments — Proceed as proposed 2024-08-15 |
- |
1993 | Sealed Overlapping Seams for Air Barriers on the Ground | This proposed change requires that air barriers in contact with the ground have overlapping seams that are sealed. | NBC20 Div.B 9.18.6.2., NBC20 Div.B 9.25.3.6. |
SCHSB: Review — Recommended for Public Review 2023-10-03 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review of PR Comments 2024-08-07 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-08-14 |
- |
1992 | palce holder for 13.8 | - | NECB20 Div.B 13.8. | - | - |
1991 | Scope and Application of Proposed Part 13 | This proposed change states the scope and application of proposed Part 13 of the NECB for the alteration of existing buildings. | NECB20 Div.B 13.1., NECB20 Div.B 13.2. |
SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-06 |
- |
1990 | Addition of the Defined Term "Alteration" | This proposed change introduces the defined term "alteration" from the NBC to the NECB. | NECB20 Div.A 1.4.1.2. | SCEE: Review 2023-07-17 SCED: Review 2023-07-26 SCES: Review 2023-08-03 SCHP: Review 2023-08-08 SCSD: Review 2023-08-11 SCFP: Review 2023-08-14 SCUE: Review 2023-08-15 SCHMA: Review 2023-08-15 SCEE: Review 2023-08-31 SCHSB: Review 2023-09-07 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-18 SCES: Review of PR Comments 2024-06-25 SCHP: Review of PR Comments 2024-06-25 SCHMA: Review of PR Comments 2024-07-05 SCFP: Review of PR Comments 2024-07-05 SCED: Review of PR Comments 2024-07-12 SCSD: Review of PR Comments 2024-07-12 SCUE: Review of PR Comments 2024-07-15 SCEE: Review of PR Comments 2024-08-23 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-09-24 |
- |
1989 | Application of a New Part on Operational Greenhouse Gas Emissions | This proposed change adds the application of a new Part proposed to be introduced to the NECB to address operational greenhouse gas emissions. | NECB20 Div.A 1.3.3.1. | SCEE: Draft 2023-06-21 SCEE: Review 2023-07-17 SCED: Review 2023-07-26 SCES: Review 2023-08-02 SCHSB: Review 2023-08-08 SCSD: Review 2023-08-11 SCUE: Review 2023-08-15 SCFP: Review 2023-08-15 SCHMA: Review 2023-08-15 SCHP: Review 2023-08-17 SCEE: Review 2023-08-21 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-18 SCES: Review of PR Comments 2024-06-25 SCHP: Review of PR Comments 2024-06-25 SCHMA: Review of PR Comments 2024-07-05 SCFP: Review of PR Comments 2024-07-05 SCED: Review of PR Comments 2024-07-12 SCSD: Review of PR Comments 2024-07-12 SCUE: Review of PR Comments 2024-07-15 SCEE: Review of PR Comments 2024-08-23 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-09-24 |
1805 |
1987 | Outpatient Clinics | New requirements related to operation of outpatient clinics. | NFC20 Div.B 2.1.2.2., NFC20 Div.B 2.8.1.2. |
- | - |
1986 | Outpatient Clinics | New requirements related to construction of outpatient clinics. | NBC20 Div.B 3.2.7.4., NBC20 Div.B 3.2.7.8. |
- | - |
1985 | Outpatient Clinics | Signpost to Part 3 from Part 9 | NBC20 Div.B 9.10.1.3. | - | - |
1984 | Outpatient Clinics | New requirements related to construction of outpatient clinics. | NBC20 Div.B 3.3. | - | - |
1983 | Introduce Testing Standards for Air Barriers for Roof Assemblies | This proposed change introduces two testing standards to the NECB for air leakage through roof assemblies. | NECB20 Div.B 3.2.4.3. | - | 1997 |
1982 | Outpatient Clinics | The proposed change introduces a new defined term for outpatient clinics. | NBC20 Div.A 1.4.1.2. | - | - |
1980 | Specified Wind and Snow Loads in Part 4 | This proposed change revises provisions for wind and snow loading to account for potential loading changes resulting from climate change. | NBC20 Div.B 4.1.3.2., NBC20 Div.B 4.1.6.2., NBC20 Div.B 4.1.6.5., NBC20 Div.B 4.1.6.7., NBC20 Div.B 4.1.6.9., NBC20 Div.B 4.1.6.10., NBC20 Div.B 4.1.7.3., NBC20 Div.B 4.1.8.2. |
SCES: Review 2023-08-03 SCHMA: Review 2023-08-15 SCED: Review 2023-08-30 SCHSB: Review 2023-09-25 SCHSB: Review 2024-01-31 SCSD: Review — Recommended for Public Review 2024-03-11 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCED: Review of PR Comments 2024-08-30 SCHMA: Review of PR Comments 2024-08-30 SCES: Review of PR Comments 2024-08-30 SCHSB: Review of PR Comments 2024-09-11 SCSD: Review of PR Comments — Proceed with editorial revisions 2024-09-17 |
1639, 1638, 1626, 1625, 1624, 1623, 1622, 1621, 1620, 1619, 1618, 1617 |
1979 | Updated Climatic Data | This proposed change updates Appendix C, including Table-C2, to incorporate the effects of climate change. | NBC20 Div.B Appendix C | SCHSB: Review 2023-06-28 SCHMA: Review 2023-07-04 SCFP: Review 2023-07-06 SCES: Review 2023-08-03 SCHMA: Review 2023-08-15 SCEE: Review 2023-08-21 SCHP: Review 2023-08-30 SCED: Review 2023-08-30 SCSD: Review — Recommended for Public Review 2023-09-18 SCHSB: Review 2023-09-25 SCEE: Review 2023-12-18 SCHSB: Review 2024-01-30 SCHP: Review 2024-02-16 SCDIVAC: Review — Recommended for Public Review 2024-03-15 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review of PR Comments 2024-08-23 SCED: Review of PR Comments 2024-08-30 SCHMA: Review of PR Comments 2024-08-30 SCES: Review of PR Comments 2024-08-30 SCUE: Review of PR Comments 2024-09-06 SCHP: Review of PR Comments 2024-09-06 SCFP: Review of PR Comments 2024-09-09 SCHSB: Review of PR Comments 2024-09-11 SCSD: Review of PR Comments 2024-09-17 SCDIVAC: Review of PR Comments — Proceed with editorial revisions 2024-09-24 |
1639 |
1976 | Update of Seismic Hazard in Northwestern Canada | This proposed change addresses a known issue in the NBC 2020 seismic hazard values for parts of northwestern Canada and updates Note A-1.1.3.1.(4) and Appendix C to reference the 2025 National Building Code of Canada Seismic Hazard Tool. | NBC20 Div.B 1.1.3.1., NBC20 Div.B Appendix C |
SCED: Review 2023-09-13 SCES: Review 2023-09-14 SCHSB: Review 2023-09-14 SCSD: Review 2023-09-20 SCED: Review 2023-09-20 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCED: Review of PR Comments 2024-06-03 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1974 | Deletion of Reference to Duplicate Standard | This proposed change deletes the reference to ASTM D2178/D2178M-13a, “Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing,” from Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCES: Review of PR Comments — Proceed as proposed 2024-04-15 |
- |
1973 | Replacement of Reference to Outdated CAN/CGSB Standard with a Reference to an ASTM Standard | This proposed change replaces the reference to CAN/CGSB-37.58-M86, “Membrane, Elastomeric, Cold-Applied Liquid, for Non-Exposed Use in Roofing and Waterproofing,” with a reference to ASTM C836/C836M-18, “Standard Specification for High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use with Separate Wearing Course,” in Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCES: Review of PR Comments — Proceed as proposed 2024-04-15 |
- |
1969 | New Part 9 Provision with Cross-Reference to a Standard for Testing of Protective Coverings over Foamed Plastic Insulation | This proposed change introduces Clause 9.10.17.10.(1)(d), and its cross-reference to Part 3, to maintain harmonization between proposed changes to provisions in Parts 3 and 9 for the protection of foamed plastics. | NBC20 Div.B 9.10.17.10. | Draft 2023-08-29 TG/WG Development 2023-09-08 SCFP: Review 2023-09-14 SCHSB: Review 2023-10-03 SCHSB: Review — Recommended for Public Review 2023-11-01 SCCBHCC: Pre-Public Review 2024-01-25 Analysis of PR Comments 2024-05-03 Analysis of PR Comments 2024-05-17 SCFP: Review of PR Comments 2024-05-28 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-06-20 |
- |
1967 | New Standard for Testing of Protective Coverings over Foamed Plastic Insulation | This proposed change introduces references to CAN/ULC-S145:2018, "Standard Method of Test for the Evaluation of Protective Coverings for Foamed Plastic Insulation – Full-Scale Room Test." | NBC20 Div.B 3.1.4.2.(1), NBC20 Div.B 3.1.5.15. |
SCFP: Draft 2023-06-02 TG/WG Development 2023-07-19 TG/WG Development 2023-08-29 TG/WG Development 2023-09-08 SCFP: Review 2023-09-14 SCHSB: Review 2023-10-03 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-03 Analysis of PR Comments 2024-05-17 SCFP: Review of PR Comments — Proceed with technical revisions 2024-05-28 SCHSB: Review of PR Comments 2024-06-20 |
943, 944, 1071 |
1966 | Withdrawing the flexibility in designation of a structure as regular from earthquake design perspective | This proposed change deletes the Sentence 4.1.8.6.(2) which permits that a structure which does not have any of the irregularities specified in the NBC may be considered as regular. | NBC20 Div.B 4.1.8.6. | - | - |
1965 | Removal of the Term "Storage Tank" from Part 3 of the NBC | This proposed change removes the definition of "storage tank" for the purposes of Part 3 by removing Article 3.1.1.3. from the NBC. | NBC20 Div.B 3.1.1. | SCFP: Draft 2023-03-16 SCFP: Review — Recommended for Public Review 2023-06-05 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-17 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 |
1880 |
1964 | Introduction of References to New Material and Installation Standards for Light-Density, Open-Cell, Spray-Applied Polyurethane Foam | This proposed change introduces references to CAN/ULC-S712.1:2021, "Standard for Thermal Insulation – Light Density, Open Cell Spray Applied Semi-Rigid Polyurethane Foam – Material Specification," and CAN/ULC-S712.2:2020, "Standard for Thermal Insulation – Light Density, Open Cell Spray Applied Semi-Rigid Polyurethane Foam – Installation," in Part 9 of the NBC. | NBC20 Div.B 9.25.2.2., NBC20 Div.B 9.25.2.5. |
SCHSB: Review — Recommended for Public Review 2023-10-03 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review of PR Comments — Proceed as proposed 2024-06-19 |
- |
1963 | Exposure of Mass Timber Elements | This proposed change expands the application of encapsulation materials from two to three layers of Type X gypsum board with a greater encapsulation rating. | NBC20 Div.B 3.1.6.6. | SCFP: Review — Recommended for Public Review 2023-03-02 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-23 Review of PR Comments 2024-02-12 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 |
- |
1962 | Use of the Term "Grade" in the NECB | This proposed change clarifies Note A-3.2.1.1.(1) by using “ground” instead of “grade” to refer to the finished ground level. | NECB20 Div.B 3.2.1.1.(1) | SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-05 |
1391 |
1961 | Plumbing for adaptable washroom sinks | This PCF introduces new requirements for plumbing in washroom sinks to reduce the expense of lowering the height for use by wheelchair users | NBC20 Div.B 3.8. | SCHP: Review 2023-10-12 |
- |
1959 | Replacement of the Defined Term "Fixture" with "Plumbing Fixture" | This proposed change revises the defined term “fixture” in the NPC to “plumbing fixture.” | NPC20 Div.A 1.2.2.2.(1), NPC20 Div.A 1.4.1.2.(1), NPC20 Div.A 3.2.1.1. |
SCHP: Review 2020-09-13 SCES: Review 2023-10-18 SCED: Review 2023-10-20 SCSD: Review 2023-10-23 SCEE: Review 2023-10-24 SCUE: Review 2023-10-25 SCFP: Review 2023-10-30 SCHSB: Review 2023-11-01 SCHMA: Review 2023-11-14 SCHP: Review 2023-11-22 SCDIVAC: Review — Recommended for Public Review 2023-12-05 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments 2024-08-27 SCED: Review of PR Comments 2024-08-30 SCFP: Review of PR Comments 2024-09-03 SCES: Review of PR Comments 2024-09-04 SCSD: Review of PR Comments 2024-09-10 SCUE: Review of PR Comments 2024-09-10 Review of PR Comments — Proceed with editorial revisions 2024-09-17 SCEE: Review of PR Comments 2024-09-20 SCHSB: Review of PR Comments 2024-09-20 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-11-28 |
1116 |
1958 | Washrooms in Visitable Dwelling Units | This proposed change introduces design requirements for washrooms in visitable dwelling units. | NBC20 Div.B 3.8. | SCHSB: Review 2023-03-31 SCUE: Review 2023-05-03 SCUE: TG/WG Development 2023-07-17 SCUE: Review 2023-08-22 SCUE: TG/WG Development 2023-10-17 SCUE: Review 2023-11-08 SCHSB: Review 2023-12-06 SCUE: Review 2024-01-12 SCUE: Review 2024-01-15 SCUE: Review — Recommended for Public Review 2024-01-23 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 TG/WG Development 2024-11-19 SCHSB: Review of PR Comments 2024-11-21 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-26 |
964 |
1957 | Reachable Controls in Dwelling Units | This proposed change introduces new requirements for controls in dwelling units to make them reachable from a seated or standing position. | NBC20 Div.B 3.8. | SCUE: Draft 2023-05-23 SCHSB: Review 2023-05-31 SCUE: Review 2023-06-07 SCUE: Review 2023-07-03 SCUE: TG/WG Development 2023-07-24 SCUE: TG/WG Development 2023-09-27 SCHSB: Review 2023-10-03 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Review of PR Comments 2024-05-07 SCUE: Review of PR Comments 2024-06-05 SCHSB: Review of PR Comments 2024-06-19 SCUE: Review of PR Comments — Proceed with technical revisions 2024-08-21 |
- |
1956 | Plumbing for adaptable kitchens | This PCF introduces new requirements for plumbing in kitchens to reduce the expense of adapting the space for use by wheelchair users | NBC20 Div.B 3.8. | SCUE: Draft 2023-05-23 SCHSB: Review 2023-05-31 SCUE: Review 2023-06-07 SCUE: Review 2023-07-14 SCUE: TG/WG Development 2023-07-24 SCUE: Review 2023-08-22 SCUE: TG/WG Development 2023-09-27 SCHP: Review 2023-10-12 |
964, 1429 |
1955 | Clarification of span limitation for wood-frame construction | This proposed change intends to clarify that the limitation for the span of any structural member not to exceed 12.20 m in wood-frame construction refers to the clear span. | NBC20 Div.B 9.23.1.1.(1) | - | 1696 |
1954 | Using measured airtightness in Administrative Documents | This proposed change modifies the airtightness metric required on drawings and specifications for the proposed house. | NBC20 Div.C 2.2.8.2.(1) | SCEE: Draft 2023-05-03 SCEE: Review 2023-05-24 SCES: Review 2023-05-31 SCHMA: Review 2023-06-08 SCED: Review 2023-06-08 SCSD: Review 2023-06-20 SCFP: Review 2023-06-22 SCHSB: Review 2023-06-28 SCHP: Review 2023-07-05 SCUE: Review 2023-07-11 SCEE: Review 2023-08-21 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-07-09 |
- |
1953 | Clarification of requirement for panel-type underlay beneath adhesive-applied ceramic tile | This proposed change seeks to clarify the requirement for panel-type underlay to be provided under ceramic tile applied with adhesive per 9.30.2.1.(3), in addition to the subfloor having its edges supported per 9.30.6.1.(2) (i.e. ceramic tile cannot be applied with adhesive directly to the subfloor). | NBC20 Div.B 9.30.6.1.(2) | - | 1533 |
1951 | Continuity of Insulation | This proposed change lowers the insulation requirements for the rough opening gap around windows and doors, excluding the sill. | NBC20 Div.B 9.36.2.5. | SCEE: Review — Recommended for Public Review 2023-08-29 SCHSB: Review 2023-09-11 SCHSB: Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 |
- |
1950 | Protection from Precipitation of the Rough Opening Sills for Windows and Doors | This proposed change clarifies the requirements for protection from precipitation of rough opening sills for windows and doors to more closely align these requirements with established building science principles and standards. | NBC20 Div.B 9.7.6.1., NBC20 Div.B 9.27.2., NBC20 Div.B 9.27.3. |
SCEE: Review 2023-08-29 SCHSB: Review 2023-09-25 SCHSB: Review — Recommended for Public Review 2024-06-19 SCCBHCC: Review — Recommended for Public Review 2024-09-12 |
- |
1949 | Addition of Non-asbestos Cement Board as an acceptable protection. | This proposed change seeks to include 12 mm non- asbestos cement board as an acceptable material for the protection of insulation. | NBC20 Div.B 9.25.2.3.(6) | - | 1201 |
1948 | Removal of "unreinforced concrete" and "nominally reinforced concrete" in Part 9 | This proposed change seeks to provide clarification of Part 9 requirements for concrete by removing the term "nominally reinforced concrete" and replacing "unreinforced concrete" with "concrete". | NBC20 Div.B 9.3.1.1.(1), NBC20 Div.B 9.3.1.1.(2), NBC20 Div.B 9.3.1.6.(1), NBC20 Div.B 9.3.1.7.(2) |
- | 1466 |
1947 | (CCR 2010) Adding Pointer to Relevant Requirements on Farm Buildings | This proposed change suggested to revise Sentence 3.3.6.6.(1) of Division B of NBC to raise Code users' awareness on relevant requirements in Sentence 2.2.8.1.(4) on the classification of farm buildings used for the storage of ammonium nitrate. | NBC20 Div.B 2.2.8.1.(4), NBC20 Div.B 3.3.6.6.(1), NFC20 Div.B 3.2.9.2.(1) |
- | - |
1945 | Gender-neutral pronouns in the National Energy Code for Buildings | The proposed change replaces gendered with gender-neutral pronouns in the National Energy Code | NECB20 Div.A 1.4.1.2.(1) | SCUE: Review 2024-04-05 SCHMA: Review 2024-05-16 SCFP: Review 2024-05-17 SCEE: Review 2024-06-06 SCHP: Review 2024-06-18 SCHSB: Review 2024-06-19 SCES: Review 2024-07-12 SCED: Review 2024-09-19 SCSD: Review 2024-09-20 SCDIVAC: Review — Editorial Revision/Errata (No Public Review) 2024-11-28 |
- |
1944 | Gender-neutral pronouns in the National Fire Code | The proposed change replaces gendered with gender-neutral pronouns in the National Fire Code | NFC20 Div.C 2.2. | SCUE: Review 2024-04-05 SCHMA: Review 2024-05-16 SCFP: Review 2024-05-17 SCEE: Review 2024-06-06 SCHP: Review 2024-06-18 SCHSB: Review 2024-06-19 SCES: Review 2024-07-12 SCED: Review 2024-09-19 SCSD: Review 2024-09-20 SCDIVAC: Review — Editorial Revision/Errata (No Public Review) 2024-11-28 |
- |
1943 | Harmonize Standard for Whole Building Air Leakage Testing between Prescriptive and Modeling Requirements in NECB | This proposed change suggests to harmonize the referenced standard for whole building air leakage testing between the prescriptive and modeling requirements in NECB by only referring to the newer, more accurate and reproducible testing procedure standard ASTM E3158. | NECB20 Div.B 8.4.2.9.(2) | - | 1989 |
1942 | Gender-neutral pronouns in the National Building Code | The proposed change replaces gendered pronouns in the NBC with gender-neutral language. | NBC20 Div.A 1.4.1.2.(1) | SCUE: Review 2024-04-05 SCHMA: Review 2024-05-16 SCFP: Review 2024-05-17 SCEE: Review 2024-06-06 SCHP: Review 2024-06-18 SCHSB: Review 2024-06-19 SCES: Review 2024-07-12 SCED: Review 2024-09-19 SCSD: Review 2024-09-20 SCDIVAC: Review — Editorial Revision/Errata (No Public Review) 2024-11-28 |
- |
1941 | Door-Swing Area within a Universal Washroom | This proposed change clarifies that the 1700 mm diameter turning space within a universal washroom does not overlap with the space occupied by an inward swinging door. | NBC20 Div.B 3.8.3.13.(1) | SCUE: Draft 2024-06-10 |
1782 |
1939 | Clarification of the Requirement for Sprinklers in Combustible Attic or Roof Spaces | This proposed change clarifies the requirement for sprinklers in combustible attic or roof spaces by removing "throughout" from Clause 3.2.3.7.(4)(b) and introducing a new Sentence 3.2.5.12.(8) and an accompanying Note. | NBC20 Div.B 3.2.3.7.(4), NBC20 Div.B 3.2.5.12. |
SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-07-31 SCFP: Review of PR Comments — Proceed as proposed 2024-08-15 |
- |
1938 | Removal of Redundant Sprinkler References | This proposed change removes redundant cross-references to Article 3.2.5.12. in Part 3 of Division B of the NBC. | NBC20 Div.B 3.2.3.16.(4), NBC20 Div.B 3.2.5.11.(6), NBC20 Div.B 3.3.1.17.(6), NBC20 Div.B 3.4.2.6.(2) |
SCFP: Review — Recommended for Public Review 2023-03-16 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-07-31 SCFP: Review of PR Comments — Proceed as proposed 2024-08-15 SCUE: Review of PR Comments — Proceed as proposed 2024-09-18 |
- |
1937 | Exhaust Ducts Serving Laundry-drying Equipment | This change will provide clarification of the requirements for exhaust ducts referenced in Sentence 9.32.1.3.(2) by directly stating in the body of the code the practicality that Note A-9.32.1.3 provides and will ensure consistency between Sentences 6.3.2.10(7) and 9.32.1.3.(2). | NBC20 Div.B 9.32.1.3.(2), NBC20 Div.B 6.3.2.10.(7) |
- | 1355 |
1936 | OP3 Sub-Objective and Intent Statements for Large Farm Buildings in the NFC | This proposed change introduces the OP3 sub-objective and intent statements for large farm buildings requirements in the NFC. | NFC20 Div.B 4.12.1. | Draft 2023-08-23 SCFP: Review 2023-09-14 SCHMA: Review — Editorial Revision/Errata (No Public Review) 2023-09-22 SCHMA: Review 2023-10-28 SCHMA: Review 2024-03-22 SCFP: Review 2024-03-27 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCFP: Review 2024-06-03 Analysis of PR Comments 2024-08-02 SCHMA: Review of PR Comments — Proceed with editorial revisions 2024-08-21 SCFP: Review of PR Comments 2024-09-03 |
1601 |
1935 | OP Objective and Intent Statement for Farm Buildings in NBC | Introduces OP objectives and intent statements for farm building requirements in the NBC. | NBC20 Div.B 2 | Draft 2023-08-23 SCFP: Review 2023-09-14 SCHMA: Review — Editorial Revision/Errata (No Public Review) 2023-09-22 SCHMA: Review 2023-10-28 SCHMA: Review 2024-03-22 SCFP: Review 2024-03-27 SCCBHCC: Review — Withdrawn 2024-04-30 SCFP: Review 2024-06-03 |
- |
1934 | Standardization of Terminology in NFC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NFC. | NFC20 Div.B 3.2.7.9. | SCFP: Review 2023-03-16 SCHMA: Review — Recommended for Public Review 2023-08-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHMA: Review of PR Comments — Proceed as proposed 2024-05-22 SCFP: Review of PR Comments 2024-05-28 |
- |
1933 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.3.14.(3) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1932 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.3.20.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1931 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.2.15.(3) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1930 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.3.4.3.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1929 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.5.14.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1928 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.2.18.(2) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1927 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.5.10.(5) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1926 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.2.35.(4) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1925 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.4.10.(4) | SCFP: Review 2023-03-16 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-04-29 SCFP: Review of PR Comments 2024-05-28 SCUE: Review of PR Comments — Proceed as proposed 2024-06-04 |
- |
1924 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.1.5.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1923 | Energy Conservation Points for the Building Envelope | This proposed change assigns energy conservation points for new building envelope measures. | NBC20 Div.B 9.36.8.5., NBC20 Div.B 9.36.8.7. |
SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-05 SCHSB: Review of PR Comments 2024-06-19 |
831 |
1922 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.1.11.5.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1921 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.1.11.6.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1920 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 9.10.18.2. | SCFP: Review 2023-03-16 SCHSB: Review — Recommended for Public Review 2023-10-03 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-14 SCFP: Review of PR Comments 2024-05-28 SCHSB: Review of PR Comments — Proceed as proposed 2024-06-20 |
- |
1919 | Introduction of the OP3 Sub-Objective for Large Farm Buildings in the NFC | This proposed change facilitates the introduction of the spatial separation sub-objective (OP3) for farm building requirements in the NFC by revising Sentence 2.1.1.2.(2) of Division A. | NFC20 Div.A 2.1.1.2. | TG/WG Development 2023-09-28 SCED: Review 2023-10-24 SCES: Review 2023-10-24 SCEE: Review 2023-10-26 SCSD: Review 2023-10-26 SCHSB: Review 2023-10-27 SCUE: Review 2023-11-14 SCHP: Review 2023-11-15 SCHMA: Review 2023-11-16 SCFP: Review 2023-11-20 SCDIVAC: Review — Recommended for Public Review 2023-12-05 SCHMA: Review 2024-03-22 SCFP: Review 2024-03-27 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCFP: Review 2024-06-03 Analysis of PR Comments 2024-08-02 SCHMA: Review of PR Comments 2024-08-21 SCES: Review of PR Comments 2024-08-28 SCED: Review of PR Comments 2024-09-02 SCFP: Review of PR Comments 2024-09-03 SCHP: Review of PR Comments 2024-09-04 SCEE: Review of PR Comments 2024-09-05 SCUE: Review of PR Comments 2024-09-06 SCHSB: Review of PR Comments 2024-09-09 SCSD: Review of PR Comments 2024-09-10 SCHMA: Review of PR Comments 2024-09-20 SCDIVAC: Review of PR Comments — Proceed with editorial revisions 2024-09-24 |
1601 |
1918 | Introduction of the OP3 Sub-Objective for Farm Buildings in the NBC | This proposed change facilitates the introduction of the spatial separation sub-objective (OP3) in Part 2 of Division B of the NBC by revising Article 2.1.1.2. of Div. A and Sentence 2.1.1.1.(1) of Div. B. | NBC20 Div.A 2.1.1.2., NBC20 Div.B 2.1.1.1. |
Draft 2023-09-28 SCUE: Review 2023-11-14 SCHP: Review 2023-11-15 SCHMA: Review 2023-11-16 SCFP: Review — Recommended for Public Review 2023-11-20 SCHMA: Review 2024-03-22 SCFP: Review 2024-03-27 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCFP: Review 2024-06-03 SCFP: Review of PR Comments — Proceed with technical revisions 2024-08-15 SCHMA: Review of PR Comments 2024-08-21 SCES: Review of PR Comments 2024-08-28 SCED: Review of PR Comments 2024-09-02 SCFP: Review of PR Comments 2024-09-03 SCHP: Review of PR Comments 2024-09-04 SCEE: Review of PR Comments 2024-09-05 SCUE: Review of PR Comments 2024-09-06 SCHSB: Review of PR Comments 2024-09-09 SCSD: Review of PR Comments 2024-09-10 SCFP: Review of PR Comments 2024-09-18 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-09-24 |
1601 |
1917 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.4.1. | SCFP: Review 2023-03-16 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-04-29 SCFP: Review of PR Comments 2024-05-28 SCUE: Review of PR Comments — Proceed as proposed 2024-06-04 |
- |
1916 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.3.3.7.(4) | SCFP: Review 2023-03-16 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-04-29 SCFP: Review of PR Comments 2024-05-28 SCUE: Review of PR Comments — Proceed as proposed 2024-06-04 |
- |
1915 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.5.13.(3) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1914 | Maximum Quantities of Dangerous Goods Kept in Laboratories | This proposed change revises Article 5.5.5.1. to require that quantities of all classes of dangerous goods, including compressed gases, be minimized and to provide the maximum quantities permitted for use in laboratories. | NFC20 Div.B 5.5.5.1. | SCHMA: Review 2023-05-02 SCHMA: Review — Recommended for Public Review 2023-08-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHMA: Review of PR Comments — Proceed as proposed 2024-05-22 |
- |
1912 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.5.12. | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-15 SCFP: Review of PR Comments — Proceed as proposed 2024-05-28 |
- |
1910 | Standardization of Terminology in NBC Sprinkler Requirements | This proposed change is one of a series of proposed changes that standardize the terminology related to sprinklers in the NBC. | NBC20 Div.B 3.2.4.8.(5) | SCFP: Review 2023-03-16 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-04-29 SCFP: Review of PR Comments 2024-05-28 SCUE: Review of PR Comments — Proceed as proposed 2024-06-04 |
- |
1908 | Modernizing the language in washroom provisions | The proposed change modernizes the language in washroom provisions in the NBC to include gender-based terms instead of sex-based terms | NBC20 Div.B 3.7.2.2. | SCUE: Draft 2024-04-17 SCUE: Review — Further Review 2024-06-04 |
- |
1907 | Width of doorways around non-exit stairs | Expanding the application of Sentence 3.4.3.3.(1) to doorways around non-exit stairs | NBC20 Div.B 3.3.1.14.(1) | - | 1251 |
1906 | Application of Dampproofing Material | This code change is to clarify the proper application of dampproofing material to foundation walls as found in Sentence 9.13.2.1.(1). | NBC20 Div.B 9.13.2.1.(1) | - | 1547 |
1902 | Clarifications for Artcile 4.1.8.3. | - | NBC20 Div.B 4.1.8.3. | - | - |
1901 | Modification of the Requirements for Determining the Specified Lateral Earthquake Force | This proposed change modifies the requirements for determining the specified lateral earthquake force, Vp, in Article 4.1.8.18. | NBC20 Div.B 4.1.8.18. | SCED: Review 2023-09-20 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-06-03 |
- |
1900 | Clarification of the Use of the Importance Factor in the Determination of Design Forces | This proposed change clarifies the use of the earthquake importance factor in the calculation of design forces according to Sentence 4.1.8.15.(8). | NBC20 Div.B 4.1.8.15.(8) | SCED: Review — Recommended for Public Review 2023-08-30 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-08-12 |
1481 |
1899 | Clarification of the Performance Requirements for Post-disaster Buildings, High Importance Category Buildings, and a Subset of Normal Importance Category Buildings | This proposed change clarifies the additional performance requirements in Article 4.1.8.23. for post-disaster buildings, High Importance Category buildings, and a subset of Normal Importance Category buildings. | NBC20 Div.B 4.1.8.23. | SCED: Review — Recommended for Public Review 2023-08-30 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-06-03 |
- |
1898 | Revisions to Article 4.1.8.1. (Simplified Method) | The proposed change revises Article 4.1.8.1. by adjusting the triggers that determine the locations where the simplified method for seismic design applies and modifying the approach for determining the design spectral acceleration. | NBC20 Div.B 4.1.8.1. | SCED: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-06-03 |
- |
1897 | Clarification of the Permission for Liquefiable Soils | The proposed change adds an explanatory Note clarifying the scope of the permission stated in Sentence 4.1.8.4.(5) for structures built on liquefiable soils. | NBC20 Div.B 4.1.8.4. | SCED: Review — Recommended for Public Review 2023-08-30 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-06-03 |
1642 |
1896 | Clarification of the Scope of Article 4.1.8.4. | This proposed change adds an explanatory Note clarifying that the provisions of Article 4.1.8.4. may not apply to sites with certain ground profiles. | NBC20 Div.B 4.1.8.4. | SCED: Review — Recommended for Public Review 2023-08-30 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Proceed as proposed 2024-06-03 |
1641 |
1895 | Datum for the Determination of N̅60 and s̅u in Article 4.1.8.1. | The proposed change revises the datum used for the determination of N̅60 and s̅u in Article 4.1.8.1. to make it consistent with that used in the rest of Subsection 4.1.8. | NBC20 Div.B 4.1.8.1. | SCED: Review — Recommended for Public Review 2023-08-30 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCED: Review of PR Comments — Withdrawn 2024-06-03 |
1640, 1457 |
1893 | In-factory Airtightness Testing of Factory-constructed Buildings | This proposed change introduces the in-factory airtightness testing requirement for single-section, single-story, factory-constructed buildings. | NBC20 Div.B 9.36.6.3. | - | 1871 |
1891 | (split from PCF 1819) Harmonize Airtightness Requirements in NBC Section 9.36. | This proposed change (1) aligns the airtightness requirements in the Tiered Performance Path with the Performance Path, and (2) allow the use of 3.0 or 2.5 ACH50 for proposed house modelling without conducting an airtightness test for attached and detached houses, respectively . | NBC20 Div.B 9.36.5.10., NBC20 Div.B 9.36.7.3. |
- | - |
1890 | Energy Conservation Points for Energy Performance Tiers 3, 4 and 5 | This proposed change assigns minimum sums of energy conservation points for Energy Performance Tiers 3, 4 and 5 in the prescriptive trade-off compliance path. | NBC20 Div.B 9.36.8.2. | SCEE: Review — Recommended for Public Review 2023-09-27 SCHSB: Review 2023-10-12 SCCBHCC: Pre-Public Review — Proceed with editorial revisions 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed as proposed 2024-06-05 |
- |
1889 | Energy Conservation Points for Fenestration and Doors | This proposed change assigns additional energy conservation points for higher-performing fenestration and doors. | NBC20 Div.B 9.36.8.6. | SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCHSB: Review 2023-09-07 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-04-04 |
- |
1888 | Updates to Energy Conservation Points for Airtightness Levels | This proposed change updates energy conservation points for airtightness levels in Subsection 9.36.8. | NBC20 Div.B 9.36.8.8. | SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-13 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-04-04 |
- |
1887 | Passive Stack Radon Mitigation with Active Radon Stack Option | The addition of passive vertical stack radon mitigation systems, as well as an active side wall mitigation option, to dwelling units and building containing residential occupancies in contact with the ground. | NBC20 Div.B 9.13.4. | SCHSB: Review — Further Review 2022-06-08 |
895, 951, 1330, 1519 |
1885 | Location of Water-bottle Filling Stations and Drinking Fountains in a Building Required to be Barrier-free | This proposed change clarifies where a water-bottle filling station and a drinking fountain complying with Subsection 3.8.3. should be provided in a barrier-free building. | NBC20 Div.B 3.8.2.8.(10), NBC20 Div.B 3.8.2.8.(11) |
SCUE: Draft 2024-05-29 |
1822 |
1884 | Paths of Travel Within a Visitable Dwelling Unit | This proposed change requires visitable dwelling units to have a path of travel to all amenities on the entrance floor. | NBC20 Div.B 3.8. | SCHSB: Draft 2023-03-30 SCUE: Draft 2023-05-03 SCUE: Review 2023-11-08 SCHSB: Review 2023-12-06 SCUE: Review 2024-01-12 SCUE: Review 2024-01-15 SCUE: Review — Recommended for Public Review 2024-01-23 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 TG/WG Development 2024-10-22 SCUE: Review of PR Comments — Proceed with technical revisions 2024-10-28 TG/WG Development 2024-11-19 SCHSB: Review of PR Comments 2024-11-21 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-26 |
964 |
1883 | Adaptable Dwelling Entrance | This proposed change increases the clear width of an entrance to a dwelling unit to accommodate the use of mobility devices. | NBC20 Div.B 3.8. | SCHSB: Draft 2023-03-30 SCUE: Draft 2023-05-03 SCHSB: Review 2023-06-01 SCUE: TG/WG Development 2023-07-24 SCUE: Review 2023-08-22 TG/WG Development 2023-09-12 SCHSB: Review 2023-10-03 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Review of PR Comments 2024-05-07 SCUE: Review of PR Comments 2024-06-04 SCHSB: Review of PR Comments 2024-06-19 SCUE: Review of PR Comments — Proceed as proposed 2024-08-21 |
964, 1429 |
1882 | Reinforcing Stud Walls in Washrooms for the Future Installation of Grab Bars: Showers and Bathtubs | This proposed change introduces requirements to reinforce stud walls around showers and bathtubs in dwelling units for the future installation of grab bars. | NBC20 Div.B 3.8. | SCHSB: Draft 2023-03-30 SCUE: Draft 2023-05-03 SCHSB: Review 2023-06-01 SCUE: Review 2023-08-22 SCUE: TG/WG Development 2023-09-19 SCHSB: Review 2023-10-16 SCUE: TG/WG Development 2023-10-31 SCHSB: Review 2023-11-01 SCHP: Review 2023-11-03 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCUE: Analysis of PR Comments 2024-10-15 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-01 SCHSB: Review of PR Comments 2024-11-01 SCUE: Review of PR Comments 2024-11-04 SCUE: TG/WG Development 2024-11-19 SCHSB: Review of PR Comments 2024-11-22 SCUE: Review of PR Comments — Proceed with technical revisions 2024-11-26 |
964, 1429 |
1881 | Application of Accessibility Requirements | This proposed change revises the application of Section 3.8. that exempts dwelling units from the accessibility requirements. | NBC20 Div.B 3.8. | SCHSB: Draft 2023-03-30 SCUE: Draft 2023-05-03 SCUE: TG/WG Development 2023-07-24 SCUE: Review 2023-08-22 SCUE: TG/WG Development 2023-09-12 SCHSB: Review 2023-10-22 SCUE: TG/WG Development 2023-10-31 SCHSB: Review 2023-11-02 SCUE: Review 2023-11-07 SCUE: Review 2023-11-08 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCUE: TG/WG Development 2024-05-07 SCUE: Review of PR Comments — Proceed with technical revisions 2024-06-04 SCHSB: Review of PR Comments 2024-06-19 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-08-21 |
964, 1429 |
1880 | Expanding the Application of the Accessibility Objective to All Dwelling Units | This proposed change removes the exemption for houses from the application of the accessibility objective. | NBC20 Div.A 2.1.1.2., NBC20 Div.A 3.1.1.2. |
SCHSB: Draft 2023-03-30 SCUE: Draft 2023-05-03 SCES: Review 2023-05-31 SCHSB: Review 2023-05-31 SCED: Review 2023-06-08 SCEE: Review 2023-06-16 SCHMA: Review 2023-06-19 SCFP: Review 2023-06-22 SCSD: Review 2023-07-10 SCHP: Review 2023-07-11 SCUE: Review 2023-07-18 SCDIVAC: Review — Further Review 2023-08-09 SCDIVAC: Review — Recommended for Public Review 2023-09-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCUE: TG/WG Development 2024-05-07 SCUE: Review of PR Comments 2024-06-04 SCHSB: Review of PR Comments 2024-06-19 SCED: Review of PR Comments 2024-07-12 SCEE: Review of PR Comments 2024-07-24 SCES: Review of PR Comments 2024-07-26 SCFP: Review of PR Comments 2024-07-31 SCHP: Review of PR Comments 2024-08-06 SCSD: Review of PR Comments 2024-08-16 SCHMA: Review of PR Comments 2024-08-21 Review of PR Comments 2024-08-27 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-09-24 |
964, 1429 |
1879 | Revisions to Protection Requirements for EMTC During Construction | This proposed change clarifies the requirement for the maximum exposed surface area of structural mass timber walls during building construction in Clause 5.6.4.3.(1)(d) and introduces explanatory Note A-5.6.4.3.(1)(d). | NFC20 Div.B 5.6.4.3.(1) | SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-24 Review of PR Comments 2024-02-13 SCFP: Review of PR Comments — Proceed with editorial revisions 2024-03-01 |
- |
1878 | Nearness of Non-Exit Stairways to Doors | This proposed change expands Sentence 3.3.1.14.(1) to include a reference to the requirement in Sentence 9.9.6.6.(1) regarding the nearness of non-exit stairways to doors. | NBC20 Div.B 3.3.1.14.(1) | SCUE: Review — Recommended for Public Review 2023-05-02 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCUE: Review of PR Comments — Proceed with technical revisions 2024-03-08 |
1249, 1251 |
1877 | (on-hold) Adjustment Factor for Unguarded Blower Door Airtightness Testing Results | This proposed change introduces an adjustment factor for the airtightness results of unguarded blower door testing of attached units. | NBC20 Div.B 9.36.6.3., NBC20 Div.B 9.36.6.4., NBC20 Div.B 9.36.7.3., NBC20 Div.B 9.36.8.8. |
SCHSB: Review 2023-06-08 |
- |
1874 | Fire Protection of Seismic Isolation Systems | This proposed change introduces explanatory Note A-3.1.7.5.(1) to clarify that seismic isolators are subject to the same fire protection requirements as other loadbearing building elements. | NBC20 Div.B 3.1.7.5. | SCFP: Draft 2023-02-20 SCFP: Review — Recommended for Public Review 2023-03-16 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-08 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 |
- |
1872 | Revisions to Protection Requirements for EMTC During Construction | This proposed change revises the minimum requirements for and exceptions to the encapsulation of mass timber elements. | NFC20 Div.B 2.8.2.11., NFC20 Div.B 5.6.4. |
SCFP: Review 2023-03-09 SCHMA: Review 2023-03-23 SCUE: Review 2023-04-11 SCFP: Review — Recommended for Public Review 2023-06-05 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-02-02 Analysis of PR Comments 2024-02-13 SCHMA: Review of PR Comments 2024-02-23 SCUE: Review of PR Comments 2024-02-23 SCFP: Review of PR Comments 2024-03-01 SCHMA: Review 2024-03-22 Analysis of PR Comments 2024-04-25 SCHMA: Review of PR Comments 2024-05-17 SCFP: Review of PR Comments — Resubmit for Public Review 2024-06-03 SCUE: Review of PR Comments — Resubmit for Public Review 2024-06-04 SCCBHCC: Review of PR Comments — Resubmit for Public Review 2024-09-12 |
1381 |
1871 | Heat Pump Water Heater Modelling | This updates the modelling rules for the reference house when the proposed house uses a heat pump water heater | NBC20 Div.B 9.36.7.3. | - | - |
1870 | Exposure of Mass Timber Elements | This proposed change revises the encapsulation requirements for mass timber elements based on recent research. | NBC20 Div.B 3.1.6.4., NBC20 Div.B 3.1.6.14. |
SCFP: Review — Recommended for Public Review 2023-03-02 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-02-02 Review of PR Comments 2024-02-13 SCFP: Review of PR Comments — Proceed with technical revisions 2024-02-29 |
1381 |
1869 | Energy Use Intensity Compliance Path | This proposed change introduces an energy performance compliance path based on the energy use intensity target of the building to Section 9.36. | NBC20 Div.B 9.36. | SCEE: Review — Recommended for Public Review 2023-09-29 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-06 |
- |
1868 | Energy Use Intensity Compliance Path | This proposed change introduces an energy performance compliance path based on the energy use intensity target of the building. | NECB20 Div.B 1.1.2.1., NECB20 Div.B 8.4. |
SCEE: Review — Recommended for Public Review 2023-09-29 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-06 |
- |
1866 | Alteration of Electrical Power Systems and Motors | This proposed change adds administrative requirements related to the alteration of electrical power systems and motors. | NECB20 Div.C 2.2. | SCEE: Review 2023-04-26 SCES: Review 2023-05-31 SCFP: Review 2023-06-05 SCHMA: Review 2023-06-06 SCED: Review 2023-06-08 SCHSB: Review 2023-06-28 SCSD: Review 2023-07-10 SCUE: Review 2023-07-12 SCHP: Review 2023-07-27 SCEE: Review 2023-08-31 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1865 | Alteration of Service Water Systems | This proposed change adds administrative requirements related to the alteration of service water systems. | NECB20 Div.C 2.2. | SCEE: Review 2023-04-26 SCES: Review 2023-05-31 SCFP: Review 2023-06-05 SCHMA: Review 2023-06-06 SCED: Review 2023-06-08 SCHSB: Review 2023-06-28 SCSD: Review 2023-07-10 SCUE: Review 2023-07-12 SCHP: Review 2023-07-27 SCEE: Review 2023-08-31 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1864 | Alteration of HVAC Systems | This proposed changes adds administrative requirements related to the alteration of HVAC systems. | NECB20 Div.C 2.2. | SCEE: Review 2023-04-26 SCES: Review 2023-05-31 SCFP: Review 2023-06-05 SCHMA: Review 2023-06-06 SCED: Review 2023-06-08 SCHSB: Review 2023-06-28 SCSD: Review 2023-07-10 SCUE: Review 2023-07-12 SCHP: Review 2023-07-27 SCEE: Review 2023-08-31 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1863 | Alteration of Lighting Systems | This proposed change adds administrative requirements related to the alteration of lighting systems. | NECB20 Div.C 2.2. | SCEE: Review 2023-04-26 SCES: Review 2023-05-31 SCFP: Review 2023-06-05 SCHMA: Review 2023-06-06 SCED: Review 2023-06-08 SCHSB: Review 2023-06-28 SCSD: Review 2023-07-10 SCUE: Review 2023-07-12 SCHP: Review 2023-07-27 SCEE: Review 2023-08-31 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1862 | Alteration of the Building Envelope | This proposed change adds administrative requirements related to the alteration of the building envelope. | NECB20 Div.C 1.2.1.1., NECB20 Div.C 2.2. |
SCEE: Review 2023-08-28 SCHMA: Review 2023-09-12 SCES: Review 2023-09-12 SCFP: Review 2023-09-18 SCED: Review 2023-09-20 SCSD: Review 2023-09-20 SCHSB: Review 2023-09-21 SCHP: Review 2023-09-21 SCUE: Review 2023-09-25 SCEE: Review 2023-09-28 SCDIVAC: Review — Recommended for Public Review 2023-10-16 SCHSB: Review 2023-11-01 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1861 | Alteration of Electrical Power Systems and Motors | This proposed change adds requirements that define the application of NECB Part 7 to electrical powers systems and motors subjected to alteration. | NECB20 Div.B 13.7. | SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-06 |
- |
1860 | Alteration of Service Water Systems | This proposed change adds requirements that define the application of NECB Part 6 to service water systems subjected to alteration. | NECB20 Div.B 13.6. | SCEE: Review — Recommended for Public Review 2023-08-22 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-06 |
- |
1859 | Alteration of HVAC Systems | This proposed change adds requirements that define the application of NECB Part 5 to HVAC systems subjected to alteration. | NECB20 Div.B 5.1.1.2., NECB20 Div.B 13.5. |
SCEE: Review — Recommended for Public Review 2023-08-22 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-06 |
- |
1858 | Alteration of Lighting Systems | This proposed change adds requirements that define the application of NECB Part 4 to lighting systems subjected to alteration. | NECB20 Div.B 13.4. | SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-06 |
- |
1857 | Alteration of the Building Envelope | This proposed change adds requirements defining the application of NECB Part 3 to the building envelope subjected to alteration. | NECB20 Div.B 13.3. | SCEE: Review — Recommended for Public Review 2023-09-28 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review 2024-02-08 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-06 |
- |
1856 | Rooftop enclosures as a story | This proposed change clarifies whether a rooftop enclosure should be counted as a storey of building. | NBC20 Div.B 3.2.1.1., NBC20 Div.B 3.2.5.8., NBC20 Div.B 3.2.6.1., NBC20 Div.B 3.5.4.1. |
SCFP: Draft 2023-02-20 SCFP: Review — Withdrawn 2023-03-16 |
1567, 1568, 1569 |
1855 | Maximum Travel of Enclosed Vertical Platform Lifts for Passengers | This proposed change limits the travel of enclosed vertical platform lifts. | NBC20 Div.B 3.8.3.7. | SCUE: Draft 2023-02-17 |
1593 |
1854 | Rooftop Enclosures as a Storey | This proposed change clarifies whether a rooftop enclosure provided for elevator machinery, a stairway or a service room is intended to be considered as a storey in certain fire safety applications. | NBC20 Div.B 3.2.5.8., NBC20 Div.B 3.2.6.1. |
SCFP: Draft 2023-02-14 SCFP: Review — Recommended for Public Review 2023-03-16 SCUE: Review 2023-06-07 TG/WG Development 2023-07-11 SCFP: Review 2024-03-27 SCFP: Review 2024-06-03 |
1568, 1569 |
1850 | Thermal Characteristics of Building Assemblies Below-Grade or in Contact with the Ground | This proposed change introduces requirements for the thermal characteristics of building assemblies that are below-grade or in contact with the ground in existing buildings subjected to alteration. | NBC20 Div.B 10.9.36. | SCHSB: Review 2023-09-07 SCEE: Review — Recommended for Public Review 2023-09-27 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
1849 | RP test new parts | have to test on PROD, DEV is out of date | NBC20 Div.B 10.9., NECB20 Div.B 11, NECB20 Div.B 12, NECB20 Div.B 13, NPC20 Div.B 3, NPC20 Div.B 3.2., NBC20 Div.B 9.36. |
- | - |
1847 | Firestopping of Penetrations in Tested Fire-Rated Assemblies | This proposed change expands explanatory Note A-3.1.9. to clarify that the requirements of Article 3.1.9.1. are not meant to supersede the design details of an otherwise tested assembly. | NBC20 Div.B 3.1.9., NBC20 Div.B 3.1.7.1. |
SCFP: Draft 2022-12-14 SCFP: Review — Recommended for Public Review 2023-03-09 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-12 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 |
- |
1846 | Introduction of References to Standards Related to Gypsum Board to Sentence D-1.5.1.(2) | This proposed change introduces references to three standards that are already referenced elsewhere in the NBC to Sentence D-1.5.1.(2), ASTM C1177/C1177M, “Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing,” ASTM C1178/C1178M, “Standard Specification for Coated Glass Mat Water-Resistant Gypsum Backing Panel,” and ASTM C1658/C1658M, “Standard Specification for Glass Mat Gypsum Panels.” | NBC20 Div.B Appendix D | SCFP: Draft 2022-12-08 SCFP: Review — Recommended for Public Review 2023-03-09 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-14 SCFP: Review of PR Comments — Proceed with technical revisions 2024-05-28 |
1801 |
1845 | Introduction of References to Standards Related to Gypsum Board to Article 9.29.5.2. | This proposed change introduces references to two standards that are already referenced elsewhere in the NBC to Article 9.29.5.2., ASTM C1177/C1177M, “Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing,” and ASTM C1658/C1658M, “Standard Specification for Glass Mat Gypsum Panels.” | NBC20 Div.B 9.29.5.2., NBC20 Div.B 9.23.17.2. Table A |
SCFP: Draft 2022-12-08 SCFP: Review 2023-03-09 SCHSB: Review — Recommended for Public Review 2023-10-03 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Analysis of PR Comments 2024-05-14 SCFP: Review of PR Comments 2024-05-28 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-06-20 |
1801 |
1844 | Deletion of Reference to Withdrawn Document | This proposed change deletes the reference to ULC/ORD-C410A-94, “Absorbents for Flammable and Combustible Liquids,” from explanatory Note A-4.1.6.3.(3)(b). | NFC20 Div.B 4.1.6.3. | SCHMA: Draft 2022-12-08 SCHMA: Review — Recommended for Public Review 2023-08-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHMA: Review of PR Comments — Proceed as proposed 2024-05-22 |
- |
1843 | New Greenhouse Gas Emissions Objective and Functional Statement in the NBC | This proposed change adds a greenhouse gas emissions objective and functional statement to the NBC. | NBC20 Div.A 2.1.1.2.(6), NBC20 Div.A 2.2.1.1.(1), NBC20 Div.A 3.1.1.2.(4), NBC20 Div.A 3.2.1.1.(1) |
SCCBHCC: Review 2023-02-16 SCHMA: Review 2023-03-09 SCFP: Review 2023-03-09 SCUE: Review 2023-03-15 SCHSB: Review 2023-03-30 SCEE: Review 2023-04-04 SCSD: Review 2023-04-04 SCED: Review 2023-04-11 SCHP: Review 2023-04-17 SCES: Review 2023-04-19 SCCBHCC: Review — Recommended for Public Review 2023-05-30 SCHSB: Review 2023-06-28 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCCBHCC: Review of PR Comments 2024-04-30 |
1805 |
1841 | Terminology for Gypsum Board (Part 3) | This proposed change replaces the term “tightly adhering paper” with “tightly adhered facer” in Sentence 3.1.5.13.(1). | NBC20 Div.B 3.1.5.13. | SCFP: Draft 2022-12-05 SCFP: Review — Recommended for Public Review 2023-03-09 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-01-11 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 |
1800 |
1840 | Use of the Term "Grade" in the NECB | This proposed change clarifies the documentation on the building envelope required by Sentence 2.2.2.3.(1) by using “ground” instead of “grade” to refer to the finished ground level. | NECB20 Div.C 2.2.2.3.(1) | SCEE: Review 2023-06-14 SCHMA: Review 2023-07-04 SCES: Review 2023-07-04 SCFP: Review 2023-07-05 SCSD: Review 2023-07-10 SCED: Review 2023-07-12 SCHP: Review 2023-07-28 SCUE: Review 2023-07-31 SCEE: Review 2023-08-21 SCHSB: Review 2023-09-07 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments 2024-06-06 SCHSB: Analysis of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
1391 |
1839 | Application of the NECB to the Alteration of Existing Buildings | This proposed change modifies the application of the NECB generally, and Parts 3 to 8 and 10 and proposed Part 11 specifically, to include the alteration of existing buildings. | NECB20 Div.A 1.1.1.1., NECB20 Div.A 1.3.3. |
SCEE: Review 2023-01-23 SCHMA: Review 2023-02-07 SCES: Review 2023-02-08 SCHSB: Review 2023-02-21 SCHP: Review 2023-02-24 SCFP: Review 2023-03-02 SCUE: Review 2023-03-15 SCSD: Review 2023-03-22 SCED: Review 2023-04-11 SCEE: Review 2023-04-26 SCDIVAC: Review 2023-06-08 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments 2024-02-13 SCFP: Review of PR Comments 2024-03-11 SCES: Review of PR Comments 2024-03-11 SCHMA: Review of PR Comments 2024-03-11 SCHP: Review of PR Comments 2024-03-11 SCSD: Review of PR Comments 2024-03-11 SCHSB: Review of PR Comments 2024-03-11 SCED: Review of PR Comments 2024-03-14 SCUE: Review of PR Comments 2024-03-15 SCEE: Review of PR Comments 2024-04-04 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1838 | Energy Conservation Points for HRVs/ERVs and the Building Envelope | This proposed change adjusts the points for energy conservation measures for the building envelope and for heat-recovery ventilators (HRVs) and for energy-recovery ventilators (ERVs) to align modeling with the performance path. | NBC20 Div.B 9.36.8.5., NBC20 Div.B 9.36.8.7., NBC20 Div.B 9.36.8.9. |
SCEE: Review — Recommended for Public Review 2023-08-22 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-05 SCHSB: Review of PR Comments 2024-06-19 |
- |
1837 | Prescriptive Trade-off Path - Heat Pump Water Heaters | This proposed change updates the energy conservation points assigned to heat pump water heaters | NBC20 Div.B 9.36.8.10. | - | - |
1836 | Gas-Fired Furnaces | This proposed change introduces Sentence 9.36.8.9.(5) and Table 9.36.8.9.-B to assign energy conservation points to gas-fired furnaces. | NBC20 Div.B 9.36.8.9. | SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed as proposed 2024-02-13 |
- |
1835 | Drain-Water Heat Recovery | This proposed change introduces Sentences 9.36.8.10.(4) and (5), and Table 9.36.8.10.-B to assign energy conservation points to drain-water heat-recovery units. | NBC20 Div.B 9.36.8.10. | SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-13 SCHSB: Review of PR Comments 2024-06-19 |
1813 |
1834 | Interpolation of Energy Conservation Points | This proposed change permits interpolation of energy conservation points for energy conservation measures with values that fall between those listed in NBC Tables 9.36.8.5. to 9.36.8.7. | NBC20 Div.B 9.36.8. | SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-13 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-04-04 |
- |
1833 | New Performance Metrics for Small Single-Phase Air Conditioners and Heat Pumps | This proposed change introduces new energy metrics for small single-phase air conditioners and heat pumps. | NBC20 Div.B 9.36.3.10. | SCEE: Review — Recommended for Public Review 2023-05-12 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-16 |
- |
1832 | New Performance Metrics for Small Single-Phase Air Conditioners and Heat Pumps | This proposed change introduces new energy metrics for small single-phase air conditioners and heat pumps. | NECB20 Div.B 5.2.12.1. | SCEE: Review — Recommended for Public Review 2023-05-12 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-16 |
- |
1831 | Insulation of Masonry Fireplaces | This proposed change clarifies the requirements for insulation of masonry fireplaces. | NBC20 Div.B 9.36.2.5. | SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCHSB: Review 2023-09-11 SCHSB: Review 2023-09-25 SCEE: Review of PR Comments — Proceed as proposed 2024-02-16 |
- |
1830 | Energy Performance Tier 5 of the Prescriptive Path | This proposed change provides energy-efficiency requirements for compliance with Tier 5 of the energy performance compliance prescriptive path. | NBC20 Div.B 9.36. | SCEE: Draft 2023-01-17 SCEE: Review — Recommended for Public Review 2023-09-28 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with technical revisions 2024-06-05 SCHSB: Review of PR Comments 2024-06-19 |
- |
1829 | Thermal Characteristics of Above-Ground Opaque Building Assemblies | This proposed change introduces requirements for the thermal characteristics of above-ground opaque building assemblies in existing buildings subjected to alteration. | NBC20 Div.B 10.9.36. | SCEE: Draft 2023-01-23 SCEE: Review — Recommended for Public Review 2023-09-28 SCHSB: Review 2023-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
1828 | Alteration of HVAC Systems | This proposed change introduces requirements for HVAC systems subjected to alteration. | NBC20 Div.B 10.9.36. | SCEE: Draft 2023-01-23 SCHSB: Review 2023-06-08 SCHSB: Review 2023-09-07 SCFP: Review 2023-09-26 SCEE: Review — Recommended for Public Review 2023-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
1827 | Airtightness of Altered Air Barrier Systems | This proposed change introduces requirements for the airtightness of air barriers in existing subjected to alteration. | NBC20 Div.B 10.9.36. | SCEE: Draft 2023-01-23 SCHSB: Review 2023-06-08 SCHSB: Review 2023-09-07 SCEE: Review — Recommended for Public Review 2023-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-05 |
- |
1826 | Replacement of Fenestration, Doors and Skylights | This proposed change introduces requirements for the replacement of fenestration, doors and skylights. | NBC20 Div.B 10.9.36. | SCEE: Draft 2023-01-23 SCHSB: Review 2023-06-08 SCHSB: Review 2023-07-26 SCHSB: Review 2023-09-07 SCEE: Review — Recommended for Public Review 2023-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
- |
1825 | Alteration of Service Water Heating Systems | This proposed change introduces requirements for service water heating systems subjected to alteration. | NBC20 Div.B 10.9.36. | SCEE: Draft 2023-01-16 SCHSB: Review 2023-06-08 SCHSB: Review 2023-07-26 SCHSB: Review 2023-09-07 SCFP: Review 2023-09-26 SCEE: Review — Recommended for Public Review 2023-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-05 |
- |
1824 | Scope and Application of NBC Part 10 | This proposed change introduces NBC Part 10 and states the scope and application of this proposed Part to the alteration of existing buildings. | NBC20 Div.B 10 | SCEE: Draft 2023-01-19 SCHSB: Review 2023-06-08 SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-02-13 SCFP: Review of PR Comments 2024-03-11 SCES: Review of PR Comments 2024-03-11 SCHMA: Review of PR Comments 2024-03-11 SCHP: Review of PR Comments 2024-03-11 SCSD: Review of PR Comments 2024-03-11 SCED: Review of PR Comments 2024-03-14 SCUE: Review of PR Comments 2024-03-15 SCHSB: Review of PR Comments 2024-04-09 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-04 |
- |
1823 | Thermal Characteristics of Fenestration and Doors | This proposed change places a limit on the maximum solar heat gain coefficient for fenestration and doors based on the fenestration and door area to gross wall area ratio. | NBC20 Div.B 9.36.2.7., NBC20 Div.B 9.36.5.3., NBC20 Div.B 9.36.7.3. |
SCEE: Review — Recommended for Public Review 2023-04-04 SCHSB: Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Resubmit for Public Review 2024-06-06 SCHSB: Review of PR Comments 2024-06-19 SCCBHCC: Review of PR Comments — Resubmit for Public Review 2024-09-12 |
- |
1822 | Thermal Bridging Requirements Section 9.36. | Update the thermal bridging requirements to reflect new modelling and standards | NBC20 Div.B 9.36.2. | SCHSB: Review 2023-06-08 |
- |
1821 | Thermal Bridging Requirements in the NECB | This proposed change updates the thermal bridging requirements in the NECB to reflect new modeling and standards. | NECB20 Div.B 3.1.1., NECB20 Div.B 3.2.1.2.(2) |
SCEE: Review — Recommended for Public Review 2023-06-14 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed with editorial revisions 2024-06-05 |
1532 |
1820 | New Greenhouse Gas Emissions Objective and Functional Statement in the NECB | This proposed change adds a greenhouse gas emissions objective and functional statement to the NECB. | NECB20 Div.A 2.2.1.1.(1), NECB20 Div.A 3.2.1.1.(1) |
SCCBHCC: Review 2023-02-16 SCHMA: Review 2023-03-09 SCFP: Review 2023-03-09 SCUE: Review 2023-03-15 SCHSB: Review 2023-03-30 SCEE: Review 2023-04-04 SCSD: Review 2023-04-04 SCED: Review 2023-04-11 SCHP: Review 2023-04-17 SCES: Review 2023-04-19 SCCBHCC: Review — Recommended for Public Review 2023-05-30 SCHSB: Review 2023-06-28 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCCBHCC: Review of PR Comments 2024-04-30 |
1805 |
1819 | Removing ACH50 and Harmonizing Airtightness Requirements in Section 9.36. | This proposed change replaces ACH50 with NLR50 as the regulating airtightness metric in Section 9.36. and revises the airtightness requirements in the compliance paths and for proposed house modeling. | NBC20 Div.B 9.36.5.10., NBC20 Div.B 9.36.5.14., NBC20 Div.B 9.36.6.4., NBC20 Div.B 9.36.7.3. |
SCEE: Review — Recommended for Public Review 2023-08-21 SCHSB: Review 2023-10-10 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Defer 2024-06-06 |
- |
1817 | Direction of Door Swing with Low Occupant Load | This proposed change permits an exit door serving an area with a low occupant load to swing inward. | NBC20 Div.B 3.4.6.12. | SCUE: Draft 2024-05-27 |
999 |
1814 | Removing the NLA Airtightness Metric | This proposed change removes the normalized leakage area (NLA) metric for airtightness level determination. | NBC20 Div.B 9.36.6.2., NBC20 Div.B 9.36.6.3., NBC20 Div.B 9.36.6.4. |
Draft 2022-11-04 SCEE: Review 2023-03-01 SCHSB: Review 2023-06-08 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Withdrawn 2024-06-06 |
- |
1813 | "Existing Building" and "Heritage Building" | This proposed change introduces the defined terms "existing building" and "heritage building" in the NBC and the NECB. | NBC20 Div.A 1.4.1.2., NECB20 Div.A 1.4.1.2. |
SCEE: Draft 2023-01-05 SCEE: Review 2023-01-23 SCHMA: Review 2023-02-07 SCES: Review 2023-02-08 SCHSB: Review 2023-02-21 SCHP: Review 2023-02-24 SCFP: Review 2023-03-02 SCUE: Review 2023-03-15 SCSD: Review 2023-03-22 SCED: Review 2023-04-11 SCEE: Review 2023-04-26 SCDIVAC: Review 2023-06-08 SCDIVAC: Post-Public Review — Proceed 2023-08-09 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments 2024-02-13 SCFP: Review of PR Comments 2024-03-11 SCES: Review of PR Comments 2024-03-11 SCHMA: Review of PR Comments 2024-03-11 SCHP: Review of PR Comments 2024-03-11 SCSD: Review of PR Comments 2024-03-11 SCHSB: Review of PR Comments 2024-03-11 SCED: Review of PR Comments 2024-03-14 SCUE: Review of PR Comments 2024-04-05 SCEE: Review of PR Comments 2024-06-04 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-07-09 |
- |
1812 | Application of NBC Part 10 to the Alteration of Existing Buildings | This proposed change states the application of proposed NBC Part 10 to the alteration of existing buildings. | NBC20 Div.A 1.3.3., NBC20 Div.A 2.1.1.2.(6) |
SCEE: Draft 2023-01-05 SCEE: Review 2023-01-23 SCHMA: Review 2023-02-07 SCES: Review 2023-02-08 SCHSB: Review 2023-02-21 SCHP: Review 2023-02-24 SCFP: Review 2023-03-02 SCUE: Review 2023-03-15 SCSD: Review 2023-03-22 SCED: Review 2023-04-11 SCEE: Review 2023-04-24 SCDIVAC: Review 2023-06-08 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments 2024-02-13 SCFP: Review of PR Comments 2024-03-11 SCES: Review of PR Comments 2024-03-11 SCHMA: Review of PR Comments 2024-03-11 SCHP: Review of PR Comments 2024-03-11 SCSD: Review of PR Comments 2024-03-11 SCHSB: Review of PR Comments 2024-03-11 SCED: Review of PR Comments 2024-03-14 SCUE: Review of PR Comments 2024-03-15 SCEE: Review of PR Comments 2024-04-04 SCDIVAC: Review of PR Comments — Proceed with technical revisions 2024-07-09 |
- |
1811 | Noted on Fire protection for windows and structural issues related to increased insulation thickness | - | - | - | - |
1809 | Ballast for Ground Cover in Heated Crawl Spaces | This proposed change clarifies the requirements for proper ballast to weight down the ground cover in heated crawl spaces. | NBC20 Div.B 9.18.6.2. | SCHSB: Review — Recommended for Public Review 2023-06-01 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCHSB: Review of PR Comments — Proceed as proposed 2024-01-30 SCHSB: Review of PR Comments — Proceed as proposed 2024-02-08 |
- |
1807 | Introduction of Requirements for Screens and Curtains Used in Farm Buildings | This proposed change introduces flame-testing requirements for screens and curtains used in farm buildings, and includes options to divide screens and curtains into smaller, non-contiguous areas. | NFC20 Div.B 2.3.2. | SCHMA: TG/WG Development 2022-10-12 SCHMA: Review 2023-08-15 SCHMA: TG/WG Development 2023-08-23 SCHMA: Review 2023-09-06 SCFP: Review — Recommended for Public Review 2023-09-14 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHMA: Review of PR Comments 2024-05-22 SCFP: Review of PR Comments — Withdrawn 2024-06-03 |
1644 |
1806 | Fabrics, Films and Membranes Used in Farm Building Envelope Construction | This proposed change introduces flame-spread rating requirements for fabrics, films and membranes when used in building envelope construction and provides an exemption for Group G, Division 4 major occupancy. | NBC20 Div.B 2.2.1.14. | SCHMA: TG/WG Development 2022-09-12 SCHMA: Review 2023-08-15 SCFP: Review — Deferred 2023-11-20 SCFP: Review 2024-03-01 SCFP: Review — Deferred 2024-06-03 |
1611, 1661 |
1805 | Reference to CSA B139:19 Series without Capacity Restriction | This proposed change removes the capacity restriction on aboveground storage tanks from the reference to CSA B139 Series, “Installation code for oil-burning equipment.” | NFC20 Div.B 4.1.1.1., NFC20 Div.B 4.3.13.1., NFC20 Div.B 4.3.13.4., NFC20 Div.B 4.3.13.5., NFC20 Div.B 4.3.13.6. |
SCHMA: Draft 2023-07-20 SCHMA: Review — Recommended for Public Review 2023-08-15 SCCBHCC: Pre-Public Review — Proceed 2024-01-24 SCHMA: Review of PR Comments — Proceed with editorial revisions 2024-05-22 |
1548, 1866 |
1804 | Updates to Referenced Documents | - | NBC20 Div.B 1.3.1.2., NFC20 Div.B 1.3.1.2., NPC20 Div.B 1.3.1.2., NECB20 Div.B 1.3.1.2. |
SCED: Review 2022-09-09 SCHSB: Review 2022-09-13 SCUE: Review 2022-09-28 SCHP: Review 2022-09-28 SCHMA: Review 2022-09-29 SCSD: Review 2022-09-29 SCFP: Review 2022-10-04 SCEE: Review 2022-10-13 SCES: Review 2022-10-13 SCEC: Review — Recommended for Public Review 2022-10-13 SCHP: Review of PR Comments 2023-02-24 SCFP: Review of PR Comments 2023-03-02 SCUE: Review of PR Comments 2023-03-15 SCEE: Review of PR Comments 2023-04-04 SCSD: Review of PR Comments 2023-04-04 SCES: Review of PR Comments 2023-04-05 SCHMA: Review of PR Comments 2023-05-02 SCHSB: Review of PR Comments 2023-05-31 SCED: Review of PR Comments 2023-06-08 SCDIVAC: Review of PR Comments — Proceed with editorial revisions 2023-08-09 SCCBHCC: CCBFC Decision — Approved for publication 2024-04-30 |
- |
1803 | Introduction of References to New Material and Installation Standards for Light Density, Open Cell Spray-applied Polyurethane Foam | This proposed change introduces CAN/ULC-S712.1:2021, "Standard for Thermal Insulation – Light Density, Open Cell Spray Applied Semi-rigid Polyurethane Foam – Material Specification," and CAN/ULC-S712.2:2020, "Standard for Thermal Insulation – Light Density, Open Cell Spray Applied Semi-rigid Polyurethane Foam – Installation," to Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2022-10-11 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCES: Review of PR Comments — Proceed with technical revisions 2023-05-31 |
1210, 1211, 1256 |
1802 | Deletion of Reference to Outdated CAN/CGSB Standard | This proposed change deletes the reference to CAN/CGSB-93.2-M91, “Prefinished Aluminum Siding, Soffits, and Fascia, for Residential Use,” from Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2022-10-11 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCES: Review of PR Comments — Proceed as proposed 2023-05-31 |
2045 |
1801 | Deletion of Reference to Outdated CAN/CGSB Standard | This proposed change deletes the reference to CAN/CGSB-93.1-M85, “Sheet, Aluminum Alloy, Prefinished, Residential,” from Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2022-10-11 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCES: Review of PR Comments — Proceed as proposed 2023-05-31 |
- |
1800 | Performance Requirements for Computer Room Air Conditioners | - | - | - | - |
1799 | HT test | - | - | - | - |
1797 | Protection of Adjacent Buildings | This proposed change expands explanatory Note A-5.6.1.2.(1) to clarify the intent of the related provision. | NFC20 Div.B 5.6.1. | SCHMA: TG/WG Development 2022-09-07 SCHMA: Review — Recommended for Public Review 2023-05-02 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-02-20 SCHMA: Review of PR Comments — Proceed as proposed 2024-03-22 |
- |
1794 | Increase of Height Limit for EMTC Buildings in Group D | This proposed change increases the maximum physical height in Clause 3.2.2.57.(1)(c) to 50 m. | NBC20 Div.B 3.2.2.57. | SCFP: TG/WG Development 2022-08-29 SCFP: Review — Recommended for Public Review 2022-09-20 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed as proposed 2023-06-02 |
1396 |
1793 | Fire Blocks in Concealed Wall Spaces in Farm Buildings | This proposed change introduces an alternative compliance path for fire blocking in concealed wall spaces in farm buildings, provided certain requirements are met. | NBC20 Div.B 2.2.1.8. | SCHMA: TG/WG Development 2022-08-31 SCFP: Review 2022-09-20 SCHMA: Review — Recommended for Public Review 2022-09-29 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCHMA: Analysis of PR Comments — Recommend to proceed as proposed 2023-05-03 SCHMA: Review of PR Comments — Proceed as proposed 2023-08-15 |
1606 |
1792 | Increase Height Limit for EMTC Buildings in Group C | This proposed change increases the maximum physical height in Clause 3.2.2.48.(1)(c) to 50 m of EMTC buildings. | NBC20 Div.B 3.2.2.48. | SCFP: TG/WG Development 2022-08-29 SCFP: Review — Recommended for Public Review 2022-09-20 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed as proposed 2023-06-02 |
1395 |
1791 | Combustible Cladding and Street Frontage of Mid-rise Combustible Buildings | This proposed change revises the requirements for mid-rise combustible buildings regarding cladding and street frontage. | NBC20 Div.B 3.1.4.8., NBC20 Div.B 3.2.2.10., NBC20 Div.B 3.2.5.6. |
SCFP: TG/WG Development 2022-08-30 SCFP: Review — Recommended for Public Review 2022-09-20 Review 2022-11-16 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed as proposed 2023-06-02 |
1384 |
1790 | Emergency Roof Drainage | This proposed change clarifies the requirements for storm drainage systems and expands on the use of an emergency overflow as a separate system at critical points in the storm drainage system. | NPC20 Div.B 2.4.6., NPC20 Div.B 2.4.10.4. |
SCHP: Review — Recommended for Public Review 2022-10-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed with technical revisions 2024-06-19 |
1430 |
1787 | Combustible Projections to Property Line | This proposed change revises Sentence 3.2.3.6.(5) to reference "property line". | NBC20 Div.B 3.2.3.6.(5) | SCFP: Review — Further Review 2022-05-05 SCFP: Review — Editorial Revision/Errata (No Public Review) 2022-09-22 |
852 |
1786 | Combustible Components in Swimming Pools and Hot Tubs | This proposed change adds an exemption for combustible components in pools and hot tubs. | NBC20 Div.B 3.1.5. | SCFP: TG/WG Development 2022-04-11 SCFP: Review — Recommended for Public Review 2022-05-05 SCFP: Review 2022-09-22 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed as proposed 2023-06-02 |
1594 |
1784 | Maximum Sill Height for Windows Used as Exits | This proposed change introduces a maximum sill height for openable windows used as exits in large farm buildings. | NBC20 Div.B 2.2.7.6. | SCHMA: Draft 2022-08-15 SCHMA: Review 2022-09-29 SCUE: Review 2022-12-05 SCHMA: Review — Recommended for Public Review 2023-05-02 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-02-20 SCHMA: Review of PR Comments — Proceed as proposed 2024-03-22 |
1603, 1604 |
1783 | Identification of Sanitary Drainage System | This CCR aims to add color requirements for the identification of the sanitary drainage system to Article 2.2.1.3. Identification | NPC20 Div.B 2.2.1.3. | - | 1630 |
1782 | Identification of Storm and Sanitary Drainage Systems | This proposed change adds requirements for the identification of storm and sanitary drainage systems. | NPC20 Div.B 2.2.1.3. | SCHP: Review — Recommended for Public Review 2022-10-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed with technical revisions 2024-08-27 |
1629, 1630 |
1781 | Fire Testing Method of Firestop at Perimeter Joints | This proposed change replaces the fire test method in ASTM E2307, "Standard Test Method for Determining Fire Resistance of Perimeter Fire Barriers Using Intermediate-Scale, Multi-storey Test Apparatus" by the CAN/ULC-S115, "Standard Method of Fire Tests of Firestop Systems." | NBC20 Div.B 3.1.8.3.(4), NBC20 Div.B 3.1.8.3.(2), NBC20 Div.B 9.10.9.2.(4) |
SCFP: Draft 2024-05-06 SCFP: Review — Recommended for Public Review 2024-06-03 SCHSB: Review 2024-06-19 SCHSB: Review — Recommended for Public Review 2024-08-14 SCFP: Review 2024-09-03 |
- |
1780 | Benches in Universal Dressing and Shower Rooms | This proposed change requires minimum loading and maintenance quality requirements for benches in universal dressing and shower rooms. | NBC20 Div.B 3.8.3.17. | SCUE: Draft 2022-08-11 SCUE: Review — Further Review 2024-06-04 |
1690 |
1779 | Location of Toilet Paper Dispenser within an Accessible Water-Closet Stall | This proposed change sets the location of a toilet paper dispenser within an accessible water-closet stall. | NBC20 Div.B 3.8.3.12.(1) | SCUE: Draft 2024-06-21 |
1780 |
1778 | Replace "Hearing Impairment" by "People with Hearing Loss" | This proposed change revises the term "hearing impaired" to "people with hearing loss" in Part 3. | NBC20 Div.B 3.2.4.19. | SCUE: Draft 2022-08-10 SCUE: Review — Further Review 2024-06-04 |
1528 |
1777 | Spatial Separation and Exposure Protection | This proposed change introduces requirements for the spatial separation and exposure protection of large farm buildings. | NBC20 Div.B 2.2. | SCHMA: Review 2023-05-02 SCFP: Review 2023-06-05 TG/WG Development 2023-07-14 SCFP: Review 2023-09-14 SCHMA: Review — Recommended for Public Review 2023-09-22 SCFP: Review 2024-03-27 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCFP: Review 2024-06-03 Analysis of PR Comments 2024-08-02 SCFP: Review of PR Comments 2024-08-15 SCHMA: Review of PR Comments — Proceed with technical revisions 2024-08-21 SCFP: Review of PR Comments 2024-09-03 |
1570, 1601 |
1776 | Addition of the OH5 Sub-Objective to Relevant Provisions in NFC Part 4 | This proposed change adds the OH5 sub-objective and related intent statements to provisions in the NFC related to the location of vent pipe outlets for aboveground and underground storage tanks. | NFC20 Div.B 4.3.5.2., NFC20 Div.B 4.3.11.3. |
SCHMA: Draft 2022-07-26 SCHMA: Review 2023-08-15 SCHMA: Review — Recommended for Public Review 2024-03-22 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHMA: Review of PR Comments — Proceed as proposed 2024-08-21 |
1818 |
1775 | Seismic Hazard Values for the Design of Part 9 Buildings | - | NBC20 Div.B 1.1.3.1., NBC20 Div.B Appendix C |
SCHSB: Review 2022-08-10 SCED: Review 2022-08-16 SCHSB: Review 2022-08-16 SCFP: Review 2022-08-17 SCES: Review 2022-08-18 SCUE: Review 2022-08-22 SCSD: Review 2022-08-24 SCHP: Review 2022-08-25 SCHMA: Review 2022-08-25 SCEE: Review 2022-09-02 SCHSB: Review 2022-10-06 SCHSB: Review 2022-10-24 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCHSB: Review 2023-07-26 SCHSB: Review of PR Comments 2023-09-25 SCED: Review of PR Comments 2023-11-06 SCDIVAC: Review of PR Comments — Proceed with editorial revisions 2023-12-05 |
- |
1772 | Minimum Width of Stairs or Ramps Between Handrails | This proposed change clarifies the minimum width of stairs or ramps where an intermediate handrail is required. | NBC20 Div.B 3.4.6.5. | SCUE: Draft 2022-06-01 SCUE: Review 2022-11-09 SCUE: TG/WG Development 2023-09-13 SCUE: Review 2023-09-26 SCUE: Review — Recommended for Public Review 2023-11-07 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-06-04 |
1546 |
1771 | Installation Height of Accessible Menstrual Product Dispensers | This proposed change requires that menstrual product dispensers, where provided, be mounted in an accessible location so that they may be reached from a seated posture. | NBC20 Div.B 3.8.2.8., NBC20 Div.B 3.8.3.16. |
SCUE: Draft 2022-03-01 SCHSB: Review 2022-06-29 SCUE: Review 2022-11-09 SCUE: Review — Recommended for Public Review 2023-09-26 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 Review of PR Comments 2024-05-21 SCUE: Review of PR Comments — Proceed with technical revisions 2024-06-04 SCHSB: Review of PR Comments 2024-06-19 |
1441 |
1770 | Audible and visible signal devices | This PCF updates requirements for silencing and function of visible alarms | NBC20 Div.B 3.2.4. | SCUE: TG/WG Development 2021-11-19 |
1408 |
1769 | Lighting within an Occupied Washroom | This proposed change introduces a minimal reasonable timeframe of illumination in an occupied washroom. | NBC20 Div.B 9.34.2.7. | SCUE: Draft 2021-12-21 SCUE: Review 2022-05-25 SCHSB: Review 2022-06-08 SCEE: Review 2022-07-20 SCUE: Review 2022-11-09 SCUE: Review 2023-09-26 SCHSB: Review — Recommended for Public Review 2024-02-08 SCEE: Review 2024-04-04 SCHSB: Review — Deferred 2024-04-12 SCUE: Review 2024-06-05 |
1545 |
1768 | Accessible Controls for Manual Fire Alarm Stations | This proposed change clarifies the application of the accessible control requirements for manual stations. | NBC20 Div.B 3.2.4.16., NBC20 Div.B 3.8.2.6. |
SCUE: Review 2023-03-15 SCHSB: Review 2023-06-06 SCUE: Review — Recommended for Public Review 2023-06-07 SCCBHCC: Review — Recommended for Public Review 2023-08-17 Analysis of PR Comments 2024-02-01 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-03-08 SCHSB: Review of PR Comments 2024-06-19 SCUE: Review of PR Comments — Proceed with editorial revisions 2024-09-18 |
1520 |
1767 | Slope of Ramps Not Located in Barrier-Free Paths of Travel | This proposed change modifies the maximum allowable slope of ramps not located in barrier-free paths of travel so they are safer to use. | NBC20 Div.B 9.8.5.4. | SCUE: Draft 2022-01-04 SCUE: TG/WG Development 2022-08-11 SCUE: Review 2022-09-28 SCHSB: Review — Further Review 2022-10-06 TG/WG Development 2023-02-06 SCUE: Review 2023-05-02 SCHSB: Review 2023-05-31 SCUE: TG/WG Development 2023-07-24 SCUE: TG/WG Development 2023-08-14 SCHSB: Review — Recommended for Public Review 2023-12-20 SCHSB: Review — Recommended for Public Review 2024-02-08 SCUE: Review of PR Comments 2024-06-04 SCHSB: Review of PR Comments — Proceed as proposed 2024-06-19 |
- |
1766 | Accessible Safety Signage | This proposed change introduces requirements for visual and tactile information signs for accessibility and occupant safety. | NBC20 Div.B 3.8.3.9., NBC20 Div.B 9.9.11. |
SCUE: Draft 2022-01-04 SCUE: Review 2022-11-09 SCHSB: Review — Recommended for Public Review 2024-02-08 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHSB: Review of PR Comments — Proceed as proposed 2024-09-11 SCUE: Review of PR Comments — Proceed as proposed 2024-09-18 |
- |
1765 | Projection of Protruding Building Elements | This proposed change extends the Part 9 requirements on the projection of protruding building elements to most paths of travel. | NBC20 Div.B 9.5., NBC20 Div.B 9.9.5.3., NBC20 Div.B 3.3.1.8.(2), NBC20 Div.B 3.3.1.8.(3) |
SCUE: Draft 2022-01-04 SCUE: TG/WG Development 2022-08-11 SCUE: Review 2022-09-28 SCHSB: Review 2022-10-06 TG/WG Development 2022-12-12 SCHSB: Review — Further Review 2023-01-18 TG/WG Development 2023-02-06 SCUE: Review 2023-05-02 SCHSB: Review — Recommended for Public Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCHSB: Review of PR Comments 2024-01-30 SCUE: Review of PR Comments 2024-03-08 SCHSB: Review of PR Comments — Defer 2024-06-19 |
685 |
1764 | Tactile Attention Indicator Surfaces | This proposed change introduces requirements on the provision of tactile attention indicator surfaces at certain changes in elevation. | NBC20 Div.B 3.3.1.19., NBC20 Div.B 9.8.6. |
SCUE: Draft 2022-03-01 SCUE: TG/WG Development 2022-08-11 SCUE: Review 2022-09-28 SCUE: TG/WG Development 2022-12-12 |
- |
1763 | Emergency Lighting in Universal Washrooms and Shower Rooms | This proposed change clarifies that emergency lighting is required to be installed in universal washrooms and universal dressing and shower rooms to provide the same level of safety as that provided in other washrooms. | NBC20 Div.B 3.8.3.13., NBC20 Div.B 3.8.3.17. |
SCUE: Draft 2022-01-04 SCUE: TG/WG Development 2022-08-11 SCUE: Review — Recommended for Public Review 2022-09-28 SCHSB: Review 2022-10-06 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCUE: Review of PR Comments — Proceed as proposed 2023-09-26 SCUE: Review of PR Comments — Proceed as proposed 2024-03-08 SCHSB: Review of PR Comments 2024-06-19 |
- |
1762 | Illumination Levels | This proposed change introduces minimum levels of illumination over escalators and moving walkways, and at controls and signs in public and service areas in Part 9 buildings. | NBC20 Div.B 3.2.7.1., NBC20 Div.B 9.34.2.7. |
SCUE: Draft 2022-01-04 SCUE: Review 2022-11-09 TG/WG Development 2022-12-12 SCHSB: Draft 2023-01-18 SCUE: Review 2023-05-02 SCHSB: Review 2023-05-31 SCUE: Review — Recommended for Public Review 2023-06-07 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCUE: Analysis of PR Comments 2024-01-09 SCUE: Review of PR Comments — Proceed as proposed 2024-03-08 SCEE: Review 2024-04-04 SCHSB: Review of PR Comments — Proceed with editorial revisions 2024-06-19 SCUE: Review of PR Comments — Proceed as proposed 2024-08-21 |
- |
1761 | Heating and Air-conditioning | - | - | - | - |
1760 | Deletion of an Outdated CAN/CGSB Standard | This proposed change deletes the reference to CAN/CGSB-51.32-M77, “Sheathing, Membrane, Breather Type,” from Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2022-06-24 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
- |
1759 | Deletion of an Outdated CAN/CGSB Standard | This proposed change deletes the reference to CAN/CGSB-11.3-M87, “Hardboard,” from Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2022-06-24 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
- |
1758 | Vapour Barrier Materials and Installation | This proposed change updates explanatory Note A-5.5.1.2.(1) to include a rational analysis for the determination of the permeance level for the vapour barrier and its location. | NBC20 Div.B 5.5.1.2. | SCES: Review — Recommended for Public Review 2022-06-24 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
- |
1757 | Installation of High Exposure Fenestration | This proposed change adds CSA A440.6:2020, “High exposure fenestration installation,” to explanatory Note A-5.9.2.3.(1). | NBC20 Div.B 5.9.2.3. | SCES: Review — Recommended for Public Review 2022-04-19 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
1588 |
1756 | Clarifying Requirements for Fenestration Assemblies | This proposed change eliminates the duplication of requirements in Subsections 5.9.2. and 5.9.3. and provides guidance for the assessment of condensation in other fenestration assemblies. | NBC20 Div.B 5.9.2., NBC20 Div.B 5.9.3. |
SCES: Review — Recommended for Public Review 2022-01-20 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
- |
1755 | EIFS Installation Requirements | This proposed change introduces a reference to CAN/ULC-S716.2:2019, which addresses the installation of EIFS and is currently referenced in an explanatory note, into the body of the Code. | NBC20 Div.B 5.9.4. | SCES: Review — Recommended for Public Review 2021-09-23 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
1489 |
1754 | Requirements for Wind Resistance of Vegetated Roof Assemblies | This proposed change introduces a requirement for the testing of the dynamic wind uplift resistance and wind flow resistance of vegetated roof assemblies in accordance with the CAN/CSA-A123.24:21 standard. | NBC20 Div.B 5.2.2.2. | SCES: Review — Recommended for Public Review 2021-06-21 SCES: Review — Recommended for Public Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCES: Review of PR Comments — Proceed as proposed 2024-04-15 |
1151 |
1752 | Requirements for Seats, Aisles and Guards for Assembly Occupancies | This proposed change updates the NBC requirements for fixed seat configurations, aisles and guards in assembly occupancies rather than pointing to specific NFPA 101 provisions. | NBC20 Div.B 3.3.1.18.(2), NBC20 Div.B 3.3.2. |
SCUE: Draft 2022-01-03 SCUE: TG/WG Development 2022-02-10 SCUE: TG/WG Development 2022-03-24 SCUE: TG/WG Development 2022-04-14 SCUE: Review — Recommended for Public Review 2022-05-25 SCUE: Review of PR Comments — Proceed with editorial revisions 2023-03-15 |
400 |
1751 | Requirements for Non-fixed Seating in Assembly Occupancies | This proposed change updates the NFC requirements for non-fixed seating in assembly occupancies and introduces an explanatory Note regarding standing-only spaces in assembly occupancies. | NFC20 Div.B 2.7.1.5. | SCUE: Draft 2022-01-03 SCUE: TG/WG Development 2022-03-24 SCUE: TG/WG Development 2022-04-14 SCUE: Review — Recommended for Public Review 2022-05-25 SCUE: Analysis of PR Comments — Recommend to withdraw 2023-01-24 SCUE: Review of PR Comments — Withdrawn 2023-03-15 |
400 |
1750 | Clarification on Gendered Washrooms | This proposed change to explanatory Note A-3.7.2.2.(1) clarifies the NBC requirement for a minimum number of water closets in buildings and how the NBC addresses gender-neutral washrooms. | NBC20 Div.B 3.7.2.2. | SCUE: Draft 2022-02-01 SCUE: Review 2022-04-20 SCHSB: Review 2022-05-03 SCUE: Review — Recommended for Public Review 2022-05-25 SCHSB: Review of PR Comments 2023-05-31 SCUE: Review of PR Comments — Proceed as proposed 2023-11-09 |
1431 |
1749 | Voice Communication Systems - Referenced Standards on Intelligibility | This proposed change updates explanatory Note A-3.2.4.22.(1)(b) on the intelligibility of alarm messages by removing references to standards that are not relevant to the requirement. | NBC20 Div.B 3.2.4.22. | SCUE: Draft 2022-02-01 SCUE: Review — Recommended for Public Review 2022-04-20 SCHSB: Review 2022-05-03 SCHSB: Review of PR Comments 2023-05-31 SCUE: Review of PR Comments — Proceed with technical revisions 2023-11-09 |
1329 |
1748 | test | - | - | - | - |
1746 | Harmonizing Masonry Terminology | This proposed change harmonizes the use of "cell" instead of "core" in relation to concrete block masonry and brick masonry in Section 9.36. of Division B of the NBC. | NBC20 Div.B 9.36.2.5.(5), NBC20 Div.B 9.36.2.8.(1) |
SCEE: Draft 2022-06-23 SCEE: Review — Recommended for Public Review 2022-07-19 SCEE: Review of PR Comments — Proceed as proposed 2023-02-27 |
1153 |
1733 | Energy Recovery Systems | This proposed change removes the redundant use of the 50% factor from Sentence 5.2.10.1.(4). | NECB20 Div.B 5.2.10.1.(4) | SCEE: Review — Recommended for Public Review 2022-05-30 SCEE: Review of PR Comments — Proceed as proposed 2023-04-17 |
1450 |
1732 | Missing Degree-Days Below 15°C Values | This proposed change adds values that are missing from Table C-1 under "Degree-Days Below 15°C." | NECB20 Div.B Appendix C | SCEE: Review 2022-05-30 SCES: Review 2022-10-10 SCED: Review 2022-10-20 SCHP: Review 2022-10-25 SCHSB: Review 2022-10-27 SCFP: Review 2023-01-08 SCHMA: Review 2023-01-08 SCUE: Review 2023-01-08 SCSD: Review 2023-02-01 SCEE: Review 2023-04-03 SCDIVAC: Review 2023-06-08 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments 2024-02-13 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1731 | Protection of the Potable Water System | This proposed change introduces a reference to CSA B214:21, "Installation code for hydronic heating systems." | NPC20 Div.B 2.6.2. | SCHP: TG/WG Development 2022-05-26 SCHP: Review — Recommended for Public Review 2022-10-26 SCHP: Review 2024-02-16 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHP: Review of PR Comments — Proceed with technical revisions 2024-08-27 |
1081 |
1730 | Tests and Inspection of Drainage or Venting Systems | Visual inspection of the pipe system | NPC20 Div.B 2.3.6.1. | SCHP: TG/WG Development 2022-05-26 SCHP: Review — Withdrawn 2022-07-29 |
1635 |
1729 | Mechanical Couplings | This proposed change adds requirements for plain-end-type mechanical couplings for pressure applications by referencing ANSI/AWWA&nbps;C227-17, “Bolted, Split-Sleeve Couplings.” | NPC20 Div.B 2.2.10.4. | SCHP: TG/WG Development 2022-05-26 SCHP: Review — Recommended for Public Review 2022-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed as proposed 2024-06-19 |
1449 |
1727 | Neutralization Tanks | This proposed change removes dilution as an acceptable method for the treatment of corrosive or acid waste to better protect the environment and plumbing infrastructure. | NPC20 Div.B 2.4.4.4. | SCHP: TG/WG Development 2022-05-26 SCHP: Review — Further Review 2022-06-29 SCHP: TG/WG Development 2022-09-01 SCHP: Review — Recommended for Public Review 2022-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed as proposed 2024-06-19 |
1628 |
1725 | Part-Load Performance Characteristics | This proposed change updates the part-load performance curves for boilers and furnaces. | NECB20 Div.B 8.4.5.2., NECB20 Div.B 8.4.5.3. |
SCEE: Review — Recommended for Public Review 2022-07-16 SCEE: Review of PR Comments — Proceed as proposed 2023-04-03 |
954 |
1724 | Application of Lighting Requirements | This proposed change extends the application of NECB Part 4 to lighting that is located on the building site, irrespective of whether or not the lighting is connected to the building's electrical service. | NECB20 Div.B 4.1.1.2. | SCEE: Review — Recommended for Public Review 2018-08-29 SCEE: Review — Recommended for Public Review 2023-05-12 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed as proposed 2024-02-13 |
841 |
1723 | Motorized Dampers | This proposed change introduces a requirement for motorized dampers to be insulated. | NECB20 Div.B 5.2.4.2. | SCEE: Review — Recommended for Public Review 2022-03-31 SCEE: Review of PR Comments — Proceed as proposed 2023-04-03 |
897 |
1721 | Use of the Defined Term "Occupancy" in Division C of the NECB | This proposed change removes the defined term "occupancy" from provisions where its use could cause confusion in Division C of the NECB | NECB20 Div.C 2.2.1.1.(2), NECB20 Div.C 2.2.2.1.(2) |
SCEE: Review 2022-05-09 SCES: Review 2022-06-06 SCUE: Review 2022-06-20 SCED: Review 2022-06-21 SCSD: Review 2022-06-28 SCHMA: Review 2022-06-28 SCHP: Review 2022-06-29 SCHSB: Review 2022-06-29 SCFP: Review 2022-07-26 SCEE: Review 2022-10-31 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review of PR Comments 2024-08-23 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-09-24 |
1390, 1668, 1708 |
1716 | Protection of Potable Water from Chemical Contamination | This proposed change adds references to NSF/ANSI/CAN 61-2020, "Drinking Water System Components - Health Effects," for the protection of potable water from chemical contamination. | NPC20 Div.B 2.2.6.10., NPC20 Div.B 2.2.6.11., NPC20 Div.B 2.2.6.12., NPC20 Div.B 2.2.6.13., NPC20 Div.B 2.2.6.14., NPC20 Div.B 2.2.7.1., NPC20 Div.B 2.2.7.2., NPC20 Div.B 2.2.7.3., NPC20 Div.B 2.2.7.4., NPC20 Div.B 2.2.7.6., NPC20 Div.B 2.2.7.7., NPC20 Div.B 2.2.9., NPC20 Div.B 2.2.10. |
SCHP: TG/WG Development 2022-03-03 SCHP: Review — Recommended for Public Review 2022-03-30 SCHP: Review of PR Comments — Proceed as proposed 2023-02-24 |
1577 |
1715 | Washroom Terminology | Coordinate the identification and replacement of multiple terms that have been used interchangeably in the NBC with the term "washroom" | NBC20 Div.B 9.32.3.7.(4), NBC20 Div.B 9.32.3.7.(7), NBC20 Div.B 9.32.3.11.(1), NBC20 Div.B 9.5.4.1.(1), NBC20 Div.B 9.9.5.9.(1), NBC20 Div.B 9.10.12.4.(5), NBC20 Div.B 9.10.14.4.(7), NBC20 Div.B 9.10.17.11.(1), NBC20 Div.B 9.23.15.2.(4), NBC20 Div.B 9.32.3.3.(10), NBC20 Div.B 9.33.6.10.(2), NBC20 Div.B 9.33.6.11.(2), NBC20 Div.B 9.34.2.2.(1) |
SCHSB: Review 2022-12-08 SCHP: Review 2023-09-13 SCHSB: Review — Withdrawn 2024-02-08 SCHSB: Review — Withdrawn 2024-06-20 |
- |
1713 | Passive Vertical Radon Stack | This proposed change adds requirements for radon mitigation by use of a passive vertical radon stack in dwelling units and home-type care occupancies that have a wall, roof or floor assembly in contact with the ground. | NBC20 Div.B 9.13.4. | SCHSB: Review — Further Review 2022-06-08 SCHSB: Review — Further Review 2023-06-01 SCHSB: Review — Recommended for Public Review 2023-10-03 SCHSB: Review of PR Comments 2024-06-19 SCHSB: Review of PR Comments — Proceed with technical revisions 2024-08-07 |
895, 951, 1330, 1519 |
1711 | "Clear Width" Versus "Unobstructed Width" | This proposed change applies a consistent use of "clear width", "unobstructed width" and other similar terms across the NBC and NFC. | NBC20 Div.B 3.3.1.9., NBC20 Div.B 3.3.2.4., NBC20 Div.B 9.5.4.1., NBC20 Div.B 9.9.5.2., NFC20 Div.B 2.7.1.5. |
SCUE: Draft 2022-02-01 SCUE: Review 2022-04-20 SCHSB: Review 2022-06-08 SCUE: Review — Recommended for Public Review 2022-06-20 SCUE: Review of PR Comments — Proceed as proposed 2023-05-03 SCHSB: Review of PR Comments 2023-06-01 SCHSB: Review of PR Comments — Proceed with editorial revisions 2024-09-11 |
1529 |
1710 | Washrooms | Coordinate the identification and replacement of multiple terms that have been used interchangeably in the NBC with the term "washroom" | NBC20 Div.B 3.1.13.3., NBC20 Div.B 3.2.2.21.(1), NBC20 Div.B 3.3.3.5., NBC20 Div.B 3.4.4.4.(8), NBC20 Div.B 3.8.3.6.(3), NBC20 Div.B 3.2.6.2.(5), NBC20 Div.B 3.2.4.20.(9), NBC20 Div.B 3.2.2.35.(4) |
- | - |
1708 | Maximum length of barrier-free ramps | Provide guidance for overall length of barrier-free ramps recognizing that travel in either direction on a barrier-free ramp requires increased strength and stamina by all users. | NBC20 Div.B 3.8.3.5. | SCUE: TG/WG Development 2021-12-10 |
1544 |
1707 | Macerating Toilet System | This proposed change introduces a definition for “macerating toilet system" in the NPC. | NPC20 Div.A 1.4.1.2. | SCHP: TG/WG Development 2022-02-14 SCHP: Review 2022-05-27 SCES: Review 2022-06-20 SCUE: Review 2022-06-20 SCSD: Review 2022-06-28 SCHMA: Review 2022-06-28 SCEE: Review 2022-07-04 SCED: Review 2022-07-05 SCHSB: Review 2022-09-13 SCFP: Review 2023-06-02 SCHP: Review 2023-09-13 SCDIVAC: Review — Recommended for Public Review 2023-09-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
1790 |
1706 | Definitions of "Washroom" and Related Terminology | This proposed change introduces a definition for the term “washroom” and clarifies the related terms "private use" and "public use" to align the NPC with the NBC. | NPC20 Div.A 1.4.1.2. | SCHP: TG/WG Development 2022-02-14 SCHP: Review 2022-05-27 SCES: Review 2022-06-20 SCUE: Review 2022-06-20 SCSD: Review 2022-06-28 SCHMA: Review 2022-06-28 SCEE: Review 2022-07-04 SCED: Review 2022-07-05 SCHSB: Review 2022-12-08 SCFP: Review 2023-06-02 SCHP: Review 2023-09-13 SCHSB: Review 2023-12-08 SCHSB: Review 2024-02-08 SCDIVAC: Review — Recommended for Public Review 2024-03-15 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCHP: Review of PR Comments 2024-08-27 SCED: Review of PR Comments 2024-08-30 SCFP: Review of PR Comments 2024-09-03 SCES: Review of PR Comments 2024-09-04 SCHMA: Review of PR Comments 2024-09-05 SCSD: Review of PR Comments 2024-09-10 SCUE: Review of PR Comments 2024-09-10 SCHSB: Review of PR Comments 2024-09-19 SCEE: Review of PR Comments 2024-09-20 SCHP: Review of PR Comments 2024-09-24 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-11-28 |
1965 |
1705 | L-shaped grab bar for water-closet stalls for persons with limited mobility | This PCF requires an L-shaped grab bar instead of a horizontal grab bar at water-closets for stalls for people with limited mobility. | NBC20 Div.B 3.8.3.15., NBC20 Div.B 3.8.3.12. |
SCUE: TG/WG Development 2021-12-10 |
- |
1703 | Gypsum Board Application on Flat Wall Insulating Concrete Form Units | - | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2021-10-26 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
- |
1701 | Spatial separation table values | This proposed change adds the equation upon which the values in spatial separation tables in Part 9 were based to the Notes to Part 9. | NBC20 Div.B 9.10.14.4., NBC20 Div.B 9.10.15.4. |
TG/WG Development 2021-04-15 SCFP: Review 2021-10-27 |
1183 |
1700 | Activation of smoke dampers by smoke detector | This proposed change clarifies that the activation of smoke damper and combination smoke/fire damper does not necessarily require a fire alarm system where it is not required. | NBC20 Div.B 3.2.4.10.(1) | SCUE: Draft 2021-10-06 SCFP: Review — Withdrawn 2021-10-26 |
- |
1699 | Activation of Smoke Dampers by Smoke Detectors | This proposed change introduces Note A-3.1.8.11.(3) to clarify that the activation of a smoke damper or combination smoke/fire damper by a smoke detector does not necessarily require that device to be part of a fire alarm system where such system is not otherwise required by the NBC. | NBC20 Div.B 3.1.8.11.(3) | SCUE: Draft 2021-10-06 SCFP: Review — Recommended for Public Review 2021-10-26 SCUE: Review 2022-04-20 SCFP: Review 2022-06-14 SCHSB: Review 2022-09-13 SCFP: Review 2022-09-20 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-07-17 SCUE: Review of PR Comments 2024-02-12 SCFP: Review of PR Comments — Proceed as proposed 2024-02-29 SCHSB: Review of PR Comments 2024-06-20 |
- |
1698 | Addition of a Cross-reference to Firestopping Provisions for Permitted Service Penetrations | This proposed change introduces a cross-reference to Subsection 3.1.9. to clarify that the service penetrations permitted by Sentence 3.2.4.2.(4) are required to be firestopped in accordance with that Subsection. | NBC20 Div.B 3.2.4.2. | SCUE: Draft 2021-10-06 SCFP: Review 2021-10-26 SCUE: Review — Recommended for Public Review 2022-04-20 SCFP: Review of PR Comments 2023-03-02 SCUE: Review of PR Comments — Proceed with editorial revisions 2023-03-15 |
1126 |
1697 | Cross reference to firestopping provisions for permitted service penetrations | This proposed change adds a cross reference to firestopping provisions for permitted service penetrations where Article 9.10.18.6. allows each portion of a building on either side of a 1 hour fire rated separation to be treated as a separate building. | NBC20 Div.B 9.10.18.6.(1) | SCFP: Draft 2021-10-06 SCFP: Review 2021-10-26 |
1126 |
1696 | Drains Serving Elevator Pits | - | NPC20 Div.B 2.4.3.6. | SCHP: Draft 2021-09-27 |
1420 |
1695 | Wet Vents | - | NPC20 Div.B 2.5.6.2. | - | 1102 |
1694 | Air gaps permitted in a noxious environment | This proposed change allows air gaps to be located in a noxious environment when a zone protection is provided outside that noxious environment. | NPC20 Div.B 2.6.2.9. | SCHP: Draft 2021-09-27 SCHP: TG/WG Development 2022-02-18 SCHP: Review — Withdrawn 2022-10-25 |
1220 |
1693 | Support for Nominally Horizontal Piping | This proposed change introduces horizontal spacing of supports for solid wall PVC plastic pipe. | NPC20 Div.B 2.3.4.5. | SCHP: TG/WG Development 2021-08-17 SCHP: Review — Further Review 2021-09-29 SCHP: Review — Recommended for Public Review 2022-10-25 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments 2024-06-19 SCHP: Review of PR Comments — Proceed with editorial revisions 2024-08-27 |
1281, 1483 |
1692 | Small Diameter Piping in Condensate Drainage Systems | This proposed change introduces requirements for condensate drainage systems that serve heating, ventilating and air-conditioning systems. | NPC20 Div.B 2.2.5., NPC20 Div.B 2.4.1.1., NPC20 Div.B 2.4.2.1., NPC20 Div.B 2.4.2.3., NPC20 Div.B 2.4.3., NPC20 Div.B 2.4.5., NPC20 Div.B 2.4.9. |
SCHP: Draft 2021-09-08 SCHP: Review — Further Review 2022-05-27 SCHP: Review — Recommended for Public Review 2022-06-29 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed with editorial revisions 2024-06-19 |
- |
1691 | Vent Pipe Outlets for Underground Storage Tanks | This proposed change introduces an additional requirement for vent pipe outlets for underground storage tanks of combustible liquids for consistency with the requirements for aboveground storage tanks. | NFC20 Div.B 4.3.11.3.(2) | SCHMA: TG/WG Development 2021-09-08 SCHMA: Review — Recommended for Public Review 2021-09-29 SCHMA: Analysis of PR Comments — Recommend to proceed as proposed 2023-01-18 SCHMA: Review of PR Comments — Proceed as proposed 2023-05-02 |
- |
1690 | Condensate Drainage | The proposed change introduces the defined term “condensate drainage system" in the NPC and revises the definitions of the terms "clear-water waste" and “drainage system” to address condensate drainage. | NPC20 Div.A 1.4.1.2. | SCHP: Draft 2021-09-08 SCHP: TG/WG Development 2022-03-03 SCHP: Review 2022-05-27 SCHMA: Review 2022-08-08 SCFP: Review 2022-08-08 SCES: Review 2022-08-26 SCHSB: Review 2022-09-13 SCUE: Review 2022-10-17 SCED: Review 2022-10-20 SCSD: Review 2022-10-24 SCHP: Review 2022-10-25 SCEE: Review 2022-10-31 SCHP: Review 2023-02-24 SCHP: Review 2023-09-13 SCDIVAC: Review — Recommended for Public Review 2023-10-16 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Analysis of PR Comments 2024-06-19 SCHP: Review of PR Comments 2024-06-19 SCDIVAC: Review of PR Comments — Proceed as proposed 2024-07-09 |
- |
1685 | Reference CAN/ULC-S134 for protection of foamed plastic | This proposed change modifies the test requirements for protection of foamed plastic in exterior walls. | NBC20 Div.B 3.2.3.8. | TG/WG Development 2021-04-12 SCFP: Review 2021-05-06 |
- |
1684 | Intent statement revision for Sentences 3.2.3.7.(3) and (4) | This proposed change revises the intent statements of Sentences 3.2.3.7.(3) and (4) to clarify their intents. | NBC20 Div.B 3.2.3.7.(3), NBC20 Div.B 3.2.3.7.(4) |
SCFP: TG/WG Development 2021-05-07 SCFP: Review — Editorial Revision/Errata (No Public Review) 2021-05-13 |
- |
1683 | Termination of the Emergency Vents of Secondary Containments in Double-walled Storage Tanks | This proposed change introduces an exception in Sentence 4.3.5.2.(3) for emergency vents connected to the secondary containment of a double-walled storage tank. | NFC20 Div.B 4.3.5.2. | SCHMA: TG/WG Development 2021-05-03 SCHMA: Review — Recommended for Public Review 2021-05-11 SCHMA: Analysis of PR Comments — Recommend to proceed as proposed 2023-01-18 SCHMA: Review of PR Comments — Proceed as proposed 2023-05-02 |
1538 |
1681 | Distillery as a medium-hazard industrial occupancy | This proposed change adds distilleries as an example of medium-hazard industrial occupancy in the NBC and NFC. | NBC20 Div.B 3.1.2.1.(1), NFC20 Div.B 4.10.2.1. |
TG/WG Development 2021-04-17 SCFP: Review — Further Review 2021-05-13 SCHMA: Review — Further Review 2021-09-29 |
1208 |
1680 | Spatial Separation Table Values | This proposed change corrects errors in Tables 3.2.3.1.-C to -E (spatial separation tables) and introduces the equation with which the values were calculated. | NBC20 Div.B 3.2.3.1. | TG/WG Development 2021-04-15 SCFP: Review — Further Review 2021-05-13 SCFP: Review — Recommended for Public Review 2021-10-27 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed with technical revisions 2023-06-02 |
1183 |
1679 | Clarification of Fire-protection Requirements for Self-service Storage Buildings | This proposed change introduces "self-service storage buildings" to Sentence 9.10.1.3.(1) to clarify that the applicable fire-protection requirements are specified in NBC 2020, Division B, Part 3. | NBC20 Div.B 9.10.1.3.(1), NBC20 Div.B 9.1.1.1. |
SCHSB: Draft 2021-04-14 SCHSB: Review — Recommended for Public Review 2022-04-13 SCHSB: Review of PR Comments — Proceed with editorial revisions 2023-05-31 |
1319 |
1677 | Clarification of 38 mm × 140 mm Stud Usage | This proposed change revises Table 9.23.10.1. to clarify that 38 mm × 140 mm studs spaced at 400 mm can be used in exterior walls when only supporting a roof or a roof plus one floor. | NBC20 Div.B 9.23.10.1. Table | SCHSB: Draft 2021-04-07 SCHSB: Review — Recommended for Public Review 2022-04-13 SCHSB: Review of PR Comments — Proceed as proposed 2023-05-31 |
1302 |
1671 | Definition of "System" | This proposed change introduces a definition for the term "system" in Part 5 of the NECB. | NECB20 Div.B 5.1.1.4. | SCEE: Review — Recommended for Public Review 2022-03-31 SCEE: Review of PR Comments — Proceed with editorial revisions 2023-04-17 |
1271 |
1666 | Clear Travel Path of Travel to Lavatories and Mirrors | This proposed change sets a clear path of travel to lavatories and mirrors for people using a wheelchair. | NBC20 Div.B 3.8.3.16.(1) | - | 1781 |
1664 | Option for Insulation Under Ducts (Factory-Constructed Buildings) | The proposed change updates Sentence 9.36.2.11.(6) to provide an alternative to the existing effective thermal resistance requirement for insulation under trunk ducts installed below insulated floor framing in factory-constructed buildings. | NBC20 Div.B 9.36.2.11. | SCEE: Draft 2021-01-13 SCEE: Review — Recommended for Public Review 2023-02-27 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCEE: Review of PR Comments — Proceed as proposed 2024-02-13 |
811 |
1662 | Programming of Exterior Lighting Controls | This proposed change introduces a requirement for programming that shuts off or reduces power to exterior lighting for buildings after normal daily building activity has ended or after 12 a.m. | NECB20 Div.B 4.2.4.1. | SCEE: Review — Recommended for Public Review 2022-03-31 SCEE: Review of PR Comments — Proceed as proposed 2023-05-12 |
1406 |
1660 | Soft Conversion - Stroke Width Requirement for Signs | This proposed change addresses the soft conversion of the stroke width requirement for signs. The change is part of a larger package of changes to address the soft conversion of dimensions throughout the Code. | NFC20 Div.B 2.7.1.4. | SCUE: Draft 2021-01-05 SCUE: Review — Recommended for Public Review 2021-11-24 SCUE: Review of PR Comments — Proceed as proposed 2023-03-15 |
- |
1657 | Masonry Terminology used in Table A-9.36.2.4.(1)-D | This proposed change replaces nominal values with actual ones for brick thickness and density as well as the term "core" with "cell" in Table A-9.36.2.4.(1)-D. | NBC20 Div.B 9.36.2.4.(1) | SCEE: Review — Recommended for Public Review 2022-05-30 SCHSB: Review 2022-06-29 SCEE: Review of PR Comments — Proceed as proposed 2023-02-27 |
1153 |
1653 | Use of the Term "Grade" in the NECB | This proposed change clarifies Note A-3.2.3.2.(1) by using “ground” instead of “grade” to refer to the finished ground level. | NECB20 Div.B 3.2.3.2.(1) | SCEE: Pre-Public Review — Proceed 2023-02-27 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCEE: Review of PR Comments — Proceed as proposed 2024-06-05 |
1391 |
1651 | Use of the Defined Term "Occupancy" in the NECB | This proposed change removes the defined term "occupancy" from provisions where its use could cause confusion. | NECB20 Div.B 4.1.1.2.(2), NECB20 Div.B 5.1.1.2.(2) |
SCEE: Review — Recommended for Public Review 2022-03-31 SCCBHCC: Pre-Public Review — Proceed 2024-04-30 SCEE: Review of PR Comments — Proceed as proposed 2024-08-23 |
1390, 1668, 1708 |
1650 | Definition of "Installed Interior Lighting Power" | This proposed change deletes the reference to units from the definition of the term "Installed Interior Lighting Power." | NECB20 Div.A 1.4.1.2. | SCEE: Review 2022-05-30 SCES: Review 2022-06-20 SCUE: Review 2022-06-20 SCSD: Review 2022-06-28 SCHMA: Review 2022-06-28 SCHP: Review 2022-06-29 SCHSB: Review 2022-06-29 SCED: Review 2022-07-05 SCFP: Review 2022-07-06 SCEC: Review — Recommended for Public Review 2022-08-25 SCFP: Review of PR Comments 2023-03-02 SCUE: Review of PR Comments 2023-03-15 SCEE: Review of PR Comments 2023-04-06 SCES: Review of PR Comments 2023-05-31 SCED: Review of PR Comments 2023-06-08 SCHMA: Review of PR Comments 2023-06-15 SCHSB: Review 2023-06-28 SCSD: Review 2023-07-20 SCDIVAC: Review of PR Comments — Proceed as proposed 2023-08-09 |
1324 |
1644 | Replace "Visually Impaired Persons" by "People with Vision Loss" | This proposed change revises the term "visually impaired persons" to "people with vision loss" in Part 9. | NBC20 Div.B 9.9.5.3.(1), NBC20 Div.B 9.8.7.3.(1), NBC20 Div.B 9.8.7.3.(2) |
SCUE: Draft 2020-02-04 SCUE: Review 2024-06-04 |
1528 |
1638 | Protection of electrical conductors within a storey | Clarification of wording on the exemption of electrical conductor protection for fire alarm system branch circuits connecting individual devices and transponders in a single storey | NBC20 Div.B 3.2.7.10.(7) | SCUE: Draft 2019-10-01 SCUE: Review 2022-05-25 SCHSB: Review 2022-06-08 SCUE: Review — Editorial Revision/Errata (No Public Review) 2022-06-20 |
1407 |
1589 | Vision glass in doors in primary horizontal routes | This change proposes to require that doors in primary horizontal routes be provided with a vision panel. | NBC20 Div.B 3.3.1.20. | SCUE: TG/WG Development 2019-05-07 SCUE: TG/WG Development 2019-06-12 SCUE: Review — Further Review 2019-06-18 SCUE: TG/WG Development 2022-05-11 |
- |
1585 | Handrail Colour Contrast | This proposed change adds a requirement of colour contrast for handrails compared to the adjacent background and wall surfaces. | NBC20 Div.B 3.4.6.5. | SCUE: Draft 2019-04-29 SCUE: TG/WG Development 2019-05-07 SCUE: TG/WG Development 2022-11-07 |
- |
1583 | Accessible Parking | This proposed change introduces requirements for accessible parking areas in the NBC. | NBC20 Div.B 3.8.2.5., NBC20 Div.B 3.8.3. |
SCUE: TG/WG Development 2019-04-29 SCUE: Review — Further Review 2019-05-29 SCUE: TG/WG Development 2019-06-12 SCUE: Review — Further Review 2019-06-18 SCUE: TG/WG Development 2022-03-11 |
- |
1582 | Grab Bars in Bathtubs and Showers | This proposed change introduces a requirement for the installation of grab bars in all bathtubs and showers. | NBC20 Div.B 9.31.1., NBC20 Div.B 9.31.2. |
SCHSB: Review 2019-05-22 SCHSB: Review — Recommended for Public Review 2019-06-25 TG/WG Development 2020-09-03 SCHSB: Review of PR Comments 2021-02-25 SCUE: Review of PR Comments 2021-03-14 SCUE: Review of PR Comments 2021-03-29 SCUE: Review of PR Comments 2021-04-23 SCUE: Review of PR Comments 2021-05-05 SCHSB: Review of PR Comments — Defer 2021-05-11 |
235, 994 |
1581 | Grab Bars for Bathtubs and Showers | This proposed change introduces requirements on the installation of grab bars for bathtubs and showers. | NBC20 Div.B 3.7.2. | SCHSB: Review 2019-05-22 SCUE: Review — Recommended for Public Review 2019-05-29 SCHSB: Review 2019-06-25 SCUE: Review 2019-06-25 SCUE: Review 2019-07-16 SCHSB: Review of PR Comments 2020-05-29 SCHSB: Review of PR Comments 2020-06-12 TG/WG Development 2020-09-03 SCHSB: Analysis of PR Comments 2021-02-25 SCHSB: Analysis of PR Comments 2021-03-10 SCUE: Review of PR Comments 2021-03-15 SCUE: Review of PR Comments 2021-03-29 SCUE: Review of PR Comments 2021-04-23 SCUE: Review of PR Comments — Defer 2021-05-05 |
235, 994 |
1578 | Step dimensions in dwelling units | This proposed change harmonizes step dimensions in dwelling units (rise and run) with step dimensions in public buildings | NBC20 Div.B 9.8.4. | - | 1232 |
1575 | Change defined term "barrier-free" to "accessible" | This PCF proposes to change the terminology "barrier-free" to "accessible" in the NBC. There is no change to the definition and it will only apply to the accessibility context. | NBC20 Div.A 1.4.1.2., NBC20 Div.A 2.1.1.2.(5), NBC20 Div.A 2.2.1.1.(1) |
SCUE: TG/WG Development 2019-04-24 SCUE: Review — Editorial Revision/Errata (No Public Review) 2019-05-30 SCEC: Review — Editorial Revision/Errata (No Public Review) 2019-07-11 SCEC: Review — Further Review 2019-12-13 SCEC: TG/WG Development 2021-07-21 |
- |
1572 | Tactile attention indicator surfaces (TAIS) for exit Stairs | The change proposed location where TAIS shall be installed in exit stairs. | NBC20 Div.B 3.3.1.19. | SCUE: TG/WG Development 2019-05-07 SCUE: TG/WG Development 2019-06-12 SCUE: Review — Further Review 2019-06-18 SCUE: TG/WG Development 2022-11-07 |
- |
1571 | Tactile Direction Indicators | This proposed change introduces provisions, including a design requirement for tactile direction indicators. | NBC20 Div.B 3.8.2.10., NBC20 Div.B 3.3.1.19., NBC20 Div.B 3.8.3.9. |
SCUE: TG/WG Development 2019-05-07 SCUE: TG/WG Development 2019-06-12 SCUE: Review — Further Review 2019-06-18 SCUE: Review 2022-05-25 SCHSB: Review 2022-06-08 SCUE: Review — Recommended for Public Review 2022-06-20 SCHSB: Review of PR Comments 2023-05-31 SCUE: Review of PR Comments — Proceed with editorial revisions 2023-11-09 |
- |
1507 | Minimum Cleanout Fitting Dimension | This proposed change sets the minimum dimension for cleanout fittings to be at least 4 in. in size for building drains that are at least 4 in. in size. | NPC20 Div.B 2.4.7. | SCHP: Draft 2019-02-28 |
1227 |
1483 | Introduction of a New Standard on Asphalt Core Boards | This proposed change introduces CAN/CSA-A123.25-18, “Asphalt core boards used in roofing,” to Table 5.9.1.1. | NBC20 Div.B 5.9.1.1. | SCES: Review — Recommended for Public Review 2019-04-12 SCES: Review of PR Comments — Proceed as proposed 2023-02-13 |
1272 |
1476 | Testing of Protection for Foamed Plastic Insulation | This proposed change updates existing references to test methods for the evaluation of thermal barriers for foamed plastic insulation. | NBC20 Div.B 3.1.4.2.(1), NBC20 Div.B 3.1.5.15. |
SCFP: TG/WG Development 2019-02-15 SCFP: Review — Deferred 2019-04-02 SCFP: Review 2022-05-05 SCFP: Review 2022-08-12 SCFP: Review — Recommended for Public Review 2022-09-20 SCCBHCC: Review — Recommended for Public Review 2023-01-19 Analysis of PR Comments 2023-05-18 SCFP: Review of PR Comments — Proceed with technical revisions 2023-06-02 |
943, 944, 1071 |
1475 | Resistance to Lateral Loads | The proposed change updates the Part 9 provisions for resistance to lateral loads due to earthquakes and wind. It responds to an increase in seismic hazard values for many locations in Canada by replacing Sa(0.2) with the seismic design parameter, Smax, and by defining new wood-frame wall types. | NBC20 Div.B 9.4.1.1., NBC20 Div.B 9.4.2., NBC20 Div.B 9.20.1., NBC20 Div.B 9.23.1.1., NBC20 Div.B 9.23.2., NBC20 Div.B 9.23.3.1., NBC20 Div.B 9.23.3.4., NBC20 Div.B 9.23.3.5., NBC20 Div.B 9.23.6.1., NBC20 Div.B 9.23.11.4., NBC20 Div.B 9.23.13., NBC20 Div.B 9.23.16.1., NBC20 Div.B 9.23.16.5., NBC20 Div.B 9.31.6.2.(3), NBC20 Div.B 9.33.4.7.(2) |
SCHSB: Review 2019-05-24 SCHSB: Review 2019-08-07 SCHSB: Review — Recommended for Public Review 2019-09-12 SCHSB: Review of PR Comments 2021-01-28 SCHSB: Review of PR Comments 2021-02-17 SCHSB: Review of PR Comments 2021-03-31 SCHSB: Review of PR Comments — Defer 2021-05-11 SCHSB: Review — Further Review 2022-07-26 SCHSB: Review — Recommended for Public Review 2022-08-10 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCHSB: Review of PR Comments 2023-06-01 SCHSB: Review 2023-07-26 SCHSB: Review of PR Comments — Proceed with editorial revisions 2023-09-25 SCED: Review of PR Comments 2023-11-06 |
- |
1470 | Backwater valve and sump pit drainage | Addition of backwater valves to Article 9.14.5.2. and clarification of discharge location of sump pits. | NBC20 Div.B 9.14.5., NECB20 Div.B 8.4.5.1. |
SCHSB: Review — Deferred 2019-05-23 SCHP: Review 2023-03-13 |
- |
1467 | Introduction of a New Standard for Asphalt Core Boards | This proposed change introduces CSA A123.25:18, “Asphalt core boards used in roofing,” into Table 9.26.2.1.-B. | NBC20 Div.B 9.26.2.1. | SCHSB: Review — Recommended for Public Review 2022-09-13 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review of PR Comments — Proceed as proposed 2024-06-19 |
1270 |
1464 | Coatings of connectors and fasteners in contact with treated wood | The proposed change would revise Subsection 9.23.6. to increase the galvanized coating criteria for fasteners and connectors in contact with pressure-treated wood. | NBC20 Div.B 9.23.2. | - | 508 |
1440 | Limiting Distance and Fire Department Response | This proposed change clarifies that the locations exempted from having to be sprinklered according to the standards referenced in Article 3.2.5.12. are not actually exempted in the context of the application of Article 9.10.15.3. when they are located adjacent to the exposing building face. | NBC20 Div.B 9.10.15.3. | SCHSB: Review — Recommended for Public Review 2019-05-24 SCHSB: Review of PR Comments — Defer 2020-12-16 |
- |
1432 | Required Handrails for Stairs Serving a Single Dwelling Unit or a House with a Secondary Suite | This proposed change harmonizes the number of handrails required for interior and exterior stairs and ramps serving a single dwelling unit or a house with a secondary suite. | NBC20 Div.B 9.8.7.1. | SCHSB: Review — Recommended for Public Review 2019-05-23 SCUE: Review of PR Comments 2020-06-25 SCHSB: Review of PR Comments — Defer 2020-08-12 |
- |
1429 | Graspability of Handrails | Change to Part 9 handrail graspability design to align with Part 3 definition of graspable. | NBC20 Div.B 9.8.7.5. | - | 966, 1328 |
1427 | Replacement of an Outdated CGSB Standard | This proposed change replaces CAN/CGSB-1.501-M89, "Method for Permeance of Coated Wallboard," with ASTM D1653-13, "Standard Test Methods for Water Vapor Transmission of Organic Coating Films," in Part 9 of the NBC. | NBC20 Div.B 9.13.2.2., NBC20 Div.B 9.25.4.2. |
SCHSB: Review — Recommended for Public Review 2022-09-13 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHSB: Review of PR Comments — Proceed as proposed 2024-06-19 |
1238, 1305 |
1426 | Replacement of an Outdated CGSB Standard | This proposed change replaces the reference to CAN/CGSB-1.501-M89, “Method for Permeance of Coated Wallboard,” with a reference to ASTM D1653-13, “Standard Test Methods for Water Vapor Transmission of Organic Coating Films,” for testing the vapour permeance of coatings. | NBC20 Div.B 5.5.1.2., NBC20 Div.B 5.9.1.1. |
SCES: Review — Recommended for Public Review 2020-07-22 SCES: Review of PR Comments — Proceed with editorial revisions 2023-02-13 |
1238, 1305 |
1393 | Defined Term Storm Water | The proposed change would harmonize between the English and the French definition of the term storm water. | NPC20 Div.A 1.4.1.2. | - | 1063 |
1390 | Size of Drainage Pipes Serving Water Closets | This proposed change deletes Sentences 2.4.9.2.(2) and (3), which set minimum sizes for branch and building drains, and soil-or-waste stacks, respectively. | NPC20 Div.B 2.4.9.2. | SCHP: Draft 2019-02-28 SCHP: Review — Recommended for Public Review 2019-04-17 SCHP: Review of PR Comments — Defer 2020-05-12 SCHP: TG/WG Development 2022-02-15 SCHP: TG/WG Development 2022-03-21 SCHP: TG/WG Development 2022-07-06 SCHP: Review — Recommended for Public Review 2022-09-28 SCCBHCC: Review — Recommended for Public Review 2023-01-19 SCHP: Review of PR Comments — Proceed as proposed 2023-09-13 |
1242 |
1389 | Location of Drain Pipes | This proposed change requires that a drain pipe that is directly connected to multiple fixture outlet pipes or a fixture drain be located within a single room or suite. | NPC20 Div.B 2.4.2.3. | SCHP: Draft 2019-02-28 SCHP: Review — Recommended for Public Review 2019-04-17 SCHP: Review of PR Comments — Defer 2020-05-12 TG/WG Development 2022-02-15 TG/WG Development 2022-03-21 SCHP: Review — Withdrawn 2022-09-28 |
1187 |
1381 | Drainage to Sumps by Gravity | The proposed change would prohibit the use of a sump or tank on piping that can drained by gravity. | NPC20 Div.B 2.4.6.3. | SCHP: TG/WG Development 2018-09-12 |
1023 |
1377 | Introduction of Requirements for Oil Separators | This proposed change adds requirements for oil separators to the NPC by introducing a reference to CAN/ULC-S656-14, “Standard for Oil-Water Separators.” | NPC20 Div.B 2.2.3.2. | SCHP: Draft 2019-02-28 SCHP: TG/WG Development 2022-05-26 SCHP: Review — Recommended for Public Review 2022-06-29 SCHP: Review — Recommended for Public Review 2022-09-28 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCHP: Review of PR Comments — Proceed as proposed 2024-03-07 |
955 |
1371 | Relief Valves | This proposed change adds the requirement for discharge pipes to be connected to relief valves on hot water tanks. | NPC20 Div.B 2.6.1.7. | SCHP: Draft 2019-02-28 SCHP: TG/WG Development 2022-01-14 SCHP: Review — Recommended for Public Review 2022-05-27 SCHP: Review of PR Comments — Proceed as proposed 2023-02-24 |
1117 |
1370 | Size of Storm Drainage Pipes | This proposed change extends sizing requirements already in place for soil or waste pipes to storm drainage pipes. | NPC20 Div.B 2.4.9.1. | SCHP: Draft 2019-02-28 SCHP: Review — Further Review 2021-09-29 SCHP: Review 2023-10-12 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed as proposed 2024-06-19 |
1115 |
1367 | Capability of Support | The proposed change would add clarification to the Sentence 2.3.4.1.(2) | - | SCHP: Draft 2018-07-16 |
1099 |
1353 | Location of Low Permeance Materials | This proposed change clarifies the application of Table 9.25.5.2. | NBC20 Div.B 9.25.5.2. | SCHSB: Review — Recommended for Public Review 2019-05-23 SCHSB: Review of PR Comments 2020-05-08 SCHSB: Review of PR Comments — Defer 2020-07-20 |
- |
1341 | Raised Surfaces Protected by Guards | This proposed change clarifies the Code intent regarding surfaces that need to be protected by guards. | NBC20 Div.B 3.3.1.18.(1), NBC20 Div.B 3.4.6.6.(1) |
SCUE: Draft 2018-05-16 SCUE: Review — Recommended for Public Review 2018-06-06 Pre-Public Review — Proceed 2018-11-06 SCUE: Review — Deferred 2019-06-11 SCUE: Review of PR Comments — Proceed with editorial revisions 2022-04-20 |
1085 |
1332 | Replacement and Addition of Standards in Table 5.9.1.1. | This proposed change replaces the standard CAN/CGSB-41.24-95, "Rigid Vinyl Siding, Soffits and Fascia," by ASTM D3679-17, "Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Siding," and ASTM D4477-16, "Standard Specification for Rigid (Unplasticized) Poly(Vinyl Chloride) (PVC) Soffit," in Table 5.9.1.1., and adds the standards ASTM D7254-17, "Standard Specification for Polypropylene (PP) Siding," and ASTM D7793-17, "Standard Specification for Insulated Vinyl Siding," to the Table. | NBC20 Div.B 5.9.1.1. Table | SCES: Review — Recommended for Public Review 2018-04-20 Pre-Public Review — Proceed 2018-11-06 SCES: Review of PR Comments — Defer 2019-04-12 SCES: Review — Recommended for Public Review 2023-05-31 SCCBHCC: Review — Recommended for Public Review 2023-08-17 SCES: Review of PR Comments — Proceed as proposed 2024-04-15 |
2036 |
1299 | Long-life Sealed Battery Smoke Alarms | This proposal permits long-life sealed battery smoke alarms in location where the codes allow the used of battery-operated smoke alarms. | NFC20 Div.B 2.1.3.3., NBC20 Div.B 9.10.19.4. |
Draft 2022-05-02 SCUE: Review 2024-04-05 |
1216 |
1237 | Handrails: A-9.8.7.5. Ergonomic Design. Notion of "graspability of the handrails" | This proposed change clarifies the notion of "graspability of the handrails" | NBC20 Div.B 9.8.7.5. | - | - |
1233 | Handrails: Dimensional limits for handrail cross-sections for Part 9 Buildings | This proposed change would revise Article 9.8.7.5. Ergonomic Design to introduce the dimensional limits for handrail cross-sections for Part 9 buildings | NBC20 Div.B 9.8.7.5. | - | - |
1141 | Application of 9.10.15. to garages and carports | This Proposed change clarifies how to apply spatial separations requirements to attached garages and attached carports to dwelling units | NBC20 Div.B 9.10.15.1. | SCHSB: Review — Deferred 2018-07-09 SCHSB: Review — Deferred 2019-05-24 |
- |
1077 | Inspection, Testing and Maintenance | This proposed change clarifies that municipal hydrants are required to comply with the requirements for inspection, testing, and maintenance in accordance with Sentence 6.4.1.1.(1) of Division B of the NFC. | NFC20 Div.B 6.4.1.1. | SCHMA: Review — Recommended for Public Review 2017-05-16 Pre-Public Review — Proceed 2017-10-26 SCHMA: Review of PR Comments — Defer 2018-05-28 |
1043 |
992 | Standard for Wall Carriers for Water Closets | This proposed change introduces a reference to a standard for wall carriers for water closets. | NPC20 Div.B 2.2.2. | SCHP: Draft 2016-07-29 SCHP: TG/WG Development 2016-08-11 SCHP: TG/WG Development 2022-02-15 SCHP: Review — Recommended for Public Review 2022-09-28 SCCBHCC: Pre-Public Review — Proceed 2024-01-25 SCHP: Review of PR Comments — Proceed as proposed 2024-06-12 |
976 |
855 | Spatial Separation Requirements and Fire Department Response Time- Option 3 | This proposed change eliminates the 10 Min response time, states that the requirements in Subsection 9.10.15. are the default based on the assumption that the AHJ have evaluated the firefighting capabilities and explains in an Appendix Note the fallback position. | NBC20 Div.B 9.10.15. | - | - |
854 | Spatial Separation requirements and Fire Department Response Time - Option 2 | This proposed change eliminates the 10 Min response time, allows the AHJ to establish its own limiting distance or apply the traditional limiting distance restrictions and explains in an Appendix Note the fire department assumptions based on which the code requirements were developed. | NBC20 Div.B 9.10.15. | - | - |
853 | Spatial Separation Requirements and Fire Department Response Time- Option 1 | This proposed change eliminates the 10 Min response time without replacement and explains in an Appendix Note (Linked to the Subsection title) the fire department assumptions based on which the code requirements were developed. | NBC20 Div.B 9.10.15. | - | - |
851 | Travel limit to exit | This propose changes provides relaxations to travel limit to exit in a sprinklered buildings | NBC20 Div.B 9.9.9.1. | - | - |
805 | Replace CSA A82.31 with ASTM C840 on Gypsum Board Installation | This proposed change replaces the reference to an outdated CSA standard with an up-to-date acceptable ASTM standard on gypsum board installation and makes Part 5, Part 9 and Appendix D consistent. | NBC20 Div.B 9.29.5.1.(2), NBC20 Div.B 9.10.9.2.(5), NBC20 Div.B 9.10.12.4.(3), NBC20 Div.B 9.10.14.5.(8), NBC20 Div.B 9.10.14.5.(12), NBC20 Div.B 9.10.15.5.(7), NBC20 Div.B 9.10.15.5.(11) |
SCHSB: TG/WG Development 2013-10-21 SCHSB: Review — Deferred 2013-11-20 SCFP: Review 2014-04-29 |
- |
741 | Information Required on Structural Drawings | This proposed change deletes the reference to cladding in Sentence (1) and adds a new Sentence dealing with structural drawings of secondary structural elements. | NBC20 Div.C 2.2.4.3. | SCSD: Review 2013-04-05 SCSD: Review 2019-03-18 SCES: Review 2019-04-12 SCEC: Review — Further Review 2019-07-11 SCSD: Review 2019-07-24 SCEC: Review — Recommended for Public Review 2019-08-06 SCSD: Analysis of PR Comments 2020-04-20 SCES: Review of PR Comments 2020-04-30 SCUE: Review of PR Comments 2020-05-11 SCEE: Review of PR Comments 2020-05-11 SCHMA: Review of PR Comments 2020-05-12 SCFP: Review of PR Comments 2020-05-14 SCHP: Review of PR Comments 2020-06-11 SCED: Review of PR Comments 2020-06-15 SCHSB: Review of PR Comments 2020-06-26 SCSD: Review of PR Comments 2020-07-20 SCEC: Review of PR Comments 2021-03-10 SCSD: Review of PR Comments 2021-05-20 SCEC: Review — Further Review 2021-05-21 |
- |
514 | Steel studs sizes for non-loadbearing interior walls | This proposed change is considered an errata as it aims to correct an oversight there was a change in referencing a standard for steel wall framing, between the 2005 and the 2010 NBC. The stud sizes in the appendix note A-9.10.3.1 do not match the intended values. | NBC20 Div.B 9.10.3.1. | SCHSB: Review 2013-04-23 |
- |
456 | Harmonization of Application of National Model Codes | This proposed change harmonizes the application statements of the National Fire Code and the National Building Code by adding the defined term "alteration" to the National Fire Code and rewording the application statement of the NFC to include the new defined term. | NFC20 Div.A 1.1., NFC20 Div.A 1.4.1.2. |
SCHMA: Draft 2013-04-17 SCHMA: Draft 2014-04-07 Review — Deferred 2020-03-27 |
- |
361 | Size Limit for Open Stringers | This proposed change limits the size of the triangular openings formed by the stair risers and treads and the bottom element of a required guard. | NBC20 Div.B 3.4.6.6. | SCUE: Review 2012-12-05 SCUE: Review — Recommended for Public Review 2021-11-24 SCHSB: Review 2022-04-13 SCUE: Review of PR Comments — Proceed with editorial revisions 2023-11-09 |
- |
350 | Slip Resistance on Stairs and Ramps | Proposed change to address Part 3-Part 9 differences for public stairs. | NBC20 Div.B 3.4.6.1.(1) | SCUE: Review — Deferred 2012-12-05 SCUE: Review — Deferred 2015-02-19 |
- |
311 | Door Closers for Use with Swinging Doors | This proposed change introduces the reference to the ULC-S133, "Tests for Door Closers Intended for Use with Swinging Doors" for self-closing devices on foors in fire separations. | NBC20 Div.B 3.1.8.13., NBC20 Div.B 9.10.13.10. |
SCFP: Draft 2013-04-23 |
357 |
164 | Combustible Dust | This CCR clarifies the design of systems and structures where combustible dust is produced in quantities or concentrations that create an explosion or fire hazard exist. The proposal replaces Articles 5.3.1.4. through 5.3.1.10. with references to applicable NFPA Standards. | NFC20 Div.B 5.3.1. | SCHMA: Review — Deferred 2012-06-13 SCHMA: Review — Deferred 2016-10-18 |
674 |