{"id":848,"date":"2023-04-28T19:56:25","date_gmt":"2023-04-28T23:56:25","guid":{"rendered":"https:\/\/restrict-nrc2.nrc-cnrc.gc.ca\/?page_id=848"},"modified":"2026-03-17T10:09:08","modified_gmt":"2026-03-17T14:09:08","slug":"code-change-request-tracking-database","status":"publish","type":"page","link":"https:\/\/cbhcc-cchcc.ca\/en\/code-change-request-tracking-database\/","title":{"rendered":"Code change request &#8211; Tracking database"},"content":{"rendered":"\n<p>Every code change request is entered into the database below where it is given a unique identification (ID) number for tracking purposes. The code change request then follows the path outlined in the <a href=\"https:\/\/cbhcc-cchcc.ca\/en\/code-development-process\/\">code development process<\/a>.<\/p>\n\n\n\n<p>This code change request tracking database can be used by proponents to follow the progress of their code change request and its status. Information in the database can be accessed using the filter option or toggle arrows to sort by:<\/p>\n\n\n\n<ul class=\"db-track wp-block-list\" style=\"margin-left: 3em;\">\n\n<li>ID number (the number received by email when the code change request was submitted),<\/li>\n\n\n<li>title,<\/li>\n\n\n<li>proponent (the name of the person or organization who submitted the code change request),<\/li>\n\n\n<li>submitted date,<\/li>\n\n\n<li><a href=\"https:\/\/cbhcc-cchcc.ca\/en\/explanation-of-code-change-request-statuses\/\" data-type=\"link\" data-id=\"https:\/\/cbhcc-cchcc.ca\/en\/request-a-code-change\/\">status<\/a>,<\/li>\n\n\n<li>code reference, and<\/li>\n\n\n<li><a href=\"https:\/\/cbhcc-cchcc.ca\/en\/proposed-changes\/\" data-type=\"link\" data-id=\"https:\/\/cbhcc-cchcc.ca\/en\/proposed-changes\/\">proposed change number<\/a> (the number assigned when a committee has started its work on the issue and created a proposed change form for potential publication).<\/li>\n\n<\/ul>\n\n\n\n<p>Please direct any questions to <a href=\"mailto:CONSTCodesChangeReq@nrc-cnrc.gc.ca\">CBHCC code change request<\/a>.<\/p>\n\n\n<p class=\"show-entry\">&nbsp;<\/p>\n\n<table id='example' class='display' style='table-layout:auto;width:100%;'><thead><tr><th>ID<\/th><th>Title<\/th><th>Proponent<\/th><th>Submitted Date<\/th><th>Status<\/th><th>Code Reference<\/th><th>Proposed Change Number<\/th><\/tr><\/thead><tbody><tr><td>2555<\/td><td>-<\/td><td>Horswill, Micha<\/td><td>2026-03-24<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2554<\/td><td>-<\/td><td>Chase, Andy, Province of British Columbia<\/td><td>2026-03-27<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2553<\/td><td>-<\/td><td>Chase, Andy, Province of British Columbia<\/td><td>2026-03-27<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2552<\/td><td>-<\/td><td>Mesh, Joseph<\/td><td>2026-03-26<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2551<\/td><td>-<\/td><td>Mesh, Joseph<\/td><td>2026-03-26<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2550<\/td><td>-<\/td><td>SCHUPLEY, VICTOR, MULVEY + BANANI INC.<\/td><td>2026-03-25<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2549<\/td><td>Alignment of Domestic Clothes Washer Classification with Volume-Based Standards in NPC Table 2.6.3.2<\/td><td>McMaster, Matt<\/td><td>2026-03-23<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>NPC Division B 2.6.3.2.<\/td><td>-<\/td><\/tr><tr><td>2548<\/td><td>-<\/td><td>bacon, tyler<\/td><td>2026-03-19<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2547<\/td><td>Clarification of Wet Venting Requirements and Horizontal Offset Provisions in NPC Article 2.5.2.1<\/td><td>Merante, Rafael, Town of Innsiifl<\/td><td>2026-03-06<\/td><td><strong>Received<\/strong><br \/>2026-03-31<br \/><\/td><td>NPC Division B 2.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>2546<\/td><td>-<\/td><td>Murray, Trevor, Government of New Brunsiwck<\/td><td>2026-03-10<\/td><td><strong>Received<\/strong><br \/>2026-03-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2545<\/td><td>-<\/td><td>Edge, Adrian, Fenestration Canada<\/td><td>2026-03-04<\/td><td><strong>Received<\/strong><br \/>2026-03-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2544<\/td><td>Add a New Pressure Reducing Valve Standard to be Referenced in NPC 2.2.10.12<\/td><td>Wong, Kevin, Uponor<\/td><td>2026-02-26<\/td><td><strong>Received<\/strong><br \/>2026-03-13<br \/><\/td><td>NPC Division B 2.2.10.12.<\/td><td>-<\/td><\/tr><tr><td>2543<\/td><td>Installation of Sanitary T fittings in a Normally Horizontal Sanitary Drainage Pipe<\/td><td>Carbone, Marco, Mad thinking inc<\/td><td>2026-02-22<\/td><td><strong>Received<\/strong><br \/>2026-02-27<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NPC Division B 2.2.4.2.<\/td><td>-<\/td><\/tr><tr><td>2542<\/td><td>-<\/td><td>Roberge, Ian, GLT+<\/td><td>2026-02-20<\/td><td><strong>Received<\/strong><br \/>2026-02-23<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2541<\/td><td>Expansion of Table 9.10.14.4.-A for Smaller Exposing Building Face Areas<\/td><td>Andrews, Rachel, City of Brandon<\/td><td>2026-02-19<\/td><td><strong>Received<\/strong><br \/>2026-02-20<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NBC Division B 9.10.14.4.A.<\/td><td>-<\/td><\/tr><tr><td>2540<\/td><td>-<\/td><td>McMaster, Matt<\/td><td>2026-02-18<\/td><td><strong>Received<\/strong><br \/>2026-02-20<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2539<\/td><td>Updates to the tables of Referenced Documents<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2026-02-17<\/td><td><strong>Received<\/strong><br \/>2026-02-20<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NBC Division B 1.3.1.<\/td><td>-<\/td><\/tr><tr><td>2538<\/td><td>-<\/td><td>Stainforth, Robert, Health Canada, Government of Canada<\/td><td>2026-02-12<\/td><td><strong>Received<\/strong><br \/>2026-02-16<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2537<\/td><td>-<\/td><td>Edwards, Griff, UL Standards &amp; Engagement<\/td><td>2026-02-11<\/td><td><strong>Received<\/strong><br \/>2026-02-16<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2536<\/td><td>Update ECPs allowable for fenestration vs doors<\/td><td>Faulkner, Vern, SNBSC<\/td><td>2026-01-29<\/td><td><strong>Received<\/strong><br \/>2026-01-30<br \/><\/td><td>NBC Division B 9.36.8.6.(1)<\/td><td>-<\/td><\/tr><tr><td>2535<\/td><td>-<\/td><td>Dallaporta, Jean, ENVIROPORTA INC.<\/td><td>2026-01-26<\/td><td><strong>Received<\/strong><br \/>2026-01-30<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2534<\/td><td>Roof Access for Buildings on Slope Sites<\/td><td>Gaherty, Stuart, J. S. Held ULC<\/td><td>2026-01-26<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NBC Division B 3.2.5.3.(1),<br \/>NBC Division B 3.2.6.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2533<\/td><td>Allowing Energy Storage System (ESS) as an Emergency Power Source<\/td><td>Wetton, Michael, Stantec<\/td><td>2026-01-26<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NBC Division B 3.2.7.,<br \/>NBC Division B 3.6.2.8.<\/td><td>-<\/td><\/tr><tr><td>2532<\/td><td>Expansion of Water Supply Shut-off Valve Requirements for Water Heating Appliances<\/td><td>Edwards, Reid<\/td><td>2026-01-24<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NPC Division B 2.6.1.3.<\/td><td>-<\/td><\/tr><tr><td>2531<\/td><td>Special Fire Suppression Systems<\/td><td>Lapointe, F\u00e9lix, Minist\u00e8re de la S\u00e9curit\u00e9 publique<\/td><td>2026-01-21<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NFC Division B 2.1.3.5.(3)<\/td><td>-<\/td><\/tr><tr><td>2530<\/td><td>Clarification on Vertical Venting Installation Requirements<\/td><td>Therrien Vrignon, Joel, Tower Engineering Group<\/td><td>2026-01-20<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NPC Division B 2.5.6.2.<\/td><td>-<\/td><\/tr><tr><td>2529<\/td><td>Terminology update describing examples of residential occupancies<\/td><td>Dupuis, Robert C, Robert Dupuis Architect<\/td><td>2026-01-19<\/td><td><strong>Received<\/strong><br \/>2026-01-27<br \/><\/td><td>NBC Division B A-3.1.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2528<\/td><td>Valves<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2026-01-15<\/td><td><strong>Received<\/strong><br \/>2026-01-16<br \/><\/td><td>NPC Division B 2.2.10.6.(7)<\/td><td>-<\/td><\/tr><tr><td>2527<\/td><td>-<\/td><td>Lim, Francine<\/td><td>2026-01-09<\/td><td><strong>Received<\/strong><br \/>2026-01-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2526<\/td><td>Minimum run dimension for rectangular stair treads<\/td><td>McClelland, Mark, Stair Contractor, Nova Staircraft<\/td><td>2026-01-08<\/td><td><strong>Received<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 9.8.4.2.<\/td><td>-<\/td><\/tr><tr><td>2525<\/td><td>Coordination of Sentence 3.2.5.12.(7)\u00a0with NFPA 13 in terms of describing sprinklering <\/td><td>Victor, Frankie, GHL Consultants<\/td><td>2026-01-06<\/td><td><strong>Received<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 10<\/td><td>-<\/td><\/tr><tr><td>2524<\/td><td>Qualification Requirements for cured-in-place-pipe (CIPP) Rehabilitation Systems<\/td><td>Murra, Abraham, Abraham Murra Consulting<\/td><td>2025-12-31<\/td><td><strong>Received<\/strong><br \/>2026-01-09<br \/><\/td><td>NPC Division B 2.3.<\/td><td>-<\/td><\/tr><tr><td>2523<\/td><td>Prevent snow from sliding off rooftop solar panels<\/td><td>Schmelter, Dwight<\/td><td>2025-12-24<\/td><td><strong>Received<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 4.1.6.11.<\/td><td>-<\/td><\/tr><tr><td>2522<\/td><td>Firestopping of Penetrations in Part 9<\/td><td>Paquette, Ryan, City of Saskatoon - building official<\/td><td>2025-12-23<\/td><td><strong>Received<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 9.10.,<br \/>NBC Division B 3.1.9.<\/td><td>-<\/td><\/tr><tr><td>2521<\/td><td>Clarification of requirements for separation of exit stairs for levels below the entrance storey<\/td><td>H\u00e9bert, Sylvain<\/td><td>2025-12-21<\/td><td><strong>Received<\/strong><br \/>2025-12-23<br \/><\/td><td>NBC Division B 3.2.6.2.<\/td><td>-<\/td><\/tr><tr><td>2520<\/td><td>Acceptance of Cable- and Frame-Supported Membrane Structures<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2025-12-22<\/td><td><strong>Received<\/strong><br \/>2025-12-23<br \/><\/td><td>NBC Division B 3.1.15.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2519<\/td><td>Standpipes and Hose Systems<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-12-19<\/td><td><strong>Received<\/strong><br \/>2025-12-23<br \/><\/td><td>NBC Division B 3.2.5.8.,<br \/>NBC Division B 3.2.5.<\/td><td>-<\/td><\/tr><tr><td>2518<\/td><td>Standpipe and Hose Systems Requirements Updates for Distilleries and Construction Sites<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-12-19<\/td><td><strong>Received<\/strong><br \/>2025-12-23<br \/><\/td><td>NFC Division B 4.10.8.1.,<br \/>NFC Division B 4.10.8.2.,<br \/>NFC Division B 5.3.3.4.,<br \/>NFC Division B 5.6.1.5.,<br \/>NFC Division B 6.4.1.<\/td><td>-<\/td><\/tr><tr><td>2517<\/td><td>-<\/td><td>KHADOO, Mark, Jayshore Enterprise Limited<\/td><td>2025-12-18<\/td><td><strong>Received<\/strong><br \/>2025-12-19<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2515<\/td><td>-<\/td><td>Wilke, Bradley<\/td><td>2025-11-28<\/td><td><strong>Received<\/strong><br \/>2025-12-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2514<\/td><td>Requirement for Drain Pans Under All Storage-Type Service Water Heaters<\/td><td>Letourneau, Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2025-11-17<\/td><td><strong>Received<\/strong><br \/>2025-11-25<br \/><\/td><td>NPC Division B 2.6.1.7.(9)<\/td><td>-<\/td><\/tr><tr><td>2513<\/td><td>Yoke Vents <\/td><td>Aubin, Marc-Antoine<\/td><td>2025-11-16<\/td><td><strong>Received<\/strong><br \/>2025-11-25<br \/><\/td><td>NPC Division B 2.5.4.3.<\/td><td>-<\/td><\/tr><tr><td>2512<\/td><td>-<\/td><td>Murray, Trevor, Government of New Brunsiwck<\/td><td>2025-11-24<\/td><td><strong>Received<\/strong><br \/>2025-11-25<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2511<\/td><td>Phone signals\/communication in underground parking<\/td><td>Banwarie, Rae<\/td><td>2025-11-14<\/td><td><strong>Received<\/strong><br \/>2025-11-25<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2510<\/td><td>Delete Subsection 3.1.3. of NBC on Multiple Occupancy Requirements<\/td><td>Germann, Stefan<\/td><td>2025-11-14<\/td><td><strong>Received<\/strong><br \/>2025-11-25<br \/><\/td><td>NBC Division B 3.1.3.<\/td><td>-<\/td><\/tr><tr><td>2509<\/td><td>Defining what is a barrier-free washroom<\/td><td>Aubin, Marc-Antoine<\/td><td>2025-11-10<\/td><td><strong>Received<\/strong><br \/>2025-11-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2508<\/td><td>\"Public Use\" and \"Private Use\" Definitions<\/td><td>Hood, Edward, HH Angus &amp; Associates Consulting Engineers<\/td><td>2025-11-07<\/td><td><strong>Received<\/strong><br \/>2025-11-13<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2507<\/td><td>Reference CSA Z317.13 (Infection control in health care facilities)in the NBC<\/td><td>perri, Cassandra, canadian standards association<\/td><td>2025-11-06<\/td><td><strong>Received<\/strong><br \/>2025-11-13<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2506<\/td><td>Addition of Provisions for Cured-in-Place Pipe<\/td><td>Murra, Abraham, Abraham Murra Consulting, representing Wavin Limited<\/td><td>2025-11-04<\/td><td><strong>Received<\/strong><br \/>2025-11-13<br \/><\/td><td>NPC Division B 1.3.1.2.,<br \/>NPC Division B 2.3.<\/td><td>-<\/td><\/tr><tr><td>2505<\/td><td>Add TSPR Metric for HVAC Efficiency to NECB Part 13<\/td><td>Saghlatoun, Saeedeh, BC Ministry of Energy and Climate Solutions<\/td><td>2025-11-04<\/td><td><strong>Received<\/strong><br \/>2025-11-13<br \/><\/td><td>NECB Division B 13.5.,<br \/>NECB Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2504<\/td><td>Clarification for operation of electromagnetic locks under 3.4.6.18.(1) and 3.4.6.16.(4)<\/td><td>Drouin, Maxime, Solution Maxime Drouin<\/td><td>2025-10-16<\/td><td><strong>Received<\/strong><br \/>2025-10-31<br \/><\/td><td>NBC Division B 3.4.6.18.(1),<br \/>NBC Division B 3.4.6.16.(4)<\/td><td>-<\/td><\/tr><tr><td>2503<\/td><td>Alignment of NPC with the Plenum Requirements in NBC <\/td><td>Edwards, Reid<\/td><td>2025-10-29<\/td><td><strong>Received<\/strong><br \/>2025-10-31<br \/><\/td><td>NPC Division B 2.2.5.11.(2)<\/td><td>-<\/td><\/tr><tr><td>2502<\/td><td>Allowable fenestration and door area<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2025-10-22<\/td><td><strong>Received<\/strong><br \/>2025-10-31<br \/><\/td><td>NECB Division B 3.2.1.4.<\/td><td>-<\/td><\/tr><tr><td>2501<\/td><td>Part-load performance characteristics for heat pump water heaters<\/td><td>Haddad, Kamel, Natural Resources Canada<\/td><td>2025-10-08<\/td><td><strong>Received<\/strong><br \/>2025-10-31<br \/><\/td><td>NECB Division B 8.4.6.<\/td><td>-<\/td><\/tr><tr><td>2500<\/td><td>Location of Smoke Detector Downstream of Smoke Damper or Combination Smoke\/Fire Damper<\/td><td>Dor\u00e9, Genevi\u00e8ve<\/td><td>2025-09-21<\/td><td><strong>Received<\/strong><br \/>2025-10-08<br \/><\/td><td>NBC Division B 3.1.8.11.(3)<\/td><td>-<\/td><\/tr><tr><td>2499<\/td><td>Objects falling through balcony railings\/guards creating hazards<\/td><td>Butt, Michael, Personal<\/td><td>2025-10-03<\/td><td><strong>Received<\/strong><br \/>2025-10-08<br \/><\/td><td>NBC Division B 3.4.6.6.,<br \/>NBC Division B 3.4.7.6.,<br \/>NBC Division B 3.3.1.18.,<br \/>NBC Division B 3.3.4.7.,<br \/>NBC Division B 9.8.8.<\/td><td>-<\/td><\/tr><tr><td>2498<\/td><td>Actuation of Smoke and Heat Vents above Stages<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-09-27<\/td><td><strong>Received<\/strong><br \/>2025-10-08<br \/><\/td><td>NBC Division B 3.3.2.14.(5)<\/td><td>-<\/td><\/tr><tr><td>2497<\/td><td>Inspection, Testing and Maintenance of Smoke and Heat Vents Above Stages<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-09-27<\/td><td><strong>Received<\/strong><br \/>2025-10-08<br \/><\/td><td>NFC Division B 6.7.1.1.<\/td><td>-<\/td><\/tr><tr><td>2496<\/td><td>Update NFPA 101 provisions in the NBC to align with the 2018 edition<\/td><td>McMaster, Matt<\/td><td>2025-09-16<\/td><td><strong>Received<\/strong><br \/>2025-09-19<br \/><\/td><td>NBC Division B 3.3.2.1.<\/td><td>-<\/td><\/tr><tr><td>2495<\/td><td>Clarification of Suds Pressure Zone Extent in Building Drainage Systems<\/td><td>Sweet, Kyle, Merit Mechanical<\/td><td>2025-09-16<\/td><td><strong>Received<\/strong><br \/>2025-09-19<br \/><\/td><td>NPC Division B 2.4.2.1.(4)<\/td><td>-<\/td><\/tr><tr><td>2494<\/td><td>Clarification of numbers of water closets for assembly occupancies<\/td><td>O\u2019Brien, Grace, City of Edmonton<\/td><td>2025-09-10<\/td><td><strong>Received<\/strong><br \/>2025-09-12<br \/><\/td><td>NBC Division B 3.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>2493<\/td><td> Flammable and Combustible Liquids<\/td><td>Parliament, Mark, Viega LLC<\/td><td>2025-09-02<\/td><td><strong>Received<\/strong><br \/>2025-09-05<br \/><\/td><td>NFC Division B 4.5.5.<\/td><td>-<\/td><\/tr><tr><td>2492<\/td><td>Clarification of Backflow Prevention Provisions<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-09-02<\/td><td><strong>Received<\/strong><br \/>2025-09-05<br \/><\/td><td>NPC Division B 2.2.10.,<br \/>NPC Division B 2.6.2.<\/td><td>-<\/td><\/tr><tr><td>2491<\/td><td>Provide clarification for reference building modeling<\/td><td>Syed, Ali, NRCan<\/td><td>2025-09-02<\/td><td><strong>Received<\/strong><br \/>2025-09-05<br \/><\/td><td>NECB Division B 8.4.4.2.<\/td><td>-<\/td><\/tr><tr><td>2490<\/td><td>Sound Transmission Loss of Encapsulated CLT Elements<\/td><td>Mahn, Jeffrey, National Research Council Canada<\/td><td>2025-09-02<\/td><td><strong>Received<\/strong><br \/>2025-09-05<br \/><\/td><td>NBC Division B 3.1.6.6.<\/td><td>-<\/td><\/tr><tr><td>2489<\/td><td>Sanitary Waste Valves<\/td><td>Murra, Abraham, Abraham Murra Consulting, representing Wavin Limited<\/td><td>2025-08-29<\/td><td><strong>Received<\/strong><br \/>2025-09-05<br \/><\/td><td>NPC Division A 1.4.1.2.,<br \/>NPC Division B 2.2.3.,<br \/>NPC Division B 2.4.5.,<br \/>NPC Division B 2.5.3.1.<\/td><td>-<\/td><\/tr><tr><td>2488<\/td><td>Updating Waterline Sizing Methods for Modern Fixtures for a Single or Two-Family Dwelling<\/td><td>Edwards, Reid<\/td><td>2025-08-27<\/td><td><strong>Received<\/strong><br \/>2025-08-29<br \/><\/td><td>NPC Division B 2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2487<\/td><td>Sound transmission class ratings and transmission loss data <\/td><td>Toome, Mihkel<\/td><td>2025-08-25<\/td><td><strong>Received<\/strong><br \/>2025-08-29<br \/><\/td><td>NBC Division B A-9.10.3.1.<\/td><td>-<\/td><\/tr><tr><td>2486<\/td><td>Refine requirements for Vertical Stiffness Irregularity<\/td><td>AbuGazia, Mohamed, Salas O\u2019Brien<\/td><td>2025-08-13<\/td><td><strong>Received<\/strong><br \/>2025-08-14<br \/><\/td><td>NBC Division B 4.1.8.6.<\/td><td>-<\/td><\/tr><tr><td>2485<\/td><td>-<\/td><td>Page, Robert<\/td><td>2025-08-11<\/td><td><strong>Received<\/strong><br \/>2025-08-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2484<\/td><td>General language improvement throughout the Code<\/td><td>MacKinnon, Jennifer<\/td><td>2025-07-22<\/td><td><strong>Received<\/strong><br \/>2025-07-29<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>2483<\/td><td>Revise Support Spacing for CPVC<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2025-07-14<\/td><td><strong>Received<\/strong><br \/>2025-07-15<br \/><\/td><td>NPC Division B 2.3.4.5.<\/td><td>-<\/td><\/tr><tr><td>2482<\/td><td>Uses of plastic pipe and fittings that meet CSA B182.2 standards<\/td><td>Hood, Edward, HH Angus &amp; Associates Consulting Engineers<\/td><td>2025-07-10<\/td><td><strong>Received<\/strong><br \/>2025-07-11<br \/><\/td><td>NPC Division B 2.2.5.9.,<br \/>NPC Division B 2.2.5.11.<\/td><td>-<\/td><\/tr><tr><td>2481<\/td><td>-<\/td><td>Lane, Jason, SBI Modular Ltd.<\/td><td>2025-07-10<\/td><td><strong>Received<\/strong><br \/>2025-07-11<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2480<\/td><td>Clarification of numbers of lavatories calculations<\/td><td>Lane, Jason, SBI Modular Ltd.<\/td><td>2025-07-10<\/td><td><strong>Received<\/strong><br \/>2025-07-11<br \/><\/td><td>NBC Division B 3.7.2.3.<\/td><td>-<\/td><\/tr><tr><td>2479<\/td><td>Protection Exemption for Electrical Conductors within a Storey<\/td><td>O'Hara, Alexandre, BPA<\/td><td>2025-06-27<\/td><td><strong>Received<\/strong><br \/>2025-07-08<br \/><\/td><td>NBC Division B 3.2.7.10.(7)<\/td><td>-<\/td><\/tr><tr><td>2478<\/td><td>Bird Friendly Design - <\/td><td>Bourque, Julie, Environment and Climate Change Canada<\/td><td>2025-07-04<\/td><td><strong>Received<\/strong><br \/>2025-07-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2477<\/td><td>Provisions for Vacuum Drainage Systems<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2025-07-02<\/td><td><strong>Received<\/strong><br \/>2025-07-07<br \/><\/td><td>NPC Division A 1.1.1.1.(2),<br \/>NPC Division A 1.3.1.2.,<br \/>NPC Division A 1.4.1.2.,<br \/>NPC Division B 2.2.2.2.,<br \/>NPC Division B 2.4.1.1.(1),<br \/>NPC Division B 2.4.9.2.<\/td><td>-<\/td><\/tr><tr><td>2476<\/td><td>Provision for Floor Drains in Dwelling Units within Multi-Unit Residential Buildings<\/td><td>Lin, Derek<\/td><td>2025-07-02<\/td><td><strong>Received<\/strong><br \/>2025-07-03<br \/><\/td><td>NPC Division B 2.4.2.1.<\/td><td>-<\/td><\/tr><tr><td>2475<\/td><td>Clarify exemptions for fire-resistance rating of membranes penetrated by noncombustible outlet boxes<\/td><td>L\u2019Arrivee, Michael, City of Port Moody<\/td><td>2025-06-30<\/td><td><strong>Received<\/strong><br \/>2025-07-03<br \/><\/td><td>NBC Division B 3.1.9.3.(3)<\/td><td>-<\/td><\/tr><tr><td>2474<\/td><td>-<\/td><td>Verstraten, Darren, Township of Springwater<\/td><td>2025-06-26<\/td><td><strong>Received<\/strong><br \/>2025-06-27<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2473<\/td><td>Clarify Retrofit Provisions and Testing Requirements for Fire Alarm Systems in Operational Buildings<\/td><td>Kaneswaran, Suthan, Quasar CG<\/td><td>2025-06-20<\/td><td><strong>Received<\/strong><br \/>2025-06-23<br \/><\/td><td>NBC Division B 10<\/td><td>-<\/td><\/tr><tr><td>2472<\/td><td>-<\/td><td>Mostafa, Dr. Ahmed, CMTE Inc.<\/td><td>2025-06-20<\/td><td><strong>Received<\/strong><br \/>2025-06-23<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2471<\/td><td>Clarification of minimum sump pit area\/volume<\/td><td>RITSEMA, STEPHEN, LIBERTY PUMPS<\/td><td>2025-06-18<\/td><td><strong>Received<\/strong><br \/>2025-06-20<br \/><\/td><td>NBC Division B 9.14.5.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2470<\/td><td>Adding dedicated section addressing alteration of existing buildings in the National Model Code<\/td><td>Martin, Jeff, Element Forensic Engineering<\/td><td>2025-06-10<\/td><td><strong>Received<\/strong><br \/>2025-06-13<br \/><\/td><td>NBC Division B 10<\/td><td>-<\/td><\/tr><tr><td>2469<\/td><td>-<\/td><td>Perevalov, Andrey<\/td><td>2025-06-10<\/td><td><strong>Received<\/strong><br \/>2025-06-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2468<\/td><td>Minimum stall size for water closets not in barrier-free spaces<\/td><td>Shakil, Ammar<\/td><td>2025-06-02<\/td><td><strong>Received<\/strong><br \/>2025-06-04<br \/><\/td><td>NBC Division B 3.7.2.2.,<br \/>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>2467<\/td><td>Determination of pressure available for friction loss<\/td><td>Canuel-Langlois, T.P., Emilie, Normalys Inc.<\/td><td>2025-05-15<\/td><td><strong>Received<\/strong><br \/>2025-05-30<br \/><\/td><td>NPC Division B A-2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2466<\/td><td>Offset in Leaders Requirements<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2025-05-29<\/td><td><strong>Received<\/strong><br \/>2025-05-30<br \/><\/td><td>NPC Division B 2.4.9.5.<\/td><td>-<\/td><\/tr><tr><td>2465<\/td><td>Limits on deactivation of fire alarm monitoring for testing\/maintenance (NFC)<\/td><td>Currie, David J, Damar Security Systems<\/td><td>2025-05-28<\/td><td><strong>Received<\/strong><br \/>2025-05-30<br \/><\/td><td>NFC Division B 2.1.3.,<br \/>NFC Division B 6.1.1.<\/td><td>-<\/td><\/tr><tr><td>2464<\/td><td>Clarify \"adequate water supply for firefighting\" in NBC Part 3<\/td><td>Chase, Andy, Province of British Columbia<\/td><td>2025-05-25<\/td><td><strong>Received<\/strong><br \/>2025-05-30<br \/><\/td><td>NBC Division B 3.2.5.7.<\/td><td>-<\/td><\/tr><tr><td>2463<\/td><td>Expansion of Premise Isolation Requirements to Include Moderate Hazard Buildings<\/td><td>Friedt, Stephen, Technical Safety Authority of Saskatchewan<\/td><td>2025-05-23<\/td><td><strong>Received<\/strong><br \/>2025-05-30<br \/><\/td><td>NPC Division B 2.6.2.6.<\/td><td>-<\/td><\/tr><tr><td>2462<\/td><td>Provision for infant change tables<\/td><td>Agrawal, Vanessa<\/td><td>2025-05-21<\/td><td><strong>Received<\/strong><br \/>2025-05-29<br \/><\/td><td>NBC Division B 3.8.,<br \/>NBC Division B 3.7.2.<\/td><td>-<\/td><\/tr><tr><td>2461<\/td><td>Review ECPs for opaque walls and HRVs\/ERVs<\/td><td>Sharp, Gary, NAIMA Canada<\/td><td>2025-05-20<\/td><td><strong>Received<\/strong><br \/>2025-05-29<br \/><\/td><td>NBC Division B 9.36.8.5.,<br \/>NBC Division B 9.36.8.7.,<br \/>NBC Division B 9.36.8.9.<\/td><td>-<\/td><\/tr><tr><td>2460<\/td><td>Operating schedules for demand control ventilation<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2025-05-16<\/td><td><strong>Received<\/strong><br \/>2025-05-29<br \/><\/td><td>NECB Division B 8.4.3.2.<\/td><td>-<\/td><\/tr><tr><td>2459<\/td><td>NECB compliance tool<\/td><td>McCall, Greg, City of Vancouver<\/td><td>2025-05-06<\/td><td><strong>Received<\/strong><br \/>2025-05-29<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>2458<\/td><td>Structural Composite Lumber Products<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2025-03-07<\/td><td><strong>Received<\/strong><br \/>2025-04-24<br \/><\/td><td>NBC Division B D-2.3.6.,<br \/>NBC Division B D-2.3.4.<\/td><td>-<\/td><\/tr><tr><td>2457<\/td><td>Number of accessible parking spaces<\/td><td>Aubin, Marc-Antoine<\/td><td>2025-03-07<\/td><td><strong>Received<\/strong><br \/>2025-04-16<br \/><\/td><td>NBC Division B A-3.8.2.5.<\/td><td>-<\/td><\/tr><tr><td>2456<\/td><td>Updated reference to CSA O86 and related revisions to Part 9 Span Table for HEMFIR Lumber Species <\/td><td>Oliveira, Damian, Canadian Wood Council<\/td><td>2025-04-04<\/td><td><strong>Received<\/strong><br \/>2025-04-16<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 9.23.4.2.,<br \/>NBC Division B 9.23.12.3.<\/td><td>-<\/td><\/tr><tr><td>2455<\/td><td>Wool-Based Insulation Products<\/td><td>laguerre, nava<\/td><td>2025-04-04<\/td><td><strong>Received<\/strong><br \/>2025-04-16<br \/><\/td><td>NBC Division B 9.25.2.,<br \/>NBC Division B 5.9.1.1.<\/td><td>-<\/td><\/tr><tr><td>2454<\/td><td>Location of Fuel-Fired Appliances<\/td><td>Campbell, Mike, City of Greater Sudbury<\/td><td>2025-04-04<\/td><td><strong>Received<\/strong><br \/>2025-04-16<br \/><\/td><td>NBC Division B 9.10.10.4.(1)<\/td><td>-<\/td><\/tr><tr><td>2453<\/td><td>Maximum size of transparent panels in doors, and requirements for vision panels for accessibility<\/td><td>Laprise, Alexandre, Groupe A<\/td><td>2025-03-26<\/td><td><strong>Received<\/strong><br \/>2025-04-10<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NBC Division B 3.4.1.8.,<br \/>NBC Division B 3.3.1.19.<\/td><td>-<\/td><\/tr><tr><td>2452<\/td><td>Carbon Monoxide Alarms Requirements Applicable to Home-Type Care Occupancy<\/td><td>Campbell, Felicia, Government of Saskatchewan<\/td><td>2025-03-20<\/td><td><strong>Received<\/strong><br \/>2025-04-10<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NBC Division B 9.32.3.9.(1)<\/td><td>-<\/td><\/tr><tr><td>2451<\/td><td>Requirements for windows when used as walls<\/td><td>Fulton, Bryce, RJC Engineers<\/td><td>2025-03-21<\/td><td><strong>Received<\/strong><br \/>2025-04-10<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NBC Division B 3.3.1.20.,<br \/>NBC Division B 4.1.5.16.,<br \/>NBC Division B 9.8.8.1.<\/td><td>-<\/td><\/tr><tr><td>2450<\/td><td>Update Terminology for Greater Inclusivity<\/td><td>Dang, Tommy, Building and Safety Standards Branch<\/td><td>2025-03-12<\/td><td><strong>Received<\/strong><br \/>2025-04-10<br \/><strong>Received<\/strong><br \/>2026-03-10<br \/><\/td><td>NPC Division B 2.2.5.2.,<br \/>NPC Division B 2.4.5.4.,<br \/>NPC Division B 2.4.7.1.(4),<br \/>NPC Division B 2.4.7.2.(3),<br \/>NPC Division B 2.4.7.2.(4),<br \/>NPC Division B 2.4.7.3.,<br \/>NPC Division B 2.5.7.6.,<br \/>NPC Division B 2.5.8.5.,<br \/>NFC Division B A-4.1.6.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2449<\/td><td>Assess Risks of flooding and wildfires for housing in Canada (Policy perspective)<\/td><td>bacon, tyler<\/td><td>2025-02-28<\/td><td><strong>Received<\/strong><br \/>2025-03-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2448<\/td><td>Bracing Requirements for Low to Moderate Wind and Seismic Forces<\/td><td>Williams, Jordan, Cenlo Engineering Inc.<\/td><td>2025-03-06<\/td><td><strong>Received<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division B 9.23.13.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2447<\/td><td>Prohibit flying lantern in NFC<\/td><td>Black, Kathy, Member of Public<\/td><td>2025-03-05<\/td><td><strong>Received<\/strong><br \/>2025-03-07<br \/><\/td><td>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>2446<\/td><td>Amend Sump Pit Size Requirement to Align with Standard Manufactured Dimensions<\/td><td>Jess Don Dunford, Paula Sanvido, Jess Don Dunford<\/td><td>2025-02-21<\/td><td><strong>Received<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division B 9.14.5.2.<\/td><td>-<\/td><\/tr><tr><td>2445<\/td><td>Carbon Monoxide Detector in All Residential Occupancies<\/td><td>Sturgeon, Gary<\/td><td>2025-02-19<\/td><td><strong>Received<\/strong><br \/>2025-03-07<br \/><\/td><td>NFC Division B 2.1.3.<\/td><td>-<\/td><\/tr><tr><td>2444<\/td><td>Seperate various loads in tiered building energy performance compliance<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2025-02-09<\/td><td><strong>Received<\/strong><br \/>2025-02-14<br \/><\/td><td>NECB Division B 10<\/td><td>-<\/td><\/tr><tr><td>2443<\/td><td>Application of Subsection 9.10.15. Spatial Separation Between Houses<\/td><td>Middleton, Darryl<\/td><td>2025-02-07<\/td><td><strong>Received<\/strong><br \/>2025-02-14<br \/><\/td><td>NBC Division B 9.10.15.1.<\/td><td>-<\/td><\/tr><tr><td>2442<\/td><td>Correction of units for allowable air leakage of storm doors<\/td><td>Lin, Hanlei<\/td><td>2025-02-06<\/td><td><strong>Received<\/strong><br \/>2025-02-14<br \/><\/td><td>NBC Division B 9.7.3.1.(4)<\/td><td>-<\/td><\/tr><tr><td>2441<\/td><td>Stricter Requirements for Noise and Chemical Emissions from HVAC Systems<\/td><td>Swain, Marion, Home owner<\/td><td>2024-12-14<\/td><td><strong>Received<\/strong><br \/>2025-02-04<br \/><\/td><td>NBC Division B 9.33.1.4.<\/td><td>-<\/td><\/tr><tr><td>2440<\/td><td>Ventilation of Clothes Dryers and Bathrooms<\/td><td>Bentley, Douglas<\/td><td>2025-01-30<\/td><td><strong>Received<\/strong><br \/>2025-02-04<br \/><\/td><td>NBC Division B 6.3.2.10.(7),<br \/>NBC Division B A-6.3.2.10.(7),<br \/>NBC Division B 9.32.3.13.<\/td><td>-<\/td><\/tr><tr><td>2439<\/td><td>Fire-Resistance Rating for Exterior Balconies<\/td><td>Turpin, Sherri, Sherri Turpin Architect<\/td><td>2025-01-22<\/td><td><strong>Received<\/strong><br \/>2025-02-04<br \/><\/td><td>NBC Division B 3.2.2.11.<\/td><td>-<\/td><\/tr><tr><td>2438<\/td><td>Fire Smart Principles<\/td><td>Moreside, Ryan, FireSmart BC<\/td><td>2025-01-15<\/td><td><strong>Received<\/strong><br \/>2025-01-21<br \/><\/td><td>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>2437<\/td><td>Floor level identification clarification<\/td><td>Meier, Aaron, LMDG Building Code Consultants Ltd<\/td><td>2025-01-15<\/td><td><strong>Received<\/strong><br \/>2025-01-21<br \/><\/td><td>NBC Division B 3.4.6.19.<\/td><td>-<\/td><\/tr><tr><td>2436<\/td><td>Removal of Condensate Drain Provision from ERV installation requirements<\/td><td>Hope, R Stephen, Minto Group<\/td><td>2025-01-14<\/td><td><strong>Received<\/strong><br \/>2025-01-21<br \/><\/td><td>NBC Division B 9.32.3.12.(5)<\/td><td>-<\/td><\/tr><tr><td>2435<\/td><td>Health-related requirements for HVAC Systems: Emissions & Noise Standards<\/td><td>Ogg, Paula<\/td><td>2024-12-14<\/td><td><strong>Received<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 5<\/td><td>-<\/td><\/tr><tr><td>2434<\/td><td>Mechanical damage protection thickness for thermal insulation<\/td><td>Stuart, Bryan<\/td><td>2024-12-13<\/td><td><strong>Received<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B 9.25.2.3.(6)<\/td><td>-<\/td><\/tr><tr><td>2433<\/td><td>Potential conservatism in provision for non-linear time history analysis in Article 4.1.8.22 (SED)<\/td><td>Zhong, Myron<\/td><td>2024-12-09<\/td><td><strong>Received<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B 4.1.8.22.(1)<\/td><td>-<\/td><\/tr><tr><td>2432<\/td><td>Fire prevention inspections for day care centres<\/td><td>McMullen, Matthew, Rocky View County Fire Department<\/td><td>2024-11-28<\/td><td><strong>Received<\/strong><br \/>2024-12-04<br \/><\/td><td>NFC Division B 2.10.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2431<\/td><td>Visual fire\/smoke alarm signals<\/td><td>Belzile, Richard, Canadian Association of the Deaf | Association des Sourds du Canada<\/td><td>2024-11-25<\/td><td><strong>Received<\/strong><br \/>2024-11-26<br \/><\/td><td>NBC Division B 3.2.1.19.<\/td><td>-<\/td><\/tr><tr><td>2430<\/td><td>Update total area of building envelope <\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2024-11-12<\/td><td><strong>Received<\/strong><br \/>2024-11-14<br \/><\/td><td>NECB Division B 8.4.2.9.<\/td><td>-<\/td><\/tr><tr><td>2429<\/td><td>Add note to Table 8.4.4.7.-B<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2024-11-12<\/td><td><strong>Received<\/strong><br \/>2024-11-14<br \/><\/td><td>NECB Division B 8.4.4.7.<\/td><td>-<\/td><\/tr><tr><td>2428<\/td><td>Update operating schedules for energy modeling<\/td><td>Terpstra, Mark, Alberta Infrastructure<\/td><td>2024-11-12<\/td><td><strong>Received<\/strong><br \/>2024-11-14<br \/><\/td><td>NECB Division B A-8.4.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2427<\/td><td>Security systems and fire detection on construction sites<\/td><td>Hager, Austin, Tattletale Portable Alarm Systems<\/td><td>2024-11-08<\/td><td><strong>Received<\/strong><br \/>2024-11-12<br \/><\/td><td>NFC Division B 2.8.2.11.,<br \/>NFC Division B 5.6.1.14.<\/td><td>-<\/td><\/tr><tr><td>2426<\/td><td>Specified snow loads for greenhouses<\/td><td>van Eekelen, Arjen, Prins Ontario<\/td><td>2024-11-07<\/td><td><strong>Received<\/strong><br \/>2024-11-12<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2425<\/td><td>Specified snow loads for greenhouses<\/td><td>te Kamp, Frank, Paul Boers<\/td><td>2024-11-07<\/td><td><strong>Received<\/strong><br \/>2024-11-12<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2424<\/td><td>Specified Snow loads for greenhouses<\/td><td>De Gier, Edwin, Prins BC<\/td><td>2024-11-07<\/td><td><strong>Received<\/strong><br \/>2024-11-12<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2423<\/td><td>Requirements for drywall patching tools and technique and list approved product <\/td><td>Carbone, Marco, Mad thinking inc<\/td><td>2024-11-06<\/td><td><strong>Received<\/strong><br \/>2024-11-12<br \/><\/td><td>NBC Division B 9.25.5.<\/td><td>-<\/td><\/tr><tr><td>2422<\/td><td>specified snow loads for greenhouses<\/td><td>Wiebe, Franz, Universal Fabricating<\/td><td>2024-10-30<\/td><td><strong>Received<\/strong><br \/>2024-11-01<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2421<\/td><td>Revise occupancy classification of Automated Greenhouses to Group G Division 4<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-10-30<\/td><td><strong>Received<\/strong><br \/>2024-11-01<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2420<\/td><td>Clarify location of exits to avoid impractical installation of exits on side wall of greenhouses<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-10-30<\/td><td><strong>Received<\/strong><br \/>2024-11-01<br \/><\/td><td>NBC Division B 2.2.7.5.(2)<\/td><td>-<\/td><\/tr><tr><td>2419<\/td><td>Low-temperature ventilation reduction factor of an HRV<\/td><td>Cooke, Gordon, Building Knowledge Canada<\/td><td>2024-10-30<\/td><td><strong>Received<\/strong><br \/>2024-11-01<br \/><\/td><td>NBC Division B 9.32.3.10.(5)<\/td><td>-<\/td><\/tr><tr><td>2418<\/td><td>Clarifying Hose Connections<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-10-29<\/td><td><strong>Received<\/strong><br \/>2024-11-01<br \/><\/td><td>NBC Division B 3.2.5.10.<\/td><td>-<\/td><\/tr><tr><td>2417<\/td><td>ASTC rating vs. floor\/ceiling assembly composition<\/td><td>Thibeault, Val\u00e9rie, Ville de Gatineau<\/td><td>2024-10-24<\/td><td><strong>Received<\/strong><br \/>2024-10-25<br \/><\/td><td>NBC Division B 9.11.1.1.,<br \/>NBC Division B 9.9.4.2.,<br \/>NBC Division B 9.10.9.16.<\/td><td>-<\/td><\/tr><tr><td>2416<\/td><td>Pedestrian ramps in parking garages<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2024-10-22<\/td><td><strong>Received<\/strong><br \/>2024-10-23<br \/><\/td><td>NBC Division B 3.3.1.14.,<br \/>NBC Division B 3.4.6.7.,<br \/>NBC Division B 9.8.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2415<\/td><td>Specified snow load for the design of greenhouses<\/td><td>Howe, Kyle, Vertical Engineering Ltd.<\/td><td>2024-10-17<\/td><td><strong>Received<\/strong><br \/>2024-10-18<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2414<\/td><td>Sealing Of Backwater Valve Basin<\/td><td>Dyal, Christopher, Radon Home Defence<\/td><td>2024-10-15<\/td><td><strong>Received<\/strong><br \/>2024-10-16<br \/><\/td><td>NBC Division B 9.25.3.3.(6),<br \/>NBC Division B 9.25.3.3.(7)<\/td><td>-<\/td><\/tr><tr><td>2413<\/td><td>Potential overestimation of seismic weight W in NBC for post disaster and high importance buildings<\/td><td>SAINT-ONGE, ELIE, HYDRO-QUEBEC<\/td><td>2024-09-27<\/td><td><strong>Received<\/strong><br \/>2024-10-10<br \/><\/td><td>NBC Division B 4.1.8.2.<\/td><td>-<\/td><\/tr><tr><td>2412<\/td><td>Harmonize the Requirements in Water Supply and Hydrant Systems within NFC and Alberta Fire Code<\/td><td>Bowler, Ben, Calgary Fire Department<\/td><td>2024-09-26<\/td><td><strong>Received<\/strong><br \/>2024-09-27<br \/><\/td><td>NFC Division B 5.6.3.5.<\/td><td>-<\/td><\/tr><tr><td>2411<\/td><td>Protection of openable windows<\/td><td>MacKenzie, Michael, West Lane Designs Inc<\/td><td>2024-09-19<\/td><td><strong>Received<\/strong><br \/>2024-09-20<br \/><\/td><td>NBC Division B 9.8.8.1.<\/td><td>-<\/td><\/tr><tr><td>2410<\/td><td>Live loads loads for Fire fighting equipment <\/td><td>Carson, Daniel, WSP<\/td><td>2024-09-18<\/td><td><strong>Received<\/strong><br \/>2024-09-20<br \/><\/td><td>NBC Division B 4.1.5.3.,<br \/>NBC Division B 4.1.5.4.,<br \/>NBC Division B 4.1.5.5.,<br \/>NBC Division B 4.1.5.9.<\/td><td>-<\/td><\/tr><tr><td>2409<\/td><td>Add Requirements on Conformance to CAN\/ULC-S109 in a Group A, Division 1, 2, or 3 Occupancy<\/td><td>Rushton, Alexander, Calgary Fire Department<\/td><td>2024-09-18<\/td><td><strong>Received<\/strong><br \/>2024-09-20<br \/><\/td><td>NBC Division B 3.1.2.3.<\/td><td>-<\/td><\/tr><tr><td>2408<\/td><td>Review of Grenfell Tower Inquiry's Phase 2 Report<\/td><td>bacon, tyler<\/td><td>2024-09-12<\/td><td><strong>Received<\/strong><br \/>2024-09-16<br \/><\/td><td>NBC Division B ,<br \/>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>2407<\/td><td>Incentivizing Net-Zero Ready Construction by 2032 to Reduce Utility Costs<\/td><td>bacon, tyler<\/td><td>2024-09-12<\/td><td><strong>Received<\/strong><br \/>2024-09-16<br \/><\/td><td>NBC Division B 9.36.,<br \/>NECB Division B 10.1.<\/td><td>-<\/td><\/tr><tr><td>2406<\/td><td>Differentiate a Single-Family Dwelling from a Short-Term Rental in Residential C type Occupancies<\/td><td>Parry, Ben, Calgary Fire Department<\/td><td>2024-09-13<\/td><td><strong>Received<\/strong><br \/>2024-09-16<br \/><\/td><td>NFC Division B 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2405<\/td><td>Applying Portable Extinguisher Requirements to Short-Term Rentals<\/td><td>Whynot, Steve, Calgary Fire Department<\/td><td>2024-09-12<\/td><td><strong>Received<\/strong><br \/>2024-09-16<br \/><\/td><td>NFC Division B 2.1.5.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2404<\/td><td>Parking of Vehicles Transporting Dangerous Goods<\/td><td>MacKenzie, Ken, City of Calgary Fire Dept (SCO)<\/td><td>2024-09-12<\/td><td><strong>Received<\/strong><br \/>2024-09-16<br \/><\/td><td>NFC Division B 2.4.4.3.<\/td><td>-<\/td><\/tr><tr><td>2403<\/td><td>-<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-08-30<\/td><td><strong>Received<\/strong><br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2402<\/td><td>Wind loads on parapets<\/td><td>Tancredi, Mike, Ferroeng Group Inc.<\/td><td>2024-08-09<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B 4.1.7.3.<\/td><td>-<\/td><\/tr><tr><td>2401<\/td><td>Specified Snow loads for greenhouses<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-08-06<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2400<\/td><td>Correcting To in Minimum Lighting Requirements<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-08-06<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B 3.2.7.4.<\/td><td>-<\/td><\/tr><tr><td>2399<\/td><td>Adding automated greenhouses to Group G, Division 4 major occupancy classifications<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-08-06<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B A-2.1.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2398<\/td><td>Minimum specified live loads  for greenhouses<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-08-06<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B 2.3.2.1.<\/td><td>-<\/td><\/tr><tr><td>2397<\/td><td>Changing \"minimize\" to \"prevent\" regarding liquid manure leakage<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2024-08-06<\/td><td><strong>Received<\/strong><br \/>2024-08-20<br \/><\/td><td>NBC Division B 2.3.2.5.(6)<\/td><td>-<\/td><\/tr><tr><td>2396<\/td><td>Apartment sound insulation<\/td><td>Busch, Todd, Todd Busch Consulting<\/td><td>2024-08-05<\/td><td><strong>Received<\/strong><br \/>2024-08-06<br \/><\/td><td>NBC Division B 5.8.,<br \/>NBC Division B 9.11.<\/td><td>-<\/td><\/tr><tr><td>2395<\/td><td>Smoke Damper and Combination Smoke\/Fire Damper Actuation<\/td><td>Sun, Bill, Ellard Willson Engineering LTD<\/td><td>2024-08-01<\/td><td><strong>Received<\/strong><br \/>2024-08-02<br \/><\/td><td>NBC Division B 3.1.8.11.(3)<\/td><td>-<\/td><\/tr><tr><td>2394<\/td><td>Legionella growth in cold water systems<\/td><td>MacDonald, Judy A, Public Works Canada<\/td><td>2024-08-01<\/td><td><strong>Received<\/strong><br \/>2024-08-02<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>2393<\/td><td>Keeping records for the inspection of emergency lights and exit signs<\/td><td>Twining, Dave, Troy Life &amp; Fire Safety<\/td><td>2024-06-14<\/td><td><strong>Received<\/strong><br \/>2024-07-31<br \/><\/td><td>NFC Division B 6.5.1.6.,<br \/>NFC Division B 6.5.1.7.,<br \/>NFC Division B 6.5.1.8.<\/td><td>-<\/td><\/tr><tr><td>2392<\/td><td>Adding specifications for door viewer heights on entrance doors<\/td><td>McLean, Eric<\/td><td>2024-07-24<\/td><td><strong>Received<\/strong><br \/>2024-07-29<br \/><\/td><td>NBC Division B 3.8.<\/td><td>-<\/td><\/tr><tr><td>2391<\/td><td>High Density PolyEthylene pipe<\/td><td>Ethier, Alexandre, Soleno<\/td><td>2024-07-23<\/td><td><strong>Received<\/strong><br \/>2024-07-24<br \/><\/td><td>NBC Division B 9.14.3.<\/td><td>-<\/td><\/tr><tr><td>2390<\/td><td>Construction of exterior wall assemblies deemed to satisfy Clause 3.1.5.5.(1)(b)<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-07-19<\/td><td><strong>Received<\/strong><br \/>2024-07-23<br \/><\/td><td>NBC Division B D-6.1.1.<\/td><td>-<\/td><\/tr><tr><td>2389<\/td><td>Modifying means of egress from suites<\/td><td>Krogsgaard, Kresten E, City of Regina<\/td><td>2024-07-16<\/td><td><strong>Received<\/strong><br \/>2024-07-18<br \/><\/td><td>NBC Division B 9.9.7.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2388<\/td><td>Valet Trash Collection Services in MURBs<\/td><td>Viacaba, Luis<\/td><td>2024-07-15<\/td><td><strong>Received<\/strong><br \/>2024-07-16<br \/><\/td><td>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>2387<\/td><td>Firewalls in Large Farm Buildings<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-07-11<\/td><td><strong>Received<\/strong><br \/>2024-07-12<br \/><\/td><td>NBC Division B 2.2.1.7.<\/td><td>-<\/td><\/tr><tr><td>2386<\/td><td>Exceptions in Determining Building Height (for Platforms of EMTC)<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-07-11<\/td><td><strong>Received<\/strong><br \/>2024-07-12<br \/><\/td><td>NBC Division B 3.2.1.1.(6)<\/td><td>-<\/td><\/tr><tr><td>2385<\/td><td>Review testing standards for three-phase induction motors<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2024-07-08<\/td><td><strong>Received<\/strong><br \/>2024-07-11<br \/><\/td><td>NECB Division B 7<\/td><td>-<\/td><\/tr><tr><td>2384<\/td><td>Add administrative provisions for peer-review process for earthquake design <\/td><td>Dutrisac, H\u00e9l\u00e8ne<\/td><td>2024-07-03<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division C 2.2.4.<\/td><td>-<\/td><\/tr><tr><td>2383<\/td><td>Add regulatory requirements in the NBC for dealing with special geotechnical conditions<\/td><td>Dutrisac, H\u00e9l\u00e8ne<\/td><td>2024-07-03<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.4.<\/td><td>-<\/td><\/tr><tr><td>2382<\/td><td>Examine alignment between targeted seismic performance and NBC provisions <\/td><td>Dutrisac, H\u00e9l\u00e8ne<\/td><td>2024-07-03<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.4.<\/td><td>-<\/td><\/tr><tr><td>2381<\/td><td>Duplicate of CCR 2283 (New SFRSs)<\/td><td>Adebar, Perry, The University of British Columbia<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.,<br \/>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2380<\/td><td>Duplicate of CCR 2283 (New SFRSs)<\/td><td>Adebar, Perry, The University of British Columbia<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.,<br \/>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2379<\/td><td>Duplicate of CCR 2283 (New SFRSs)<\/td><td>Adebar, Perry, The University of British Columbia<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.,<br \/>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2378<\/td><td>Add requirements for Embodied GHGe<\/td><td>Kriplani, Nadia<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.36.,<br \/>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>2377<\/td><td>Expanding the defined term for encapsulated mass timber construction<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2376<\/td><td>Duplicate of CCR 2316 (Separation of Major Occupancies - EMTC)<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.3.1.<\/td><td>-<\/td><\/tr><tr><td>2375<\/td><td>Application of additional requirements for high buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.6.1.<\/td><td>-<\/td><\/tr><tr><td>2374<\/td><td>Encapsulation of mass timber elements - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.4.<\/td><td>-<\/td><\/tr><tr><td>2373<\/td><td>Encapsulation materials - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.6.<\/td><td>-<\/td><\/tr><tr><td>2372<\/td><td>Combustible roofing materials - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.7.<\/td><td>-<\/td><\/tr><tr><td>2371<\/td><td>Combustible window sashes and frames - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.8.<\/td><td>-<\/td><\/tr><tr><td>2370<\/td><td>Exterior cladding as a function of building height - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.9.,<br \/>NBC Division B 3.2.3.7.<\/td><td>-<\/td><\/tr><tr><td>2369<\/td><td>Combustible interior finishes - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.14.(2),<br \/>NBC Division B 3.1.6.14.(3)<\/td><td>-<\/td><\/tr><tr><td>2368<\/td><td>Multiple major occupancies - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.6.<\/td><td>-<\/td><\/tr><tr><td>2367<\/td><td>Separation of horizontal concealed spaces within floor\/roof assemblies - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.11.5.<\/td><td>-<\/td><\/tr><tr><td>2366<\/td><td>Evaluation of roof coverings for roof assemblies at different elevations - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.15.2.(5)<\/td><td>-<\/td><\/tr><tr><td>2365<\/td><td>Exterior cladding as a function of building height - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.6.9.,<br \/>NBC Division B 3.2.3.7.<\/td><td>-<\/td><\/tr><tr><td>2364<\/td><td>Exterior balcony floor assembly - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.11.(2)<\/td><td>-<\/td><\/tr><tr><td>2363<\/td><td>Automatic sprinkler systems for certain balconies and decks - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.5.12.(7)<\/td><td>-<\/td><\/tr><tr><td>2362<\/td><td>Superimposed major occupancies - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.7.<\/td><td>-<\/td><\/tr><tr><td>2361<\/td><td>Automatic sprinkler systems - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.18.(1)<\/td><td>-<\/td><\/tr><tr><td>2360<\/td><td>Group A, Division 2, up to 18 storeys [A2-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2359<\/td><td>Group A, Division 3, up to 15 storeys [A3-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2358<\/td><td>Group B, Division 2, up to 8 storeys [B2-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2357<\/td><td>Group C, up to 24 storeys [C-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2356<\/td><td>Group D, up to 24 storeys [D-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2355<\/td><td>Group C, up to 24 storeys [C-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2354<\/td><td>Group E, up to 12 storeys [E-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2353<\/td><td>Group F, Division 2, up to 11 storeys [F2-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2352<\/td><td>Group F, Division 3, up to 14 storeys [F3-1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2351<\/td><td>Group A, Division 2, up to 12 storeys [A2-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2350<\/td><td>Group A, Division 3, up to 8 storeys [A3-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2349<\/td><td>Group B, Division 2, up to 6 storeys [B2-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2348<\/td><td>Group B, Division 3, up to 7 storeys [B3-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2347<\/td><td>Group C, up to 12 storeys [C-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.48.<\/td><td>-<\/td><\/tr><tr><td>2346<\/td><td>Group D, up to 12 storeys [D-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.57.<\/td><td>-<\/td><\/tr><tr><td>2345<\/td><td>Group E, up to 8 storeys [E-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2344<\/td><td>Group F, Division 2, up to 8 storeys [F2-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2343<\/td><td>Group F, Division 3, up to 10 storeys [F3-2] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2342<\/td><td>Group A, Division 2, up to 8 storeys [A2-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2341<\/td><td>Group A, Division 3, up to 6 storeys [A3-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2340<\/td><td>Group B, Division 3, up to 5 storeys [B3-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2339<\/td><td>Group C, up to 8 storeys [C-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2338<\/td><td>Group D, up to 9 storeys [D-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2337<\/td><td>Group E, up to 6 storeys [E-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2336<\/td><td>Group F, Division 2, up to 5 storeys [F2-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2335<\/td><td>Group F, Division 3, up to 7 storeys [F3-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2334<\/td><td>Group F, Division 1, up to 3 Storeys, Sprinklered [F1-3] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2333<\/td><td>Group A, Division 2, up to 6 storeys [A2-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2332<\/td><td>Group A, Division 3, up to 2 storeys [A3-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2331<\/td><td>Group B, Division 2, up to 3 storeys [B2-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2330<\/td><td>Group B, Division 3, up to 3 storeys [B3-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2329<\/td><td>Group C, up to 6 storeys [C-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2328<\/td><td>Group D, up to 6 storeys [D-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2327<\/td><td>Group E, up to 4 storeys [E-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2326<\/td><td>Group F, Division 2, up to 4 storeys [F2-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2325<\/td><td>Group F, Division 3, up to 6 storeys [F3-3.1] - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2324<\/td><td>Podium buildings (Group C major occupancies) - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2323<\/td><td>Podium buildings (Group D major occupancies) - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2322<\/td><td>Exterior cladding on podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.4.8.<\/td><td>-<\/td><\/tr><tr><td>2321<\/td><td>Fire blocks in horizontal concealed spaces for podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.11.5.(3),<br \/>NBC Division B 3.1.11.5.(4),<br \/>NBC Division B A-3.1.11.5.(3),<br \/>NBC Division B A-3.1.11.5.(4)<\/td><td>-<\/td><\/tr><tr><td>2320<\/td><td>Applying the additional requirements for high buildings to podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.6.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2319<\/td><td>Automatic sprinkler systems for podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.18.(1)<\/td><td>-<\/td><\/tr><tr><td>2318<\/td><td>Automatic sprinkler systems for podium building balconies and decks - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.5.12.(7)<\/td><td>-<\/td><\/tr><tr><td>2317<\/td><td>Emergency power for fire alarm systems in podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.7.8.(3)<\/td><td>-<\/td><\/tr><tr><td>2316<\/td><td>Separation of major occupancies - EMTC and mid-rise combustible construction [Duplicate of CCR 2376]<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.3.1.<\/td><td>-<\/td><\/tr><tr><td>2315<\/td><td>Multiple major occupancies for podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>2314<\/td><td>Superimposed major occupancies for podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.7.(1)<\/td><td>-<\/td><\/tr><tr><td>2313<\/td><td>Duplicate of CCR 2323 and CCR 2324 (Podium Buildings)<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2312<\/td><td>Roof covering classification for podium buildings - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.15.2.(3),<br \/>NBC Division B 3.1.15.2.(5)<\/td><td>-<\/td><\/tr><tr><td>2311<\/td><td>Revisions to protection requirements for EMTC during construction - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NFC Division B 5.6.4.1.(1),<br \/>NFC Division B 5.6.4.4.(2)<\/td><td>-<\/td><\/tr><tr><td>2310<\/td><td>Additional requirements for podium buildings during construction - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NFC Division B 5.6.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2309<\/td><td>Mass timber firewalls - EMTC<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 1.4.1.2.,<br \/>NBC Division B 3.1.10.1.,<br \/>NBC Division B 3.1.10.2.,<br \/>NBC Division B 3.1.10.3.,<br \/>NBC Division B 3.1.10.4.(1),<br \/>NBC Division B A-3.1.10.2.(4),<br \/>NBC Division B 3.1.6.3.<\/td><td>-<\/td><\/tr><tr><td>2308<\/td><td>The use of structural composite lumber and cross laminated timber in heavy timber construction<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.4.7.<\/td><td>-<\/td><\/tr><tr><td>2307<\/td><td>Revisions to Appendix D-2, Fire-Resistance Ratings, Wood and Steel Framed Walls, Floors, and Roofs<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B D-2.3.4.,<br \/>NBC Division B D-2.3.5.,<br \/>NBC Division B D-2.3.6.,<br \/>NBC Division B D-2.3.9.<\/td><td>-<\/td><\/tr><tr><td>2306<\/td><td>Updates to the fire-resistance information for wood-frame wall assemblies in Appendix D-2<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B D-2.3.1.,<br \/>NBC Division B D-2.3.4.,<br \/>NBC Division B D-2.3.5.,<br \/>NBC Division B D-2.3.6.,<br \/>NBC Division B D-2.3.8.,<br \/>NBC Division B D-2.3.9.,<br \/>NBC Division B D-2.3.13.<\/td><td>-<\/td><\/tr><tr><td>2305<\/td><td>Fire blocks and furring in exterior walls<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 3.1.11.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2304<\/td><td>Revise definition of \"loadbearing\"<\/td><td>Fetterly, Noah, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2303<\/td><td>Low-Slope Membrane Roofing Systems<\/td><td>Ramachandran, Sathya, EXP Services Inc.<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.7.,<br \/>NBC Division B 5.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>2302<\/td><td>-<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2301<\/td><td>-<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2300<\/td><td>Expanding Defined Term \"Encapsulated Mass Timber Construction\" to Introduce Types 1, 2, 3<\/td><td>Ibrahimli, Vusal, Canadian Wood Council<\/td><td>2024-06-29<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NFC Division A 1.4.1.2.(1),<br \/>NFC Division A A-1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2299<\/td><td>Provisions for horizontal sliding, folding or accordion-type doors as an acceptable solution<\/td><td>Duckworth, Kyle, LMDG Building Code Consultants Ltd.<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NFC Division B 2.7.2.1.,<br \/>NBC Division B 3.3.1.12.(4),<br \/>NBC Division B 9.9.6.4.(5)<\/td><td>-<\/td><\/tr><tr><td>2298<\/td><td>Update greenhouse gas emissions factors<\/td><td>Koepfgen, Pete, FortisBC<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.36.12.<\/td><td>-<\/td><\/tr><tr><td>2297<\/td><td>Update operational GHG emission requirements<\/td><td>Koepfgen, Pete, FortisBC<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.36.12.<\/td><td>-<\/td><\/tr><tr><td>2296<\/td><td>Re-evaluate Energy Performance Tier 5<\/td><td>Koepfgen, Pete, FortisBC<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.36.7.2.<\/td><td>-<\/td><\/tr><tr><td>2295<\/td><td>Update Part 9 information to reflect current design practices<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2294<\/td><td>Update to Table 9.23.10.1., Size and Spacing of Studs<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.23.10.1.<\/td><td>-<\/td><\/tr><tr><td>2293<\/td><td>Weight-based cladding attached to sheathing, through continuous insulation, and fastener requirement<\/td><td>Du, Yang, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.27.5.<\/td><td>-<\/td><\/tr><tr><td>2292<\/td><td>Revise floor loading assumption for all floors to align with CSA S406-16<\/td><td>Flores, Diego, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B A-9.15.2.4.(1)<\/td><td>-<\/td><\/tr><tr><td>2291<\/td><td>Brick ties directly to wood structural sheathing in Article 9.20.9.5. Ties for Masonry Veneer<\/td><td>Du, Yang, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.20.9.5.<\/td><td>-<\/td><\/tr><tr><td>2290<\/td><td>Braced wall panel length adjustment when using hold-downs<\/td><td>Oliveira, Damian, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2289<\/td><td>Add balloon-type CLT shear walls as acceptable seismic force resisting systems in Table 4.1.8.9<\/td><td>Mikael, Ali, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2288<\/td><td>Update Part 9 Span Tables and reference to CWC Span Book<\/td><td>Du, Yang, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.23.4.2.<\/td><td>-<\/td><\/tr><tr><td>2287<\/td><td>Review height limit in Table 4.1.8.9. of the NBC for nailed shear walls SFRS<\/td><td>Mikael, Ali, Canadian Wood Council<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2286<\/td><td>Add new lumber species combination to Part 9 span tables<\/td><td>Desjardins, Richard, National Lumber Grades Authority (NLGA)<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/><\/td><td>NBC Division B 9.23.4.2.,<br \/>NBC Division B 9.23.12.3.<\/td><td>-<\/td><\/tr><tr><td>2285<\/td><td>Revise Energy Performance Tier 5 to minimum 60% energy efficiency improvement<\/td><td>Lohmann, Frank, Canadian Home Builders\u2019 Association<\/td><td>2024-06-28<\/td><td><strong>Received<\/strong><br \/>2024-07-04<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.36.7.2.<\/td><td>-<\/td><\/tr><tr><td>2284<\/td><td>Revise provisions for Structural Irregularities<\/td><td>Adebar, Perry, The University of British Columbia<\/td><td>2024-07-02<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 4.1.8.6.<\/td><td>-<\/td><\/tr><tr><td>2283<\/td><td>Add new Seismic Force Resisting Systems (SFRS) in Table 4.1.8.9.<\/td><td>Adebar, Perry, The University of British Columbia<\/td><td>2024-07-02<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2282<\/td><td>Add reference to CSSBI 61 for steel studs<\/td><td>Majlesi, Sarah, CISC<\/td><td>2024-07-02<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.24.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2281<\/td><td>Technical and Administrative provisions for the Selection and Scaling of Ground Motion Histories<\/td><td>Dutrisac, H\u00e9l\u00e8ne<\/td><td>2024-07-02<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 4.1.8.4.(4)<\/td><td>-<\/td><\/tr><tr><td>2280<\/td><td>Add reference to CSA P.15:23, Test method for rating micro combined heat and power (mCHP) devices.<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-09-04<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2279<\/td><td>Reference new standard CSA P.15 Test method for rating micro combined heat and power (mCHP) devices<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-09-04<br \/><\/td><td>NECB Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2278<\/td><td>Add new standards for heating appliances<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NECB Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2277<\/td><td>Add new standards for heating appliances<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 9.36.3.10.<\/td><td>-<\/td><\/tr><tr><td>2276<\/td><td>Add new standards for Combination Space and Water Heating Systems<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NECB Division B 1.3.1.2.,<br \/>NECB Division B 5.2.12.1.P.<\/td><td>-<\/td><\/tr><tr><td>2275<\/td><td>Add new standards for Combination Space and Water Heating Systems<\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 9.36.3.10.,<br \/>NBC Division B 9.36.4.2.,<br \/>NBC Division B 9.36.5.15.<\/td><td>-<\/td><\/tr><tr><td>2274<\/td><td>Fire alarm systems for systems serving multiple towers or buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 3.2.4.4.<\/td><td>-<\/td><\/tr><tr><td>2273<\/td><td>Provisions for buildings above storage garages<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 3.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>2272<\/td><td>Add standard for gas-fired air conditioning and heat pump appliances <\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NECB Division B 1.3.1.2.,<br \/>NECB Division B 5.2.12.1.P.,<br \/>NECB Division B 6.2.2.1.<\/td><td>-<\/td><\/tr><tr><td>2271<\/td><td>Add standard for gas-fired air conditioning and heat pump appliances <\/td><td>Kidd, Nikki, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 9.36.3.10.,<br \/>NBC Division B 9.36.4.2.<\/td><td>-<\/td><\/tr><tr><td>2270<\/td><td>Plumbing systems in volumetric modular construction<\/td><td>Chung, Sarah, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>2269<\/td><td>New Referenced Modular Construction Standard and Adds Definition for Modular Building<\/td><td>Chung, Sarah, CSA Group<\/td><td>2024-06-27<\/td><td><strong>Received<\/strong><br \/>2024-07-03<br \/><\/td><td>NBC Division B 3,<br \/>NBC Division B 4.4.,<br \/>NBC Division B 6,<br \/>NBC Division B 9.5.<\/td><td>-<\/td><\/tr><tr><td>2268<\/td><td>Adaptability of dwelling units - doors<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.5.5.,<br \/>NBC Division B 9.7.2.1.,<br \/>NBC Division B 9.9.6.1.,<br \/>NBC Division B 9.9.6.8.<\/td><td>-<\/td><\/tr><tr><td>2267<\/td><td>Adaptability of dwelling units - Illumination<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.34.2.1.<\/td><td>-<\/td><\/tr><tr><td>2266<\/td><td>Adaptability of dwelling units - stairs<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.8.1.5.,<br \/>NBC Division B 9.9.4.8.,<br \/>NBC Division B 9.8.4.9.,<br \/>NBC Division B 9.8.7.1.<\/td><td>-<\/td><\/tr><tr><td>2265<\/td><td>Adaptability of dwelling units - floor finishes<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-11-06<br \/><\/td><td>NBC Division B 9.30.1.1.<\/td><td>-<\/td><\/tr><tr><td>2264<\/td><td>Adaptability of dwelling units - smoke alarms<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.9.9.,<br \/>NBC Division B 9.10.19.2.<\/td><td>-<\/td><\/tr><tr><td>2263<\/td><td>Adaptability of dwelling units - vertical path of travel (space for elevator)<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.8.<\/td><td>-<\/td><\/tr><tr><td>2262<\/td><td>Adaptability of dwelling units - controls<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.34.1.<\/td><td>-<\/td><\/tr><tr><td>2261<\/td><td>Adaptability of dwelling units - wall finishes<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 9.29.1.<\/td><td>-<\/td><\/tr><tr><td>2260<\/td><td>Adaptable dwelling units - grab bars<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.31.2.3.<\/td><td>-<\/td><\/tr><tr><td>2259<\/td><td>Adaptable dwelling units - washrooms<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 9.31.4.1.<\/td><td>-<\/td><\/tr><tr><td>2258<\/td><td>Add GHG emission factor for wood biomass<\/td><td>OWLAM, BABAK, CSA GROUP<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/><\/td><td>NBC Division B 9.36.<\/td><td>-<\/td><\/tr><tr><td>2257<\/td><td>Add GHG emission factor for wood biomass<\/td><td>OWLAM, BABAK, CSA GROUP<\/td><td>2024-06-26<\/td><td><strong>Received<\/strong><br \/>2024-06-27<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 11<\/td><td>-<\/td><\/tr><tr><td>2256<\/td><td>Increase width of barrier-free path of travel<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2255<\/td><td>Doorway width in residential suites<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.6.(3)<\/td><td>-<\/td><\/tr><tr><td>2254<\/td><td>falsework, scaffolding and formwork<\/td><td>Majlesi, Sarah, CISC<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 4.1.1.3.(4)<\/td><td>-<\/td><\/tr><tr><td>2253<\/td><td>Egressibility for people with disabilities<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.3.1.7.<\/td><td>-<\/td><\/tr><tr><td>2252<\/td><td>Visible signals for fire alarms for people with hearing loss<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.2.4.19.<\/td><td>2202<\/td><\/tr><tr><td>2251<\/td><td>Accessible seating options in assembly occupancies<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.22.(1)<\/td><td>-<\/td><\/tr><tr><td>2250<\/td><td>Accessibility in dwelling units - possible framework for Part 9<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.5.2.<\/td><td>-<\/td><\/tr><tr><td>2249<\/td><td>Adaptable dwelling units - garages and carports<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 9.35.1.2.<\/td><td>-<\/td><\/tr><tr><td>2248<\/td><td>Expansion of scope and objectives of the NBC to include resilience.<\/td><td>Sandink, Dan, Institute for Catastrophic Loss Reduction, Insurance Bureau of Canada, Engineers Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/><\/td><td>NBC Division A 2.2.1.1.,<br \/>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2247<\/td><td>Desing of structural members and their connections<\/td><td>Majlesi, Sarah, CISC<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/><\/td><td>NBC Division B 9.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2246<\/td><td>Documentation for Continuity of Fire Separations at Penetrations<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/><\/td><td>NBC Division C 2.2.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2245<\/td><td>Accessible dwelling units<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>2244<\/td><td>(possible duplicate of CCR 2238) Updating definitions of accessibility\/barrier free<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/><\/td><td>NBC Division A 2.2.1.1.(1)<\/td><td>1575, 2120<\/td><\/tr><tr><td>2243<\/td><td>Adaptable dwelling units - space and area requirements<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.5.<\/td><td>-<\/td><\/tr><tr><td>2242<\/td><td>Definitions for accessible\/adaptable dwelling units<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2241<\/td><td>Doors and doorways in dwelling units and public spaces<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-24<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.5.5.1.,<br \/>NBC Division B 9.5.5.2.,<br \/>NBC Division B 9.5.5.3.,<br \/>NBC Division B 9.9.6.3.,<br \/>NBC Division B 9.7.2.1.,<br \/>NBC Division B 9.9.6.1.,<br \/>NBC Division B 9.9.6.8.<\/td><td>-<\/td><\/tr><tr><td>2240<\/td><td>Introduction of new resilience objective and definition of resilience <\/td><td>Larriv\u00e9e, Caroline, Ouranos<\/td><td>2024-06-23<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/><\/td><td>NBC Division A 2.2.,<br \/>NBC Division A 1.4.1.<\/td><td>-<\/td><\/tr><tr><td>2239<\/td><td>Width of a barrier-free path of travel over long intervals<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.2.(5)<\/td><td>-<\/td><\/tr><tr><td>2238<\/td><td>Updating definitions of accessibility\/barrier free (objective)<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division A 2.2.1.1.(1)<\/td><td>2120<\/td><\/tr><tr><td>2237<\/td><td>Simplify the compliance paths in NBC Section 3.8. to only include CSA B651:18<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.8.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2236<\/td><td>Exemption for Party Wall Constructed as Firewall for Adjacent Sprinklered Houses<\/td><td>Tracey, Sean, NFPA<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Performance-Based Solutions<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.11.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2235<\/td><td>(possible duplicate of CCR 2238) Updating definitions of accessibility\/barrier free<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/><\/td><td>NBC Division A 2.2.1.1.(1)<\/td><td>1575, 2120<\/td><\/tr><tr><td>2234<\/td><td>Fire Separations Rating between Rooms and Spaces within Sprinklered Residential Buildings  <\/td><td>Tracey, Sean, NFPA<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Performance-Based Solutions<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.9.13.(3),<br \/>NBC Division B 9.10.9.16.(3)<\/td><td>-<\/td><\/tr><tr><td>2233<\/td><td>Definition of \"Barrier-free\" defined term<\/td><td>Joseph, Collinda, Accessibility Standards Canada<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>2120<\/td><\/tr><tr><td>2232<\/td><td>Exemption for Fire-Resistance Rating in Sprinklered Houses<\/td><td>Tracey, Sean, NFPA<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Performance-Based Solutions<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.8.10.(1)<\/td><td>-<\/td><\/tr><tr><td>2231<\/td><td>Fire-Resistance Rating of Means of Egress in Sprinklered Buildings<\/td><td>Tracey, Sean, NFPA<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Performance-Based Solutions<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.9.4.2.,<br \/>NBC Division B 9.9.4.4.,<br \/>NBC Division B 9.9.4.5.,<br \/>NBC Division B 9.9.4.6.<\/td><td>-<\/td><\/tr><tr><td>2230<\/td><td>Ceiling lifts in universal washrooms<\/td><td>Banfai, John, Motion<\/td><td>2024-06-21<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>2229<\/td><td>Referencing ASHRAE 62.2 for dwelling units with non-transient occupancies<\/td><td>Kemp, Steve, RDH Building Science<\/td><td>2024-06-20<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-01-30<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2228<\/td><td>Cold-formed steel products and framing members<\/td><td>Majlesi, Sarah, CISC<\/td><td>2024-06-20<\/td><td><strong>Received<\/strong><br \/>2024-06-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 4.3.4.2.<\/td><td>-<\/td><\/tr><tr><td>2227<\/td><td>Protection of wood framing members in contact with the ground<\/td><td>Edwards, Gwyneth<\/td><td>2024-06-17<\/td><td><strong>Received<\/strong><br \/>2024-06-18<br \/><\/td><td>NBC Division B 9.23.2.3.<\/td><td>-<\/td><\/tr><tr><td>2226<\/td><td>Update reference to CSA Z7396.1 <\/td><td>Qasim, Taimur, CSA Group<\/td><td>2024-06-13<\/td><td><strong>Received<\/strong><br \/>2024-06-18<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2225<\/td><td>Height Limit for Cold-Formed SFRS in Article 4.1.8.1.<\/td><td>McMaster, Matt<\/td><td>2024-06-12<\/td><td><strong>Received<\/strong><br \/>2024-06-18<br \/><\/td><td>NBC Division B 4.1.8.1.,<br \/>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>2224<\/td><td>Update reference to CSA Z317.2<\/td><td>Shah, Ankita Manoj, CSA Group<\/td><td>2024-06-11<\/td><td><strong>Received<\/strong><br \/>2024-06-18<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2223<\/td><td>Update reference to CSA Z32<\/td><td>Shah, Ankita Manoj, CSA Group<\/td><td>2024-06-11<\/td><td><strong>Received<\/strong><br \/>2024-06-18<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2222<\/td><td>Energy Efficiency of Buildings<\/td><td>bacon, tyler<\/td><td>2024-06-01<\/td><td><strong>Received<\/strong><br \/>2024-06-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 8<\/td><td>-<\/td><\/tr><tr><td>2221<\/td><td>Sealing Gaps During Construction<\/td><td>Kitching, Katherine, (I am the owner of a small business Yellow Hammer Carpentry)<\/td><td>2024-05-31<\/td><td><strong>Received<\/strong><br \/>2024-06-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Harmonization of Alteration of Existing Buildings<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.25.,<br \/>NECB Division B 3.2.4.<\/td><td>-<\/td><\/tr><tr><td>2220<\/td><td>Removal of the Term \"Ambulatory\"<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2024-05-31<\/td><td><strong>Received<\/strong><br \/>2024-06-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 9.10.2.2.(1),<br \/>NBC Division B 3.3.1.7.(4),<br \/>NBC Division B 3.1.2.5.(1)<\/td><td>2123<\/td><\/tr><tr><td>2219<\/td><td>Add reference to CSA S345 for design and construction of steel storage racks<\/td><td>Hirst, Jonathan, North American Storage Equipment Incorporated<\/td><td>2024-05-28<\/td><td><strong>Received<\/strong><br \/>2024-05-30<br \/><\/td><td>NBC Division B 4.4.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2218<\/td><td>Addition of requirements for reinforced concrete lintels in foundation walls in Part 9 buildings<\/td><td>St-Hilaire, Steve, Perco-Design<\/td><td>2024-05-23<\/td><td><strong>Received<\/strong><br \/>2024-05-27<br \/><\/td><td>NBC Division B 9<\/td><td>-<\/td><\/tr><tr><td>2217<\/td><td>Add reference to Canadian Ambient Air Quality Standards<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-05-24<\/td><td><strong>Received<\/strong><br \/>2024-05-27<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-01-30<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>2216<\/td><td>Combustible Window Frames in EMTC Buildings<\/td><td>Harmsworth, Andrew, GHL Consultants Ltd. SCFP<\/td><td>2024-05-19<\/td><td><strong>Received<\/strong><br \/>2024-05-21<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.6.8.<\/td><td>-<\/td><\/tr><tr><td>2215<\/td><td>Installation of Smoke Dampers<\/td><td>Johnson, Zachary, AMCA International<\/td><td>2024-05-20<\/td><td><strong>Received<\/strong><br \/>2024-05-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.8.11.<\/td><td>-<\/td><\/tr><tr><td>2214<\/td><td>Add new code provisions for protection of homes from wildfire<\/td><td>bacon, tyler<\/td><td>2024-05-15<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>2213<\/td><td>Application of lighting requirements to display lighting<\/td><td>McCall, Greg, City of Vancouver<\/td><td>2024-05-15<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NECB Division B 4.2.1.4.(4)<\/td><td>-<\/td><\/tr><tr><td>2212<\/td><td>Connections to Sanitary Drainage Systems<\/td><td>Wright, Chris, UA Local 46 JTAC<\/td><td>2024-05-14<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NPC Division B 2.4.2.1.<\/td><td>-<\/td><\/tr><tr><td>2211<\/td><td>Clarifying the Exemption in NBC for Earthquake Design for Farm Buildings<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2024-05-07<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NBC Division B 2.3.4.1.<\/td><td>-<\/td><\/tr><tr><td>2210<\/td><td>Addressing Inequities in Fire Alarm System Requirements for Agricultural Occupancies<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2024-05-07<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NBC Division B 2.2.3.1.<\/td><td>-<\/td><\/tr><tr><td>2209<\/td><td>Prohibition of Group C Occupancies in Farm Buildings<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2024-05-07<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NBC Division B 2.2.1.2.,<br \/>NFC Division B 2.1.2.2.<\/td><td>-<\/td><\/tr><tr><td>2208<\/td><td>Add new requirements for cisterns holding potable water<\/td><td>Manning, Sidney C, Alberta Municipal Affairs<\/td><td>2024-05-02<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NPC Division B 2.6.1.<\/td><td>-<\/td><\/tr><tr><td>2207<\/td><td>Add new requirements for Mass Notification Systems<\/td><td>Lang, Scott, Honeywell<\/td><td>2024-05-01<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.4.<\/td><td>-<\/td><\/tr><tr><td>2206<\/td><td>Define Elements requiring Fire Protection in the Structural System<\/td><td>Harmsworth, Andrew, GHL Consultants Ltd. SCFP<\/td><td>2024-05-01<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>2205<\/td><td>Add ULC-S588 for carbon monoxide detectors<\/td><td>Lang, Scott, Honeywell<\/td><td>2024-04-30<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 6.9.3.<\/td><td>-<\/td><\/tr><tr><td>2204<\/td><td>Use CAN\/ULC-S524 for location of smoke detectors<\/td><td>Kuffner, William, SNC-Lavalin Inc<\/td><td>2024-04-30<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.8.11.(3)<\/td><td>-<\/td><\/tr><tr><td>2203<\/td><td>Referencing the CSA A460:19 Bird Friendly Building Design standard<\/td><td>Mesure, Michael R., Fatal Light Awareness Program (FLAP) Canada<\/td><td>2024-04-29<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.9.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2202<\/td><td>Carbon monoxide detectors forming part of a residential fire warning system<\/td><td>Lang, Scott, Honeywell<\/td><td>2024-04-29<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 6.9.3.1.<\/td><td>-<\/td><\/tr><tr><td>2201<\/td><td>Add CAN\/ULC-715.1 (high density closed cell spray-applied polyurethane foam)<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2024-04-29<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NBC Division B 9.25.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2200<\/td><td>Installation of High Density Closed Cell Spray Applied Rigid Polyurethane Foam<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2024-04-29<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/><\/td><td>NBC Division B 9.25.2.5.<\/td><td>-<\/td><\/tr><tr><td>2199<\/td><td>Referencing the CSA A460:19 Bird Friendly Building Design standard<\/td><td>Simone, Kyra, McMaster University<\/td><td>2024-04-29<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.9.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2198<\/td><td>Reference Building Heating Equipment Assumption for Performance Tier Compliance<\/td><td>Hermanson, Tyler, 4 Elements<\/td><td>2024-04-26<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NECB Division B 8.4.4.9.(4)<\/td><td>-<\/td><\/tr><tr><td>2197<\/td><td>Acceptable Solution for 3D Printed Homes<\/td><td>Strauss, Ryland, Strauss Developments<\/td><td>2024-04-22<\/td><td><strong>Received<\/strong><br \/>2024-05-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>2196<\/td><td>Insulation of Ground Slabs<\/td><td>Halitzki, Roman, Roman Halitzki Architecture and Development<\/td><td>2024-04-16<\/td><td><strong>Received<\/strong><br \/>2024-04-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 3.4.3.,<br \/>NECB Division B 3.2.3.1.,<br \/>NECB Division B A-3.2.3.3.<\/td><td>-<\/td><\/tr><tr><td>2195<\/td><td>Operational GHG Emission Targets<\/td><td>Lopoukhine, Raphael, Passive House Canada<\/td><td>2024-04-22<\/td><td><strong>Received<\/strong><br \/>2024-04-23<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.36.11.<\/td><td>-<\/td><\/tr><tr><td>2194<\/td><td>Adjustable Dampers and Balance Stops<\/td><td>Banger, Balraj, Pioneer HVAC Systems Inc<\/td><td>2024-04-15<\/td><td><strong>Received<\/strong><br \/>2024-04-16<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2193<\/td><td>Introducing New Standards for Water Supply for Fire Protection Systems<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-04-12<\/td><td><strong>Received<\/strong><br \/>2024-04-16<br \/><\/td><td>NBC Division B 3.2.5.7.,<br \/>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2192<\/td><td>Water Service Pipe<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-04-12<\/td><td><strong>Received<\/strong><br \/>2024-04-16<br \/><\/td><td>NPC Division A 1.4.1.2.,<br \/>NPC Division B 2.1.2.3.,<br \/>NPC Division B 2.2.1.6.,<br \/>NPC Division B 2.3.7.2.,<br \/>NPC Division B 2.6.2.1.,<br \/>NPC Division B 2.6.2.4.<\/td><td>-<\/td><\/tr><tr><td>2191<\/td><td>Fire Protection Systems<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-04-12<\/td><td><strong>Received<\/strong><br \/>2024-04-16<br \/><\/td><td>NFC Division B 6.4.1.1.,<br \/>NFC Division B 6.6.1.1.<\/td><td>-<\/td><\/tr><tr><td>2190<\/td><td>Definition for \"ventilation air\"<\/td><td>Rivera, Austin, Centrotherm Eco Systems<\/td><td>2024-04-11<\/td><td><strong>Received<\/strong><br \/>2024-04-16<br \/><\/td><td>NBC Division B 1.4.,<br \/>NBC Division B 3.1.5.18.,<br \/>NBC Division B 3.6.5.1.,<br \/>NBC Division B 9.32.3.13.,<br \/>NBC Division B 9.33.6.<\/td><td>-<\/td><\/tr><tr><td>2189<\/td><td>Concrete Cover to Protect Buildings against Tornadoes and Earthquakes<\/td><td>Postma, Tim, n\/a<\/td><td>2024-04-07<\/td><td><strong>Received<\/strong><br \/>2024-04-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2188<\/td><td>New Reference to ASHRAE Standard 241-2023 for Control of Infectious Aerosols<\/td><td>Bartholow, Carson, Level Consulting Engineers Ltd.<\/td><td>2024-04-04<\/td><td><strong>Received<\/strong><br \/>2024-04-08<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>2187<\/td><td>Building radio communications coverage for emergency responders<\/td><td>Espejo, Tess, ULC Inc.<\/td><td>2024-03-20<\/td><td><strong>Received<\/strong><br \/>2024-03-28<br \/><\/td><td>NFC Division B 2<\/td><td>-<\/td><\/tr><tr><td>2186<\/td><td>Dampproofing of Floors on Ground <\/td><td>Ciarlo, Salvatore, Owens Corning Canada LP<\/td><td>2024-03-27<\/td><td><strong>Received<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.13.2.6.(1),<br \/>NBC Division B 9.13.2.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2185<\/td><td>Permitting exits through multiple lobbies<\/td><td>Kim, Jun Hyung<\/td><td>2024-03-25<\/td><td><strong>Received<\/strong><br \/>2024-03-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.4.4.2.<\/td><td>-<\/td><\/tr><tr><td>2184<\/td><td>Consider sliding doors in doorway opening width<\/td><td>St-Gelais, William<\/td><td>2024-03-14<\/td><td><strong>Received<\/strong><br \/>2024-03-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.5.5.1.<\/td><td>-<\/td><\/tr><tr><td>2183<\/td><td>\"Clear width\" rather than \"minimum width\" for doors<\/td><td>St-Gelais, William<\/td><td>2024-03-14<\/td><td><strong>Received<\/strong><br \/>2024-03-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 9.5.5.<\/td><td>-<\/td><\/tr><tr><td>2182<\/td><td>Clarifying requirements for Back-Siphonage Preventers and Backflow Preventers<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-03-18<\/td><td><strong>Received<\/strong><br \/>2024-03-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.2.10.10.(1)<\/td><td>-<\/td><\/tr><tr><td>2181<\/td><td>Adding Flexibility to Air-Barrier requirements for Floors-on-ground<\/td><td>St-Gelais, William<\/td><td>2024-03-13<\/td><td><strong>Received<\/strong><br \/>2024-03-14<br \/><\/td><td>NBC Division B 9.25.3.6.(1),<br \/>NBC Division B 9.18.6.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2180<\/td><td>Clarifying Fire Dampers Requirements for Through and Membrane Penetrations<\/td><td>St-Gelais, William<\/td><td>2024-03-13<\/td><td><strong>Received<\/strong><br \/>2024-03-14<br \/><\/td><td>NBC Division B 9.10.13.13.<\/td><td>-<\/td><\/tr><tr><td>2179<\/td><td>Simplifying application of plumbing fixture standards<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-03-07<\/td><td><strong>Received<\/strong><br \/>2024-03-14<br \/><\/td><td>NPC Division B 2.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>2178<\/td><td>Improving the effectiveness of toilet flushing<\/td><td>Gould, Charlie H<\/td><td>2024-03-08<\/td><td><strong>Received<\/strong><br \/>2024-03-14<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.10.6.(2)<\/td><td>-<\/td><\/tr><tr><td>2177<\/td><td>Correcting requirements for Dampproofing of Floors-on-Ground<\/td><td>St-Gelais, William<\/td><td>2024-03-13<\/td><td><strong>Received<\/strong><br \/>2024-03-13<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.13.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>2176<\/td><td>Clarifying that parging requirements apply to concrete foundations <\/td><td>St-Gelais, William<\/td><td>2024-03-13<\/td><td><strong>Received<\/strong><br \/>2024-03-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.15.6.<\/td><td>-<\/td><\/tr><tr><td>2175<\/td><td>Availabiliy of Non-Gendered Washrooms<\/td><td>Mesquita, Jeanne<\/td><td>2024-02-27<\/td><td><strong>Received<\/strong><br \/>2024-03-13<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.8.2.8.<\/td><td>-<\/td><\/tr><tr><td>2174<\/td><td>Measuring building energy Consumption through metering and sub-metering<\/td><td>Zaeri Esfahani, Narges, National Research Council Canada, Carleton University<\/td><td>2024-02-20<\/td><td><strong>Received<\/strong><br \/>2024-02-22<br \/><\/td><td>NECB Division B 4.2.,<br \/>NECB Division B 5.2.,<br \/>NECB Division B 6.2.,<br \/>NECB Division B 7.2.,<br \/>NBC Division B 9.36.3.,<br \/>NECB Division B 9.36.4.<\/td><td>-<\/td><\/tr><tr><td>2173<\/td><td>Provision of waste bins and lavatories inside water closet stalls<\/td><td>Robinson, Barbara A., Norton Engineering Inc.<\/td><td>2024-02-20<\/td><td><strong>Received<\/strong><br \/>2024-02-22<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>2172<\/td><td>Provision of roof anchorage for building maintenance<\/td><td>Barreto, Marcelo<\/td><td>2024-02-20<\/td><td><strong>Received<\/strong><br \/>2024-02-22<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 4.4.<\/td><td>-<\/td><\/tr><tr><td>2171<\/td><td>Amending a portion of the Explanatory Note on doorway width <\/td><td>Isaac, Steve, Tillicum Agencies<\/td><td>2024-02-15<\/td><td><strong>Received<\/strong><br \/>2024-02-19<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B A-3.8.3.6.(2)<\/td><td>2147<\/td><\/tr><tr><td>2170<\/td><td>Up-gradable and Accessible Utilities<\/td><td>Wong, Michael<\/td><td>2024-01-26<\/td><td><strong>Received<\/strong><br \/>2024-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2169<\/td><td>Specify or Delete the Other Equally Effective Means of Trap Seals and Update the Appendix Figure<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2024-01-30<\/td><td><strong>Received<\/strong><br \/>2024-02-01<br \/><\/td><td>NPC Division B 2.4.5.5.(1),<br \/>NPC Division B 2.4.5.5.(1)<\/td><td>-<\/td><\/tr><tr><td>2168<\/td><td>Underlay Required Beneath Shingles<\/td><td>MacDonald, David, Town Of Oromocto<\/td><td>2024-01-30<\/td><td><strong>Received<\/strong><br \/>2024-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.26.6.1.,<br \/>NBC Division B 9.26.6.2.<\/td><td>-<\/td><\/tr><tr><td>2167<\/td><td>Electric Vehicle (EV) Fire Safety Concerns for Parking Garages<\/td><td>McDonald, Edward<\/td><td>2024-01-12<\/td><td><strong>Received<\/strong><br \/>2024-01-16<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.4.7.,<br \/>NFC Division B 2.2.<\/td><td>2166, 2167<\/td><\/tr><tr><td>2166<\/td><td>Consistency of Fire-Resistance Rating for Storage Garages between Parts 3 and 9<\/td><td>Schalk, Richard, City of Airdrie<\/td><td>2024-01-11<\/td><td><strong>Received<\/strong><br \/>2024-01-16<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 3.3.5.6.<\/td><td>-<\/td><\/tr><tr><td>2165<\/td><td>Correction of explanatory note for water vapour permeance of wood-based sheathing materials<\/td><td>Di Lenardo, Bruno, Engineer and former Director of City Building Department and NRC\/CRC\/CCMC employee - Retired<\/td><td>2024-01-09<\/td><td><strong>Received<\/strong><br \/>2024-01-16<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B A-9.25.5.1.(3)<\/td><td>-<\/td><\/tr><tr><td>2164<\/td><td>Installation of Heat Pump<\/td><td>Hooshley, ROBERT<\/td><td>2024-01-02<\/td><td><strong>Received<\/strong><br \/>2024-01-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-03-28<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NBC Division B 9.33.4.<\/td><td>-<\/td><\/tr><tr><td>2163<\/td><td>Update NFPA 55 Standard Referenced Edition<\/td><td>McRae, Tim, Chemours Canada<\/td><td>2023-12-18<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/>CBHCC: <strong>Reviewed (legacy) <\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 3.1.1.4.,<br \/>NFC Division B 5.5.5.3.,<br \/>NBC Division B 6.9.1.2.(1)<\/td><td>2096 (published)<\/td><\/tr><tr><td>2162<\/td><td>Electric Vehicle (EV) Charging Infrastructure<\/td><td>Hasham, Irfaan, Global Automakers of Canada<\/td><td>2023-12-31<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.34.<\/td><td>-<\/td><\/tr><tr><td>2161<\/td><td>Non-Combustible Cladding Waived<\/td><td>Di Lenardo, Bruno, Engineer and former Director of City Building Department and NRC\/CRC\/CCMC employee - Retired<\/td><td>2023-12-28<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 3.2.3.7.(4)<\/td><td>-<\/td><\/tr><tr><td>2160<\/td><td>Smoke Dampers Waived<\/td><td>Blanchard, Aidan, RJ Bartlett Engineering Ltd<\/td><td>2023-12-22<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 3.1.8.9.(1)<\/td><td>-<\/td><\/tr><tr><td>2159<\/td><td>New Wall Assembly Design in Table 9.10.3.1.-A<\/td><td>Edwards, Simon, HGC Engineering<\/td><td>2023-12-21<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2158<\/td><td>Energy Modeling Testing Validation<\/td><td>Glazer, Jason, GARD Analytics, Inc.<\/td><td>2023-12-21<\/td><td><strong>Received<\/strong><br \/>2024-01-02<br \/><\/td><td>NECB Division B 8.4.2.11.,<br \/>NECB Division B 8.4.2.2.,<br \/>NECB Division B 8.4.3.9.,<br \/>NECB Division B 3.1.1.7.(4),<br \/>NECB Division B 3.1.1.5.,<br \/>NECB Division A 1.1.4.2.(1)<\/td><td>2056 (published)<\/td><\/tr><tr><td>2157<\/td><td>CSA B52-23 Mechanical Refrigeration<\/td><td>McRae, Tim, Chemours Canada<\/td><td>2023-12-18<\/td><td><strong>Received<\/strong><br \/>2023-12-21<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B A-1.3.1.2.A.<\/td><td>2096 (published)<\/td><\/tr><tr><td>2156<\/td><td>Climatic Design Data<\/td><td>Christie, Andy, City of Kimberley<\/td><td>2023-12-18<\/td><td><strong>Received<\/strong><br \/>2023-12-21<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B C-2<\/td><td>-<\/td><\/tr><tr><td>2155<\/td><td>Minimum Number of Parking Spaces with EV Charging Stations <\/td><td>Cohen, Josh, SWTCH<\/td><td>2023-12-18<\/td><td><strong>Received<\/strong><br \/>2023-12-21<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2024-09-12<br \/><\/td><td>NECB Division B 7.1.<\/td><td>-<\/td><\/tr><tr><td>2154<\/td><td>Parapet Design to Support Temporary Guard Load During Construction<\/td><td>Grenier, Renaud, Les toitures BLP<\/td><td>2023-12-14<\/td><td><strong>Received<\/strong><br \/>2023-12-18<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-03-28<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.5.3.(2),<br \/>NBC Division B 9.20.6.5.,<br \/>NBC Division B 4.1.5.14.<\/td><td>-<\/td><\/tr><tr><td>2153<\/td><td>Introduction of a New CSA F300:2022, \"Residential Depressurization\" Standard<\/td><td>McLellan, Christopher<\/td><td>2023-12-15<\/td><td><strong>Received<\/strong><br \/>2023-12-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.32.3.8.(7)<\/td><td>-<\/td><\/tr><tr><td>2152<\/td><td>Expand Accessibility Requirements to Dwelling Units<\/td><td>Gallant, Murray<\/td><td>2023-12-08<\/td><td><strong>Received<\/strong><br \/>2023-12-15<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2151<\/td><td>Tactile Walking Surface Indicators<\/td><td>Gallant, Murray<\/td><td>2023-12-08<\/td><td><strong>Received<\/strong><br \/>2023-12-15<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.3.1.19.(1)<\/td><td>-<\/td><\/tr><tr><td>2150<\/td><td>Update Referenced Clauses to the CSA\/ASC B651 Standard in the NBC <\/td><td>Gallant, Murray<\/td><td>2023-12-08<\/td><td><strong>Received<\/strong><br \/>2023-12-15<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.1.19.(1)<\/td><td>-<\/td><\/tr><tr><td>2149<\/td><td>Update to Referenced Standard for the Accessible Design for the Built Environment<\/td><td>Gallant, Murray<\/td><td>2023-12-08<\/td><td><strong>Received<\/strong><br \/>2023-12-15<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-03-28<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.3.1.19.(1),<br \/>NBC Division B 3.8.3.1.(1),<br \/>NBC Division B 3.8.3.1.,<br \/>NBC Division B 3.8.3.3.(1),<br \/>NBC Division B 3.8.3.9.(1),<br \/>NBC Division B 3.8.3.9.(2),<br \/>NBC Division B A-3.8.3.1.(1)<\/td><td>2192<\/td><\/tr><tr><td>2148<\/td><td>New Standard for Containment Sumps, Sump Fittings and Accessories<\/td><td>Werner, Laura, ULC Standards<\/td><td>2023-12-12<\/td><td><strong>Received<\/strong><br \/>2023-12-15<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 4.3.9.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2147<\/td><td>Prohibition Use of Centrifugal Pumps for Transferring Contaminated Water<\/td><td>Hart, Trevor, Calgary Fire Department<\/td><td>2023-12-07<\/td><td><strong>Received<\/strong><br \/>2023-12-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 4.3.7.8.<\/td><td>-<\/td><\/tr><tr><td>2146<\/td><td>Dead-End Corridor Within a Suite<\/td><td>Kuffner, William, WSP<\/td><td>2023-12-04<\/td><td><strong>Received<\/strong><br \/>2023-12-05<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.1.9.(5)<\/td><td>-<\/td><\/tr><tr><td>2145<\/td><td>Clarification of Application for Calculating the Maximum Exempt Amount of Dangerous Goods<\/td><td>April, Jean-Philippe, Direction des assurances du r\u00e9seau de la sant\u00e9 et des services sociaux<\/td><td>2023-11-27<\/td><td><strong>Received<\/strong><br \/>2023-12-04<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 3.2.7.1.<\/td><td>-<\/td><\/tr><tr><td>2144<\/td><td>New CSA A93:19 standard superseding existing CAN3-A93-M82 Standard<\/td><td>Li, Michael, CSA Group<\/td><td>2023-11-29<\/td><td><strong>Received<\/strong><br \/>2023-11-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2143<\/td><td>Add New References for Gas-Fueled Vehicle Maintenance Facilities<\/td><td>Duda, Mark, CSA Group <\/td><td>2023-11-20<\/td><td><strong>Received<\/strong><br \/>2023-11-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 6.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2142<\/td><td>Gap Created by the Open Riser in Dwelling Units<\/td><td>Potvin, Brigitte M, Codes Canada<\/td><td>2023-11-23<\/td><td><strong>Received<\/strong><br \/>2023-11-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.4.6.8.,<br \/>NBC Division B 9.8.4.9.<\/td><td>-<\/td><\/tr><tr><td>2141<\/td><td>Fire Stopping of Outlet Electrical Boxes Penetrating a Vertical Fire Separation<\/td><td>Tsisserev, Ark, AES Engineering<\/td><td>2023-11-16<\/td><td><strong>Received<\/strong><br \/>2023-11-17<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.9.3.(3)<\/td><td>-<\/td><\/tr><tr><td>2140<\/td><td>Dwelling Air Circulation and Access to Elevators <\/td><td>Brown, Glenn, Private citizen<\/td><td>2023-11-11<\/td><td><strong>Received<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 6.3.,<br \/>NBC Division B 9.32.<\/td><td>-<\/td><\/tr><tr><td>2139<\/td><td>Fire and Sound Resistance to Include Triple Leaf Wall Construction<\/td><td>Mahn, Jeffrey, National Research Council Canada<\/td><td>2023-11-06<\/td><td><strong>Received<\/strong><br \/>2023-11-14<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.3.1.A.<\/td><td>-<\/td><\/tr><tr><td>2138<\/td><td>Fire-Resistance Rating of Penetrations in Partly Occupied Buildings during Construction<\/td><td>Boucher, Gilbert, Sepcran Inc.<\/td><td>2023-11-01<\/td><td><strong>Received<\/strong><br \/>2023-11-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 5.6.1.12.<\/td><td>-<\/td><\/tr><tr><td>2137<\/td><td>Fire Damper Requirement in Rated Floor Assembly in a Dwelling Unit in Part 9<\/td><td>Paquette, Ryan<\/td><td>2023-11-02<\/td><td><strong>Received<\/strong><br \/>2023-11-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.13.13.<\/td><td>-<\/td><\/tr><tr><td>2136<\/td><td>Smoke-Tight Barrier Behind Acrylic Tubs<\/td><td>Paquette, Ryan<\/td><td>2023-11-02<\/td><td><strong>Received<\/strong><br \/>2023-11-09<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.9.16.<\/td><td>-<\/td><\/tr><tr><td>2135<\/td><td>Continuation of Vertical Fire Separation in Crawl Space<\/td><td>Muir, Karen, Rockliff Pierzchajlo Kroman Architects Ltd.<\/td><td>2023-11-02<\/td><td><strong>Received<\/strong><br \/>2023-11-09<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.3.,<br \/>NBC Division B 3.2.2.9.<\/td><td>-<\/td><\/tr><tr><td>2134<\/td><td>Circuit Venting<\/td><td>Reiber, Kurt Alan, Technical Safety Authority of Saskatchewan<\/td><td>2023-10-31<\/td><td><strong>Received<\/strong><br \/>2023-11-02<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-03-28<br \/><\/td><td>NPC Division B A-2.5.3.1.<\/td><td>2141<\/td><\/tr><tr><td>2133<\/td><td>Additional options for egress doors<\/td><td>Koffel, William, Koffel Associates, Inc.<\/td><td>2023-10-31<\/td><td><strong>Received<\/strong><br \/>2023-11-02<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.3.1.12.<\/td><td>-<\/td><\/tr><tr><td>2132<\/td><td>Concrete Piles Used in Deep Foundations for Part 9 Buildings<\/td><td>Blood, Guy, None, I\u2019m now retired<\/td><td>2023-10-28<\/td><td><strong>Received<\/strong><br \/>2023-10-31<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.15.<\/td><td>-<\/td><\/tr><tr><td>2131<\/td><td>Fire-Resistance Rating of Penetrations in Partly Occupied Buildings during Construction<\/td><td>Boucher, Gilbert, Sepcran Inc.<\/td><td>2023-10-24<\/td><td><strong>Received<\/strong><br \/>2023-10-26<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 5.6.1.12.<\/td><td>-<\/td><\/tr><tr><td>2130<\/td><td>Fire-Resistance Rating of File Storage Room in Detention Occupancies<\/td><td>Wu, Yue, AB Fire Safety Consultant Inc.<\/td><td>2023-10-24<\/td><td><strong>Received<\/strong><br \/>2023-10-26<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.3.5.<\/td><td>2222<\/td><\/tr><tr><td>2129<\/td><td>Vinyl or Laminated Flooring Usage<\/td><td>saito, michael<\/td><td>2023-10-13<\/td><td><strong>Received<\/strong><br \/>2023-10-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.30.<\/td><td>-<\/td><\/tr><tr><td>2128<\/td><td>Upper limit on the allowable design supply temperature of hydronic heating systems<\/td><td>Fridgen, Kyle, National Research Council Canada<\/td><td>2023-10-11<\/td><td><strong>Received<\/strong><br \/>2023-10-16<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-03-28<br \/><\/td><td>NECB Division B 5.2.1.1.,<br \/>NECB Division B 5.4.1.2.,<br \/>NECB Division B 8.4.4.9.(6)<\/td><td>2140<\/td><\/tr><tr><td>2127<\/td><td>Rapid Access to Buildings<\/td><td>Payne, Brian J, Ram Canada Inc.<\/td><td>2023-10-12<\/td><td><strong>Received<\/strong><br \/>2023-11-07<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.5.1.3.<\/td><td>-<\/td><\/tr><tr><td>2126<\/td><td>Confusion of Terminology between French and English Edition of the NPC<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2023-10-04<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2125<\/td><td>Inspection, Maintenance and Testing of Smoke Dampers<\/td><td>Grundie, Bob, WestCan Fire Safety Services<\/td><td>2023-09-23<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.2.2.4.(5)<\/td><td>-<\/td><\/tr><tr><td>2124<\/td><td>Inspection and Maintenance_Fire stop flaps<\/td><td>Grundie, Bob, WestCan Fire Safety Services<\/td><td>2023-09-23<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.2.2.4.(5)<\/td><td>-<\/td><\/tr><tr><td>2123<\/td><td>Add an Clause to Div. B, 2.1.3.5. to refer to NFPA 2001, Clean Agent Fire Extinguishing system<\/td><td>Grundie, Bob, WestCan Fire Safety Services<\/td><td>2023-09-23<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.1.3.5.<\/td><td>-<\/td><\/tr><tr><td>2122<\/td><td>Addition of a Heat Detectors interconnected to the smoke alarm systems in residential buildings<\/td><td>Rydall, Duncan C, Town of The Blue Mountains<\/td><td>2023-09-24<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.18.4.<\/td><td>-<\/td><\/tr><tr><td>2121<\/td><td>Definition of Hallway<\/td><td>Paquette, Ryan, City of Saskatoon - building official<\/td><td>2023-09-25<\/td><td><strong>Received<\/strong><br \/>2023-10-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2120<\/td><td>Clarification of Loads on Walls Acting as Guards<\/td><td>Proper, Nathan, Tacoma Engineers Inc.<\/td><td>2023-09-28<\/td><td><strong>Received<\/strong><br \/>2023-10-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Adaptation<br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.5.16.(1)<\/td><td>-<\/td><\/tr><tr><td>2119<\/td><td>Prohibition of Occupancy Combinations for Group F, Division 2<\/td><td>Kim, Jun Hyung<\/td><td>2023-09-26<\/td><td><strong>Received<\/strong><br \/>2023-09-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.3.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2118<\/td><td>Using of insulated metal panels (IMPs) in buildings more than 18m high.<\/td><td>Belisle, Alexandre, Groupe Norbec Inc.<\/td><td>2023-09-15<\/td><td><strong>Received<\/strong><br \/>2023-09-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.5.7.<\/td><td>-<\/td><\/tr><tr><td>2117<\/td><td>Alternative Climate Data not Addressed in HOT 2000 Software<\/td><td>Ochana, Jehad, Ochana Engineering Ltd<\/td><td>2023-09-14<\/td><td><strong>Received<\/strong><br \/>2023-09-25<br \/><\/td><td>NBC Division B C<\/td><td>-<\/td><\/tr><tr><td>2116<\/td><td>Protection from Mechanical Damage<\/td><td>Knull, Tom, Government of Alberta<\/td><td>2023-09-13<\/td><td><strong>Received<\/strong><br \/>2023-09-25<br \/><\/td><td>NPC Division B 2.3.5.4.(1)<\/td><td>-<\/td><\/tr><tr><td>2115<\/td><td>Safety Way Guidance Systems<\/td><td>Espejo, Tess, ULC Inc.<\/td><td>2023-09-08<\/td><td><strong>Received<\/strong><br \/>2023-09-25<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NFC Division B 2.7.4.<\/td><td>-<\/td><\/tr><tr><td>2114<\/td><td>Condensation on windows<\/td><td>Gould, Charlie H<\/td><td>2023-09-02<\/td><td><strong>Received<\/strong><br \/>2023-09-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2113<\/td><td>Definition of \"suite\" and door swing in a building having a single major occupancy <\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2023-08-31<\/td><td><strong>Received<\/strong><br \/>2023-09-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.4.2.1.,<br \/>NBC Division B A-1.4.1.2.(1),<br \/>NBC Division B 3.3.1.11.(1)<\/td><td>-<\/td><\/tr><tr><td>2112<\/td><td>Integrity of Exits. Scissors stairs and standpipes<\/td><td>Lehoux, Bruno, SPAC - Gouvernement du Canada<\/td><td>2023-08-31<\/td><td><strong>Received<\/strong><br \/>2023-09-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 3.4.4.4.(1),<br \/>NBC Division B 3.4.4.4.(3)<\/td><td>-<\/td><\/tr><tr><td>2111<\/td><td>Doors requiring Door Release Hardware<\/td><td>St-Jean, Daniel<\/td><td>2023-08-23<\/td><td><strong>Received<\/strong><br \/>2023-08-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.4.6.16.(2)<\/td><td>-<\/td><\/tr><tr><td>2110<\/td><td>Exemption for restraint of non-structural components<\/td><td>Babuik, Nicole A, Read Jones Christoffersen Ltd.<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.8.18.(2)<\/td><td>-<\/td><\/tr><tr><td>2109<\/td><td>Description of Good Engineering Practice<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 6.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>2108<\/td><td>Residential doorways Part 3 - Part 9 harmonization<\/td><td>L\u00e9tourneau, Dave DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.3.4.<\/td><td>-<\/td><\/tr><tr><td>2107<\/td><td>Accessible elevators<\/td><td>L\u00e9tourneau, Dave DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.8.2.3.,<br \/>NBC Division B 3.5.3.1.,<br \/>NBC Division B 3.5.3.3.,<br \/>NBC Division B 3.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>2106<\/td><td>Protection of operable residential egress windows<\/td><td>L\u00e9tourneau, Dave DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 9.8.8.1.,<br \/>NBC Division B 9.9.10.1.<\/td><td>-<\/td><\/tr><tr><td>2105<\/td><td>Improvement Fire Safety for Interconnected Floor Spaces<\/td><td>L\u00e9tourneau, Dave DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.8.1.(3),<br \/>NBC Division B 3.2.8.1.,<br \/>NBC Division B 3.2.8.2.(5),<br \/>NBC Division B 3.2.8.2.(6),<br \/>NBC Division B 3.2.8.3.<\/td><td>-<\/td><\/tr><tr><td>2104<\/td><td>Fire\/Heat Detectors in Unsprinklered Altered Buildings<\/td><td>L\u00e9tourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-08-22<\/td><td><strong>Received<\/strong><br \/>2023-08-22<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Harmonization of Alteration of Existing Buildings<br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.4.10.<\/td><td>-<\/td><\/tr><tr><td>2103<\/td><td>Determination of wind loads<\/td><td>D\u2019Amours, Alexandre, Beaulieu Rev\u00eatement<\/td><td>2023-08-16<\/td><td><strong>Received<\/strong><br \/>2023-08-16<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.7.6.<\/td><td>-<\/td><\/tr><tr><td>2102<\/td><td>Relocating buildings<\/td><td>vander Ros, Cassidy<\/td><td>2023-08-14<\/td><td><strong>Received<\/strong><br \/>2023-08-15<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2101<\/td><td>Separation of Janitors Rooms for Part 9 Buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.9.<\/td><td>-<\/td><\/tr><tr><td>2100<\/td><td>Separation of Common Laundry Rooms for Part 9 Buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.9.<\/td><td>-<\/td><\/tr><tr><td>2099<\/td><td>Posting of Occupant Load for Part 9 Buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 9.9.1.3.<\/td><td>-<\/td><\/tr><tr><td>2098<\/td><td>Fabric Canopies and Marquees for Part 9 Buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 9.10.<\/td><td>-<\/td><\/tr><tr><td>2097<\/td><td>Prohibition of Occupancy Combinations for Group F, Division 2<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.12.3.<\/td><td>-<\/td><\/tr><tr><td>2096<\/td><td>Emergency lighting for public washrooms<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.2.7.3.,<br \/>NBC Division B 9.9.12.3.(1)<\/td><td>-<\/td><\/tr><tr><td>2095<\/td><td>Egress Windows or Doors for Bedrooms for a Part 3 house <\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/><\/td><td>NBC Division B 3.3.4.4.,<br \/>NBC Division B 9.9.10.1.<\/td><td>2050<\/td><\/tr><tr><td>2094<\/td><td>Clarifying the requirement for egress windows or doors for Part 9 buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 9.9.10.1.<\/td><td>-<\/td><\/tr><tr><td>2093<\/td><td>Clarifying public and private use washrooms in the definition<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>1706 (published)<\/td><\/tr><tr><td>2092<\/td><td>Clarifying the number of required lavatories<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2023-11-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.7.2.3.(1)<\/td><td>-<\/td><\/tr><tr><td>2091<\/td><td>Public Corridor Separations<\/td><td> Pullan, Art<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-09-13<br \/><\/td><td>NBC Division B 3.3.1.4.<\/td><td>-<\/td><\/tr><tr><td>2090<\/td><td>Egress Doors vs Exit Doors from Ground Level Suites<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.4.1.1.<\/td><td>2168, 2203<\/td><\/tr><tr><td>2089<\/td><td>Barrier-Free Fitting Rooms, Private Phone Rooms, and Other Similar Rooms<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.8.2.<\/td><td>-<\/td><\/tr><tr><td>2088<\/td><td>Sprinkler and Standpipe Penetrations through Contiguous Exits<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/><\/td><td>NBC Division B 3.4.4.4.(3)<\/td><td>-<\/td><\/tr><tr><td>2087<\/td><td>Clarification of application of Part 3 requirements for specific Part 9 buildings<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/><\/td><td>NBC Division B 3.9.,<br \/>NBC Division B 3.1.18.,<br \/>NBC Division B 9.1.1.<\/td><td>-<\/td><\/tr><tr><td>2086<\/td><td>Storage Garage Vestibules - Distance Between Doors<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/><\/td><td>NBC Division B 3.3.5.7.<\/td><td>-<\/td><\/tr><tr><td>2085<\/td><td>Minimum Ceiling Heights for Dwelling Units<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2023-08-10<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 9.5.3.1.<\/td><td>-<\/td><\/tr><tr><td>2084<\/td><td>Firefighting Access to Above-Grade Storeys<\/td><td>Krogsgaard, Kresten E, City of Regina<\/td><td>2023-08-09<\/td><td><strong>Received<\/strong><br \/>2023-08-10<br \/><\/td><td>NBC Division B 3.2.5.1.<\/td><td>-<\/td><\/tr><tr><td>2083<\/td><td>Required Guards. Protection of openable windows<\/td><td>Adamson, Terry D, Fenestration Canada<\/td><td>2023-08-09<\/td><td><strong>Received<\/strong><br \/>2023-08-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.8.8.1.,<br \/>NBC Division B 9.8.8.1.(4),<br \/>NBC Division B 3.3.4.8.<\/td><td>-<\/td><\/tr><tr><td>2082<\/td><td>Reference building Solar Heat Gain Coefficient<\/td><td>Caicedo, Paul V, Embe Consulting Engineers Inc.<\/td><td>2023-08-08<\/td><td><strong>Received<\/strong><br \/>2023-08-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NECB Division B 8.4.4.3.<\/td><td>-<\/td><\/tr><tr><td>2081<\/td><td>Replacement of steel rebar with fiberglass rebar<\/td><td>Bremner, Steve  M<\/td><td>2023-08-04<\/td><td><strong>Received<\/strong><br \/>2023-08-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.3.1.,<br \/>NBC Division B 9.15.4.,<br \/>NBC Division B 9.20.17.2.,<br \/>NBC Division B 9.20.17.4.(4),<br \/>NBC Division B 9.10.3.1.,<br \/>NBC Division B 3.1.4.8.(8),<br \/>NBC Division B 3.1.10.3.(2),<br \/>NBC Division B 4.1.8.3.(8),<br \/>NBC Division B D-2.1.5.,<br \/>NBC Division B D-2.2.3.,<br \/>NBC Division B D-2.3.5.,<br \/>NBC Division B D-2.6.1.,<br \/>NBC Division B D-2.6.6.1.,<br \/>NBC Division B D-2.8.,<br \/>NBC Division B D-2.9.,<br \/>NBC Division B ,<br \/>NBC Division B D-7.1.<\/td><td>-<\/td><\/tr><tr><td>2080<\/td><td>Safety Way Guidance Systems<\/td><td>Goodyear, Dave, D. Goodyear Fire Consuting<\/td><td>2023-07-31<\/td><td><strong>Received<\/strong><br \/>2023-08-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NFC Division B 2.7.3.3.<\/td><td>-<\/td><\/tr><tr><td>2079<\/td><td>Safety Way Guidance Systems<\/td><td>Goodyear, Dave, D. Goodyear Fire Consuting<\/td><td>2023-07-31<\/td><td><strong>Received<\/strong><br \/>2023-08-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.2.6.10.<\/td><td>-<\/td><\/tr><tr><td>2078<\/td><td>Inadequate inspection of emergency lighting systems<\/td><td>Dionne, Marjorie, STANPRO<\/td><td>2023-07-27<\/td><td><strong>Received<\/strong><br \/>2023-07-28<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2024-06-05<br \/><\/td><td>NFC Division B 6.5.1.6.<\/td><td>-<\/td><\/tr><tr><td>2077<\/td><td>Plastic Windows<\/td><td>saito, michael<\/td><td>2023-07-27<\/td><td><strong>Received<\/strong><br \/>2023-07-28<br \/><\/td><td>NBC Division B 9.7.4.,<br \/>NBC Division B 9.7.5.<\/td><td>-<\/td><\/tr><tr><td>2076<\/td><td>Finger Print Scanner to Open Doors<\/td><td>saito, michael<\/td><td>2023-07-27<\/td><td><strong>Received<\/strong><br \/>2023-07-28<br \/><\/td><td>NBC Division B 9.7.4.,<br \/>NBC Division B 9.7.5.,<br \/>NBC Division B 9.7.6.<\/td><td>-<\/td><\/tr><tr><td>2075<\/td><td>Wooden vs Concrete Floors<\/td><td>saito, michael<\/td><td>2023-07-27<\/td><td><strong>Received<\/strong><br \/>2023-07-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2074<\/td><td>Adding defined term \"Fire Separation\" to Combustible Piping Materials<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2023-07-25<\/td><td><strong>Received<\/strong><br \/>2023-07-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 3.1.5.19.<\/td><td>-<\/td><\/tr><tr><td>2073<\/td><td>Safety Way Guidance Systems (SWGS)<\/td><td>Farley, Michele, Mrs.<\/td><td>2023-07-20<\/td><td><strong>Received<\/strong><br \/>2023-07-26<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NFC Division B 2.7.4.<\/td><td>-<\/td><\/tr><tr><td>2072<\/td><td>Safety Way Guidance Systems (SWGS)<\/td><td>Farley, Michele, Mrs.<\/td><td>2023-07-20<\/td><td><strong>Received<\/strong><br \/>2023-07-26<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.2.10.<\/td><td>-<\/td><\/tr><tr><td>2071<\/td><td>Adoption of ASHRAE 241: Control of Infectious Aerosols<\/td><td>Holko, Stephanie, Ontario Society of Professional Engineers<\/td><td>2023-07-14<\/td><td><strong>Received<\/strong><br \/>2023-07-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 9.32.,<br \/>NBC Division B 6.3.<\/td><td>-<\/td><\/tr><tr><td>2070<\/td><td>Additional measures to resist uplift loads due to wind <\/td><td>Janotta, Michael<\/td><td>2023-07-13<\/td><td><strong>Received<\/strong><br \/>2023-07-17<br \/><\/td><td>NBC Division B 9.23.14.<\/td><td>-<\/td><\/tr><tr><td>2069<\/td><td>Location of Cleanouts<\/td><td>Brown , Brian M, Drain Doctor<\/td><td>2023-07-13<\/td><td><strong>Received<\/strong><br \/>2023-07-17<br \/><\/td><td>NPC Division B 2.4.7.4.<\/td><td>-<\/td><\/tr><tr><td>2068<\/td><td>Revision to the Defined Term \"Grade\"<\/td><td>Letourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec <\/td><td>2023-07-03<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>2067<\/td><td>Minimum Fire-Resistance Rating of a Lightweight-Framed Flooring for Houses<\/td><td>Letourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec <\/td><td>2023-07-03<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.8.1.<\/td><td>-<\/td><\/tr><tr><td>2066<\/td><td>Floor Drains<\/td><td>Letourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec <\/td><td>2023-07-03<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.7.2.6.,<br \/>NBC Division B 9.31.4.3.<\/td><td>2138<\/td><\/tr><tr><td>2065<\/td><td>Introduction of a Ready-Mix Concrete Certification Program<\/td><td>L\u00e9tourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-11<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.1.,<br \/>NBC Division B 9.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>2064<\/td><td>Installation of Non-Liquid Saturated Treatment Systems<\/td><td>Letourneau , Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec <\/td><td>2023-07-11<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 3.7.2.1.,<br \/>NBC Division B 9.31.4.1.<\/td><td>-<\/td><\/tr><tr><td>2063<\/td><td>Tents and Air-Supported Structures<\/td><td>Letourneau, Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-11<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 3.1.18.<\/td><td>-<\/td><\/tr><tr><td>2062<\/td><td>Installation of Cooking Equipment for Part 3 and Part 9 Buildings<\/td><td>L\u00e9tourneau, Dave DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-11<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-11-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.3.1.2.,<br \/>NBC Division B 3.3.3.5.,<br \/>NBC Division B 6.3.1.6.,<br \/>NBC Division B 6.3.1.7.,<br \/>NBC Division B 6.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>2061<\/td><td>Introduce Sprinkler Protection for Fixed-Glass Wall System<\/td><td>Letourneau, Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-03<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 3.1.7.,<br \/>NBC Division B 3.2.4.8.(2)<\/td><td>-<\/td><\/tr><tr><td>2060<\/td><td>Ventilation Provisions to Ensure Indoor Air Quality<\/td><td>Letourneau, Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-11<\/td><td><strong>Received<\/strong><br \/>2023-07-12<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 6.3.1.7.,<br \/>NBC Division B 9.32.1.2.<\/td><td>-<\/td><\/tr><tr><td>2059<\/td><td>Minimum Glazed Area in Dwelling Units<\/td><td>Letourneau, Dave  DL, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2023-07-03<\/td><td><strong>Received<\/strong><br \/>2023-07-11<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 3.7.4.,<br \/>NBC Division B 9.7.2.<\/td><td>-<\/td><\/tr><tr><td>2058<\/td><td>Cellular Core PVC Pipe and Fittings<\/td><td>Scott, Suzanne, Westlake Pipe &amp; Fittings<\/td><td>2023-07-10<\/td><td><strong>Received<\/strong><br \/>2023-07-10<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2023-12-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.5.16.,<br \/>NPC Division B A-2.2.5.A.<\/td><td>-<\/td><\/tr><tr><td>2057<\/td><td>Add Requirements for Energy Storage Systems (ESS) in Dwelling Units<\/td><td>Lohmann (and Ark Tsisserev), Frank, Canadian Home Builders\u2019 Association<\/td><td>2023-07-07<\/td><td><strong>Received<\/strong><br \/>2023-07-10<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 3.6.2.,<br \/>NBC Division B 9.10.9.,<br \/>NBC Division B 9.10.19.<\/td><td>2162<\/td><\/tr><tr><td>2056<\/td><td>Introduction of ASHRAE Standard 241, \"Control of Infectious Aerosols\"<\/td><td>Lato, Mary<\/td><td>2023-07-05<\/td><td><strong>Received<\/strong><br \/>2023-07-06<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.,<br \/>NPC Division B 2.5.<\/td><td>-<\/td><\/tr><tr><td>2055<\/td><td>Exemptions for Rooftop Enclosures from Building Height Calculation<\/td><td>Chase, Andy, Province of British Columbia<\/td><td>2023-06-30<\/td><td><strong>Received<\/strong><br \/>2023-07-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.1.1.(1),<br \/>NBC Division B 3.2.2.14.,<br \/>NBC Division B 3.2.4.18.(1),<br \/>NBC Division B 3.3.1.3.,<br \/>NBC Division B A-3.3.1.3.,<br \/>NBC Division B 3.5.2.1.(5),<br \/>NBC Division B 9.9.7.1.,<br \/>NBC Division B 9.10.4.4.(1)<\/td><td>-<\/td><\/tr><tr><td>2054<\/td><td>Introduction of Referenced Standards for Drainage Products<\/td><td>Orton, David, NSF<\/td><td>2023-06-29<\/td><td><strong>Received<\/strong><br \/>2023-07-05<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.2.10.3.,<br \/>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2053<\/td><td>Replacement of Referenced Standards for Grease Interceptors<\/td><td>Orton, David, NSF<\/td><td>2023-06-29<\/td><td><strong>Received<\/strong><br \/>2023-07-05<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-03-07<br \/><\/td><td>NPC Division B 2.2.3.2.,<br \/>NPC Division B A-2.2.3.2.(3),<br \/>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>2052<\/td><td>Design of Potable Water Systems per Updated Pipe Sizing Table <\/td><td>Radziminski, Christopher, City of Vancouver<\/td><td>2023-06-29<\/td><td><strong>Received<\/strong><br \/>2023-07-05<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NPC Division B 2.6.3.1.<\/td><td>2174<\/td><\/tr><tr><td>2051<\/td><td>Automatic Sprinkler Systems for Balconies<\/td><td>Larson, Jordan, Anderson Associates<\/td><td>2023-06-22<\/td><td><strong>Received<\/strong><br \/>2023-07-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.5.12.<\/td><td>-<\/td><\/tr><tr><td>2050<\/td><td>Reference New ASHRAE Ventilation Standard <\/td><td>Ouellette, Jesse<\/td><td>2023-06-13<\/td><td><strong>Received<\/strong><br \/>2023-06-15<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>2049<\/td><td>Height of Vision Glass vs. Door Release Hardware<\/td><td>Shek, Patrick K, Building Department, City of Burnaby, 4949 Canada Way, Burnaby, BC, V5G 1M2<\/td><td>2022-11-02<\/td><td><strong>Received<\/strong><br \/>2023-06-21<br \/><\/td><td>NBC Division B 3.3.1.20.(6),<br \/>NBC Division B 3.4.1.8.,<br \/>NBC Division B 3.3.1.13.(3),<br \/>NBC Division B 3.8.3.6.(4)<\/td><td>1589<\/td><\/tr><tr><td>2048<\/td><td>Remove the word \"undue\" from the provision<\/td><td>Lapointe, F\u00e9lix, Minist\u00e8re de la S\u00e9curit\u00e9 publique<\/td><td>2023-05-26<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.4.7.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2047<\/td><td>New Standard for the Design and Installation of Special Fire Suppression System<\/td><td>Lapointe, F\u00e9lix, Minist\u00e8re de la S\u00e9curit\u00e9 publique<\/td><td>2023-05-26<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/><\/td><td>NFC Division B 2.1.3.5.(3)<\/td><td>-<\/td><\/tr><tr><td>2046<\/td><td>Withdrawal of CAN\/CGSB-82.6-M86 Standard from the NBC <\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.6.1.2.(2),<br \/>NBC Division B A-9.6.1.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2045<\/td><td>Withdrawal of CAN\/CGSB-93.2-M91 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 3.2.3.6.(5),<br \/>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.10.14.5.(8),<br \/>NBC Division B 9.10.14.5.(12),<br \/>NBC Division B 9.10.15.5.(7),<br \/>NBC Division B 9.10.15.5.(11),<br \/>NBC Division B 9.27.11.1.(2),<br \/>NBC Division B A-9.27.11.1.(2)<\/td><td>1802 (published)<\/td><\/tr><tr><td>2044<\/td><td>Withdrawal of CAN\/CGSB-93.1-M85 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.27.11.1.(3),<br \/>NBC Division B A-9.27.11.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2043<\/td><td>Withdrawal of CAN\/CGSB-82.6-M86 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.6.1.2.(2),<br \/>NBC Division B A-9.6.1.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2042<\/td><td>Withdrawal of CAN\/CGSB-71.26-M88 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B A-9.23.4.2.(2)<\/td><td>-<\/td><\/tr><tr><td>2041<\/td><td>Withdrawal of CAN\/CGSB-51.71-2005 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 9.32.3.8.(7)<\/td><td>-<\/td><\/tr><tr><td>2040<\/td><td>Withdrawal of CAN\/CGSB-51.33-M89 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.25.4.2.(5),<br \/>NBC Division B 9.25.4.2.(6)<\/td><td>-<\/td><\/tr><tr><td>2039<\/td><td>Withdrawal of CAN\/CGSB-51.32-M77 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.8.1.1.,<br \/>NBC Division B 9.20.13.9.(1),<br \/>NBC Division B 9.26.2.1.,<br \/>NBC Division B 9.27.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2038<\/td><td>Withdrawal of CGSB 51-GP-27M Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.25.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2037<\/td><td>Withdrawal of CAN\/CGSB-51.25-M87 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.17.2.A.,<br \/>NBC Division B 9.25.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2036<\/td><td>Replace Withdrawn CAN\/CGSB-41.24-95 Standard<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-07<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>1332 (published)<\/td><\/tr><tr><td>2035<\/td><td>Withdrawal of CAN\/CGSB-37.58-M86 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.13.3.2.(2),<br \/>NBC Division B 9.26.2.1.B.<\/td><td>-<\/td><\/tr><tr><td>2034<\/td><td>Withdrawal of CGSB 37-GP-56M-1985 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.13.3.2.(2),<br \/>NBC Division B 9.26.2.1.B.<\/td><td>-<\/td><\/tr><tr><td>2033<\/td><td>Withdrawal of CGSB 37-GP-55M-1979 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.26.16.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2032<\/td><td>Withdrawal of CGSB 37-GP-55M-1979 Standard from the NBC <\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.26.16.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2031<\/td><td>Withdrawal of CAN\/CGSB-37.54-95 Standard from the NBC <\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.13.3.2.(2),<br \/>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.26.2.1.<\/td><td>-<\/td><\/tr><tr><td>2030<\/td><td>Withdrawal of CAN\/CGSB-37.51-M90 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.26.15.1.(1)<\/td><td>-<\/td><\/tr><tr><td>2029<\/td><td>Withdrawal of CAN\/CGSB-37.50-M89 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.13.3.2.(2),<br \/>NBC Division B B-9.26.2.1.B.<\/td><td>-<\/td><\/tr><tr><td>2028<\/td><td>Withdrawal of CGSB 37-GP-9Ma-1983 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.13.3.2.(2),<br \/>NBC Division B 9.26.2.1.A.<\/td><td>-<\/td><\/tr><tr><td>2027<\/td><td>Withdrawal of CAN\/CGSB-19.22-M89 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.29.10.5.(1)<\/td><td>-<\/td><\/tr><tr><td>2026<\/td><td>Withdrawal of CAN\/CGSB-12.20-M89 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.6.1.(1),<br \/>NBC Division B 9.6.1.3.(1),<br \/>NBC Division B A-9.6.1.3.(2)<\/td><td>-<\/td><\/tr><tr><td>2025<\/td><td>Withdrawal of CAN\/CGSB-12.11-M90 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.1.20.(3),<br \/>NBC Division B 3.4.6.15.(1),<br \/>NBC Division B 3.4.6.15.(3),<br \/>NBC Division B 9.6.1.2.(1),<br \/>NBC Division B 9.6.1.4.(1),<br \/>NBC Division B 9.8.8.7.(1)<\/td><td>-<\/td><\/tr><tr><td>2024<\/td><td>Withdrawal of CAN\/CGSB-12.10-M76 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2023<\/td><td>Withdrawal of CAN\/CGSB-12.10-M76 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2022<\/td><td>Withdrawal of CAN\/CGSB-12.9-M91 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2021<\/td><td>Withdrawal of CAN\/CGSB-12.4 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2020<\/td><td>Withdrawal of CAN\/CGSB-12.4 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2019<\/td><td>Withdrawal of CAN\/CGSB-12.3 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2018<\/td><td>Withdrawal of CAN\/CGSB-12.2 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2017<\/td><td>Withdrawal of CAN\/CGSB-11.3 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.29.7.1.(1),<br \/>NBC Division B 9.30.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2016<\/td><td>Withdrawal of CAN\/CGSB-10.3 Standard from the NBC<\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.21.3.4.(2),<br \/>NBC Division B 9.21.3.9.(1),<br \/>NBC Division B 9.22.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2015<\/td><td>Withdrawal of CAN\/CGSB-7.2-94 Standard from the NBC <\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.17.3.4.(1),<br \/>NBC Division B 9.17.3.4.<\/td><td>-<\/td><\/tr><tr><td>2014<\/td><td>Withdrawal of CAN\/CGSB-1.501-M89 Standard from the NBC <\/td><td>Long, Robert, Public Services and Procurement Canada<\/td><td>2023-05-24<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.5.1.2.(2),<br \/>NBC Division B 9.25.4.2.(7)<\/td><td>1426 (published), 1427 (published)<\/td><\/tr><tr><td>2013<\/td><td>Inclusion of a Thermal Factors for the Specified Snow Load Calculation Method on Greenhouses<\/td><td>Coristine, Aaron M, Ontario Greenhouse Vegetable Growers<\/td><td>2023-05-23<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2024-09-12<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>2012<\/td><td>Requirement on a Hot Water Distribution System of a Developed Length with Potable Water System <\/td><td>Jastrzebski, Brent William<\/td><td>2023-05-22<\/td><td><strong>Received<\/strong><br \/>2023-05-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.6.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>2011<\/td><td>Building Classification for the Storage of Baled Combustible Fibres<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2023-05-15<\/td><td><strong>Received<\/strong><br \/>2023-05-15<br \/>CBHCC: <strong>CBHCC Decision (legacy)  &mdash; Approved<\/strong><br \/>2023-08-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2023-09-22<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NFC Division B 3.2.6.2.(1),<br \/>NBC Division B 2.1.4.1.(1),<br \/>NBC Division B 3.1.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>2010<\/td><td>Building Classification for the Storage of Ammonium Nitrate<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2023-05-15<\/td><td><strong>Received<\/strong><br \/>2023-05-15<br \/>CBHCC: <strong>CBHCC Decision (legacy)  &mdash; Approved<\/strong><br \/>2023-08-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2023-09-22<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.3.6.6.(1),<br \/>NBC Division B 2.2.8.1.(4),<br \/>NFC Division B 3.2.9.2.(1)<\/td><td>-<\/td><\/tr><tr><td>2009<\/td><td>Locations of Required Guards<\/td><td>Dang, Tommy, Building and Safety Standards Branch<\/td><td>2023-05-09<\/td><td><strong>Received<\/strong><br \/>2023-05-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 9.8.8.1.,<br \/>NBC Division B 3.3.1.18.<\/td><td>-<\/td><\/tr><tr><td>2008<\/td><td>Window Screens<\/td><td>Lightning, Dakota<\/td><td>2023-04-29<\/td><td><strong>Received<\/strong><br \/>2023-05-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>2007<\/td><td>Modification to objective statement<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/><\/td><td>NECB Division A 2.2.<\/td><td>-<\/td><\/tr><tr><td>2006<\/td><td>Define Tiers in Part 10 as discretionary<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/><\/td><td>NECB Division B 10.1.<\/td><td>-<\/td><\/tr><tr><td>2005<\/td><td>Set-back temperatures in high efficiency buildings with low energy systems<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/><\/td><td>NECB Division B 5.2.11.1.<\/td><td>-<\/td><\/tr><tr><td>2004<\/td><td>Clarify the requirements for heat recovery system<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.10.1.<\/td><td>-<\/td><\/tr><tr><td>2003<\/td><td>Cooling by Direct Use of Outdoor Air (Air Economizer System)<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/><\/td><td>NECB Division B 5.2.2.8.<\/td><td>-<\/td><\/tr><tr><td>2002<\/td><td>Air intake and outlet dampers<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.36.3.3.(2)<\/td><td>-<\/td><\/tr><tr><td>2001<\/td><td>Administrative Provisions for Structural Design in Division C<\/td><td>Houvardas, Mike, Tower Engineering Group<\/td><td>2023-04-26<\/td><td><strong>Received<\/strong><br \/>2023-04-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2000<\/td><td>Reporting loss of containment event<\/td><td>Tufail, Modusser, Strathcona County<\/td><td>2023-04-25<\/td><td><strong>Received<\/strong><br \/>2023-04-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 4.1.6.3.<\/td><td>-<\/td><\/tr><tr><td>1999<\/td><td>Spiral Stairs Handrails and Measurements <\/td><td>David, Wayne  Frank, Canadian ornamental ironworks <\/td><td>2023-04-24<\/td><td><strong>Received<\/strong><br \/>2023-04-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.8.4.7.<\/td><td>-<\/td><\/tr><tr><td>1998<\/td><td>Clarification on the Type the Concealed Spaces Exempt from the Protection of Foam Plastics<\/td><td>Harding, Thomas J, Capital Region Service Commission<\/td><td>2023-04-20<\/td><td><strong>Received<\/strong><br \/>2023-04-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.4.2.(1),<br \/>NBC Division B 9.10.17.10.(1)<\/td><td>-<\/td><\/tr><tr><td>1997<\/td><td>Introduce Testing Standards for Air Barriers for Roof Assemblies<\/td><td>Dalgleish, Laverne, bpc Building Performance Consortium Inc.<\/td><td>2023-04-04<\/td><td><strong>Received<\/strong><br \/>2023-04-04<br \/>CBHCC: <strong>CBHCC Decision (legacy)  &mdash; Approved<\/strong><br \/>2023-08-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2023-08-29<br \/><\/td><td>NECB Division B 3.2.4.3.(2)<\/td><td>1983<\/td><\/tr><tr><td>1996<\/td><td>Commissioning of Energy Using Systems - Alteration to Existing Buildings<\/td><td>Lau, Toby K.W., BC Hydro<\/td><td>2023-04-03<\/td><td><strong>Received<\/strong><br \/>2023-04-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>1995<\/td><td>Increase the Minimum Insulation of Exterior Wall Assemblies<\/td><td>Willemsen, Tom<\/td><td>2023-03-29<\/td><td><strong>Received<\/strong><br \/>2023-05-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division B 9.36.2.6.,<br \/>NECB Division B 3.1.1.6.<\/td><td>-<\/td><\/tr><tr><td>1994<\/td><td>Increase the Regulation of AIRBNB Rented Facilities<\/td><td>Lepage, Mathews<\/td><td>2023-03-23<\/td><td><strong>Received<\/strong><br \/>2023-05-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.4.1.,<br \/>NFC Division B 2.1.5.1.(3),<br \/>NBC Division B 9.10.18.2.<\/td><td>-<\/td><\/tr><tr><td>1993<\/td><td>Span and Use Tables for Engineered Lumber Products<\/td><td>Cecchetto, Renzo, funktionaldesign<\/td><td>2023-03-26<\/td><td><strong>Received<\/strong><br \/>2023-05-24<br \/><\/td><td>NBC Division B 9.3.2.8.(1),<br \/>NBC Division B 9.23.4.2.(1),<br \/>NBC Division B 9.23.4.5.(1),<br \/>NBC Division B 9.23.14.10.(1)<\/td><td>-<\/td><\/tr><tr><td>1992<\/td><td>Update concrete aggregate size to standard size in SI units<\/td><td>B\u00e9dard, Luc, Association b\u00e9ton Qu\u00e9bec<\/td><td>2023-03-23<\/td><td><strong>Received<\/strong><br \/>2023-03-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.3.1.1.(4)<\/td><td>-<\/td><\/tr><tr><td>1991<\/td><td>Alignment of concrete compressive strength requirements with CSA A23.1<\/td><td>B\u00e9dard, Luc, Association b\u00e9ton Qu\u00e9bec<\/td><td>2023-03-23<\/td><td><strong>Received<\/strong><br \/>2023-03-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.3.1.6.<\/td><td>-<\/td><\/tr><tr><td>1990<\/td><td>Inclusion of GHS revision 7- Flammable Gases <\/td><td>Czajko, Caroline, Heating, Refrigeration, and Air Conditioning Institue of Canada (HRAI)<\/td><td>2023-03-10<\/td><td><strong>Received<\/strong><br \/>2023-03-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 3.1.1.4.(1)<\/td><td>-<\/td><\/tr><tr><td>1989<\/td><td>Harmonize standard for whole building air leakage testing for modelling in NECB<\/td><td>Kayll, David, Frontenac Building Science Inc.<\/td><td>2023-03-09<\/td><td><strong>Received<\/strong><br \/>2023-03-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-06-13<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2023-08-29<br \/><\/td><td>NECB Division B 8.4.2.9.(2)<\/td><td>1943<\/td><\/tr><tr><td>1988<\/td><td>Include Reference to CSA A500 Building Guards Throughout NBC<\/td><td>Vegh, Petr, Exp Services Inc.<\/td><td>2023-03-07<\/td><td><strong>Received<\/strong><br \/>2023-03-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.1.18.(1),<br \/>NBC Division B 3.3.1.18.(2),<br \/>NBC Division B 3.3.1.20.(8),<br \/>NBC Division B 3.4.6.6.(1),<br \/>NBC Division B 3.4.6.6.(5),<br \/>NBC Division B 3.4.7.6.(1),<br \/>NBC Division B 3.4.7.6.(4),<br \/>NBC Division B 4.3.6.1.<\/td><td>-<\/td><\/tr><tr><td>1987<\/td><td>Continuity of insulation in ceiling below attics<\/td><td>MacDonald, David, Town of Oromocto<\/td><td>2023-03-01<\/td><td><strong>Received<\/strong><br \/>2023-03-06<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2025-02-25<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-04-02<br \/><\/td><td>NBC Division B 9.36.2.7.(8)<\/td><td>-<\/td><\/tr><tr><td>1986<\/td><td>Revision of the Defined Term for \"Building Sewer\"<\/td><td>Knull, Tom, Government of Alberta<\/td><td>2023-02-28<\/td><td><strong>Received<\/strong><br \/>2023-03-06<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1985<\/td><td>Inclusion of CLT data for airborne sound<\/td><td>Golden, Matthew V, Pliteq, Inc.<\/td><td>2023-02-28<\/td><td><strong>Received<\/strong><br \/>2023-03-06<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B A-5.8.1.4.<\/td><td>-<\/td><\/tr><tr><td>1984<\/td><td>Addition of the defined term - Masonry heater<\/td><td>DenToom, Allison M, Engineers and Geoscientists BC<\/td><td>2023-02-24<\/td><td><strong>Received<\/strong><br \/>2023-02-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.22.1.1.<\/td><td>-<\/td><\/tr><tr><td>1983<\/td><td>Substituting conventional solid fuel fireplaces with Masonry Heaters<\/td><td>DenToom, Allison M, Engineers and Geoscientists BC<\/td><td>2023-02-24<\/td><td><strong>Received<\/strong><br \/>2023-02-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.22.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1982<\/td><td>Potential Ice Blocks to Exterior Exhaust for Heating Systems<\/td><td>Sengupta, Milan<\/td><td>2023-02-22<\/td><td><strong>Received<\/strong><br \/>2023-02-23<br \/><\/td><td>NBC Division B 6.2.1.5.,<br \/>NBC Division B 9.33.5.2.<\/td><td>-<\/td><\/tr><tr><td>1981<\/td><td>Revise the Note (1) to Table 1.3.1.2. for the Reliability of the Edition of ASHRAE Standards<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2023-02-20<\/td><td><strong>Received<\/strong><br \/>2023-02-21<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NECB Division B 1.3.1.2.,<br \/>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1980<\/td><td>ANSI\/ASHRAE 62.1, \"Ventilation for Acceptable Indoor Air Quality\"<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2023-02-20<\/td><td><strong>Received<\/strong><br \/>2023-02-21<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>1979<\/td><td>Add Reference to NFPA 105 in the NFC<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2023-02-13<\/td><td><strong>Received<\/strong><br \/>2023-02-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.2.2.4.<\/td><td>-<\/td><\/tr><tr><td>1978<\/td><td>Canada Post Mail Rooms in Exits through Lobbies<\/td><td>Kim, Jun Hyung<\/td><td>2023-02-07<\/td><td><strong>Received<\/strong><br \/>2023-02-08<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.4.4.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1977<\/td><td>Access to drains from outside. <\/td><td>Marquez , Henry<\/td><td>2023-02-07<\/td><td><strong>Received<\/strong><br \/>2023-02-08<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.7.4.<\/td><td>-<\/td><\/tr><tr><td>1976<\/td><td>Requirement for Egress Window and Walkout in Secondary Suite in Basement<\/td><td>Beechey, Paul<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 9.9.10.1.<\/td><td>-<\/td><\/tr><tr><td>1975<\/td><td>Replacing the term \"trap\" with \"fixture outlet pipe\" <\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.9.3.<\/td><td>-<\/td><\/tr><tr><td>1974<\/td><td>Restrictions on Loads for Heating and Cooling Equipment to Prevent Oversizing<\/td><td>Xu, Dan, Mechanical Service Advisory Commitee (MSAC)<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NBC Division B 9.33.5.1.<\/td><td>-<\/td><\/tr><tr><td>1973<\/td><td>Wall Finishes requirement for free-standing bathtubs<\/td><td>Graziani, Gary<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.29.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1972<\/td><td>Chimneys Clearance from Combustible Materials<\/td><td>Pucci, Ben, MMAH, Code Advisory Unit, Building and Development Branch<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.21.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1971<\/td><td>Cleanout Requirement with Pressurized Force Main<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.7.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1970<\/td><td>Expand Application for Direct Connections for Floor Drains<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2021-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.2.3.(2)<\/td><td>-<\/td><\/tr><tr><td>1969<\/td><td>Connection of the Drain Line of a Drinking Water Treatment System<\/td><td>Wong, Kevin, CWQA<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.2.10.17.<\/td><td>-<\/td><\/tr><tr><td>1968<\/td><td>Requirements for Emergency Lighting<\/td><td>Pucci, Ben, MMAH, Code Advisory Unit, Building and Development Branch<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.7.3.(1),<br \/>NBC Division B 9.9.12.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1967<\/td><td>Adding a New Defined Term - Running Trap<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.7.1.(2),<br \/>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1966<\/td><td>Add New Defined Term - Receiving Fixture<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.3.3.11.(1),<br \/>NPC Division B 2.4.2.3.(1),<br \/>NPC Division B 2.4.2.3.(2),<br \/>NPC Division B 2.4.2.3.(3),<br \/>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1965<\/td><td>Revise Defined Term- Public Use<\/td><td>Hui, Danny, Code Advisory Unit, Building and Development Branch, MMAH<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NPC Division A 1.4.1.2.(1)<\/td><td>1706 (published)<\/td><\/tr><tr><td>1964<\/td><td>Add New Defined Term - Gang Trap <\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.4.3.,<br \/>NPC Division B 2.4.5.1.(3),<br \/>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1963<\/td><td>Add New Defined Term - Common Trap<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td>Hazardous Materials and Activities: <strong>Received<\/strong><br \/>2023-01-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.9.3.,<br \/>NPC Division A 1.4.1.1.<\/td><td>-<\/td><\/tr><tr><td>1962<\/td><td>Administrative Requirements for the Installation of Metal Gazebos<\/td><td>Sloat, Linda A<\/td><td>2023-02-04<\/td><td><strong>Received<\/strong><br \/>2023-02-06<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division C 2.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1961<\/td><td>Temperature rating of heat activated device<\/td><td>Joyce, Matthew, Price Industries Ltd.<\/td><td>2023-02-03<\/td><td><strong>Received<\/strong><br \/>2023-02-06<br \/><\/td><td>NBC Division B 3.1.8.10.(3)<\/td><td>-<\/td><\/tr><tr><td>1960<\/td><td>Add a New Section for Secondary Suites<\/td><td>Penna, Steve, LMCBO<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9<\/td><td>-<\/td><\/tr><tr><td>1959<\/td><td>Supplemental Exhaust Fan in Excessive Moisture Areas<\/td><td>Rambaruth, Dheerish, Building and Development Branch, Ministry of Municipal Affairs and Housing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2023-11-16<br \/><\/td><td>NBC Division B 9.32.3.7.(4)<\/td><td>-<\/td><\/tr><tr><td>1958<\/td><td>Span Tables for the Selection of LVL Members<\/td><td>Norton, Doug, PLC Systems Consulting<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 9.23.4.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1957<\/td><td>Revise Table 9.15.3.4. for Minimum Footing Sizes<\/td><td>Stuart, Bryan<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.15.3.4.(1)<\/td><td>-<\/td><\/tr><tr><td>1956<\/td><td>Protection from Soil Gas Ingress<\/td><td>Wood, Robert  A, CARST<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 9.13.4.2.<\/td><td>-<\/td><\/tr><tr><td>1955<\/td><td>Replace wooden door frames on ground floor residential homes with steel door frames<\/td><td>Rinna, William, York Regional Police<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.7.4.,<br \/>NBC Division B 9.7.5.<\/td><td>-<\/td><\/tr><tr><td>1954<\/td><td>Maximum Sill Height for Egress Windows in Basement<\/td><td>Hilfrich, Liz, Code Consultant<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.9.10.1.(1),<br \/>NBC Division B 9.10.20.2.(2),<br \/>NBC Division B 3.4.7.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1953<\/td><td>Construction of Exterior Stairs of Dwellings<\/td><td>Bowlby, Matthew<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2019-04-03<br \/><\/td><td>NBC Division B 9.8.9.5.<\/td><td>-<\/td><\/tr><tr><td>1952<\/td><td>Termination of Handrails for Stairs and Ramps<\/td><td>Hilfrich, Liz, Code Consultant<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 9.8.7.3.(2),<br \/>NBC Division B 3.3.4.7.<\/td><td>-<\/td><\/tr><tr><td>1951<\/td><td>Design and Installation of Non-Potable Water Systems Standard<\/td><td>Hill, Jenny<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.7.1.2.,<br \/>NPC Division B 2.7.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1950<\/td><td>Definition of Fire Damper <\/td><td>McCole, Joseph John, Self Employed on contract work with various consulting engineering companies <\/td><td>2023-02-01<\/td><td><strong>Received<\/strong><br \/>2023-02-02<br \/>CBHCC: <strong>CBHCC Decision (legacy)  &mdash; Approved<\/strong><br \/>2023-02-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division A 1.4.1.2.(1),<br \/>NFC Division B 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1949<\/td><td>Provide Objective Performance Measures for Voice Communication Systems<\/td><td>Kuffner, William, Zenix Engineering Ltd.<\/td><td>2023-02-01<\/td><td><strong>Received<\/strong><br \/>2023-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.4.22.(1),<br \/>NBC Division B 3.2.4.23.(2)<\/td><td>-<\/td><\/tr><tr><td>1948<\/td><td>Reference to CSA S345 for structural design of steel storage racks<\/td><td>Hirst, Jonathan, North American Storage Equipment Incorporated<\/td><td>2023-01-30<\/td><td><strong>Received<\/strong><br \/>2023-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.4.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1947<\/td><td>New Definition for Sleeping Room<\/td><td>McCole, Joseph John, Self Employed on contract work with various consulting engineering companies <\/td><td>2023-01-30<\/td><td><strong>Received<\/strong><br \/>2023-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 1.4.1.2.(1),<br \/>NFC Division B 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1945<\/td><td>Venting Requirements for Grease Interceptors<\/td><td>Westcott, Andy, TACBOC Plumbing \/ Advisory Committee<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-08-02<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.5.5.2.<\/td><td>-<\/td><\/tr><tr><td>1944<\/td><td>Sizing of Water Distribution System<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NPC Division B 2.6.3.2.<\/td><td>-<\/td><\/tr><tr><td>1943<\/td><td>Clarification of the Minimum Size of the Vent for a Drain<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2021-10-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.5.1.1.(3)<\/td><td>-<\/td><\/tr><tr><td>1942<\/td><td>Slope of Drain Pipes Using Gravity<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.6.<\/td><td>2133<\/td><\/tr><tr><td>1941<\/td><td>Vertical Cleanouts for Vertical Sink Waste<\/td><td>Pijawka, Paul<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.7.4.<\/td><td>2132<\/td><\/tr><tr><td>1940<\/td><td>Clarification of of the Term \"Backflow\"<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.6.4.,<br \/>NBC Division B 1.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>1939<\/td><td>Support for Underground Horizontal Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.3.4.6.(1)<\/td><td>-<\/td><\/tr><tr><td>1938<\/td><td>Support for Underground Horizontal Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2023-01-20<\/td><td>CBHCC: <strong>Received<\/strong><br \/>2023-01-20<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.3.4.6.(1)<\/td><td>-<\/td><\/tr><tr><td>1937<\/td><td>Introduction of New Standards for Pipe Rehabilitation<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NPC Division B 2.2.5.<\/td><td>-<\/td><\/tr><tr><td>1936<\/td><td>Application for Sanitary Fittings<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.4.1.,<br \/>NPC Division B 2.2.4.2.<\/td><td>-<\/td><\/tr><tr><td>1935<\/td><td>Requirement for Interceptors<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.3.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1934<\/td><td>Rainwater Harvesting<\/td><td>Hill, Jenny<\/td><td>2023-01-20<\/td><td>CBHCC: <strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>1933<\/td><td>Cross-Connection of Drainage Pipes<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 7.1.5.2.(2)<\/td><td>1782 (published)<\/td><\/tr><tr><td>1932<\/td><td>Protection from Corrosion of Exposed Steel<\/td><td>Fortier, Martin, GoliathTech Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 4.2.3.10.<\/td><td>-<\/td><\/tr><tr><td>1931<\/td><td>Power door operators for childcare facilities<\/td><td>Didomenico, Nick<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2021-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.8.2.7.,<br \/>NBC Division B 3.8.3.6.(6)<\/td><td>-<\/td><\/tr><tr><td>1930<\/td><td>Alternative joints for air duct systems (OBC 2012)<\/td><td>Stewart, Darryl<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2021-01-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1929<\/td><td>Sensors on Door Operators<\/td><td>Bryan, David<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.8.3.6.(6)<\/td><td>-<\/td><\/tr><tr><td>1928<\/td><td>Clearance for Waterclosets<\/td><td>Pijawka, Paul<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>1927<\/td><td>Clarifications for Barrier-Free Access to Linen Chutes and Refuse Chutes<\/td><td>Pucci, Ben, MMAH, Code Advisory Unit, Building and Development Branch<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-20<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.6.3.3.(5)<\/td><td>-<\/td><\/tr><tr><td>1926<\/td><td>Requirement for Reinforcement for Grab Bars in all Bathrooms<\/td><td>Scharwtzentruber, Timothy, Township of Wellesley<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.7.2.,<br \/>NBC Division B 3.8.3.<\/td><td>-<\/td><\/tr><tr><td>1925<\/td><td>Stipulate Safety Way Guidance Systems in NBC for high rise buildings<\/td><td>Farley, Michele, FCS Fire Consulting Services Ltd.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.2.10.<\/td><td>-<\/td><\/tr><tr><td>1924<\/td><td>Clarify the application of Sentence 3.2.7.1.(4) for lighting outlets in a residential building<\/td><td>Dunn, Adam, Municipality of Clarington<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.7.1.(8)<\/td><td>-<\/td><\/tr><tr><td>1923<\/td><td>Protect Power Supply for Elevator Sump Pumps<\/td><td>Thomson, Peter, TACBOC Plumbing<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 3.2.6.5.(6)<\/td><td>-<\/td><\/tr><tr><td>1922<\/td><td>Add Fire Protection Requirements for Cooktops in Part 3 NBC<\/td><td>Hui, Danny, Code Advisory Unit, Building and Development Branch, MMAH<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-24<br \/><\/td><td>NBC Division B 9.10.22.,<br \/>NBC Division B 3.3.<\/td><td>-<\/td><\/tr><tr><td>1921<\/td><td>Fire performance of hospital bedding<\/td><td>McCole, Joseph John, Self Employed on contract work with various consulting engineering companies <\/td><td>2023-01-26<\/td><td><strong>Received<\/strong><br \/>2023-01-30<br \/><\/td><td>NFC Division B 1.1.1.1.,<br \/>NFC Division B 2.3.1.,<br \/>NFC Division B 2.3.2.<\/td><td>-<\/td><\/tr><tr><td>1920<\/td><td>Amend inclusion of foam core board in combustible construction<\/td><td>Hilfrich, Liz, Code Consultant<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-03-29<br \/><\/td><td>NBC Division B 3.1.4.<\/td><td>-<\/td><\/tr><tr><td>1919<\/td><td>Amend Definition of Combustible Content<\/td><td>Somerton, Glenn, Morrison Hershfield<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-03-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1917<\/td><td>Amend Definition of Basement <\/td><td>Davidovich, G, Individual<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-25<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1916<\/td><td>Removable Panels and Picket in Guards<\/td><td>Anic, Brianne, City of Sarnia<\/td><td>2023-01-24<\/td><td><strong>Received<\/strong><br \/>2023-01-25<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-09-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 9.8.8.7.,<br \/>NBC Division B 9.8.8.5.,<br \/>NBC Division B 3.3.1.18.,<br \/>NBC Division B 9.8.8.6.<\/td><td>-<\/td><\/tr><tr><td>1915<\/td><td>Requirements on the Efficiency of a Drain Water Heat Recovery (DWHR)<\/td><td>Fontaine, Marc, EcoInnovation Technologies Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-20<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-12-18<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-05-15<br \/><\/td><td>NBC Division B 9.36.8.10.(3),<br \/>NBC Division B 9.36.4.<\/td><td>-<\/td><\/tr><tr><td>1914<\/td><td>Scorecard Approach as a Compliance Path<\/td><td>RenewABILITY Energy Inc., , RenewABILITY Energy Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-20<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B 9.36.8.<\/td><td>-<\/td><\/tr><tr><td>1913<\/td><td>Requirements on the Efficiency of a Drain Water Heat Recovery (DWHR)<\/td><td>RenewABILITY Energy Inc., , RenewABILITY Energy Inc.<\/td><td>2022-03-13<\/td><td><strong>Received<\/strong><br \/>2023-01-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 8.4.<\/td><td>-<\/td><\/tr><tr><td>1912<\/td><td>Drain Water Heat Recovery in Part 3<\/td><td>RenewABILITY Energy Inc., , RenewABILITY Energy Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-20<br \/><\/td><td>NBC Division B 9.36.5.12.(2)<\/td><td>-<\/td><\/tr><tr><td>1911<\/td><td>Requirements on the Minimum Rated Efficiency of Drain Water Heat Recovery (DWHR) System<\/td><td>RenewABILITY Energy Inc., , RenewABILITY Energy Inc.<\/td><td>2023-01-20<\/td><td><strong>Received<\/strong><br \/>2023-01-25<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-11-16<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B 9.36.5.12.(2),<br \/>NBC Division B 9.36.4.<\/td><td>-<\/td><\/tr><tr><td>1910<\/td><td>Tiered approach \/ Passive House Canada & Toronto Green Standard.<\/td><td>Leroux, Simon, HOK Architects<\/td><td>2023-01-20<\/td><td>CBHCC: <strong>Received<\/strong><br \/>2023-01-20<br \/><\/td><td>NBC Division B 9.36.,<br \/>NECB Division B 10.1.2.<\/td><td>-<\/td><\/tr><tr><td>1909<\/td><td>Increasing the integrity of the air barrier system at the connections<\/td><td>MacDonald, David, Town of Oromocto<\/td><td>2023-01-23<\/td><td><strong>Received<\/strong><br \/>2023-01-23<br \/>CBHCC: <strong>Reviewed (legacy) <\/strong><br \/>2023-02-16<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2023-02-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-01<br \/><\/td><td>NBC Division B 9.36.2.10.(9)<\/td><td>-<\/td><\/tr><tr><td>1908<\/td><td>Underlay Required Beneath Shingles<\/td><td>Keeler, Greg, Owens Corning Roofing and Asphalt, LLC<\/td><td>2023-01-05<\/td><td><strong>Received<\/strong><br \/>2023-01-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.26.6.1.<\/td><td>-<\/td><\/tr><tr><td>1907<\/td><td>Introduce ASTM D8257 for Synthetic Underlayment<\/td><td>Keeler, Greg, Owens Corning Roofing and Asphalt, LLC<\/td><td>2023-01-05<\/td><td><strong>Received<\/strong><br \/>2023-01-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>-<\/td><\/tr><tr><td>1906<\/td><td>Exception for a Dead-end Corridor to Exterior Passageways<\/td><td>Victor, Frankie, GHL Consultants<\/td><td>2022-12-29<\/td><td><strong>Received<\/strong><br \/>2023-01-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.3.1.9.(5),<br \/>NBC Division B 3.3.1.3.(9)<\/td><td>-<\/td><\/tr><tr><td>1905<\/td><td>Notching and Drilling of Lateral Bracing Panels<\/td><td>Baildham, Riley<\/td><td>2022-12-23<\/td><td><strong>Received<\/strong><br \/>2023-01-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-03-28<br \/><\/td><td>NBC Division B 9.23.5.<\/td><td>-<\/td><\/tr><tr><td>1904<\/td><td>Revert Back ANSI\/ASHRAE 62.1, \"Ventilation for Indoor Air Quality\" Edition<\/td><td>Hayes, Eoghan, Edge Sustainability Consultants <\/td><td>2022-12-23<\/td><td><strong>Received<\/strong><br \/>2022-12-23<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-03-28<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.1.1.,<br \/>NBC Division B 6.3.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1903<\/td><td>Setting the Value for Air Leakage Calculation<\/td><td>Schock, Nick NS, RED PELICAN BUILDING SCIENCE LTD.<\/td><td>2022-12-21<\/td><td><strong>Received<\/strong><br \/>2023-01-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/><\/td><td>NECB Division B 8.4.3.3.(3),<br \/>NBC Division B 8.4.2.9.(2)<\/td><td>-<\/td><\/tr><tr><td>1902<\/td><td>Withdrawal of CAN\/CGSB-41.24 Standard from the NBC<\/td><td>Dobson, Matthew, Vinyl Siding Institute, Inc.<\/td><td>2022-12-20<\/td><td><strong>Received<\/strong><br \/>2022-12-21<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-03-28<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>1332 (published)<\/td><\/tr><tr><td>1901<\/td><td>Compliance with the Code<\/td><td>Saby, Darrell C., Regional District of Nanaimo<\/td><td>2022-12-19<\/td><td><strong>Received<\/strong><br \/>2022-12-21<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division A 1.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1900<\/td><td>Common Space Definition<\/td><td>Noakes, Mildred MN, Excel Homes<\/td><td>2022-11-30<\/td><td><strong>Received<\/strong><br \/>2022-12-21<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 1.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1899<\/td><td>Safety Glazing and Wired Safety Glass<\/td><td>Webb, Margaret, CGSB Glass Committee<\/td><td>2022-12-19<\/td><td><strong>Received<\/strong><br \/>2022-12-19<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.3.1.20.(3),<br \/>NBC Division B 3.4.6.15.(1),<br \/>NBC Division B 3.4.6.15.(3),<br \/>NBC Division B 9.6.1.2.(1),<br \/>NBC Division B 9.6.1.4.(1),<br \/>NBC Division B 9.8.8.7.(1)<\/td><td>-<\/td><\/tr><tr><td>1898<\/td><td>List Examples of Types of Disabilities in Division A<\/td><td>Meszaros, Michael, Pioneer Code Consultants Ltd<\/td><td>2022-12-18<\/td><td><strong>Received<\/strong><br \/>2022-12-19<br \/><\/td><td>NBC Division B 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1897<\/td><td>Superimposed Major Occupancies<\/td><td>Meszaros, Michael, Pioneer Code Consultants Ltd<\/td><td>2022-12-18<\/td><td><strong>Received<\/strong><br \/>2022-12-19<br \/><\/td><td>NBC Division B 3.2.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>1896<\/td><td>Firestop Rating of Penetrations by Outlet Boxes<\/td><td>Meszaros, Michael, Pioneer Code Consultants Ltd<\/td><td>2022-12-18<\/td><td><strong>Received<\/strong><br \/>2022-12-19<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.9.4.(1)<\/td><td>-<\/td><\/tr><tr><td>1895<\/td><td>Baffles in Oil Interceptors<\/td><td>Haley, Joel, Halifax Water<\/td><td>2022-12-15<\/td><td><strong>Received<\/strong><br \/>2022-12-16<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B A-2.5.5.2.,<br \/>NPC Division B 2.2.3.2.<\/td><td>-<\/td><\/tr><tr><td>1894<\/td><td>Add Composite Steel Plate Shear Walls\/Concrete-Filled as a new SFRS inNBC<\/td><td>Montgomery, C. James, Technical Committee, CSA S16 Design of Steel Structures<\/td><td>2022-12-14<\/td><td><strong>Received<\/strong><br \/>2022-12-16<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>1893<\/td><td>Removal of floor area limits for secondary suites<\/td><td>Dantzer, Ken, CaraCo Development Corporation<\/td><td>2022-12-08<\/td><td><strong>Received<\/strong><br \/>2022-12-09<br \/><\/td><td>NBC Division B 9.1.2.1.<\/td><td>-<\/td><\/tr><tr><td>1892<\/td><td>Provide Annual Emergency Training to Local Personnel to Fix Elevator in Case of Problem<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2022-12-07<\/td><td><strong>Received<\/strong><br \/>2022-12-07<br \/><\/td><td>NBC Division B 3.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>1891<\/td><td>Removal of exemption for protection of openable windows<\/td><td>Hubley, Scott A, City of St Albert<\/td><td>2022-12-06<\/td><td><strong>Received<\/strong><br \/>2022-12-07<br \/><\/td><td>NBC Division B 9.8.8.1.(5)<\/td><td>-<\/td><\/tr><tr><td>1890<\/td><td>Activation of Supervisory Devices during Regular Testing<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2022-12-06<\/td><td><strong>Received<\/strong><br \/>2022-12-07<br \/><\/td><td>NBC Division B 3.2.5.,<br \/>NFC Division B 6.4.1.<\/td><td>-<\/td><\/tr><tr><td>1889<\/td><td>Activation of Supervisory Devices at Commissioning<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2022-12-06<\/td><td><strong>Received<\/strong><br \/>2022-12-07<br \/><\/td><td>NBC Division B 3.2.4.,<br \/>NBC Division B 3.2.4.<\/td><td>-<\/td><\/tr><tr><td>1888<\/td><td>Add Prescriptive Requirements for Commercial Refrigeration Equipment and Systems<\/td><td>Genest, Frederic, Natural Resources Canada<\/td><td>2022-12-02<\/td><td><strong>Received<\/strong><br \/>2022-12-05<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.12.<\/td><td>-<\/td><\/tr><tr><td>1887<\/td><td>Replace of L-shape Grab Bar by Straight Grab Bar in Horizontal and Vertical Locations<\/td><td>Gettelman, Alan NMN, Bobrick Washroom Equipment, Inc.<\/td><td>2022-11-30<\/td><td><strong>Received<\/strong><br \/>2022-12-02<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/><\/td><td>NBC Division B 3.8.3.12.,<br \/>NBC Division B 3.8.3.17.,<br \/>NBC Division B 3.8.3.18.<\/td><td>-<\/td><\/tr><tr><td>1886<\/td><td>Replace all references to CSA S136 in NBC to AISI S100 <\/td><td>Perras, Brett, CISC-ICCA<\/td><td>2022-11-25<\/td><td><strong>Received<\/strong><br \/>2022-11-25<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division A 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1885<\/td><td>Gas Detection for New Construction and Renovated Buildings<\/td><td>Costa, Salvatori D, Teck Resources<\/td><td>2022-11-24<\/td><td><strong>Received<\/strong><br \/>2022-11-25<br \/><\/td><td>NFC Division B 2.1.3.<\/td><td>-<\/td><\/tr><tr><td>1884<\/td><td>Continuity of Air Barrier System into Exterior Wall Assemblies<\/td><td>MacDonald, David, Town of Oromocto<\/td><td>2022-11-21<\/td><td><strong>Received<\/strong><br \/>2022-11-22<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NBC Division B 9.25.3.3.<\/td><td>-<\/td><\/tr><tr><td>1883<\/td><td>Specified Loads for Exterior Guards<\/td><td>Mazerolle, Claude CM, Les Entreprises Claude Mazerolle, inc.<\/td><td>2022-11-09<\/td><td><strong>Received<\/strong><br \/>2022-11-09<br \/><\/td><td>NBC Division B 9.8.8.2.(5)<\/td><td>-<\/td><\/tr><tr><td>1882<\/td><td>Minimum Construction Width of Exterior Walls<\/td><td>stewart, mark j<\/td><td>2022-11-08<\/td><td><strong>Received<\/strong><br \/>2022-11-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-09-04<br \/><\/td><td>NBC Division B 9.36.3.5.<\/td><td>-<\/td><\/tr><tr><td>1881<\/td><td>Penetrations by Air Conditioning Piping through the Building Envelope<\/td><td>MacDonald, David, Town of Oromocto<\/td><td>2022-11-07<\/td><td><strong>Received<\/strong><br \/>2022-11-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.36.2.10.,<br \/>NBC Division B 9.25.3.3.(6)<\/td><td>-<\/td><\/tr><tr><td>1880<\/td><td>Removal of the Term \"Storage Tank\" from Part 3 of the NBC<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2022-11-07<\/td><td><strong>Received<\/strong><br \/>2022-11-09<br \/><\/td><td>NBC Division B 3.1.1.<\/td><td>1965 (published)<\/td><\/tr><tr><td>1879<\/td><td>Wind Pressure and Required Wood Nailing of Framing<\/td><td>Thompson, David P., kta Structural Engineers Ltd.<\/td><td>2022-11-04<\/td><td><strong>Received<\/strong><br \/>2022-11-09<br \/><\/td><td>NBC Division B 9.23.3.4.(3)<\/td><td>-<\/td><\/tr><tr><td>1878<\/td><td>Update to Referenced Standard for the Efficiency of Electrical Motors<\/td><td>Loggia, Sam, CSA Group<\/td><td>2022-11-03<\/td><td><strong>Received<\/strong><br \/>2022-11-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NECB Division B 7.2.4.1.(1)<\/td><td>2096 (published)<\/td><\/tr><tr><td>1877<\/td><td>Update to Referenced Standard for Lighting and Emergency Power Systems<\/td><td>Loggia, Sam, CSA Group<\/td><td>2022-11-03<\/td><td><strong>Received<\/strong><br \/>2022-11-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.7.5.(1),<br \/>NFC Division B 6.5.1.1.(1),<br \/>NFC Division B 6.5.1.4.(1),<br \/>NFC Division B A-6.5.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1876<\/td><td>Update to Referenced Standard for Fans and Ventilators<\/td><td>Loggia, Sam, CSA Group<\/td><td>2022-11-03<\/td><td><strong>Received<\/strong><br \/>2022-11-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.32.3.10.(7)<\/td><td>-<\/td><\/tr><tr><td>1875<\/td><td>Containers and Portable Tanks - Design and Construction<\/td><td>atkinson, cheryl<\/td><td>2022-10-28<\/td><td><strong>Received<\/strong><br \/>2022-10-31<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NFC Division B 4.2.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1874<\/td><td>Update to Referenced Document for Plumbing Engineering Design<\/td><td>Thompson, Eric, Schier Products<\/td><td>2022-10-27<\/td><td><strong>Received<\/strong><br \/>2022-10-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NPC Division B A-2.4.4.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1873<\/td><td>Update metric SCOP to \"net sensible COP\" in Table 5.2.12.1.-H for Computer Room AC<\/td><td>Urban, Ruth, Caneta Research<\/td><td>2022-10-24<\/td><td><strong>Received<\/strong><br \/>2022-10-24<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.12.1.(1)<\/td><td>2105<\/td><\/tr><tr><td>1872<\/td><td>Rim Joists<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-10-18<\/td><td><strong>Received<\/strong><br \/>2022-10-19<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 9.3.2.<\/td><td>-<\/td><\/tr><tr><td>1871<\/td><td>In-factory Testing for Airtightness of Modular Homes<\/td><td>Maynard, Kathleen, Canadian Home Builders\u2019 Association<\/td><td>2022-10-14<\/td><td><strong>Received<\/strong><br \/>2022-10-17<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-04-25<br \/><\/td><td>NBC Division B 9.36.6.3.<\/td><td>1893<\/td><\/tr><tr><td>1870<\/td><td>Non-Potable Water System Design<\/td><td>Bauer, Jozef E, CANL Distributing Ltd. <\/td><td>2022-10-13<\/td><td><strong>Received<\/strong><br \/>2022-10-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B A-2.7.1.1.,<br \/>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1869<\/td><td>Air Intake of Rooms Exhausting Air into a Storage Garage<\/td><td>Ouellette, Jesse<\/td><td>2022-10-07<\/td><td><strong>Received<\/strong><br \/>2022-10-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 6.3.2.7.(3)<\/td><td>-<\/td><\/tr><tr><td>1868<\/td><td>Requirements for Heating, Ventilating and Air-Conditioning of Health Care Facilities<\/td><td>Ouellette, Jesse<\/td><td>2022-10-07<\/td><td><strong>Received<\/strong><br \/>2022-10-12<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.2.1.<\/td><td>-<\/td><\/tr><tr><td>1867<\/td><td>Access Through a Vestibule<\/td><td>Ruetz, Matt, City of Kitchener<\/td><td>2022-10-07<\/td><td><strong>Received<\/strong><br \/>2022-10-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.5.7.(4)<\/td><td>-<\/td><\/tr><tr><td>1866<\/td><td>Clarify the application of CSA B139-19 and NFC 2020<\/td><td>Meier, Aaron, LMDG Building Code Consultants Ltd<\/td><td>2022-10-06<\/td><td><strong>Received<\/strong><br \/>2022-10-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-09-22<br \/><\/td><td>NFC Division B 4.1.1.1.(3),<br \/>NFC Division B 4.3.13.4.(1)<\/td><td>1805 (published)<\/td><\/tr><tr><td>1865<\/td><td>Installation and Inspection of Materials Requiring Fire-Resistance Rating<\/td><td>McHugh, William J, Firestop Contractors International Association<\/td><td>2022-10-06<\/td><td><strong>Received<\/strong><br \/>2022-10-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.7.1.<\/td><td>-<\/td><\/tr><tr><td>1864<\/td><td>Qualified Fireproofing Contractor Program<\/td><td>McHugh, William J, Firestop Contractors International Association<\/td><td>2022-10-06<\/td><td><strong>Received<\/strong><br \/>2022-10-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.7.1.<\/td><td>-<\/td><\/tr><tr><td>1863<\/td><td>Inspection of Firestops<\/td><td>McHugh, William J, Firestop Contractors International Association<\/td><td>2022-10-06<\/td><td><strong>Received<\/strong><br \/>2022-10-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B A-3.1.8.3.(2)<\/td><td>-<\/td><\/tr><tr><td>1862<\/td><td>Standard for Fibre-Reinforced Polymers<\/td><td>Benmokrane, Brahim, Universit\u00e9 de Sherbrooke<\/td><td>2022-10-04<\/td><td><strong>Received<\/strong><br \/>2022-10-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.3.1.<\/td><td>-<\/td><\/tr><tr><td>1861<\/td><td>Inspection of Firestops<\/td><td>McHugh, William J, Firestop Contractors International Association<\/td><td>2022-10-04<\/td><td><strong>Received<\/strong><br \/>2022-10-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NFC Division B 2.2.<\/td><td>-<\/td><\/tr><tr><td>1860<\/td><td>Qualified Firestop Contractor Program<\/td><td>McHugh, William J, Firestop Contractors International Association<\/td><td>2022-10-04<\/td><td><strong>Received<\/strong><br \/>2022-10-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.9.1.<\/td><td>-<\/td><\/tr><tr><td>1859<\/td><td>Energy Efficiency Laboratory Fan System Design<\/td><td>Girgis, Elisabeth, Public Service and Procurement Canada<\/td><td>2022-09-28<\/td><td><strong>Received<\/strong><br \/>2022-09-28<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.3.3.,<br \/>NECB Division B 5.2.3.4.<\/td><td>-<\/td><\/tr><tr><td>1858<\/td><td>Installation of Smoke and Combination Smoke\/Fire Dampers<\/td><td>Sun, Bill, Ellard Willson Engineering LTD<\/td><td>2022-09-14<\/td><td><strong>Received<\/strong><br \/>2022-09-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.11.(3)<\/td><td>-<\/td><\/tr><tr><td>1857<\/td><td>Clarify Emergency Responder Safety in the National Model Codes<\/td><td>Porcari, Gian-Luca , National Research Council Canada <\/td><td>2022-09-08<\/td><td><strong>Received<\/strong><br \/>2022-09-12<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-10-13<br \/><\/td><td>NBC Division A 2.2.1.1.(1)<\/td><td>1998<\/td><\/tr><tr><td>1856<\/td><td>Installation of Smoke Dampers and Location of Smoke Detector Actuating Devices<\/td><td>Tsisserev, Ark, AES Engineering<\/td><td>2022-09-10<\/td><td><strong>Received<\/strong><br \/>2022-09-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.11.(3)<\/td><td>-<\/td><\/tr><tr><td>1855<\/td><td>Fusible Links for Fire Dampers<\/td><td>Joyce, Matthew, Price Industries Ltd.<\/td><td>2022-09-06<\/td><td><strong>Received<\/strong><br \/>2022-09-08<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.10.(2)<\/td><td>-<\/td><\/tr><tr><td>1854<\/td><td>Revise the Title of Article 7.1.2.1. in the French Version<\/td><td>L\u00e9veill\u00e9, Philippe, Pageau Morel inc.<\/td><td>2022-09-06<\/td><td><strong>Received<\/strong><br \/>2022-09-06<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 7.1.2.1.<\/td><td>-<\/td><\/tr><tr><td>1853<\/td><td>PEX\/PERT and CPVC pipe diameter sizing.<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2022-08-31<\/td><td><strong>Received<\/strong><br \/>2022-09-06<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.6.3.1.<\/td><td>-<\/td><\/tr><tr><td>1852<\/td><td>Replace the Terms \"Preserved Wood Foundations\" with \"Permanent Wood Foundations\"<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-08-18<\/td><td><strong>Received<\/strong><br \/>2022-08-19<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.15.2.4.,<br \/>NBC Division B 9.20.5.1.<\/td><td>-<\/td><\/tr><tr><td>1851<\/td><td>Removing References to CSA-0437 Standard for OSB and Waferboard<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-08-17<\/td><td><strong>Received<\/strong><br \/>2022-08-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.23.13.6.,<br \/>NBC Division B 9.23.15.,<br \/>NBC Division B 9.23.16.,<br \/>NBC Division B 9.27.1.1.,<br \/>NBC Division B 9.27.5.1.,<br \/>NBC Division B 9.27.10.,<br \/>NBC Division B 9.29.9.,<br \/>NBC Division B 9.30.2.2.(1),<br \/>NBC Division B 9.23.12.3.<\/td><td>-<\/td><\/tr><tr><td>1850<\/td><td>Replace the Term \"Moving Walkways\" with \"Moving Walks\"<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2022-08-16<\/td><td><strong>Received<\/strong><br \/>2022-08-17<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.8.1.4.,<br \/>NBC Division B 3.8.2.4.<\/td><td>-<\/td><\/tr><tr><td>1849<\/td><td>Segmental Retaining Wall Design Requirements<\/td><td>Jonasson, Eric, Risi Stone Inc.<\/td><td>2022-08-16<\/td><td><strong>Received<\/strong><br \/>2022-08-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.<\/td><td>-<\/td><\/tr><tr><td>1848<\/td><td>Rating for Wall Sheathing<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-08-16<\/td><td><strong>Received<\/strong><br \/>2022-08-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.17.2.<\/td><td>-<\/td><\/tr><tr><td>1847<\/td><td>Fire Separation Requirement in Car Dealerships<\/td><td>Goguen, Mathieu, Greater Miramichi Regional Service Commission<\/td><td>2022-08-15<\/td><td><strong>Received<\/strong><br \/>2022-08-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.5.6.,<br \/>NBC Division B 9.10.9.18.<\/td><td>-<\/td><\/tr><tr><td>1846<\/td><td>Smoke and Fire Dampers Waived<\/td><td>MacKeracher, David W., MCW Consultants Ltd.<\/td><td>2022-08-14<\/td><td><strong>Received<\/strong><br \/>2022-08-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.8.(2),<br \/>NBC Division B 3.1.8.9.(2)<\/td><td>-<\/td><\/tr><tr><td>1845<\/td><td>Wastewater energy transfer retention vessels.<\/td><td>Marchet, Antonio, NRC-IRAP<\/td><td>2022-07-18<\/td><td><strong>Received<\/strong><br \/>2022-08-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.6.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1844<\/td><td>Update to Table 9.10.3.1.-A related to sound transmission<\/td><td>Mahn, Jeffrey, National Research Council Canada<\/td><td>2022-08-11<\/td><td><strong>Received<\/strong><br \/>2022-08-12<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-26<br \/><\/td><td>NBC Division B 9.10.3.1.<\/td><td>-<\/td><\/tr><tr><td>1843<\/td><td>Blast Load Resistance<\/td><td>Huntley, Shelley, Global Affairs Canada<\/td><td>2022-08-08<\/td><td><strong>Received<\/strong><br \/>2022-08-10<br \/><\/td><td>NBC Division B 4.1.2.1.,<br \/>NBC Division B 4.1.3.2.<\/td><td>-<\/td><\/tr><tr><td>1842<\/td><td>Update of CSA C22.2 No. 113 - Fans & Ventilators<\/td><td>Attarde, Sunny , CSA Group<\/td><td>2022-07-15<\/td><td><strong>Received<\/strong><br \/>2022-07-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.32.3.10.(7)<\/td><td>-<\/td><\/tr><tr><td>1841<\/td><td>Cooling System Clarification for Heat Pumps<\/td><td>Trudeau, Marc, The AME Consulting Group Ltd.<\/td><td>2022-07-04<\/td><td><strong>Received<\/strong><br \/>2022-07-04<br \/><\/td><td>NECB Division B 8.4.4.13.<\/td><td>-<\/td><\/tr><tr><td>1840<\/td><td>Central Heating Coil Requirement for HVAC System 6<\/td><td>Trudeau, Marc, The AME Consulting Group Ltd.<\/td><td>2022-07-04<\/td><td><strong>Received<\/strong><br \/>2022-07-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NECB Division B 8.4.4.7.<\/td><td>-<\/td><\/tr><tr><td>1839<\/td><td>Reference ASTM C840 \"Standard Specification for Application and Finishing of Gypsum Board\"<\/td><td>Schmeida, Michael , Gypsum Association<\/td><td>2022-07-01<\/td><td><strong>Received<\/strong><br \/>2022-07-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.3.6.(5),<br \/>NBC Division B 9.10.9.2.(5),<br \/>NBC Division B 9.10.12.4.(3),<br \/>NBC Division B 9.10.14.5.(8),<br \/>NBC Division B 9.10.14.5.(12),<br \/>NBC Division B 9.10.15.5.(7),<br \/>NBC Division B 9.10.15.5.(11),<br \/>NBC Division B 9.29.5.1.(2),<br \/>NBC Division B 9.10.3.1.<\/td><td>-<\/td><\/tr><tr><td>1838<\/td><td>Protection from Dampness<\/td><td>Tweidt, Ty D, Building &amp; Technical Standards Branch, Ministry of Government Relations, Government of Saskatchewan<\/td><td>2022-06-30<\/td><td><strong>Received<\/strong><br \/>2022-07-04<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.2.3.<\/td><td>-<\/td><\/tr><tr><td>1837<\/td><td>Reintroduce of a Subsection for Fibre-Cement Cladding<\/td><td>Bowness, Christopher, Boca Engineering Co.<\/td><td>2022-06-29<\/td><td><strong>Received<\/strong><br \/>2022-06-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.27.<\/td><td>-<\/td><\/tr><tr><td>1836<\/td><td>Fibre-Cement Cladding Materials<\/td><td>Bowness, Christopher, Boca Engineering Co.<\/td><td>2022-06-29<\/td><td><strong>Received<\/strong><br \/>2022-06-30<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>-<\/td><\/tr><tr><td>1835<\/td><td>Replace Withdrawn CAN\/CGSB-51.32-M Standard<\/td><td>chabot, francois, rothoblaas<\/td><td>2022-06-28<\/td><td><strong>Received<\/strong><br \/>2022-06-28<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.23.13.9.(1),<br \/>NBC Division B 9.26.2.1.,<br \/>NBC Division B 9.27.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1834<\/td><td>Update of Article 9.29.5.2. to reference ASTM and CSA standards for multiple gypsum panel products<\/td><td>Schmeida, Michael , Gypsum Association<\/td><td>2022-06-28<\/td><td><strong>Received<\/strong><br \/>2022-06-28<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.29.5.2.<\/td><td>-<\/td><\/tr><tr><td>1833<\/td><td>Reference of ASTM C1280 with Table 9.23.17.(2)-A<\/td><td>Schmeida, Michael , Gypsum Association<\/td><td>2022-06-28<\/td><td><strong>Received<\/strong><br \/>2022-06-28<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.17.2.<\/td><td>-<\/td><\/tr><tr><td>1832<\/td><td>Harmonize the thermal efficiency requirements for the service heating equipment   <\/td><td>Bigonesse, Alexandre, NRCan<\/td><td>2022-06-15<\/td><td><strong>Received<\/strong><br \/>2022-06-20<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B 9.36.5.16.<\/td><td>-<\/td><\/tr><tr><td>1831<\/td><td>Reference Building Modeling of HVAC System<\/td><td>Chatfield, Melanie<\/td><td>2022-06-03<\/td><td><strong>Received<\/strong><br \/>2022-06-06<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NECB Division B 8.4.4.7.<\/td><td>-<\/td><\/tr><tr><td>1830<\/td><td>Reference Building Modeling of Heat Pump<\/td><td>Chatfield, Melanie<\/td><td>2022-06-03<\/td><td><strong>Received<\/strong><br \/>2022-06-06<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-05-05<br \/><\/td><td>NECB Division B 8.4.4.13.(2)<\/td><td>-<\/td><\/tr><tr><td>1829<\/td><td>Combustible Window Sashes and Frames in EMTC Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2022-06-03<\/td><td><strong>Received<\/strong><br \/>2022-06-06<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.6.8.<\/td><td>-<\/td><\/tr><tr><td>1828<\/td><td>Withdrawal of CAN\/CGSB 51.33-M<\/td><td>Belanger, Brent, CertainTeed Canada<\/td><td>2022-05-31<\/td><td><strong>Received<\/strong><br \/>2022-05-31<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.25.4.2.(5)<\/td><td>-<\/td><\/tr><tr><td>1827<\/td><td>Withdrawal of CAN\/CGSB-51.34-M<\/td><td>Belanger, Brent, CertainTeed Canada<\/td><td>2022-05-31<\/td><td><strong>Received<\/strong><br \/>2022-05-31<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.25.4.2.(4)<\/td><td>-<\/td><\/tr><tr><td>1826<\/td><td>Audible signal silencing<\/td><td>Kovich, Mike , Sentinel Systems <\/td><td>2022-05-29<\/td><td><strong>Received<\/strong><br \/>2022-05-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-01<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.4.18.(8)<\/td><td>-<\/td><\/tr><tr><td>1825<\/td><td>Snow Loads on Greenhouse Roofing Structure<\/td><td>Schepers, Albert, GS Engineering Consultants Inc.<\/td><td>2022-05-27<\/td><td><strong>Received<\/strong><br \/>2022-05-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 2.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>1824<\/td><td>Prescriptive ICF Design for Part 9 Structures<\/td><td>Bennion, Douglas, Insulating Concrete Forms Manufacturers Association<\/td><td>2022-05-26<\/td><td><strong>Received<\/strong><br \/>2022-05-30<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1823<\/td><td>Reduction in Drainage Pipe Sizing<\/td><td>Blundell, Rainier, Ontario Plumbing Inspectors Association<\/td><td>2022-05-18<\/td><td><strong>Received<\/strong><br \/>2022-05-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-01-11<br \/><\/td><td>NPC Division B 2.4.9.1.<\/td><td>-<\/td><\/tr><tr><td>1822<\/td><td>Water-bottle Filling Stations<\/td><td>Cheung, Rick, City of Vancouver<\/td><td>2022-05-09<\/td><td><strong>Received<\/strong><br \/>2022-05-11<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.8.2.8.(11)<\/td><td>1885<\/td><\/tr><tr><td>1821<\/td><td>Connections to sanitary drainage systems.<\/td><td>Wright, Chris, UA Local 46 JTAC<\/td><td>2022-05-05<\/td><td><strong>Received<\/strong><br \/>2022-05-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2024-09-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.2.1.(1)<\/td><td>2130<\/td><\/tr><tr><td>1820<\/td><td>Introduce an Explanatory Note to Sentence\u00a06.1.1.3.(2) <\/td><td>Genest, Fr\u00e9d\u00e9ric, Ressources naturelles Canada<\/td><td>2022-05-04<\/td><td><strong>Received<\/strong><br \/>2022-05-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 6.1.1.3.(2)<\/td><td>-<\/td><\/tr><tr><td>1819<\/td><td>Guardrail opening dimensions<\/td><td>Giles, Erov<\/td><td>2022-04-25<\/td><td><strong>Received<\/strong><br \/>2022-04-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.3.1.18.<\/td><td>-<\/td><\/tr><tr><td>1818<\/td><td>Adding Objective OH5 to Articles 4.3.5.2. and 4.3.11.3.<\/td><td>Richards, Paul<\/td><td>2022-04-19<\/td><td><strong>Received<\/strong><br \/>2022-04-21<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2023-05-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2024-03-22<br \/><\/td><td>NFC Division B 4.3.5.2.,<br \/>NFC Division B 4.3.11.3.<\/td><td>1776 (published)<\/td><\/tr><tr><td>1817<\/td><td>Clarify if heavy timber joists in older buildings are covered under Table 3.1.4.7. <\/td><td>Johnson, Andrew T, Johnson Engineered Solutions Limited<\/td><td>2022-04-19<\/td><td><strong>Received<\/strong><br \/>2022-04-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.4.7.<\/td><td>-<\/td><\/tr><tr><td>1816<\/td><td>Allow single egress for multi-unit residential buildings up to 6 storeys in Part 3<\/td><td>Speckert, Conrad, LGA Architectural Partners<\/td><td>2022-04-18<\/td><td><strong>Received<\/strong><br \/>2022-04-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-11-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-04-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2024-03-01<br \/><\/td><td>NBC Division B 3.4.2.1.<\/td><td>-<\/td><\/tr><tr><td>1815<\/td><td>Allow single egress for multi-unit residential buildings (Part 9) up to 3 storeys<\/td><td>Speckert, Conrad, LGA Architectural Partners<\/td><td>2022-04-18<\/td><td><strong>Received<\/strong><br \/>2022-04-21<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2022-11-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-04-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2024-03-01<br \/><\/td><td>NBC Division B 9.9.8.2.<\/td><td>-<\/td><\/tr><tr><td>1814<\/td><td>\"Water closet\" \"toilet\" terminology  <\/td><td>Dupuis, Robert C, Robert Dupuis Architect<\/td><td>2022-04-13<\/td><td><strong>Received<\/strong><br \/>2022-04-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B ,<br \/>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1813<\/td><td>Drain Water Heat Recovery (DWHR)<\/td><td>Fontaine, Marc, EcoInnovation Technologies Inc.<\/td><td>2022-04-04<\/td><td><strong>Received<\/strong><br \/>2022-04-13<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-31<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-12-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-11<br \/><\/td><td>NBC Division B 9.36.8.10.,<br \/>NBC Division B 9.36.4.<\/td><td>1835 (published)<\/td><\/tr><tr><td>1812<\/td><td>Mitigating Risk to Persons with Disabilities During a Fire Condition<\/td><td>Staniowski, Joseph M., Staniowski<\/td><td>2022-04-05<\/td><td><strong>Received<\/strong><br \/>2022-04-13<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 1.4.1.2.,<br \/>NBC Division B 3.1.8.5.,<br \/>NBC Division B 3.8.3.6.(6)<\/td><td>2204<\/td><\/tr><tr><td>1811<\/td><td>Silencing of audible alarms<\/td><td>Miller, Gordon, NORTHFORT Fire &amp; Life Safety<\/td><td>2022-03-29<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-04-05<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.4.18.(12)<\/td><td>-<\/td><\/tr><tr><td>1810<\/td><td>Add factory-assembled prefabricated wood panels as a acceptable solution in Part 3<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-03-29<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division A 1.1.1.,<br \/>NBC Division C 2.2.7.5.<\/td><td>-<\/td><\/tr><tr><td>1809<\/td><td>Add factory-assembled prefabricated wood panels as a acceptable solution in Part 9<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2022-03-29<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.,<br \/>NBC Division C 2.2.7.<\/td><td>-<\/td><\/tr><tr><td>1808<\/td><td>Floor Systems and Braced Wall Bands<\/td><td>Baildham, Riley<\/td><td>2022-03-24<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.13.4.,<br \/>NBC Division B 9.23.13.5.(5),<br \/>NBC Division B 9.23.13.7.<\/td><td>-<\/td><\/tr><tr><td>1807<\/td><td>Inconsistency between Article 3.2.7.6. and the Canadian Electrical code<\/td><td>Tsisserev, Ark, AES Engineering<\/td><td>2022-03-23<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.7.6.<\/td><td>-<\/td><\/tr><tr><td>1806<\/td><td>General Lighting for Outdoor Swimming Pools <\/td><td>Behiels, Adam, Mulvey And Banani<\/td><td>2022-03-22<\/td><td><strong>Received<\/strong><br \/>2022-03-31<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.7.<\/td><td>-<\/td><\/tr><tr><td>1805<\/td><td>New Greenhouse Gas Sub-Objective<\/td><td>Hicks, Katie , Natural Resources Canada, Office of Energy Efficiency, Buildings and Industry Division<\/td><td>2022-03-11<\/td><td><strong>Received<\/strong><br \/>2022-03-15<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-13<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-11-01<br \/><\/td><td>NECB Division A 2.2.1.1.(1),<br \/>NBC Division A 2.2.1.1.(1)<\/td><td>1820 (published), 1843 (published), 1989 (published)<\/td><\/tr><tr><td>1804<\/td><td>Editorial change to requirements for Backwater Valve in NPC<\/td><td>Wright, Chris, UA Local 46 JTAC<\/td><td>2022-03-10<\/td><td><strong>Received<\/strong><br \/>2022-03-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.4.6.4.(2)<\/td><td>-<\/td><\/tr><tr><td>1803<\/td><td>Principal Ventilation System Exhaust Fan<\/td><td>MACPHAIL, DAVID M, RESORT MUNICIPALITY OF WHISTLER<\/td><td>2022-03-03<\/td><td><strong>Received<\/strong><br \/>2022-03-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2024-09-12<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 9.32.3.3.<\/td><td>-<\/td><\/tr><tr><td>1802<\/td><td>Protection of Soffits Enclosing a Projection<\/td><td>St-Gelais, William<\/td><td>2022-03-02<\/td><td><strong>Received<\/strong><br \/>2022-03-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.12.4.(2),<br \/>NBC Division B 3.2.3.16.(1)<\/td><td>-<\/td><\/tr><tr><td>1801<\/td><td>Terminology and types of gypsum board (App. D)<\/td><td>Schmeida, Michael , Gypsum Association<\/td><td>2022-03-01<\/td><td><strong>Received<\/strong><br \/>2022-03-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-10-04<br \/><\/td><td>NBC Division B D-1.5.1.<\/td><td>1845 (published), 1846 (published)<\/td><\/tr><tr><td>1800<\/td><td>Terminology and types of gypsum board (Part 3)<\/td><td>Schmeida, Michael , Gypsum Association<\/td><td>2022-03-01<\/td><td><strong>Received<\/strong><br \/>2022-03-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-04<br \/><\/td><td>NBC Division B 3.1.5.13.<\/td><td>1841 (published)<\/td><\/tr><tr><td>1799<\/td><td>Exterior Walls that are Setback From the Exterior Walls Below<\/td><td>Baildham, Riley<\/td><td>2022-03-01<\/td><td><strong>Received<\/strong><br \/>2022-03-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.13.7.(2)<\/td><td>-<\/td><\/tr><tr><td>1798<\/td><td>Interior lighting controls<\/td><td>Larose, Camil, Wattstopper<\/td><td>2022-02-27<\/td><td><strong>Received<\/strong><br \/>2022-02-28<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.1.(3),<br \/>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1797<\/td><td>Update the list of Flashing Materials for Masonry Construction permitted in NBC<\/td><td>St-Gelais, William<\/td><td>2022-02-21<\/td><td><strong>Received<\/strong><br \/>2022-02-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.20.13.1.<\/td><td>-<\/td><\/tr><tr><td>1796<\/td><td>Press Connect Fittings<\/td><td>Carpenter, Bob, Viega LLC<\/td><td>2022-02-04<\/td><td><strong>Received<\/strong><br \/>2022-02-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.2.7.<\/td><td>-<\/td><\/tr><tr><td>1795<\/td><td>Continuity of Horizontal Fire Separations Abutting Exterior Facades<\/td><td>Lucas, Vijay , Jensen Hughes<\/td><td>2022-02-03<\/td><td><strong>Received<\/strong><br \/>2022-02-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.8.3.(4)<\/td><td>-<\/td><\/tr><tr><td>1794<\/td><td>New standard: CSA Z250, \"Process for delivery of volumetric modular buildings\"<\/td><td>Haylestrom, Steven, The Modular Solution<\/td><td>2022-01-31<\/td><td><strong>Received<\/strong><br \/>2022-02-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.1.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1793<\/td><td>Add a reference to a new Standard for materials in concealed space used as plenum.<\/td><td>McBain, Brian, Underwriters Laboratories of Canada<\/td><td>2022-01-31<\/td><td><strong>Received<\/strong><br \/>2022-02-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.6.4.3.(1)<\/td><td>2173<\/td><\/tr><tr><td>1792<\/td><td>Conformity Assessment with Referenced Standards<\/td><td>Fallow, William, Technical Inspection Services, Dept of Justice and Public Safety<\/td><td>2022-01-18<\/td><td><strong>Received<\/strong><br \/>2022-01-18<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1791<\/td><td>Window cleaning systems<\/td><td>Lapointe, Jean, Commission des Normes, de l\u2019\u00c9quit\u00e9, de la Sant\u00e9 et de la S\u00e9curit\u00e9 du Travail<\/td><td>2022-01-20<\/td><td><strong>Received<\/strong><br \/>2022-01-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1790<\/td><td>Macerating Toilet System Defined Terminology<\/td><td>Aguilar, Hugo O, IAPMO<\/td><td>2022-01-19<\/td><td><strong>Received<\/strong><br \/>2022-01-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>1707 (published)<\/td><\/tr><tr><td>1789<\/td><td>Overall Thermal Transmittance of the Building Envelope<\/td><td>Winder, Kelly D, Crosier Kilgour &amp; Partners Ltd<\/td><td>2022-01-14<\/td><td><strong>Received<\/strong><br \/>2022-01-18<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NECB Division B 3.2.1.4.<\/td><td>-<\/td><\/tr><tr><td>1788<\/td><td>Setback Allowance for Temporary Garage Shelters<\/td><td>De Zotti, Marisa<\/td><td>2022-01-13<\/td><td><strong>Received<\/strong><br \/>2022-01-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1787<\/td><td>Fall protection from Part 9 Roof Tops<\/td><td>Dalimonte, David, Coro electric <\/td><td>2022-01-11<\/td><td><strong>Received<\/strong><br \/>2022-01-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1786<\/td><td>Protection of loose-fill insulation<\/td><td>Chown, Adaire, Consultant<\/td><td>2021-12-16<\/td><td><strong>Received<\/strong><br \/>2021-12-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.25.2.4.<\/td><td>-<\/td><\/tr><tr><td>1785<\/td><td>Required venting of attic and roof spaces<\/td><td>Chown, Adaire, Consultant<\/td><td>2021-12-16<\/td><td><strong>Received<\/strong><br \/>2021-12-16<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.19.1.1.<\/td><td>-<\/td><\/tr><tr><td>1784<\/td><td>Location and Installation of Materials Providing Thermal Resistance<\/td><td>Chown, Adaire, Consultant<\/td><td>2021-12-16<\/td><td><strong>Received<\/strong><br \/>2021-12-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-01-20<br \/><\/td><td>NBC Division B 5.3.1.3.<\/td><td>-<\/td><\/tr><tr><td>1783<\/td><td>Barrier-free path of travel adjacent to lavatories and mirrors<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2021-12-10<\/td><td><strong>Received<\/strong><br \/>2021-12-10<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2024-09-12<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-10-07<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-11-20<br \/><\/td><td>NBC Division B 3.8.3.16.<\/td><td>1666<\/td><\/tr><tr><td>1782<\/td><td>Door-Swing Area and Turning Space within a Universal Washroom<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2021-12-09<\/td><td><strong>Received<\/strong><br \/>2021-12-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 3.8.3.13.<\/td><td>1941<\/td><\/tr><tr><td>1781<\/td><td>Accessible Path of Travel within Washrooms<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2021-12-09<\/td><td><strong>Received<\/strong><br \/>2021-12-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 3.8.3.16.(1)<\/td><td>1666<\/td><\/tr><tr><td>1780<\/td><td>Location of Toilet Paper Dispenser within an Accessible Water-Closet Stall<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2021-12-08<\/td><td><strong>Received<\/strong><br \/>2021-12-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 3.8.3.12.(1)<\/td><td>1779<\/td><\/tr><tr><td>1779<\/td><td>International Symbol of Access<\/td><td>Topping, Bob , DesignABLE Environments <\/td><td>2021-11-30<\/td><td><strong>Received<\/strong><br \/>2021-11-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.9.<\/td><td>-<\/td><\/tr><tr><td>1778<\/td><td>Commercial building nuisance issues<\/td><td>Gagnon, David P<\/td><td>2021-11-24<\/td><td><strong>Received<\/strong><br \/>2021-11-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 2.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1777<\/td><td>Separate signal circuits<\/td><td>Twining, Dave, Troy Life &amp; Fire Safety<\/td><td>2021-11-22<\/td><td><strong>Received<\/strong><br \/>2021-11-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.4.18.(8)<\/td><td>-<\/td><\/tr><tr><td>1776<\/td><td>Separate signal circuits<\/td><td>Twining, Dave, Troy Life &amp; Fire Safety<\/td><td>2021-11-22<\/td><td><strong>Received<\/strong><br \/>2021-11-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.4.18.(8)<\/td><td>-<\/td><\/tr><tr><td>1775<\/td><td>-<\/td><td>Franquet, John-Edward <\/td><td>2021-11-08<\/td><td><strong>Received<\/strong><br \/>2021-11-15<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-01-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1774<\/td><td>Maximum Area of Glazed Openings in Exterior Walls of Houses<\/td><td>Giroux, Anthony J, BCABD Building Designers<\/td><td>2021-11-04<\/td><td><strong>Received<\/strong><br \/>2021-11-08<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Harmonization<br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.10.15.4.<\/td><td>-<\/td><\/tr><tr><td>1773<\/td><td>Support for horizontal piping of storm drainage system<\/td><td>Mohammed, Mannan, Reliance Worldwide Corporation<\/td><td>2021-11-01<\/td><td><strong>Received<\/strong><br \/>2021-11-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-12-03<br \/><\/td><td>NPC Division B 2.3.4.5.<\/td><td>-<\/td><\/tr><tr><td>1772<\/td><td>Reducing valves<\/td><td>Mohammed, Mannan, Reliance Worldwide Corporation<\/td><td>2021-11-01<\/td><td><strong>Received<\/strong><br \/>2021-11-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-12-03<br \/><\/td><td>NPC Division B 2.2.10.12.<\/td><td>-<\/td><\/tr><tr><td>1771<\/td><td>Accessibility Requirements for Universal Washrooms - Signage<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.2.13.(2),<br \/>NBC Division B 3.8.3.9.<\/td><td>-<\/td><\/tr><tr><td>1770<\/td><td>Showers in Universal Washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1769<\/td><td>Lighting in Universal Washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1768<\/td><td>Wall-mounted privacy screens in Universal Washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1767<\/td><td>Noise level of ventilation in universal washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.13.<\/td><td>-<\/td><\/tr><tr><td>1766<\/td><td>Adjustable sinks in Universal Washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.,<br \/>NBC Division B 3.8.3.15.<\/td><td>-<\/td><\/tr><tr><td>1765<\/td><td>Universal washrooms entrance width<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1764<\/td><td>Adjustable Adult Change Tables<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1763<\/td><td>Ceiling mounted lifts in Universal Washrooms<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1762<\/td><td>Accessibility Requirements for Universal Washrooms - Bilateral Grab Bars<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.(1)<\/td><td>-<\/td><\/tr><tr><td>1761<\/td><td>Requirements for height adjustable change tables<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1760<\/td><td>CSA Z10535.2-17 Lifts for the transfer of persons<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.<\/td><td>-<\/td><\/tr><tr><td>1759<\/td><td>Accessibility Requirements for Universal Washrooms - Swing Grab Bar<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.12.(1)<\/td><td>-<\/td><\/tr><tr><td>1758<\/td><td>Accessibility Requirements for Universal Washrooms - Change Table<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.3.13.(2)<\/td><td>-<\/td><\/tr><tr><td>1757<\/td><td>Accessible Adult Changing Space in B3 Occupancies<\/td><td>Willows, David B., Accessible Washrooms for All \/ Toilettes accessibles pour tous<\/td><td>2021-10-28<\/td><td><strong>Received<\/strong><br \/>2021-10-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-03-15<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2023-10-18<br \/><\/td><td>NBC Division B 3.8.2.8.(15)<\/td><td>2127<\/td><\/tr><tr><td>1756<\/td><td>Revision of the User's Guide-NECB 2017 for the Total Vertical Fenestration and Door Area<\/td><td>Tweidt, Ty D, Building &amp; Technical Standards Branch, Ministry of Government Relations, Government of Saskatchewan<\/td><td>2021-10-21<\/td><td><strong>Received<\/strong><br \/>2021-10-26<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 8.4.4.3.(3)<\/td><td>-<\/td><\/tr><tr><td>1755<\/td><td>Reliability of Sprinkler Systems in Residential Buildings<\/td><td>C\u00f4t\u00e9, Marie-Pier, Victaulic<\/td><td>2021-10-20<\/td><td><strong>Received<\/strong><br \/>2021-10-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.3.4.<\/td><td>-<\/td><\/tr><tr><td>1754<\/td><td>CSA-B401 Maintenance facilities code for CNG and LNG facilities and parking structures in NFC <\/td><td>Cairns, Julie, CSA Group (on behalf of the B401 Technical Subcommittee)<\/td><td>2021-10-15<\/td><td><strong>Received<\/strong><br \/>2021-10-15<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-09-29<br \/><\/td><td>NFC Division B 5,<br \/>NFC Division A 2.2.1.1.,<br \/>NFC Division A 3.2.<\/td><td>-<\/td><\/tr><tr><td>1753<\/td><td>Color of Paper to Red on Fire-Rated Gypsum Board<\/td><td>Bremner, Steve  M<\/td><td>2021-10-05<\/td><td><strong>Received<\/strong><br \/>2021-10-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.9.,<br \/>NBC Division B 9.24.3.2.<\/td><td>-<\/td><\/tr><tr><td>1752<\/td><td>Definition of pedestrian\/pedestrian entrance<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2021-10-04<\/td><td><strong>Received<\/strong><br \/>2021-10-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 3.8.2.2.<\/td><td>2122<\/td><\/tr><tr><td>1751<\/td><td>Waterless Toilets<\/td><td>Brisson, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-28<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.7.2.1.,<br \/>NBC Division B 9.31.4.1.<\/td><td>-<\/td><\/tr><tr><td>1750<\/td><td>Dual-Flush Water Closet<\/td><td>Iguer, Yasmine  YI, Minist\u00e8re des Affaires municipales et de l\u2019Habitation<\/td><td>2021-09-28<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/><\/td><td>NPC Division B 2.6.1.6.<\/td><td>-<\/td><\/tr><tr><td>1749<\/td><td>Update the maximum water flow rate for private lavatories and sink faucets<\/td><td>Iguer, Yasmine  YI, Minist\u00e8re des Affaires municipales et de l\u2019Habitation<\/td><td>2021-09-28<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/><\/td><td>NPC Division B 2.2.10.6.(2),<br \/>NPC Division B ,<br \/>NECB Division B 6.2.6.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1748<\/td><td>Modify the title of Part 6<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 6<\/td><td>-<\/td><\/tr><tr><td>1747<\/td><td>Control of Temperature of Air Leaving the Supply Air Handler<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B A-5.2.8.8.(3)<\/td><td>-<\/td><\/tr><tr><td>1746<\/td><td>Roofs in Contact with the Ground<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/><\/td><td>NECB Division B 3.2.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1745<\/td><td>Clarify the HVAC modeling requirement for the reference building and change the provision's location<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-14<br \/><\/td><td>NECB Division B 8.4.2.10.(1),<br \/>NECB Division B 8.4.4.<\/td><td>-<\/td><\/tr><tr><td>1744<\/td><td>Change Article Title from \"HVAC Systems Calculations\" to \"HVAC Systems\" <\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 8.4.2.10.<\/td><td>2113 (published)<\/td><\/tr><tr><td>1743<\/td><td>Take systems' performance into consideration when determining the annual energy consumption<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2025-02-27<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-04-02<br \/><\/td><td>NECB Division B 8.4.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1742<\/td><td>Limit the re-assess of compliance to buildings only to design alters that result lower performance<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-12-18<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-08-14<br \/><\/td><td>NECB Division B 8.1.1.2.(3)<\/td><td>-<\/td><\/tr><tr><td>1741<\/td><td>Deleting requirements on Monitoring the Electrical Distribution System and Voltage Drop<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/><\/td><td>NECB Division B 7.2.1.,<br \/>NECB Division B 7.2.2.<\/td><td>-<\/td><\/tr><tr><td>1740<\/td><td>Add requirements on booster pumps to NECB<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 6.2.8.2.<\/td><td>-<\/td><\/tr><tr><td>1739<\/td><td>Requirements on lavatories<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 6.2.6.2.<\/td><td>-<\/td><\/tr><tr><td>1738<\/td><td>Requirements on showers<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 6.2.6.1.<\/td><td>-<\/td><\/tr><tr><td>1737<\/td><td>Requirements on temperature controls for service water heating systems<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 6.2.4.1.<\/td><td>-<\/td><\/tr><tr><td>1736<\/td><td>Requirements on Solar Thermal Service Water Heating Equipment<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 6.2.2.3.<\/td><td>-<\/td><\/tr><tr><td>1735<\/td><td>Reference to relevant provincial, territorial or municipal building regulations<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 6.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1734<\/td><td>Scope of NECB Part 6<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 6.1.1.1.<\/td><td>-<\/td><\/tr><tr><td>1733<\/td><td>Seasonal shutdown of HVAC systems<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 5.2.11.3.<\/td><td>-<\/td><\/tr><tr><td>1732<\/td><td>'Energy Recovery' vs 'Heat or Energy Recovery'<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 5.2.10.,<br \/>NECB Division B 5.2.10.1.<\/td><td>-<\/td><\/tr><tr><td>1731<\/td><td>Change to Subsection Title <\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 5.2.9.<\/td><td>-<\/td><\/tr><tr><td>1730<\/td><td>Automatic shutdown of heating equipment used to protect freezing of pipes<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 5.2.8.7.<\/td><td>-<\/td><\/tr><tr><td>1729<\/td><td>Temperature conditions for automatic shutdown of ice and snow-melting heaters<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-28<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division B 5.2.8.7.(1)<\/td><td>-<\/td><\/tr><tr><td>1728<\/td><td>Unconditioned space vs Space other than an air-conditioned space<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.7.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1727<\/td><td>Variable-Flow Pumping Systems - Exemptions<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.6.2.<\/td><td>-<\/td><\/tr><tr><td>1726<\/td><td>Additional testing requirements for Leakage Testing of Ducts<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.2.4.<\/td><td>-<\/td><\/tr><tr><td>1725<\/td><td>Calculation for Leakage Testing of Ducts <\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Mitigation<br \/>2024-09-12<br \/>NMCC on Climate Change Mitigation: <strong>Presented to NMCC<\/strong><br \/>2025-02-25<br \/><\/td><td>NECB Division B 5.2.2.4.(2)<\/td><td>-<\/td><\/tr><tr><td>1724<\/td><td>Voids in fall ceilings used as return air plenums<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 5.2.2.3.,<br \/>NECB Division B 5.2.2.3.<\/td><td>-<\/td><\/tr><tr><td>1723<\/td><td>Determination of Lighting Power Density - Duplicate of CCR 1679<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.3.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1722<\/td><td>Revision to the Abbreviation Used in a Formula<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.3.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1721<\/td><td>Expanding the Title of Article 4.2.4.1.<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.4.1.<\/td><td>-<\/td><\/tr><tr><td>1720<\/td><td>Bathroom Application for Lighting Switches in Hotels and Motels<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.6.(2)<\/td><td>-<\/td><\/tr><tr><td>1719<\/td><td>Terminology change<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.2.6.(2)<\/td><td>-<\/td><\/tr><tr><td>1718<\/td><td>Clarification of Terminology Used for the Installation of Lighting Controls in Storage Garages<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1717<\/td><td>Interior Lighting Controls<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.2.1.(23)<\/td><td>-<\/td><\/tr><tr><td>1716<\/td><td>Clarification of Terminology Used for the Installation of Lighting Controls<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1715<\/td><td>INTERIOR LIGHTING POWER ALLOWANCE FOR DISPLAY OF SALE ITEMS<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1714<\/td><td>INTERIOR LIGHTING POWER ALLOWANCE FOR DECORATIVE LIGHTING OR DISPLAY LIGHTING<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1713<\/td><td>INTERIOR LIGHTING POWER ALLOWANCE OF HALLWAY OR TRANSITION AREA<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1712<\/td><td>SPACE-BY- SPACE METHOD FOR DOMINANT SPACE TYPES<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1711<\/td><td>APPLICATION OF THE BUILDING AREA METHOD<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B A-4.2.1.5.<\/td><td>-<\/td><\/tr><tr><td>1710<\/td><td>LIGHTING FOR FUNCTIONS, SPACES OR EQUIPMENT<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.4.<\/td><td>-<\/td><\/tr><tr><td>1709<\/td><td>Remove Requirements for Internally Illuminated Exit Signs and Fluorescent Lamp Ballasts<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2022-03-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.1.,<br \/>NECB Division B 4.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>1708<\/td><td>REMOVING CLAUSE 4.1.1.2.(2)(C) FROM NECB<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-20<br \/><\/td><td>NECB Division B 4.1.1.2.(2)<\/td><td>1651 (published), 1721 (published)<\/td><\/tr><tr><td>1707<\/td><td>Revision to the Definition of Partition in NECB<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-06<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1706<\/td><td>Revision of the Application Statement to Consider Pools as Individual Building Structure<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-27<\/td><td><strong>Received<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division A 1.1.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1705<\/td><td>Waterless Toilets<\/td><td>Brisson, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-09-20<\/td><td><strong>Received<\/strong><br \/>2021-09-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-05-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.7.2.1.,<br \/>NBC Division B 9.31.4.1.<\/td><td>-<\/td><\/tr><tr><td>1704<\/td><td>Replace the Superseded CAN\/ULC-S505 Standard with ANSI\/CAN\/UL\/ULC 33<\/td><td>McBain, Brian, ULC<\/td><td>2021-09-22<\/td><td><strong>Received<\/strong><br \/>2021-09-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-06-14<br \/><\/td><td>NBC Division B 3.1.8.10.(2)<\/td><td>-<\/td><\/tr><tr><td>1703<\/td><td>Add Requirements for Back-up Water Supply for Sprinkler Systems in High Seismic Locations<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2021-09-21<\/td><td><strong>Received<\/strong><br \/>2021-09-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.2.5.7.<\/td><td>-<\/td><\/tr><tr><td>1702<\/td><td>Contiguous Floor numbering<\/td><td>Cheung, Rick, City of Vancouver<\/td><td>2021-09-20<\/td><td><strong>Received<\/strong><br \/>2021-09-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.4.6.19.<\/td><td>-<\/td><\/tr><tr><td>1701<\/td><td>Clarify the Intent of \"Clear Floor Space\" in Barrier-Free Design<\/td><td>Topping, Bob , DesignABLE Environments <\/td><td>2021-09-14<\/td><td><strong>Received<\/strong><br \/>2021-09-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B A-3.8.<\/td><td>2088<\/td><\/tr><tr><td>1700<\/td><td>Clear Floor Space on the Non-Latch Side of Sliding Doors<\/td><td>Topping, Bob , DesignABLE Environments <\/td><td>2021-09-14<\/td><td><strong>Received<\/strong><br \/>2021-09-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-04-05<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.3.6.(11)<\/td><td>2089<\/td><\/tr><tr><td>1699<\/td><td>Support for Underground Horizontal Piping<\/td><td>Robinson, Barbara A., Norton Engineering Inc.<\/td><td>2021-09-14<\/td><td><strong>Received<\/strong><br \/>2021-09-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.5.9.<\/td><td>-<\/td><\/tr><tr><td>1698<\/td><td>Areas exempt from requiring a barrier free path of travel<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2021-09-02<\/td><td><strong>Received<\/strong><br \/>2021-09-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-11-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2022-02-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.2.3.<\/td><td>-<\/td><\/tr><tr><td>1697<\/td><td>Expand the application of Part 9 Division B of NBC to small Group C, D, F3 occupancy buildings<\/td><td>Rocha, Nelson P., Studio 9 Architecture + Planning Ltd.<\/td><td>2021-08-30<\/td><td><strong>Received<\/strong><br \/>2021-09-07<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-06-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division A 1.3.3.3.<\/td><td>-<\/td><\/tr><tr><td>1696<\/td><td>Clarification of \"clear span\" versus \"supported span\"<\/td><td>Goguen, Mathieu, Greater Miramichi Regional Service Commission<\/td><td>2021-08-30<\/td><td><strong>Received<\/strong><br \/>2021-08-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-03<br \/><\/td><td>-<\/td><td>1955<\/td><\/tr><tr><td>1695<\/td><td>Voice communication system code reference<\/td><td>Lane, Brendan R, Smith + Andersen<\/td><td>2021-08-25<\/td><td><strong>Received<\/strong><br \/>2021-08-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-24<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1694<\/td><td>Access to buildings (lock boxes)<\/td><td>Zipser, Neal, Knox Company<\/td><td>2021-08-25<\/td><td><strong>Received<\/strong><br \/>2021-08-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-02-17<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1693<\/td><td>Locking of Fire Department Connection (FDC) Cap and Standpipe Cap<\/td><td>Zipser, Neal, Knox Company<\/td><td>2021-08-25<\/td><td><strong>Received<\/strong><br \/>2021-08-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-18<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-06-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2024-03-22<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NFC Division B 2.1.3.1.<\/td><td>-<\/td><\/tr><tr><td>1692<\/td><td>Plastic non-pressure pipe standards <\/td><td>Barrette, Martin, Armtec Inc.<\/td><td>2021-08-04<\/td><td><strong>Received<\/strong><br \/>2021-08-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NPC Division B ,<br \/>NPC Division B 2.2.5.8.<\/td><td>-<\/td><\/tr><tr><td>1691<\/td><td>Plastic non-pressure pipe standards<\/td><td>Navarro, Alex, ADS<\/td><td>2021-08-04<\/td><td><strong>Received<\/strong><br \/>2021-08-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NPC Division B ,<br \/>NPC Division B 2.2.5.8.<\/td><td>-<\/td><\/tr><tr><td>1690<\/td><td>Benches in universal dressing and shower rooms<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2021-07-28<\/td><td><strong>Received<\/strong><br \/>2021-07-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2022-02-09<br \/><\/td><td>NBC Division B 3.8.3.16.(2)<\/td><td>1780<\/td><\/tr><tr><td>1689<\/td><td>Exits through lobbies<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2021-07-22<\/td><td><strong>Received<\/strong><br \/>2021-07-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-06-05<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.4.4.2.<\/td><td>-<\/td><\/tr><tr><td>1688<\/td><td>Roof Anchorage<\/td><td>Lan, Lin (Victor), FDL Design and Construction Inc.<\/td><td>2021-07-21<\/td><td><strong>Received<\/strong><br \/>2021-07-26<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.3.4.(3)<\/td><td>-<\/td><\/tr><tr><td>1687<\/td><td>Accessible Fitting Rooms<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2021-07-19<\/td><td><strong>Received<\/strong><br \/>2021-07-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2022-02-09<br \/><\/td><td>NBC Division B 3.8.<\/td><td>2125<\/td><\/tr><tr><td>1686<\/td><td>Interior lighting power allowance for display of sale items<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-13<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1685<\/td><td>Interior lighting power allowance of hallway or transition area<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-13<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1684<\/td><td>Interior lighting power allowance for decorative lighting or display lighting<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-13<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1683<\/td><td>Space-by- Space method for dominant space types<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-13<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>1682<\/td><td>Secondary Water Supply for High Buildings<\/td><td>Mitchell, Peter R., Association of Professional Engineers and Geoscientists of BC<\/td><td>2021-07-14<\/td><td><strong>Received<\/strong><br \/>2021-07-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.2.5.7.<\/td><td>-<\/td><\/tr><tr><td>1681<\/td><td>Roofs in Contact with the Ground<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/><\/td><td>NECB Division B 3.2.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1680<\/td><td>Clarification of Requirements for Foamed Plastic Insulation of Air Duct Systems<\/td><td>Krogsgaard, Kresten E, City of Regina<\/td><td>2021-07-12<\/td><td><strong>Received<\/strong><br \/>2021-07-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-06-14<br \/><\/td><td>NBC Division B 9.33.6.4.<\/td><td>-<\/td><\/tr><tr><td>1679<\/td><td>Revise the Acronym Used Referring to Lighting Power in a Space<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.3.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1678<\/td><td>Revision to the Abbreviation Used in a Formula <\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.3.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1677<\/td><td>Expanding the Title of Article 4.2.4.1.<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.4.1.<\/td><td>-<\/td><\/tr><tr><td>1676<\/td><td>Clarification to the application of lighting requirements<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.2.6.(2)<\/td><td>-<\/td><\/tr><tr><td>1675<\/td><td>Clarification of lighting requirements for commercial temporary lodgings<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.2.6.(2)<\/td><td>-<\/td><\/tr><tr><td>1674<\/td><td>Clarification of Terminology Used for the Installation of Lighting Controls in Storage Garages<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1673<\/td><td>Interior Lighting Controls<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.2.1.(23)<\/td><td>-<\/td><\/tr><tr><td>1672<\/td><td>Clarification of Terminology Used for the Installation of Lighting Controls<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 4.2.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1671<\/td><td>Application of the Building Area method <\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B A-4.2.1.5.<\/td><td>-<\/td><\/tr><tr><td>1670<\/td><td>Lighting for functions, spaces or equipment <\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-06<br \/><\/td><td>NECB Division B 4.2.1.4.(5)<\/td><td>-<\/td><\/tr><tr><td>1669<\/td><td>Remove Requirements for Internally Illuminated Exit Signs and Fluorescent Lamp Ballasts<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/><\/td><td>NECB Division B 4.2.1.1.,<br \/>NECB Division B 4.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>1668<\/td><td>Remove exemption for Part 4 application <\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-02-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-20<br \/><\/td><td>NECB Division B 4.1.1.2.(2)<\/td><td>1651 (published), 1721 (published)<\/td><\/tr><tr><td>1667<\/td><td>Revision to the Definition of Partition in NECB<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-03<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-06-14<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-09-06<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1666<\/td><td>Revision of the Application Statement to Consider Pools as Individual Building Structure<\/td><td>Sabri\u00e9, Marine, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-07-02<\/td><td><strong>Received<\/strong><br \/>2021-09-01<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-07-19<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NECB Division A 1.1.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1665<\/td><td>Electric Hot Water Tank temperature setting and Legionella Control<\/td><td>Chown, Bob, Ecoseeker Inc.<\/td><td>2021-06-29<\/td><td><strong>Received<\/strong><br \/>2021-06-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-03-07<br \/><\/td><td>NBC Division B 9.31.6.2.<\/td><td>-<\/td><\/tr><tr><td>1664<\/td><td>Unauthorized Access to Storage Areas of Dangerous Goods in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-28<\/td><td><strong>Received<\/strong><br \/>2021-06-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NFC Division B 2.14.1.<\/td><td>-<\/td><\/tr><tr><td>1663<\/td><td>Shields on Mechanical Equipment in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-28<\/td><td><strong>Received<\/strong><br \/>2021-06-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NFC Division B 2.14.1.2.<\/td><td>-<\/td><\/tr><tr><td>1662<\/td><td>Use of Open-Flame Devices in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-27<\/td><td><strong>Received<\/strong><br \/>2021-06-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NFC Division B 2.14.1.<\/td><td>-<\/td><\/tr><tr><td>1661<\/td><td>Other Fabric-Covered Structure and G-4 Major Occupancy in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-27<\/td><td><strong>Received<\/strong><br \/>2021-06-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-18<br \/><\/td><td>NBC Division B 2.2.1.14.<\/td><td>1806<\/td><\/tr><tr><td>1660<\/td><td>Lightning Protection for Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-27<\/td><td><strong>Received<\/strong><br \/>2021-06-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NBC Division B 2.2.1.<\/td><td>-<\/td><\/tr><tr><td>1659<\/td><td>Temporary Electrical Wiring in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-06-27<\/td><td><strong>Received<\/strong><br \/>2021-06-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NFC Division B 2.14.1.1.<\/td><td>-<\/td><\/tr><tr><td>1658<\/td><td>Exhaust Ducts and Outlets<\/td><td>Gall, Mark, Total HVAC<\/td><td>2021-06-23<\/td><td><strong>Received<\/strong><br \/>2021-06-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2021-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-12-18<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1657<\/td><td>Installation of Spray-Applied Polyurethane<\/td><td>McBain, Brian, ULC<\/td><td>2021-06-17<\/td><td><strong>Received<\/strong><br \/>2021-06-18<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-11-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-06-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 9.25.2.5.<\/td><td>-<\/td><\/tr><tr><td>1656<\/td><td>Insulation Materials <\/td><td>McBain, Brian, ULC<\/td><td>2021-06-17<\/td><td><strong>Received<\/strong><br \/>2021-06-18<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-11-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-06-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 9.25.2.2.<\/td><td>-<\/td><\/tr><tr><td>1655<\/td><td>Floor Slope in Front of Elevators to Prevent Flooding and Recessed Sprinklers in Low Ceilings<\/td><td>Lichy, Tomas, Richmond Elevator Maintenance Ltd.<\/td><td>2021-06-14<\/td><td><strong>Received<\/strong><br \/>2021-06-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.2.5.,<br \/>NBC Division B 3.5.2.<\/td><td>-<\/td><\/tr><tr><td>1654<\/td><td>Add USACE Air Leakage Protocol as alternative to ASTM E 3158<\/td><td>Wong, Stephen, Morrison Hershfield<\/td><td>2021-06-06<\/td><td><strong>Received<\/strong><br \/>2021-06-07<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-28<br \/><\/td><td>NECB Division B 3.2.4.<\/td><td>-<\/td><\/tr><tr><td>1653<\/td><td>New Standard for the Design and Installation of Hybrid Water and Inert Gas Fire Suppression System<\/td><td>Steele, Steven, National Sprinkler Industry JTAC<\/td><td>2021-06-01<\/td><td><strong>Received<\/strong><br \/>2021-06-02<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NFC Division B 2.1.3.5.(4)<\/td><td>-<\/td><\/tr><tr><td>1652<\/td><td>Referenced standards for automatic doors<\/td><td>Rodrigues, Nuno, Syst\u00e8mes d'entr\u00e9e Assa Abloy<\/td><td>2021-05-28<\/td><td><strong>Received<\/strong><br \/>2021-06-02<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-11-24<br \/><\/td><td>NBC Division B 3.3.1.13.<\/td><td>-<\/td><\/tr><tr><td>1651<\/td><td>Problem in complying with requirements for weak storey irregularity in Industrial Structures<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2021-05-18<\/td><td><strong>Received<\/strong><br \/>2021-05-26<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-01-28<br \/><\/td><td>NBC Division B 4.1.8.6.<\/td><td>-<\/td><\/tr><tr><td>1650<\/td><td>Light Metal Plate Connected Wood Trusses<\/td><td>Bunting, Brent D, Simpson Strong-Tie Canada, Ltd.<\/td><td>2021-05-10<\/td><td><strong>Received<\/strong><br \/>2021-05-26<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.14.11.,<br \/>NBC Division B 9.3.2.<\/td><td>-<\/td><\/tr><tr><td>1649<\/td><td>Light Metal Plate Connected Wood Trusses<\/td><td>Bunting, Brent D, Simpson Strong-Tie Canada, Ltd.<\/td><td>2021-05-10<\/td><td><strong>Received<\/strong><br \/>2021-05-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 9.23.14.11.<\/td><td>-<\/td><\/tr><tr><td>1648<\/td><td>New standard for Fuel Tank Accessories for Flammable and Combustible Liquids<\/td><td>McBain, Brian, ULC<\/td><td>2021-05-06<\/td><td><strong>Received<\/strong><br \/>2021-05-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-09-29<br \/><\/td><td>NFC Division B 4.3.7.6.(1)<\/td><td>-<\/td><\/tr><tr><td>1647<\/td><td>New standard for Fuel Tank Accessories for Flammable and Combustible Liquids<\/td><td>McBain, Brian, ULC<\/td><td>2021-05-06<\/td><td><strong>Received<\/strong><br \/>2021-05-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-09-29<br \/><\/td><td>NFC Division B 4.3.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1646<\/td><td>New standard for special purpose nonmetallic containers and tanks for combustible liquids <\/td><td>McBain, Brian, ULC<\/td><td>2021-05-06<\/td><td><strong>Received<\/strong><br \/>2021-05-06<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NFC Division B 4.3.1.2.(1)<\/td><td>2116<\/td><\/tr><tr><td>1645<\/td><td>Heat Sensors required in attached garages<\/td><td>FATA, JIMMY D, Ottawa Fire Services<\/td><td>2021-05-05<\/td><td><strong>Received<\/strong><br \/>2021-05-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2022-05-03<br \/><\/td><td>NBC Division B 9.10.19.<\/td><td>-<\/td><\/tr><tr><td>1644<\/td><td>Flammability of Screens and Curtains in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-05-03<\/td><td><strong>Received<\/strong><br \/>2021-05-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-05-18<br \/><\/td><td>NFC Division B 2.14.4.<\/td><td>1807<\/td><\/tr><tr><td>1643<\/td><td>Applicable requirement when both N60 and Su are available<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2021-04-28<\/td><td><strong>Received<\/strong><br \/>2021-04-29<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-01-28<br \/><\/td><td>NBC Division B 4.1.8.4.<\/td><td>-<\/td><\/tr><tr><td>1642<\/td><td>Clarify the scope of exceptions in Article 4.1.8.4 for liquefiable soils<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2021-04-28<\/td><td><strong>Received<\/strong><br \/>2021-04-29<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-01-28<br \/><\/td><td>-<\/td><td>1897 (published)<\/td><\/tr><tr><td>1641<\/td><td>Determination of site effects in sites with remediation<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2021-04-28<\/td><td><strong>Received<\/strong><br \/>2021-04-29<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-01-28<br \/><\/td><td>-<\/td><td>1896 (published)<\/td><\/tr><tr><td>1640<\/td><td>Datum for determining site effects (Vs30, N60, Su)in low hazard zones <\/td><td>Singh, Jitender , Codes Canada<\/td><td>2021-04-28<\/td><td><strong>Received<\/strong><br \/>2021-04-29<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-01-28<br \/><\/td><td>-<\/td><td>1895<\/td><\/tr><tr><td>1639<\/td><td>Updating the wind and snow reference values in Table C2 for the proposed guidelines for incorporatin<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-20<\/td><td><strong>Received<\/strong><br \/>2021-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2022-05-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2022-07-20<br \/><\/td><td>NBC Division B C<\/td><td>1979 (published), 1980 (published)<\/td><\/tr><tr><td>1638<\/td><td>-<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-20<\/td><td><strong>Received<\/strong><br \/>2021-04-20<br \/><\/td><td>-<\/td><td>1980 (published)<\/td><\/tr><tr><td>1637<\/td><td>Interceptors<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-03-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-29<br \/><\/td><td>NPC Division B 2.2.3.2.<\/td><td>-<\/td><\/tr><tr><td>1636<\/td><td>Tests and Inspection of Drainage or Venting Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-03-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-29<br \/><\/td><td>NPC Division B 2.3.6.2.<\/td><td>-<\/td><\/tr><tr><td>1635<\/td><td>Tests of Pipes in Drainage Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-03-21<br \/><\/td><td>NPC Division B <\/td><td>1730<\/td><\/tr><tr><td>1634<\/td><td>Support for Underground Horizontal Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-03-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-29<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1633<\/td><td>Support for Underground Horizontal Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-03-21<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-07-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-28<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1632<\/td><td>Protection of Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-03-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-07-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-28<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1631<\/td><td>Tests and Inspection of Drainage or Venting Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-03-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-29<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1630<\/td><td>Identification of Sanitary Drainage System<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-03-21<br \/><\/td><td>NPC Division B <\/td><td>1783, 1782 (published)<\/td><\/tr><tr><td>1629<\/td><td>Identification of Storm Drainage System<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-03-21<br \/><\/td><td>NPC Division B <\/td><td>1782 (published)<\/td><\/tr><tr><td>1628<\/td><td>Acid Waste Dilution and Neutralization<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2021-04-16<\/td><td><strong>Received<\/strong><br \/>2021-04-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-03-21<br \/><\/td><td>NPC Division B <\/td><td>1727 (published)<\/td><\/tr><tr><td>1627<\/td><td>Adding bird-friendly construction requirements to the code<\/td><td>Mesure, Michael R., Fatal Light Awareness Program (FLAP) Canada<\/td><td>2021-04-15<\/td><td><strong>Received<\/strong><br \/>2021-04-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1626<\/td><td>Based on the switch to uniform risk, there is no longer an importance factor for wind loads<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1625<\/td><td> the way that building importance is incorporated into the determination of specified wind load<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1624<\/td><td>climate variables to account for the variation in the movement of snow depending on the winter wind <\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1623<\/td><td>climate variables to account for the variation in the movement of snow depending on the winter wind <\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1622<\/td><td>climate variables to account for the variation in the movement of snow depending on the winter wind <\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1621<\/td><td>climate variables to account for the variation in the movement of snow depending on the winter wind <\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1620<\/td><td>Cw provisions<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1619<\/td><td>Remove Table 4.1.6.2-B<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>NBC Division B <\/td><td>1980 (published)<\/td><\/tr><tr><td>1618<\/td><td>-<\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>-<\/td><td>1980 (published)<\/td><\/tr><tr><td>1617<\/td><td>Load combination factors for wind (W) and snow (S) loads <\/td><td>Dale, Jan C, Rowan Williams Davies &amp; Irwin Inc.<\/td><td>2021-04-13<\/td><td><strong>Received<\/strong><br \/>2021-04-13<br \/><\/td><td>-<\/td><td>1980 (published)<\/td><\/tr><tr><td>1616<\/td><td>Stair Tread Thickness<\/td><td>Janzen, Ryan Mark<\/td><td>2021-04-11<\/td><td><strong>Received<\/strong><br \/>2021-04-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-04-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1615<\/td><td>Standard for Copper and Copper Alloy Press-Connect Pressure Fittings <\/td><td>Remedios, Sally , Remedios Consulting<\/td><td>2021-04-03<\/td><td><strong>Received<\/strong><br \/>2021-04-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-12-03<br \/><\/td><td>NPC Division B ,<br \/>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1614<\/td><td>Elements of Structures and Non-structural Components and Equipment<\/td><td>Chopra, Gurvinder, Electro-Federation Canada<\/td><td>2021-04-05<\/td><td><strong>Received<\/strong><br \/>2021-04-07<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-10<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1613<\/td><td>Multi-story apartment building  plumbing<\/td><td>Dunne, Brian D, ETC Telecom Vancouver Ltd<\/td><td>2021-04-06<\/td><td><strong>Received<\/strong><br \/>2021-04-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1612<\/td><td>Clarification of the Applicable Objectives for Large Farm Buildings in the NFC<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-28<\/td><td><strong>Received<\/strong><br \/>2021-03-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-29<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-11-01<br \/><\/td><td>NFC Division A 2.1.1.2.<\/td><td>-<\/td><\/tr><tr><td>1611<\/td><td>Fabric Covered G-4 Major Occupancy in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-28<\/td><td><strong>Received<\/strong><br \/>2021-03-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-05-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2024-03-22<br \/><\/td><td>NBC Division B 2.2.1.14.<\/td><td>1806<\/td><\/tr><tr><td>1610<\/td><td>Emergency Power System Requirement for Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-28<\/td><td><strong>Received<\/strong><br \/>2021-03-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-05-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 2.2.8.3.<\/td><td>-<\/td><\/tr><tr><td>1609<\/td><td>Expansion of concessions for provision of optional sprinklering in one- and two-family dwellings<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2021-03-16<\/td><td><strong>Received<\/strong><br \/>2021-03-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-05-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.9.4.4.,<br \/>NBC Division B 9.9.4.6.,<br \/>NBC Division B 9.9.9.1.,<br \/>NBC Division B 9.9.11.2.,<br \/>NBC Division B 9.9.15.4.,<br \/>NBC Division B 9.9.15.5.,<br \/>NBC Division B 9.10.4.<\/td><td>-<\/td><\/tr><tr><td>1608<\/td><td>Plumbing Engineering Design Handbook<\/td><td>Loucks, Ken, IW Consulting Service, LLC<\/td><td>2021-03-22<\/td><td><strong>Received<\/strong><br \/>2021-03-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-09-29<br \/><\/td><td>NPC Division  <\/td><td>-<\/td><\/tr><tr><td>1607<\/td><td>Lightning Protection for Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NBC Division B 2.2.8.<\/td><td>-<\/td><\/tr><tr><td>1606<\/td><td>Fire Blocking in Concealed Wall Spaces in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-18<br \/><\/td><td>NBC Division B 2.2.1.8.<\/td><td>1793 (published)<\/td><\/tr><tr><td>1605<\/td><td>Interior Exit Stair Separation Requirements<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-18<br \/><\/td><td>NBC Division B 2.2.7.2.<\/td><td>-<\/td><\/tr><tr><td>1604<\/td><td>Minimum Window Sill Height Used for Exit in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division B 2.2.7.9.<\/td><td>1784 (published)<\/td><\/tr><tr><td>1603<\/td><td>Openable Window Used as Exit in Large Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-09-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 2.2.7.9.(2)<\/td><td>1784 (published)<\/td><\/tr><tr><td>1602<\/td><td>Continuity of Fire Alarm Systems between Farm Buildings and Attached Part 3 Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-20<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/><\/td><td>NBC Division B 3.2.4.2.<\/td><td>-<\/td><\/tr><tr><td>1601<\/td><td>Spatial Separation and Exposure Protection from Farm Buildings<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-18<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-06-14<br \/><\/td><td>NBC Division B 3.2.3.1.<\/td><td>1777 (published), 1918 (published), 1919 (published), 1936 (published)<\/td><\/tr><tr><td>1600<\/td><td>Delete Explanatory Note A-1.4.1.2.(1) for the defined term \"Agricultural Occupancy\"<\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-18<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-11-01<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1599<\/td><td>Expand the Application of Part 3 to Include Part Thereof <\/td><td>Bailey, Kim, Retired<\/td><td>2021-03-18<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-11-01<br \/><\/td><td>NBC Division A 1.3.3.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1598<\/td><td>Electrical Ground Fault Monitoring Systems<\/td><td>Violo, Paul, Pivotal Product Developments<\/td><td>2021-03-17<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-04-13<br \/><\/td><td>NBC Division B 9.34.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1597<\/td><td>Permitted combustible materials in a vertical service space<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2021-03-16<\/td><td><strong>Received<\/strong><br \/>2021-03-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-10-04<br \/><\/td><td>NBC Division B 3.1.9.4.<\/td><td>-<\/td><\/tr><tr><td>1596<\/td><td>Delete sentence 3.1.9.5.(5) DWV penetration Fire Separation<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2021-03-16<\/td><td><strong>Received<\/strong><br \/>2021-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-10-04<br \/><\/td><td>NBC Division B 3.1.9.5.<\/td><td>-<\/td><\/tr><tr><td>1595<\/td><td>Clarify the conditions to apply the exemption for combustible water distribution piping<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2021-03-16<\/td><td><strong>Received<\/strong><br \/>2021-03-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-14<br \/><\/td><td>NBC Division B 3.1.9.5.<\/td><td>-<\/td><\/tr><tr><td>1594<\/td><td>Combustible Components in Public Pools and Public Spas<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2021-03-16<\/td><td><strong>Received<\/strong><br \/>2021-03-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2021-12-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-05<br \/><\/td><td>NBC Division B 3.1.5.<\/td><td>1786 (published)<\/td><\/tr><tr><td>1593<\/td><td>Passenger-Elevating Devices<\/td><td>raoui, rym isma, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2021-03-02<\/td><td><strong>Received<\/strong><br \/>2021-03-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/><\/td><td>NBC Division B 3.8.3.7.<\/td><td>1855<\/td><\/tr><tr><td>1592<\/td><td>In-plane load on guard elements to test deflection<\/td><td>Bezdan, Margaret, Geo. Bezdan Sales Ltd.<\/td><td>2021-02-09<\/td><td><strong>Received<\/strong><br \/>2021-02-11<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-29<br \/><\/td><td>NBC Division B 4.1.5.14.(4)<\/td><td>-<\/td><\/tr><tr><td>1591<\/td><td>Egress windows or doors in unsprinklered bedrooms<\/td><td>Burns, Charles,  NB Office of the Fire Marshal<\/td><td>2021-01-27<\/td><td><strong>Received<\/strong><br \/>2021-01-28<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/><\/td><td>NBC Division B 3.3.4.4.<\/td><td>2050<\/td><\/tr><tr><td>1590<\/td><td>Identification of Construction Type in Commercial, Industrial and Multi-Residential Buildings<\/td><td>Mahmood, Mansoor, Ministry of Municipal Affairs and Housing<\/td><td>2021-01-05<\/td><td><strong>Received<\/strong><br \/>2021-01-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-25<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-28<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division C ,<br \/>NFC Division C <\/td><td>-<\/td><\/tr><tr><td>1589<\/td><td>Inspection, Testing and Maintenance of Water-Based Fire Protection Systems<\/td><td>Kavanaugh, Alan, Noratek Solutions Inc.<\/td><td>2020-11-10<\/td><td><strong>Received<\/strong><br \/>2020-11-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2021-09-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2024-06-04<br \/><\/td><td>NFC Division B 6.4.1.1.<\/td><td>-<\/td><\/tr><tr><td>1588<\/td><td>New Standard for High Exposure Fenestration Installation<\/td><td>DE ROSE, DAVID, Synergy Partners<\/td><td>2021-01-14<\/td><td><strong>Received<\/strong><br \/>2021-01-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-02<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>1757 (published)<\/td><\/tr><tr><td>1587<\/td><td>Pre-rinse faucets for institutional kitchens<\/td><td>Vity\u00e9, Deborah, CSSMI<\/td><td>2021-01-14<\/td><td><strong>Received<\/strong><br \/>2021-01-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-12-29<br \/><\/td><td>NPC Division B 2.6.<\/td><td>-<\/td><\/tr><tr><td>1586<\/td><td>Resistance to Deterioration<\/td><td>Genge, Gerald R, Pretium Engineering Inc.<\/td><td>2021-01-13<\/td><td><strong>Received<\/strong><br \/>2021-01-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-06-21<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 5.1.4.2.<\/td><td>-<\/td><\/tr><tr><td>1585<\/td><td>Structural Design of Glass Guards<\/td><td>Kooymans, John W, Read Jones Christoffersen Ltd.<\/td><td>2021-01-13<\/td><td><strong>Received<\/strong><br \/>2021-01-19<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.6.1.<\/td><td>-<\/td><\/tr><tr><td>1584<\/td><td>Inspection reporting for AHJ<\/td><td>Mack, Jeffrey E, City of Fredericton Fire Deptartment<\/td><td>2021-01-13<\/td><td><strong>Received<\/strong><br \/>2021-01-19<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2021-09-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-24<br \/><\/td><td>NFC Division B 6.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1583<\/td><td>Required Guards<\/td><td>Magnus, Steven D, Fredericton Fire Department<\/td><td>2021-01-07<\/td><td><strong>Received<\/strong><br \/>2021-01-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-02-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-04-13<br \/><\/td><td>NBC Division B 9.8.8.1.<\/td><td>-<\/td><\/tr><tr><td>1582<\/td><td>Prescription of a Load Factor for Buoyancy<\/td><td>Savage, Karen E, Horizon Engineering<\/td><td>2021-01-05<\/td><td><strong>Received<\/strong><br \/>2021-01-08<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.3.2.<\/td><td>-<\/td><\/tr><tr><td>1581<\/td><td>New Standard for Installation of Fuel Supplies for Heating Equipment and Internal Combustion Engines<\/td><td>Hood, Ken, CSA B138 TC committee member<\/td><td>2020-12-21<\/td><td><strong>Received<\/strong><br \/>2020-12-22<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-09-29<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NFC Division B 5.6.1.10.(1)<\/td><td>-<\/td><\/tr><tr><td>1580<\/td><td>Resistance to Deterioration<\/td><td>DenToom, Allison M, Engineers and Geoscientists BC<\/td><td>2020-12-14<\/td><td><strong>Received<\/strong><br \/>2020-12-15<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2024-06-03<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.5.7.<\/td><td>-<\/td><\/tr><tr><td>1579<\/td><td>Adequate Water Supply for Water-Based Automatic Fire Protection System<\/td><td>DenToom, Allison M, Engineers and Geoscientists BC<\/td><td>2020-12-14<\/td><td><strong>Received<\/strong><br \/>2020-12-15<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-06-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2024-06-03<br \/><\/td><td>NBC Division B 3.2.5.7.<\/td><td>-<\/td><\/tr><tr><td>1578<\/td><td>Mobile Home Sewer Service<\/td><td>Manning, Sidney C, Alberta Municipal Affairs<\/td><td>2020-12-10<\/td><td><strong>Received<\/strong><br \/>2020-12-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.6.5.,<br \/>NPC Division B 2.4.10.12.<\/td><td>-<\/td><\/tr><tr><td>1577<\/td><td>NSF\/ANSI\/CAN 61<\/td><td>Brown, Jeremy S., NSF International<\/td><td>2020-12-10<\/td><td><strong>Received<\/strong><br \/>2020-12-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-12-03<br \/><\/td><td>NPC Division B <\/td><td>1716 (published)<\/td><\/tr><tr><td>1576<\/td><td>Safety Glazing Materials for Shower and Tub Enclosures<\/td><td>Sigler, Matt , Plumbing Manufacturers International<\/td><td>2020-12-01<\/td><td><strong>Received<\/strong><br \/>2020-12-02<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-11-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-04-13<br \/><\/td><td>NBC Division B 3.7.2.5.(1),<br \/>NBC Division B 9.6.1.4.(6)<\/td><td>-<\/td><\/tr><tr><td>1575<\/td><td>Definition of a subsoil drainage pipe<\/td><td>gibeault, tom a<\/td><td>2020-11-30<\/td><td><strong>Received<\/strong><br \/>2020-12-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-04-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1574<\/td><td>Sizing Vent Stacks or Stack Vents<\/td><td>Vance, Doug, City of Coquitlam<\/td><td>2020-11-27<\/td><td><strong>Received<\/strong><br \/>2020-12-02<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NPC Division B 2.5.8.4.(1)<\/td><td>-<\/td><\/tr><tr><td>1573<\/td><td>Definition of High Importance Category Buildings<\/td><td>Frazao, Richard, Quaketek inc.<\/td><td>2020-10-26<\/td><td><strong>Received<\/strong><br \/>2020-10-27<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.2.1.<\/td><td>-<\/td><\/tr><tr><td>1572<\/td><td>Parking spaces for persons with physical disabilities<\/td><td>Gauthier, Gilles G.G.<\/td><td>2020-10-11<\/td><td><strong>Received<\/strong><br \/>2020-10-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-27<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1571<\/td><td>Fall protection through skylights and openings during construction<\/td><td>Burk, Debbie, Corporate Coordination Unit, Ontario Ministry of Municipal Affairs and Housing<\/td><td>2020-09-22<\/td><td><strong>Received<\/strong><br \/>2020-09-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-28<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1570<\/td><td>Spatial Separation Requirements for Large Farm Buildings<\/td><td>Beadle, Steve, Ontario Ministry of Agriculture, Food and Rural Affairs<\/td><td>2020-09-01<\/td><td><strong>Received<\/strong><br \/>2020-09-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2021-09-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-10-26<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-24<br \/><\/td><td>NBC Division B <\/td><td>1777 (published)<\/td><\/tr><tr><td>1569<\/td><td>Roof-top enclosure and application of standpipe system requirements<\/td><td>Blanchard, Aidan, RJ Bartlett Engineering Ltd<\/td><td>2020-08-12<\/td><td><strong>Received<\/strong><br \/>2020-08-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-24<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-22<br \/><\/td><td>NBC Division B 3.2.5.8.<\/td><td>1856, 1854<\/td><\/tr><tr><td>1568<\/td><td>Roof-top enclosure and application of high building requirements<\/td><td>Blanchard, Aidan, RJ Bartlett Engineering Ltd<\/td><td>2020-08-12<\/td><td><strong>Received<\/strong><br \/>2020-08-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-24<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-22<br \/><\/td><td>NBC Division B 3.2.6.1.<\/td><td>1856, 1854<\/td><\/tr><tr><td>1567<\/td><td>Roof-top enclosure requirements for elevator service<\/td><td>Blanchard, Aidan, RJ Bartlett Engineering Ltd<\/td><td>2020-08-12<\/td><td><strong>Received<\/strong><br \/>2020-08-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-24<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-22<br \/><\/td><td>NBC Division B 3.5.4.1.<\/td><td>1856, 2005 (published)<\/td><\/tr><tr><td>1566<\/td><td>New Compliance Path for Performance-Based Design of Buildings<\/td><td>Calder, Keith<\/td><td>2020-08-06<\/td><td><strong>Received<\/strong><br \/>2020-08-07<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B ,<br \/>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1565<\/td><td>Public washroom facilities Locks<\/td><td>Buss, Jon, Buss Innovations, Ltd.<\/td><td>2020-08-03<\/td><td><strong>Received<\/strong><br \/>2020-08-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-06-02<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1564<\/td><td>Installation Code for Lightning Protection Systems<\/td><td>Larter, Simon C, Dobbyn Lightning Protection<\/td><td>2020-07-20<\/td><td><strong>Received<\/strong><br \/>2020-07-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-13<br \/><\/td><td>NBC Division B A-1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1563<\/td><td>Reservoirs \/ Water Retaining Structures - Seismic Base Shear<\/td><td>Patterson, Adam, WSP<\/td><td>2020-07-08<\/td><td><strong>Received<\/strong><br \/>2020-07-09<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-08-26<br \/><\/td><td>NBC Division B 4.1.8.<\/td><td>-<\/td><\/tr><tr><td>1562<\/td><td>Expansion of the Application of Emergency Planning to Areas containing Energy Storage Systems<\/td><td>Mintz, Shayne, National Fire Protection Association<\/td><td>2020-07-06<\/td><td><strong>Received<\/strong><br \/>2020-07-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-13<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-26<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/><\/td><td>NFC Division B 2.8.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1561<\/td><td>Addition of Energy Storage System Requirements - Part 3 Storage Rooms<\/td><td>Mintz, Shayne, National Fire Protection Association<\/td><td>2020-06-30<\/td><td><strong>Received<\/strong><br \/>2020-07-02<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-05-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-10-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2022-02-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 3.6.2.<\/td><td>-<\/td><\/tr><tr><td>1560<\/td><td>Addition of Stationary Energy Storage System Requirements - Part 9 Electrical Facilities<\/td><td>Mintz, Shayne, National Fire Protection Association<\/td><td>2020-06-30<\/td><td><strong>Received<\/strong><br \/>2020-07-02<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-13<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2022-02-09<br \/>CBHCC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2023-12-08<br \/><\/td><td>NBC Division B 9.34.<\/td><td>-<\/td><\/tr><tr><td>1559<\/td><td>Adding an appendix for tiny homes<\/td><td>Marquis, Jean-Philippe , Minimaliste tiny houses<\/td><td>2020-06-21<\/td><td><strong>Received<\/strong><br \/>2020-06-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1558<\/td><td>Interceptors<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.2.3.2.<\/td><td>-<\/td><\/tr><tr><td>1557<\/td><td>Tests and Inspection of Drainage or Venting Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.6.1.<\/td><td>-<\/td><\/tr><tr><td>1556<\/td><td>Tests of Pipes in Drainage Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.6.2.<\/td><td>-<\/td><\/tr><tr><td>1555<\/td><td>Testing of Pipes in Drainage Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.6.2.<\/td><td>-<\/td><\/tr><tr><td>1554<\/td><td>Support for Underground Horizontal Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.4.6.<\/td><td>-<\/td><\/tr><tr><td>1553<\/td><td>Protection of Piping<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.5.1.<\/td><td>-<\/td><\/tr><tr><td>1552<\/td><td>Tests and Inspection of Drainage or Venting Systems<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.3.6.1.<\/td><td>-<\/td><\/tr><tr><td>1551<\/td><td>Identification of Sanitary Drainage System<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.2.1.3.<\/td><td>-<\/td><\/tr><tr><td>1550<\/td><td>Identification of Storm Drainage System<\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.2.1.3.<\/td><td>-<\/td><\/tr><tr><td>1549<\/td><td>Acid Waste Dilution and Neutralization <\/td><td>Weir, Beth, on Behalf of Canadian Water Wastewater Association<\/td><td>2020-06-15<\/td><td><strong>Received<\/strong><br \/>2020-06-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-10<br \/><\/td><td>NPC Division B 2.4.4.4.<\/td><td>-<\/td><\/tr><tr><td>1548<\/td><td>Reference to CSA B139-19 in the NFC without condition<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2020-05-29<\/td><td><strong>Received<\/strong><br \/>2020-06-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-07-16<br \/><\/td><td>NFC Division B 4.1.1.1.(3),<br \/>NFC Division B A-4.1.1.1.(3),<br \/>NFC Division B 4.3.13.1.(1),<br \/>NFC Division B 4.3.13.4.(1),<br \/>NFC Division B A-4.3.13.4.(1),<br \/>NFC Division B A-4.3.13.4.A.,<br \/>NFC Division B A-4.3.13.4.B.,<br \/>NFC Division B 4.3.13.5.<\/td><td>1805 (published)<\/td><\/tr><tr><td>1547<\/td><td>Application of Dampproofing Material<\/td><td>Alqasrani, Renna, Alberta Government- Municipal Affairs <\/td><td>2020-05-28<\/td><td><strong>Received<\/strong><br \/>2020-06-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-09<br \/><\/td><td>NBC Division B 9.13.2.4.<\/td><td>1906<\/td><\/tr><tr><td>1546<\/td><td>Intermediate Handrails<\/td><td>Ocran, Naki, GHL Consultants Ltd<\/td><td>2020-05-20<\/td><td><strong>Received<\/strong><br \/>2020-05-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-06-02<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/><\/td><td>NBC Division B 3.4.6.5.(3)<\/td><td>1772 (published)<\/td><\/tr><tr><td>1545<\/td><td>Lighting within an occupied washroom<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2020-05-01<\/td><td><strong>Received<\/strong><br \/>2020-05-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-09<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-20<br \/><\/td><td>NBC Division B 3.2.7.1.,<br \/>NBC Division B 9.34.2.7.<\/td><td>1769<\/td><\/tr><tr><td>1544<\/td><td>Length of ramps<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2020-04-30<\/td><td><strong>Received<\/strong><br \/>2020-05-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/><\/td><td>NBC Division B A-3.8.3.5.(1)<\/td><td>1708<\/td><\/tr><tr><td>1543<\/td><td>Structural Design Requirements & Application Limitations<\/td><td>Tandy, Thor, UNISOL Engineering Ltd<\/td><td>2020-04-22<\/td><td><strong>Received<\/strong><br \/>2020-04-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-12-08<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.4.1.1.,<br \/>NBC Division B 9.23.1.1.<\/td><td>-<\/td><\/tr><tr><td>1542<\/td><td>Storage of Oxygen in Residential Buildings and Health Care Facilities<\/td><td>Baker, Mike, Alberta Municipal Affairs<\/td><td>2020-04-09<\/td><td><strong>Received<\/strong><br \/>2020-04-09<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/><\/td><td>NFC Division B 3.2.8.3.<\/td><td>-<\/td><\/tr><tr><td>1541<\/td><td>Introducing a New Standard ANSI\/CAN\/UL\/ULC 1369 for Aboveground Piping<\/td><td>McBain, Brian, ULC<\/td><td>2020-04-02<\/td><td><strong>Received<\/strong><br \/>2020-04-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NFC Division B 4.5.2.1.(3)<\/td><td>2112<\/td><\/tr><tr><td>1540<\/td><td>Setbacks for Garage Shelters<\/td><td>De Zotti , Marisa<\/td><td>2020-03-23<\/td><td><strong>Received<\/strong><br \/>2020-03-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-12-08<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1539<\/td><td>Width between two vehicles in parking for persons with disabilities<\/td><td>Provencher, Benoit BP<\/td><td>2020-03-18<\/td><td><strong>Received<\/strong><br \/>2020-03-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/><\/td><td>NBC Division B 3.8.2.2.<\/td><td>-<\/td><\/tr><tr><td>1538<\/td><td>Location of vent pipe outlet for secondary containment space<\/td><td>smith, matthew, Calgary Fire Dept<\/td><td>2020-03-17<\/td><td><strong>Received<\/strong><br \/>2020-03-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-05-12<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-05-11<br \/><\/td><td>NFC Division B 4.3.5.2.(3)<\/td><td>1683 (published)<\/td><\/tr><tr><td>1536<\/td><td>Introduction of a New Standard for Motor Vehicle Maintenance Facility<\/td><td>Cairns, Julie, CSA Group (on behalf of the B401 Technical Subcommittee)<\/td><td>2020-03-11<\/td><td><strong>Received<\/strong><br \/>2020-03-17<br \/><\/td><td>NBC Division B 6.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1535<\/td><td>Introduction of a New Standard for Motor Vehicle Maintenance Facility<\/td><td>Cairns, Julie, CSA Group (on behalf of the B401 Technical Subcommittee)<\/td><td>2020-03-11<\/td><td><strong>Received<\/strong><br \/>2020-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-12-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-05-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 6.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>1534<\/td><td>Structural Design Requirements & Application Limitations<\/td><td>Benmokrane, Brahim, Universit\u00e9 de Sherbrooke<\/td><td>2020-03-14<\/td><td><strong>Received<\/strong><br \/>2020-03-17<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-01-29<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-22<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2022-01-26<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 4.3.3.1.<\/td><td>-<\/td><\/tr><tr><td>1533<\/td><td>Subfloor Beneath Ceramic Tile<\/td><td>Frederick, Richard, Government of Alberta (Alberta Municipal Affairs)<\/td><td>2020-03-16<\/td><td><strong>Received<\/strong><br \/>2020-03-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-12-08<br \/><\/td><td>NBC Division B 9.30.6.1.<\/td><td>1953<\/td><\/tr><tr><td>1532<\/td><td>Include Roofing Fasteners in the Calculation of Thermal Bridging<\/td><td>Macdonald, Iain A, National Resarch Council<\/td><td>2020-03-05<\/td><td><strong>Received<\/strong><br \/>2020-03-09<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-14<br \/><\/td><td>NECB Division B 3.1.1.7.(3)<\/td><td>1821 (published)<\/td><\/tr><tr><td>1531<\/td><td>Towel hangers in Senior's residences<\/td><td>Lambert, Claudine M<\/td><td>2020-02-19<\/td><td><strong>Received<\/strong><br \/>2020-02-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/><\/td><td>NBC Division B 3.8.2.1.<\/td><td>-<\/td><\/tr><tr><td>1530<\/td><td>Fall protection through skylights and openings during construction<\/td><td>Executive Committee of the CCBFC, <\/td><td>2020-02-13<\/td><td><strong>Received<\/strong><br \/>2020-02-13<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2020-08-13<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-28<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1529<\/td><td>Use of the terms \"unobstructed width\" and \"clear width\"<\/td><td>Potvin, Brigitte M, Codes Canada<\/td><td>2020-02-07<\/td><td><strong>Received<\/strong><br \/>2020-02-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-12-08<br \/><\/td><td>NBC Division B <\/td><td>1711 (published)<\/td><\/tr><tr><td>1528<\/td><td>Visually impaired persons<\/td><td>Potvin, Brigitte M, Codes Canada<\/td><td>2020-02-04<\/td><td><strong>Received<\/strong><br \/>2020-02-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/><\/td><td>NBC Division B <\/td><td>1644, 1778<\/td><\/tr><tr><td>1527<\/td><td>Definition for \"accessible\"<\/td><td>Potvin, Brigitte M, Codes Canada<\/td><td>2020-02-04<\/td><td><strong>Received<\/strong><br \/>2020-02-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-02<br \/><\/td><td>NBC Division B 1.4.1.2.,<br \/>NBC Division A <\/td><td>2120<\/td><\/tr><tr><td>1526<\/td><td>Expand the CAM for Wood I-joists Used in Flat Roofs<\/td><td>Mulders, Roy C, ISM Architects Inc.<\/td><td>2020-02-03<\/td><td><strong>Received<\/strong><br \/>2020-02-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-12-17<br \/><\/td><td>NBC Division B D-2.3.4.<\/td><td>-<\/td><\/tr><tr><td>1525<\/td><td>Inadequate French Translation of the Terms \"Setpoint\" and \"Setback\"<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2020-02-03<\/td><td><strong>Received<\/strong><br \/>2020-02-03<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>1524<\/td><td>Translation Error for the Term \"Two Stages\"<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2020-02-03<\/td><td><strong>Received<\/strong><br \/>2020-02-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division B 8.4.4.10.(8),<br \/>NECB Division B 8.4.4.9.(7)<\/td><td>-<\/td><\/tr><tr><td>1523<\/td><td>New Standard for Fibre Reinforced Underground Tanks <\/td><td>McBain, Brian, ULC<\/td><td>2020-02-03<\/td><td><strong>Received<\/strong><br \/>2020-02-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2023-09-22<br \/><\/td><td>NFC Division B 4.3.1.2.(1),<br \/>NFC Division B 4.3.8.6.(2),<br \/>NFC Division B 4.4.3.2.(4)<\/td><td>2077<\/td><\/tr><tr><td>1522<\/td><td>Incorrect Wind Load for Glass Design<\/td><td>Wheaton, Kevin<\/td><td>2020-01-28<\/td><td><strong>Received<\/strong><br \/>2020-01-28<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.6.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1521<\/td><td>Insulating under a slab construction <\/td><td>Kilbride, Kevin, ThermaRay Inc<\/td><td>2020-01-27<\/td><td><strong>Received<\/strong><br \/>2020-01-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-12-08<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-07-14<br \/><\/td><td>NBC Division B 9.36.2.8.(4)<\/td><td>-<\/td><\/tr><tr><td>1520<\/td><td>Accessible manual stations<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2020-01-21<\/td><td><strong>Received<\/strong><br \/>2020-01-22<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-02-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2021-10-25<br \/><\/td><td>NBC Division B 3.4.6.16.<\/td><td>1768 (published)<\/td><\/tr><tr><td>1519<\/td><td>Introduce the New CGSB B149.11 Standard on Radon<\/td><td>Panu-Anghel, Cosmina I, Canadian General Standards Board<\/td><td>2020-01-13<\/td><td><strong>Received<\/strong><br \/>2020-01-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-09-17<br \/><\/td><td>NBC Division B 9.13.4.3.<\/td><td>1887, 1713 (published)<\/td><\/tr><tr><td>1518<\/td><td>Addressing Harmful Solar Reflections from Low-E Windows<\/td><td>Hoffman, Carla<\/td><td>2019-12-20<\/td><td><strong>Received<\/strong><br \/>2019-12-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-07-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1517<\/td><td>Structural Commentary - Snow Load Example Error<\/td><td>Visscher, Jared, AECOM<\/td><td>2019-12-11<\/td><td><strong>Received<\/strong><br \/>2019-12-11<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1516<\/td><td>Reference Building HVAC System Modeling<\/td><td>Ling, Zheng, NORR<\/td><td>2019-12-09<\/td><td><strong>Received<\/strong><br \/>2019-12-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-07-14<br \/><\/td><td>NECB Division B 8.4.4.7.<\/td><td>-<\/td><\/tr><tr><td>1515<\/td><td>New Requirements for Acoustical Performance in Schools<\/td><td>Scherebnyj, Katrina, BKL Consultants Ltd. <\/td><td>2019-12-05<\/td><td><strong>Received<\/strong><br \/>2019-12-06<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-28<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-02<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.11.<\/td><td>-<\/td><\/tr><tr><td>1514<\/td><td>Translation Issue for Loads on Guards and Handrails<\/td><td>Boucher, Simon, Douglas Consultants<\/td><td>2019-12-05<\/td><td><strong>Received<\/strong><br \/>2019-12-06<br \/><\/td><td>NBC Division B 4.1.5.14.(1)<\/td><td>-<\/td><\/tr><tr><td>1513<\/td><td>Emergency Response Plan in the NFC<\/td><td>Parent, Pascal, Pr\u00e9vention Mesure D'Urgence Qu\u00e9bec<\/td><td>2019-05-08<\/td><td><strong>Received<\/strong><br \/>2019-12-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-02-26<br \/><\/td><td>NFC Division B 2.8.<\/td><td>-<\/td><\/tr><tr><td>1512<\/td><td>Materials for Piping, Valves and Fittings<\/td><td>McBain, Brian, ULC<\/td><td>2019-11-26<\/td><td><strong>Received<\/strong><br \/>2019-11-27<br \/><\/td><td>NFC Division B 4.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>1511<\/td><td>Provision for Expansion and Contraction<\/td><td>McBain, Brian, ULC<\/td><td>2019-11-26<\/td><td><strong>Received<\/strong><br \/>2019-11-27<br \/><\/td><td>NFC Division B 4.5.6.14.<\/td><td>-<\/td><\/tr><tr><td>1510<\/td><td>Provision for Expansion and Contraction<\/td><td>McBain, Brian, ULC<\/td><td>2019-11-26<\/td><td><strong>Received<\/strong><br \/>2019-11-27<br \/><\/td><td>NFC Division B 4.5.6.14.<\/td><td>-<\/td><\/tr><tr><td>1509<\/td><td>Materials for Piping, Valves and Fittings<\/td><td>McBain, Brian, ULC<\/td><td>2019-11-26<\/td><td><strong>Received<\/strong><br \/>2019-11-27<br \/><\/td><td>NFC Division B 4.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>1508<\/td><td>Atmospheric Storage Tanks<\/td><td>McBain, Brian, ULC<\/td><td>2019-11-26<\/td><td><strong>Received<\/strong><br \/>2019-11-27<br \/><\/td><td>NFC Division B 4.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1507<\/td><td>Emergency Power for Lightings<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2019-11-25<\/td><td><strong>Received<\/strong><br \/>2019-11-25<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1506<\/td><td>Emergency and Backup Power for Sump Pumps<\/td><td>Olechna, Ted, Electrical Safety Authority<\/td><td>2019-11-21<\/td><td><strong>Received<\/strong><br \/>2019-11-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-15<br \/><\/td><td>NBC Division B 9.14.5.,<br \/>NBC Division B 3.2.7.<\/td><td>-<\/td><\/tr><tr><td>1505<\/td><td> Horizontal Exits as an Area of Refuge<\/td><td>Lanthier, Jean, Service des permis et inspection, Ville de Montr\u00e9al<\/td><td>2019-11-20<\/td><td><strong>Received<\/strong><br \/>2019-11-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-03-26<br \/><\/td><td>NBC Division B 3.4.6.10.<\/td><td>-<\/td><\/tr><tr><td>1504<\/td><td>Small Quantity Exemptions for Dangerous Goods<\/td><td>Atkinson, Lorelei A, Office of the Fire Marshal, Department of Municipal Affairs &amp; Housing<\/td><td>2019-11-20<\/td><td><strong>Received<\/strong><br \/>2019-11-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/><\/td><td>NFC Division B 3.2.7.1.<\/td><td>-<\/td><\/tr><tr><td>1503<\/td><td>Clarification of Venting Requirements<\/td><td>Poulin, Graham<\/td><td>2019-11-19<\/td><td><strong>Received<\/strong><br \/>2019-11-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.19.1.1.<\/td><td>-<\/td><\/tr><tr><td>1502<\/td><td>New Part for Relocatable Buildings<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-04<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-07-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-01-29<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-12-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1501<\/td><td>Compliance Path for Relocatable Buildings <\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-30<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NECB Division B 1.1.2.1.<\/td><td>-<\/td><\/tr><tr><td>1500<\/td><td>Conflicting Requirements for Relocatable Buildings<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-30<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-12-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NECB Division A 1.5.1.2.<\/td><td>-<\/td><\/tr><tr><td>1499<\/td><td>Fire Protection for Construction Camps (Relocatable Buildings)<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2021-11-30<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division B 9.10.21.<\/td><td>-<\/td><\/tr><tr><td>1498<\/td><td>Conflicting Requirements for Relocatable Buildings<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2020-07-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-01-29<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division A 1.5.1.2.<\/td><td>-<\/td><\/tr><tr><td>1497<\/td><td>Defined Term for Relocatable Buildings<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2020-07-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-01-29<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1496<\/td><td>Defined Terms - Relocatable Buildings (withdrawn by the proponent)<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1495<\/td><td>Division A Requirements for Relocatable Buildings<\/td><td>Mitchell, Craig, Modular Building Institute<\/td><td>2019-11-03<\/td><td><strong>Received<\/strong><br \/>2019-11-04<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2020-07-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-10-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-11-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-10<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-01-29<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2021-03-11<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-06-02<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2021-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-29<br \/><\/td><td>NBC Division A 1.3.3.<\/td><td>-<\/td><\/tr><tr><td>1494<\/td><td>LVL inclusion<\/td><td>Rogers, Todd, Tacoma Engineers Inc<\/td><td>2019-10-29<\/td><td><strong>Received<\/strong><br \/>2019-10-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-25<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1493<\/td><td>Elevator Car Dimensions<\/td><td>Goguen, Mathieu, Greater Miramichi Regional Service Commission<\/td><td>2019-10-15<\/td><td><strong>Received<\/strong><br \/>2019-10-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.5.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1492<\/td><td>Supervised residences for older adults<\/td><td>Bouchard, Pierre PB, CIUSSSE de l'Estrie- CHUS<\/td><td>2019-10-08<\/td><td><strong>Received<\/strong><br \/>2019-10-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1491<\/td><td>Vestibules in performance compliance path<\/td><td>Chen, cheney, Perkins&amp;Will <\/td><td>2019-10-04<\/td><td><strong>Received<\/strong><br \/>2019-10-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-07-15<br \/><\/td><td>NECB Division B 3.2.2.1.<\/td><td>-<\/td><\/tr><tr><td>1490<\/td><td>Develop a Method to Evaluate RdRo for New SFRS<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2019-10-02<\/td><td><strong>Received<\/strong><br \/>2019-10-02<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>1489<\/td><td>Installation requirements for Exterior Insulation and Finish Systems<\/td><td>Culyer, Peter A, EIFS Council of Canada<\/td><td>2019-09-18<\/td><td><strong>Received<\/strong><br \/>2019-09-18<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-11-18<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-21<br \/><\/td><td>NBC Division B 5.9.4.1.<\/td><td>1755 (published)<\/td><\/tr><tr><td>1488<\/td><td>Updating the reference of the ASHRAE 62.1 version<\/td><td>Harvey-Vaillancourt, Julien, Services Publics et Approvisionnement Canada<\/td><td>2019-09-13<\/td><td><strong>Received<\/strong><br \/>2019-09-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-08<br \/><\/td><td>NBC Division B 6.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>1487<\/td><td>Ceiling Height<\/td><td>Tomlins, Bryn A<\/td><td>2019-09-04<\/td><td><strong>Received<\/strong><br \/>2019-09-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-05-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-15<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1486<\/td><td>Maximum Flow Rates from Supply Fittings<\/td><td>Duchesne, Yves, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2019-08-21<\/td><td><strong>Received<\/strong><br \/>2019-08-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2019-10-29<br \/><\/td><td>NPC Division B 2.2.10.6.<\/td><td>-<\/td><\/tr><tr><td>1485<\/td><td>Fire Exposure on Both Sides of a wall<\/td><td>Harmsworth, Andrew, GHL Consultants Ltd. SCFP<\/td><td>2019-08-20<\/td><td><strong>Received<\/strong><br \/>2019-08-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-12-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-13<br \/><\/td><td>NBC Division B 3.1.7.5.<\/td><td>-<\/td><\/tr><tr><td>1484<\/td><td>Roof Spaces Venting<\/td><td>Duffy, Paul A., Paul Duffy and Associates<\/td><td>2019-08-19<\/td><td><strong>Received<\/strong><br \/>2019-08-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.19.1.<\/td><td>-<\/td><\/tr><tr><td>1483<\/td><td>Support for PVC piping<\/td><td>Perreault, Martin, SNC-Lavalin<\/td><td>2019-08-06<\/td><td><strong>Received<\/strong><br \/>2019-08-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-10-08<br \/><\/td><td>NPC Division B 2.3.4.5.<\/td><td>1693 (published)<\/td><\/tr><tr><td>1482<\/td><td>Load Combinations for Ultimate Limit States with Earthquake Load<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2019-08-02<\/td><td><strong>Received<\/strong><br \/>2019-08-07<br \/><\/td><td>NBC Division B 4.1.3.2.(10)<\/td><td>-<\/td><\/tr><tr><td>1481<\/td><td>Upper Limit on Seismic Forces in Capacity Design<\/td><td>Singh, Jitender , Codes Canada<\/td><td>2019-08-02<\/td><td><strong>Received<\/strong><br \/>2019-08-07<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.15.(8)<\/td><td>1900 (published)<\/td><\/tr><tr><td>1480<\/td><td>Professional Design for Foundation Underpinning Existing Building<\/td><td>Evans, Hannah, Building and Development Branch, Ontario Ministry of Municipal Affairs and Housing<\/td><td>2019-07-02<\/td><td><strong>Received<\/strong><br \/>2019-08-14<br \/><\/td><td>NBC Division C 2.2.4.<\/td><td>-<\/td><\/tr><tr><td>1479<\/td><td>Overhead Electrical Conductors and Permitted Construction of Tents and Air-Supported Structures<\/td><td>Evans, Hannah, Building and Development Branch, Ontario Ministry of Municipal Affairs and Housing<\/td><td>2019-07-02<\/td><td><strong>Received<\/strong><br \/>2019-08-14<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1478<\/td><td>Demountable Stages and Demountable Support Structures<\/td><td>Evans, Hannah, Building and Development Branch, Ontario Ministry of Municipal Affairs and Housing<\/td><td>2019-07-02<\/td><td><strong>Received<\/strong><br \/>2019-08-14<br \/><\/td><td>NBC Division B 3.3.2.,<br \/>NBC Division B 4.1.5.12.,<br \/>NBC Division B 4.1.1.3.<\/td><td>-<\/td><\/tr><tr><td>1477<\/td><td>Insulation of concrete slabs at the garage door opening<\/td><td>Nolet, Eric E.N., Innovation Gener Inc.<\/td><td>2019-07-17<\/td><td><strong>Received<\/strong><br \/>2019-07-18<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-07-15<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>1476<\/td><td>Wind Design Standard Practice for Roofing Assemblies<\/td><td>King, Linda, SPRI, Inc.<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-31<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1475<\/td><td>Investigating Resistance to Root Penetration on Vegetative Roofs<\/td><td>King, Linda, SPRI, Inc.<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-31<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1474<\/td><td>Clarification on Types of Loads<\/td><td>Wheaton, Kevin<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1473<\/td><td>Structural Design Requirements and Application Limits<\/td><td>Wheaton, Kevin<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1472<\/td><td>Use of the Terminology \"Tributary Width\" <\/td><td>Wheaton, Kevin<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-25<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.23.12.3.<\/td><td>-<\/td><\/tr><tr><td>1471<\/td><td>Terminology \"Supported joist length\" <\/td><td>Wheaton, Kevin<\/td><td>2019-07-15<\/td><td><strong>Received<\/strong><br \/>2019-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-03-30<br \/><\/td><td>NBC Division B 9.23.<\/td><td>-<\/td><\/tr><tr><td>1470<\/td><td>Calculation of the Accumulation Factor (Ca)<\/td><td>Wheaton, Kevin<\/td><td>2019-07-12<\/td><td><strong>Received<\/strong><br \/>2019-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.6.5.,<br \/>NBC Division B 4.1.6.6.,<br \/>NBC Division B 4.1.6.7.,<br \/>NBC Division B 4.1.6.8.,<br \/>NBC Division B 4.1.6.9.,<br \/>NBC Division B 4.1.6.10.,<br \/>NBC Division B 4.1.6.11.,<br \/>NBC Division B 4.1.6.12.<\/td><td>-<\/td><\/tr><tr><td>1469<\/td><td>Crane and Live Load Categories<\/td><td>Wheaton, Kevin<\/td><td>2019-07-12<\/td><td><strong>Received<\/strong><br \/>2019-07-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1468<\/td><td>Importance Factor for Specified Rain Load<\/td><td>Wheaton, Kevin<\/td><td>2019-07-12<\/td><td><strong>Received<\/strong><br \/>2019-07-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.6.1.,<br \/>NBC Division B 4.1.6.2.,<br \/>NBC Division B 4.1.6.4.<\/td><td>-<\/td><\/tr><tr><td>1467<\/td><td>Testing of Potable Water Systems<\/td><td>Perreault, Martin, SNC-Lavalin<\/td><td>2019-07-11<\/td><td><strong>Received<\/strong><br \/>2019-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-10-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-09-13<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.3.7.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1466<\/td><td>\"Unreinforced Concrete\" and \"Nominally Reinforced Concrete\".<\/td><td>Wheaton, Kevin<\/td><td>2019-07-11<\/td><td><strong>Received<\/strong><br \/>2019-07-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-25<br \/><\/td><td>NBC Division B 9.3.1.1.,<br \/>NBC Division B 9.3.1.6.(1),<br \/>NBC Division B 9.3.1.7.(2)<\/td><td>1948<\/td><\/tr><tr><td>1465<\/td><td>Application of the ASTM E1300 Standard<\/td><td>Wheaton, Kevin<\/td><td>2019-07-11<\/td><td><strong>Received<\/strong><br \/>2019-07-11<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.3.6.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1464<\/td><td>Application of Sentence 4.1.8.18.(4)<\/td><td>Wheaton, Kevin<\/td><td>2019-07-11<\/td><td><strong>Received<\/strong><br \/>2019-07-11<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-10-21<br \/><\/td><td>NBC Division B 4.1.8.18.(4)<\/td><td>-<\/td><\/tr><tr><td>1463<\/td><td>Macerator Toilets <\/td><td>Turney, Clayton W<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1462<\/td><td>Use of the Term \"Specified Load\" in Part 4 <\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 4<\/td><td>-<\/td><\/tr><tr><td>1461<\/td><td>Use of the Term \"factor\" In Subsections 4.1.6, 4.1.7. and 4.1.8.<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.6.,<br \/>NBC Division B 4.1.7.,<br \/>NBC Division B 4.1.8.<\/td><td>-<\/td><\/tr><tr><td>1460<\/td><td>Incorrect Interpretation of the Intent of the sentence<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.10.(3)<\/td><td>-<\/td><\/tr><tr><td>1459<\/td><td>Use of \"Where\" and \"If\" in Part 4<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4<\/td><td>-<\/td><\/tr><tr><td>1458<\/td><td>Liquefiable Soils and Class F soils<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.4.<\/td><td>-<\/td><\/tr><tr><td>1457<\/td><td>Definition of Average Shear Wave Velocity<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.2.<\/td><td>1895<\/td><\/tr><tr><td>1456<\/td><td>Consolidate Article 4.1.3.4. Applying to Serviceability Limit State<\/td><td>Wheaton, Kevin<\/td><td>2019-07-10<\/td><td><strong>Received<\/strong><br \/>2019-07-10<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.3.4.,<br \/>NBC Division B 4.1.3.5.,<br \/>NBC Division B 4.1.3.6.<\/td><td>-<\/td><\/tr><tr><td>1455<\/td><td>NFPA 652 - Standard on the Fundamentals of Combustible Dust<\/td><td>Mintz, Shayne, National Fire Protection Association<\/td><td>2019-07-09<\/td><td><strong>Received<\/strong><br \/>2019-07-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-08<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NBC Division B 6.9.1.<\/td><td>-<\/td><\/tr><tr><td>1454<\/td><td>Use of \"Soil\" and \"Saturated Soil\"<\/td><td>Wheaton, Kevin<\/td><td>2019-07-09<\/td><td><strong>Received<\/strong><br \/>2019-07-09<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.3.2.(8),<br \/>NBC Division B 4.1.3.2.(9)<\/td><td>-<\/td><\/tr><tr><td>1453<\/td><td>New Reference to NFPA 652, Standard on the Fundamentals of Combustible Dust<\/td><td>Mintz, Shayne, National Fire Protection Association<\/td><td>2019-07-08<\/td><td><strong>Received<\/strong><br \/>2019-07-09<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 5.3.1.3.<\/td><td>-<\/td><\/tr><tr><td>1452<\/td><td>Revision to the Title of Article 4.1.3.2.<\/td><td>Wheaton, Kevin<\/td><td>2019-07-08<\/td><td><strong>Received<\/strong><br \/>2019-07-08<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 4.1.3.2.<\/td><td>-<\/td><\/tr><tr><td>1451<\/td><td>Heat Alarms for Attached Garages in Dwelling Units<\/td><td>Schell, Ryan W, Central York Fire Services<\/td><td>2019-07-04<\/td><td><strong>Received<\/strong><br \/>2019-07-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-15<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.<\/td><td>-<\/td><\/tr><tr><td>1450<\/td><td>Calculation of the energy recovery effectiveness of the energy recovery systems<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2019-06-20<\/td><td><strong>Received<\/strong><br \/>2019-06-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-07-15<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-14<br \/><\/td><td>NECB Division B 5.2.10.1.(4),<br \/>NECB Division B 5.2.10.1.(4)<\/td><td>1733 (published)<\/td><\/tr><tr><td>1449<\/td><td>Plain end joining of pressure pipes<\/td><td>Gill, Rick, Unified Alloys<\/td><td>2019-05-24<\/td><td><strong>Received<\/strong><br \/>2019-05-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-08<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-15<br \/><\/td><td>NPC Division B 2.2.10.4.<\/td><td>1729 (published)<\/td><\/tr><tr><td>1448<\/td><td>Spatial separation of detached garages and accessory buildings<\/td><td>May, Zachary D., Building and Safety Standards Branch (BC Governement)<\/td><td>2019-05-24<\/td><td><strong>Received<\/strong><br \/>2019-05-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-11-15<br \/><\/td><td>NBC Division B 9.10.15.<\/td><td>-<\/td><\/tr><tr><td>1447<\/td><td>Means of egress from basement suites and granny flats<\/td><td>Shinaut, Ken, Boman Kemp Companies<\/td><td>2019-05-22<\/td><td><strong>Received<\/strong><br \/>2019-05-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-03-30<br \/><\/td><td>NBC Division B 9.9.10.1.<\/td><td>-<\/td><\/tr><tr><td>1446<\/td><td>Exterior Lights on Buildings Lead to Light Pollution Impacting Health<\/td><td>Ruta, Michael T.<\/td><td>2019-05-17<\/td><td><strong>Received<\/strong><br \/>2019-05-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.7.,<br \/>NBC Division A 2.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1445<\/td><td>Post fabrication cleaning of weld effected zones <\/td><td>Gill, Rick, Unified Alloys<\/td><td>2019-05-17<\/td><td><strong>Received<\/strong><br \/>2019-05-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1444<\/td><td>Move NECB Requirements into the NBC<\/td><td>May, Zachary D., Building and Safety Standards Branch (BC Governement)<\/td><td>2019-05-15<\/td><td><strong>Received<\/strong><br \/>2019-05-16<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-03-07<br \/><\/td><td>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>1443<\/td><td>Application of the NECB<\/td><td>Cartier, Shenah M, MuniCode Services Ltd.<\/td><td>2019-05-06<\/td><td><strong>Received<\/strong><br \/>2019-05-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2020-03-30<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2021-03-10<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2021-07-15<br \/><\/td><td>NECB Division A 1.1.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1442<\/td><td>operation of principal ventilation system<\/td><td>Boldt, James, Home Ventilating Institute<\/td><td>2019-05-03<\/td><td><strong>Received<\/strong><br \/>2019-05-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-03-30<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-07-15<br \/><\/td><td>NBC Division B 9.36.5.11.(5)<\/td><td>-<\/td><\/tr><tr><td>1441<\/td><td>Provision of coin-free menstrual product dispensers in lavatories and universal washrooms<\/td><td>Tribe, Selina, Douglas College<\/td><td>2019-04-23<\/td><td><strong>Received<\/strong><br \/>2019-04-23<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-02-26<br \/><\/td><td>-<\/td><td>1771 (published), 2029<\/td><\/tr><tr><td>1440<\/td><td>Reference building modeling for water loop heat pump in proposed building<\/td><td>Smith, Aaron R, M&amp;R Engineering<\/td><td>2019-04-19<\/td><td><strong>Received<\/strong><br \/>2019-04-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-10<br \/><\/td><td>NECB Division B 8.4.4.7.<\/td><td>-<\/td><\/tr><tr><td>1439<\/td><td>Insulation of HVAC system piping<\/td><td>Smith, Aaron R, M&amp;R Engineering<\/td><td>2019-04-19<\/td><td><strong>Received<\/strong><br \/>2019-04-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 5.2.5.3.<\/td><td>-<\/td><\/tr><tr><td>1438<\/td><td>Reference building modeling of small HVAC system fans<\/td><td>Smith, Aaron R, M&amp;R Engineering<\/td><td>2019-04-19<\/td><td><strong>Received<\/strong><br \/>2019-04-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 8.4.4.18.<\/td><td>-<\/td><\/tr><tr><td>1437<\/td><td>Prescriptive requirements for small HVAC system fans<\/td><td>Smith, Aaron R, M&amp;R Engineering<\/td><td>2019-04-19<\/td><td><strong>Received<\/strong><br \/>2019-04-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2024-12-18<br \/><\/td><td>NECB Division B 5.2.3.<\/td><td>2109<\/td><\/tr><tr><td>1436<\/td><td>SIPS and Stressed Skin Panels<\/td><td>Kitchener, Jeff D, In Green Systems<\/td><td>2019-04-10<\/td><td><strong>Received<\/strong><br \/>2019-04-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-07-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-12-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-06-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-03<br \/><\/td><td>NBC Division B 9.23.10.<\/td><td>-<\/td><\/tr><tr><td>1435<\/td><td>Duct Insulation<\/td><td>Leblanc, David S, TWS Engineering Ltd<\/td><td>2019-04-05<\/td><td><strong>Received<\/strong><br \/>2019-04-08<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 5.2.2.5.<\/td><td>-<\/td><\/tr><tr><td>1434<\/td><td>Spacing and Dimensions of Braced Wall Bands and Braced Wall Panels<\/td><td>Frank, Murray V, Constructive Home Solutions Inc<\/td><td>2019-04-05<\/td><td><strong>Received<\/strong><br \/>2019-04-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-03-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.23.13.5.<\/td><td>-<\/td><\/tr><tr><td>1433<\/td><td>Vent requirements in Alberta building code<\/td><td>NALIKKA, AISHA SENDAGIRE, SAIT<\/td><td>2019-04-04<\/td><td><strong>Received<\/strong><br \/>2019-04-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-03-30<br \/><\/td><td>NBC Division B 9.19.1.2.<\/td><td>-<\/td><\/tr><tr><td>1432<\/td><td>Site welding of stainless steel pipe and fittings<\/td><td>Gill, Rick, Unified Alloys<\/td><td>2019-03-27<\/td><td><strong>Received<\/strong><br \/>2019-03-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 2.3.2.8.<\/td><td>-<\/td><\/tr><tr><td>1431<\/td><td>Water Closets<\/td><td>Leclerc, Emilie EL, Universit\u00e9 Laval<\/td><td>2019-03-26<\/td><td><strong>Received<\/strong><br \/>2019-03-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-05-27<br \/><\/td><td>NBC Division B 3.7.2.2.<\/td><td>1750 (published)<\/td><\/tr><tr><td>1430<\/td><td>Emergency roof drainage<\/td><td>Spurrell, Andrew<\/td><td>2019-03-21<\/td><td><strong>Received<\/strong><br \/>2019-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 2.4.10.4.<\/td><td>1790 (published)<\/td><\/tr><tr><td>1429<\/td><td>Mandated Accessible Design for Dwelling Units<\/td><td>Chung, Kate P, Older Women's Network<\/td><td>2019-03-19<\/td><td><strong>Received<\/strong><br \/>2019-03-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-05-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2022-04-13<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.8.<\/td><td>1956, 2031 (published), 2030 (published), 1880 (published), 1881 (published), 1882 (published), 1883 (published), 2028 (published)<\/td><\/tr><tr><td>1428<\/td><td>Manual Stations required by Subclause 3.4.6.16.(5)(b)(iv)<\/td><td>Meier, Clayton W, MuniCode Services<\/td><td>2019-03-19<\/td><td><strong>Received<\/strong><br \/>2019-03-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/><\/td><td>NBC Division B 3.4.6.16.<\/td><td>-<\/td><\/tr><tr><td>1427<\/td><td>Safety Way Guidance Systems (SWGS)<\/td><td>Farley, Michele M, Mrs.<\/td><td>2019-03-15<\/td><td><strong>Received<\/strong><br \/>2019-03-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-04-03<br \/><\/td><td>NFC Division B 2.7.4.<\/td><td>-<\/td><\/tr><tr><td>1426<\/td><td>Safety Way Guidance Systems (SWGS)<\/td><td>Farley, Michele M, Mrs.<\/td><td>2019-03-15<\/td><td><strong>Received<\/strong><br \/>2019-03-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-04-03<br \/><\/td><td>NBC Division B 3.2.10.<\/td><td>-<\/td><\/tr><tr><td>1425<\/td><td>Electrical Vehicles Charging Stations in Dwellings Units<\/td><td>LeBlanc, Pierrette, Natural Resources Canada<\/td><td>2019-03-12<\/td><td><strong>Received<\/strong><br \/>2019-03-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 3.6.1.2.<\/td><td>-<\/td><\/tr><tr><td>1424<\/td><td>foundation walls<\/td><td>steen, andrew, retired . <\/td><td>2019-03-11<\/td><td><strong>Received<\/strong><br \/>2019-03-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-03-30<br \/><\/td><td>NBC Division B 9.15.4.2.<\/td><td>-<\/td><\/tr><tr><td>1423<\/td><td>Sound Transmission Control<\/td><td>Burak, Robert J, Canadian Precast\/Prestressed Concrete Institute<\/td><td>2019-03-08<\/td><td><strong>Received<\/strong><br \/>2019-03-08<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.11.1.4.,<br \/>NBC Division B 5.8.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1422<\/td><td>Revision of the existing wording of Article 3.2.7.10. <\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2019-03-07<\/td><td><strong>Received<\/strong><br \/>2019-03-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-05-11<br \/><\/td><td>NBC Division B 3.2.7.10.<\/td><td>-<\/td><\/tr><tr><td>1421<\/td><td>Adding a new Seismic Force Resisting System to Table 4.1.8.9.<\/td><td>Fox, Steven R., Canadian Sheet Steel Building Institute<\/td><td>2019-03-05<\/td><td><strong>Received<\/strong><br \/>2019-03-05<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-10<br \/><\/td><td>NBC Division B 4.1.8.9.<\/td><td>-<\/td><\/tr><tr><td>1420<\/td><td>Drains Serving Elevator Pits<\/td><td>Wager, Perry, Public Safety Division, Alberta Municipal Affairs<\/td><td>2019-03-01<\/td><td><strong>Received<\/strong><br \/>2019-03-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 2.4.3.6.<\/td><td>1696<\/td><\/tr><tr><td>1419<\/td><td>Access to Public Areas<\/td><td>Miele, Vincent, Richmond Centre for Disability<\/td><td>2019-02-14<\/td><td><strong>Received<\/strong><br \/>2019-02-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-05-11<br \/><\/td><td>NBC Division B 3.8.2.,<br \/>NBC Division B 3.8.3.<\/td><td>-<\/td><\/tr><tr><td>1418<\/td><td>Fire Protection, Occupant Safety and Accessibility<\/td><td>Toma, Susana, unemployed<\/td><td>2019-02-07<\/td><td><strong>Received<\/strong><br \/>2019-02-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1417<\/td><td>Water Closets for Business and Personal Services Occupancy<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2019-02-06<\/td><td><strong>Received<\/strong><br \/>2019-02-06<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-05-11<br \/><\/td><td>NBC Division B 3.7.2.2.B.<\/td><td>-<\/td><\/tr><tr><td>1416<\/td><td>Maximum Area of Glazed Openings in Exterior Walls of Houses<\/td><td>Evans, Christopher J.H., CJ Evans Home Designs<\/td><td>2019-01-28<\/td><td><strong>Received<\/strong><br \/>2019-01-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1415<\/td><td>Change in Application of the NBC Limiting the Application of Part 9 Buildings<\/td><td>Marshall, Richard B, Bird Construction<\/td><td>2019-01-20<\/td><td><strong>Received<\/strong><br \/>2019-01-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B ,<br \/>NBC Division A 1.3.3.3.<\/td><td>-<\/td><\/tr><tr><td>1414<\/td><td>Change in Application of the NBC Limiting the Application of Part 9 Buildings<\/td><td>Marshall, Richard B, Bird Construction<\/td><td>2019-01-20<\/td><td><strong>Received<\/strong><br \/>2019-01-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.3.3.2.<\/td><td>-<\/td><\/tr><tr><td>1413<\/td><td>Construction of Soffit<\/td><td>MacDougall, Delaine, City of Regina<\/td><td>2019-01-18<\/td><td><strong>Received<\/strong><br \/>2019-01-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.14.5.,<br \/>NBC Division B 9.10.15.5.<\/td><td>-<\/td><\/tr><tr><td>1412<\/td><td>Construction Requirement for Exposed Building Faces of Detached Garages<\/td><td>Klauke, Jeremiah, City of Saskatoon<\/td><td>2019-01-16<\/td><td><strong>Received<\/strong><br \/>2019-01-17<br \/><\/td><td>NBC Division B 9.10.14.5.<\/td><td>1441 (published)<\/td><\/tr><tr><td>1411<\/td><td>Insulation Requirement and Risk of Condensation on Piping and Duct<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2019-01-16<\/td><td><strong>Received<\/strong><br \/>2019-01-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 5.2.2.5.,<br \/>NECB Division B 5.2.5.3.<\/td><td>-<\/td><\/tr><tr><td>1410<\/td><td>Foundation walls<\/td><td>Klauke, Jeremiah, City of Saskatoon<\/td><td>2019-01-16<\/td><td><strong>Received<\/strong><br \/>2019-01-17<br \/><\/td><td>NBC Division B 9.15.4.4.<\/td><td>-<\/td><\/tr><tr><td>1409<\/td><td>Electrical Vehicle Charging Stations for Multi-unit Residential Buildings (MURBs)<\/td><td>LeBlanc, Pierrette, Natural Resources Canada<\/td><td>2019-01-14<\/td><td><strong>Received<\/strong><br \/>2019-01-15<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-03-07<br \/><\/td><td>NECB Division B 7.2.<\/td><td>-<\/td><\/tr><tr><td>1408<\/td><td>Audibility of Alarm Systems <\/td><td>WEBER, DENNIS, Canadian Fire Alarm Association (CFAA)<\/td><td>2019-01-13<\/td><td><strong>Received<\/strong><br \/>2019-01-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-06-11<br \/><\/td><td>NBC Division B 3.2.4.18.<\/td><td>1770<\/td><\/tr><tr><td>1407<\/td><td>Protection of Electrical Conductors<\/td><td>WEBER, DENNIS, Canadian Fire Alarm Association (CFAA)<\/td><td>2019-01-13<\/td><td><strong>Received<\/strong><br \/>2019-01-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-12<br \/><\/td><td>NBC Division B 3.2.7.10.<\/td><td>1638<\/td><\/tr><tr><td>1406<\/td><td>Exterior Lighting Control Programming<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2019-01-11<\/td><td><strong>Received<\/strong><br \/>2019-01-15<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 4.2.4.1.<\/td><td>1662 (published)<\/td><\/tr><tr><td>1405<\/td><td>Ceiling joists attachment and framing<\/td><td>Klauke, Jeremiah, City of Saskatoon<\/td><td>2019-01-07<\/td><td><strong>Received<\/strong><br \/>2019-01-08<br \/><\/td><td>NBC Division B 9.23.14.<\/td><td>-<\/td><\/tr><tr><td>1404<\/td><td>Foundation walls<\/td><td>Klauke, Jeremiah, City of Saskatoon<\/td><td>2019-01-07<\/td><td><strong>Received<\/strong><br \/>2019-01-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division B 9.15.4.4.<\/td><td>-<\/td><\/tr><tr><td>1403<\/td><td>Emergency Power for Lighting<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2018-12-31<\/td><td><strong>Received<\/strong><br \/>2019-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-02-26<br \/><\/td><td>NBC Division B 3.2.7.4.<\/td><td>-<\/td><\/tr><tr><td>1402<\/td><td>Requirements for Showers in Industrial Occupancies<\/td><td>Marshall, Richard B, Bird Construction<\/td><td>2018-12-30<\/td><td><strong>Received<\/strong><br \/>2019-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-05-11<br \/><\/td><td>NBC Division B 3.8.2.9.<\/td><td>-<\/td><\/tr><tr><td>1401<\/td><td>Compliance with Applicable Standards<\/td><td>McBain, Brian, ULC<\/td><td>2018-12-24<\/td><td><strong>Received<\/strong><br \/>2019-01-03<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-04-12<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>-<\/td><\/tr><tr><td>1400<\/td><td>Installation of Loose-Fill Insulation<\/td><td>McBain, Brian, ULC<\/td><td>2018-12-24<\/td><td><strong>Received<\/strong><br \/>2019-01-03<br \/><\/td><td>NBC Division B 9.25.2.4.<\/td><td>-<\/td><\/tr><tr><td>1399<\/td><td>Installation of Thermal Insulation<\/td><td>McBain, Brian, ULC<\/td><td>2018-12-24<\/td><td><strong>Received<\/strong><br \/>2019-01-03<br \/><\/td><td>NBC Division B 9.25.2.3.<\/td><td>-<\/td><\/tr><tr><td>1398<\/td><td>Fire Protection for Livestock<\/td><td>Fecteau, Vicki, Canadian Coalition for Farm Animals<\/td><td>2018-12-21<\/td><td><strong>Received<\/strong><br \/>2018-12-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NFBC Division B 3.1.,<br \/>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1397<\/td><td>Spatial Separation for Open-air Storage Garages<\/td><td>BLOUW, DIRK, AtLRG Architecture<\/td><td>2018-12-20<\/td><td><strong>Received<\/strong><br \/>2018-12-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NBC Division B 3.2.3.10.(1)<\/td><td>-<\/td><\/tr><tr><td>1396<\/td><td>Encapsulated Mass Timber Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-12-20<\/td><td><strong>Received<\/strong><br \/>2018-12-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.2.2.56.<\/td><td>1794 (published)<\/td><\/tr><tr><td>1395<\/td><td>Encapsulated Mass Timber Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-12-20<\/td><td><strong>Received<\/strong><br \/>2018-12-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.2.2.48.<\/td><td>1792 (published)<\/td><\/tr><tr><td>1394<\/td><td>Protective Encapsulation for EMTC<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-12-20<\/td><td><strong>Received<\/strong><br \/>2018-12-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-03-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/><\/td><td>NFC Division B 5.6.4.3.<\/td><td>1872 (published)<\/td><\/tr><tr><td>1393<\/td><td>Safety Way Guidance Systems<\/td><td>McBain, Brian, ULC<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-12<br \/><\/td><td>NBC Division B 3.2.10.<\/td><td>-<\/td><\/tr><tr><td>1392<\/td><td>Safety Way Guidance Systems<\/td><td>McBain, Brian, ULC<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-12<br \/><\/td><td>NFC Division B 2.7.4.<\/td><td>-<\/td><\/tr><tr><td>1391<\/td><td>Reference to the Term \"Grade\" in the NECB<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division A 1.4.1.2.(1),<br \/>NECB Division B 3.2.3.1.(3),<br \/>NECB Division B 3.2.3.2.(1),<br \/>NECB Division B 3.2.3.3.,<br \/>NECB Division B 3.2.3.3.(1),<br \/>NECB Division B 3.2.3.3.(2)<\/td><td>1653 (published), 1840 (published), 1962 (published)<\/td><\/tr><tr><td>1390<\/td><td>Reference to the Term \"Occupancy\" in the NECB<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-12<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-14<br \/><\/td><td>NECB Division A 1.4.1.2.<\/td><td>1651 (published), 1721 (published)<\/td><\/tr><tr><td>1389<\/td><td>Remove the Defined Term \"Salle de Spectacle\" in the NECB (French Version)<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-12<br \/><\/td><td>NECB Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1388<\/td><td>Acronym - LPD<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2024-09-12<br \/><\/td><td>NECB Division A 1.4.2.1.<\/td><td>-<\/td><\/tr><tr><td>1387<\/td><td>Minimum air flow for VAV system before engaging terminal reheat<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2018-12-05<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 5.2.8.9.<\/td><td>-<\/td><\/tr><tr><td>1386<\/td><td>Condensation Index for Windows, Doors and Skylights<\/td><td>Jafari, Mahmoud, Layton Consulting Ltd.<\/td><td>2018-12-06<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.7.3.3.<\/td><td>-<\/td><\/tr><tr><td>1385<\/td><td>Carbon Monoxide Alarms<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2018-12-07<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/><strong>Reviewed (legacy) <\/strong><br \/>2019-03-06<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-06-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division B 6.9.3.1.,<br \/>NBC Division B 9.32.3.9.<\/td><td>-<\/td><\/tr><tr><td>1384<\/td><td>Combustible cladding and street frontage of mid-rise combustible buildings<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2018-12-07<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2019-03-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.1.4.8.<\/td><td>1791 (published)<\/td><\/tr><tr><td>1383<\/td><td>Inclusion of CAN\/CSA-B837-14 - Collapsible fabric storage tanks (bladders)<\/td><td>Reichard, Paul, SEI Industries Ltd.<\/td><td>2018-12-08<\/td><td><strong>Received<\/strong><br \/>2018-12-11<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1382<\/td><td>Building Airtightness Measures and Improved Envelope Thermal Resistance<\/td><td>Macdonald, Iain A, National Resarch Council<\/td><td>2018-12-04<\/td><td><strong>Received<\/strong><br \/>2018-12-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.2.9.,<br \/>NBC Division B 9.36.2.10.,<br \/>NBC Division B 9.36.2.6.,<br \/>NBC Division B 9.36.2.8.<\/td><td>-<\/td><\/tr><tr><td>1381<\/td><td>Encapsulated Mass Timber Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-11-30<\/td><td><strong>Received<\/strong><br \/>2018-12-03<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2019-03-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.1.18.4.<\/td><td>1870 (published), 1872 (published)<\/td><\/tr><tr><td>1380<\/td><td>Galvanizing Sheet Thikness - footnote to Table 9.20.16.1.<\/td><td>Sato, Taijiro, Canadian Construction Materials Centre \/ National Research Council Canada<\/td><td>2018-12-02<\/td><td><strong>Received<\/strong><br \/>2018-12-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division B 9.20.16.1.<\/td><td>-<\/td><\/tr><tr><td>1379<\/td><td>Installation of emergency fixtures<\/td><td>Perreault, Martin, SNC-Lavalin<\/td><td>2018-11-27<\/td><td><strong>Received<\/strong><br \/>2018-11-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; <br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.1.3.,<br \/>NPC Division B 2.2.10.<\/td><td>-<\/td><\/tr><tr><td>1378<\/td><td>Concealed Spaces within Encapsulated Mass Timber Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-11-26<\/td><td><strong>Received<\/strong><br \/>2018-11-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.6.3.,<br \/>NBC Division B 3.1.6.4.(1)<\/td><td>1036 (published)<\/td><\/tr><tr><td>1377<\/td><td>Outlet Boxes in Encapsulated Mass Timber Construction<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-11-26<\/td><td><strong>Received<\/strong><br \/>2018-11-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-02<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Fire and Life Safety<br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.6.<\/td><td>1024 (published)<\/td><\/tr><tr><td>1376<\/td><td>\"Take Out\" versus Assembly Occupancy<\/td><td>STRICKLAND, JOHN S, Municipality of Eeast Hants<\/td><td>2018-11-26<\/td><td><strong>Received<\/strong><br \/>2018-11-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-12-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.3.2.<\/td><td>-<\/td><\/tr><tr><td>1375<\/td><td>Define Boarding, Lodging and Rooming houses <\/td><td>Rydall, Duncan C, Town of The Blue Mountains<\/td><td>2018-11-22<\/td><td><strong>Received<\/strong><br \/>2018-11-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2020-02-26<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-03-10<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1374<\/td><td>Radon - Inconsistent Langauage <\/td><td>Robinson, Keith A, DIALOG<\/td><td>2018-11-19<\/td><td><strong>Received<\/strong><br \/>2018-11-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-12<br \/><\/td><td>NBC Division B 5.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1373<\/td><td>Installation of roof drains<\/td><td>Perreault, Martin, SNC-Lavalin<\/td><td>2018-11-02<\/td><td><strong>Received<\/strong><br \/>2018-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2020-02-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B ,<br \/>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1372<\/td><td>Siphonic Roof Drainage Systems<\/td><td>Wong, Kevin, MIFAB INC.<\/td><td>2018-10-30<\/td><td><strong>Received<\/strong><br \/>2018-11-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Climate Change Adaptation<br \/>2025-01-30<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1371<\/td><td>Virology, Infections and Outbreaks<\/td><td>Bruce, Stephen , Conference Series LLC Ltd <\/td><td>2018-10-30<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-11-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1370<\/td><td>Encapsulation Layer Using Gypsum Board<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-10-29<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-05<br \/><\/td><td>NBC Division B 3.1.<\/td><td>1027 (published)<\/td><\/tr><tr><td>1369<\/td><td>Encapsulation Ratings in EMTC buildings<\/td><td>Alam, Marc, Canadian Wood Council<\/td><td>2018-10-29<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-05<br \/><\/td><td>NBC Division B 3.1.<\/td><td>1027 (published)<\/td><\/tr><tr><td>1368<\/td><td>Air Barrier Systems in Floors-on-ground + Ground Cover in Heated Crawl Spaces<\/td><td>Duzyk, Maxime MD, Demilc<\/td><td>2018-10-29<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-04<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-06-30<br \/><\/td><td>NBC Division B 9.18.6.2.,<br \/>NBC Division B 9.25.3.6.<\/td><td>-<\/td><\/tr><tr><td>1367<\/td><td>Mechanical Connectors and Outlets<\/td><td>Victaulic, Kevin K, Victaulic<\/td><td>2018-10-26<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1366<\/td><td>Stainless steel mechanical connectors and outlets<\/td><td>Victaulic, Kevin K, Victaulic<\/td><td>2018-10-26<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1365<\/td><td>mechanical couplings and outlets<\/td><td>Victaulic, Kevin K, Victaulic<\/td><td>2018-10-26<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1364<\/td><td>definition of a mechanical outlet <\/td><td>Kelly, Kevin J, Victaulic<\/td><td>2018-10-26<\/td><td><strong>Received<\/strong><br \/>2018-10-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1363<\/td><td>Mandatory Airtightness Testing<\/td><td>Larwill, Alastair G<\/td><td>2018-10-18<\/td><td><strong>Received<\/strong><br \/>2018-10-18<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.2.9.(1)<\/td><td>-<\/td><\/tr><tr><td>1362<\/td><td>New Standards for the Design and Installation of Special Fire Suppression System<\/td><td>Grundie, Robert, University of Calgary<\/td><td>2018-10-12<\/td><td><strong>Received<\/strong><br \/>2018-10-15<br \/><\/td><td>NFC Division B 2.1.3.5.(3),<br \/>NFC Division B 2.1.3.5.(4)<\/td><td>-<\/td><\/tr><tr><td>1361<\/td><td>Demand Control Ventilation Strategies Applied to the Proposed and Reference Building<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2018-10-10<\/td><td><strong>Received<\/strong><br \/>2018-10-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.15.(2)<\/td><td>-<\/td><\/tr><tr><td>1360<\/td><td>Easy First Floor Exit in houses of wooden construction material<\/td><td>Mir Ali, Mehdi Khan<\/td><td>2018-10-06<\/td><td><strong>Received<\/strong><br \/>2018-10-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.9.10.<\/td><td>-<\/td><\/tr><tr><td>1359<\/td><td>Removal of Personal Controls in Energy Modeling<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2018-10-04<\/td><td><strong>Received<\/strong><br \/>2018-10-05<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.3.4.(2),<br \/>NECB Division B 8.4.4.5.(3)<\/td><td>-<\/td><\/tr><tr><td>1358<\/td><td>Minimum supply air flow rate for HVAC System-6<\/td><td>Genest, Frederic, Natural Resources Canada \/ CanmetENERGY<\/td><td>2018-10-04<\/td><td><strong>Received<\/strong><br \/>2018-10-05<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.18.(4)<\/td><td>-<\/td><\/tr><tr><td>1357<\/td><td>Impact Sound Transmission in MURBs<\/td><td>Rojas, Lavinia<\/td><td>2018-09-29<\/td><td><strong>Received<\/strong><br \/>2018-10-02<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-12<br \/><\/td><td>NBC Division B 5.8.1.,<br \/>NBC Division B 9.11.<\/td><td>-<\/td><\/tr><tr><td>1356<\/td><td>Insulation in Heated Crawl Spaces<\/td><td>MacKenzie, Michael<\/td><td>2018-10-02<\/td><td><strong>Received<\/strong><br \/>2018-10-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.18.1.3.<\/td><td>-<\/td><\/tr><tr><td>1355<\/td><td>Requirements for Exhaust Ducts serving Laundry-drying Equipment <\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2018-10-01<\/td><td><strong>Received<\/strong><br \/>2018-10-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.32.1.3.<\/td><td>1937<\/td><\/tr><tr><td>1354<\/td><td>Adding Partitions\/Dividers between Mens Urinal <\/td><td>Chimienti, Pietro<\/td><td>2018-09-21<\/td><td><strong>Received<\/strong><br \/>2018-09-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-04-05<br \/><\/td><td>NBC Division B 3.7.2.2.<\/td><td>-<\/td><\/tr><tr><td>1353<\/td><td>Requirements for Office Partition Panels<\/td><td>Panning, David, Building &amp; Institutional Furniture Manufacturers Association<\/td><td>2018-09-05<\/td><td><strong>Received<\/strong><br \/>2018-09-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/><\/td><td>NFC Division B 2.3.1.<\/td><td>-<\/td><\/tr><tr><td>1352<\/td><td>Homes Built in Flood Zones <\/td><td>Tonikian, Roupen, GBi Experts Conseils Inc. <\/td><td>2018-08-28<\/td><td><strong>Received<\/strong><br \/>2018-08-29<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1351<\/td><td>Reduced Water Usage per Flush Cycle<\/td><td>Laneuville, Mathieu ML, Minist\u00e8re des Affaires municipales et de l'Occupation du territoire<\/td><td>2018-08-27<\/td><td><strong>Received<\/strong><br \/>2018-08-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.6.1.6.(3)<\/td><td>-<\/td><\/tr><tr><td>1350<\/td><td>Fire Safety<\/td><td>Martin, Jackie E., Viking Innovations Ltd.<\/td><td>2018-08-20<\/td><td><strong>Received<\/strong><br \/>2018-08-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 3.2.4.11.<\/td><td>-<\/td><\/tr><tr><td>1349<\/td><td>Wall exposed to another wall<\/td><td>Meier, Clayton W, MuniCode Services<\/td><td>2018-08-17<\/td><td><strong>Received<\/strong><br \/>2018-08-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-13<br \/><\/td><td>NBC Division B 3.2.3.14.<\/td><td>-<\/td><\/tr><tr><td>1348<\/td><td>Limits on Application of the NBC<\/td><td>Chown, Adaire, Consultant<\/td><td>2018-08-15<\/td><td><strong>Received<\/strong><br \/>2018-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2020-02-04<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-03-10<br \/><\/td><td>NBC Division A 1.1.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1347<\/td><td>Inclusion of Residential Clothes Dryer as Fixtures<\/td><td>Ellacott, Warrington , Whirlpool Canada LP <\/td><td>2018-07-30<\/td><td><strong>Received<\/strong><br \/>2018-07-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.9.3.,<br \/>NPC Division B 2.4.10.12.<\/td><td>-<\/td><\/tr><tr><td>1346<\/td><td>Fibrocement Pipe and Fittings<\/td><td>Beauregard, Louis<\/td><td>2018-07-27<\/td><td><strong>Received<\/strong><br \/>2018-07-27<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-09-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-04<br \/><\/td><td>NPC Division B 2.2.5.<\/td><td>1471 (published)<\/td><\/tr><tr><td>1345<\/td><td>Door Release Hardware<\/td><td>McBain, Brian, ULC<\/td><td>2018-07-26<\/td><td><strong>Received<\/strong><br \/>2018-07-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-02-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-04-03<br \/><\/td><td>NBC Division B 3.4.6.16.<\/td><td>-<\/td><\/tr><tr><td>1344<\/td><td>Definition of Readily Accessible<\/td><td>Wilson, Andy D, City of Victoria \/ BOABC<\/td><td>2018-07-23<\/td><td><strong>Received<\/strong><br \/>2018-07-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.1.3.2.<\/td><td>-<\/td><\/tr><tr><td>1343<\/td><td>New CAN\/ANSI\/AHRI 1330-2015 Standard for Gas-Fired Infrared Heaters or Systems<\/td><td>Morgenroth, Richard <\/td><td>2018-07-17<\/td><td><strong>Received<\/strong><br \/>2018-07-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-03-31<br \/><\/td><td>NECB Division B 5.2.12.1.<\/td><td>-<\/td><\/tr><tr><td>1342<\/td><td>ceiling joists when not supported on a wall<\/td><td>Klauke, Jeremiah, City of Saskatoon<\/td><td>2018-07-04<\/td><td><strong>Received<\/strong><br \/>2018-07-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.23.3.4.<\/td><td>-<\/td><\/tr><tr><td>1341<\/td><td>Accessibility to Buildings by Emergency Health Services <\/td><td>Dietz, Chad  W, BCEHS <\/td><td>2018-07-04<\/td><td><strong>Received<\/strong><br \/>2018-07-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2019-01-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-08-12<br \/><\/td><td>NFC Division B 2.8.1.<\/td><td>-<\/td><\/tr><tr><td>1340<\/td><td>Building Projects Adjacent to Existing Transmission Power Lines<\/td><td>Au, Alex, BC Hydro<\/td><td>2018-06-27<\/td><td><strong>Received<\/strong><br \/>2018-06-28<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division C 2.2.2.1.<\/td><td>-<\/td><\/tr><tr><td>1339<\/td><td>Standpipe System Design Residual Water Pressure<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2018-06-01<\/td><td><strong>Received<\/strong><br \/>2018-06-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.5.9.(4)<\/td><td>-<\/td><\/tr><tr><td>1338<\/td><td>Venting of Laundry-Drying Equipment <\/td><td>POIRIER, BERTRAND, Systemair Inc.<\/td><td>2018-06-01<\/td><td><strong>Received<\/strong><br \/>2018-06-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NBC Division B 9.32.1.3.<\/td><td>-<\/td><\/tr><tr><td>1337<\/td><td>Concrete Block Walls between Town Houses and Condos<\/td><td>Gadd, Cia<\/td><td>2018-05-31<\/td><td><strong>Received<\/strong><br \/>2018-06-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.11.<\/td><td>-<\/td><\/tr><tr><td>1336<\/td><td>Stand Pipe Connections<\/td><td>Payne, Brian J, Ram Canada Inc.<\/td><td>2018-05-30<\/td><td><strong>Received<\/strong><br \/>2018-05-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/><\/td><td>NBC Division B A-3.2.9.1.(1),<br \/>NFC Division B 6.1.1.2.(1),<br \/>NFC Division B 6.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1335<\/td><td>NFPA 24 2016 Edition \"Installation of Private Fire Service Mains and Their Appurtenances\" Addition<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2018-05-30<\/td><td><strong>Received<\/strong><br \/>2018-05-31<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2018-12-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1334<\/td><td>Water Service Pipes and Fire Service Pipes<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2018-05-30<\/td><td><strong>Received<\/strong><br \/>2018-05-31<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2018-12-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B ,<br \/>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1333<\/td><td>Standpipe System Design and Standpipe Systems Editorial Change<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2018-05-30<\/td><td><strong>Received<\/strong><br \/>2018-05-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 3.2.5.9.(4)<\/td><td>1478 (published)<\/td><\/tr><tr><td>1332<\/td><td>Standpipe System Design Total Water Supply<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2018-05-30<\/td><td><strong>Received<\/strong><br \/>2018-05-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/><\/td><td>NBC Division B 3.2.5.9.(3)<\/td><td>-<\/td><\/tr><tr><td>1331<\/td><td>Clinique ambulatoire<\/td><td>Bourdeau, Suzel, R\u00e9gie du B\u00e2itment du Qu\u00e9bec<\/td><td>2018-05-14<\/td><td><strong>Received<\/strong><br \/>2018-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2020-02-04<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-03-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-28<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 3.1.2.,<br \/>NBC Division B 3.1.3.2.,<br \/>NBC Division B 3.2.4.,<br \/>NBC Division B 3.3.1.,<br \/>NBC Division B 3.3.3.1.<\/td><td>-<\/td><\/tr><tr><td>1330<\/td><td>Radon Mitigation<\/td><td>Szewaga, Colin<\/td><td>2018-05-09<\/td><td><strong>Received<\/strong><br \/>2018-05-10<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2019-04-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2020-01-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2020-10-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-06-08<br \/><\/td><td>NBC Division B <\/td><td>1887, 1713 (published)<\/td><\/tr><tr><td>1329<\/td><td>Revision to intelligibility Explanatory Note<\/td><td>Kuffner, William, SNC-Lavalin Inc<\/td><td>2018-05-04<\/td><td><strong>Received<\/strong><br \/>2018-05-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-12<br \/><\/td><td>NBC Division B A-3.2.4.22.<\/td><td>1749 (published)<\/td><\/tr><tr><td>1328<\/td><td>Handrail Graspabilty<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2018-05-03<\/td><td><strong>Received<\/strong><br \/>2018-05-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-11-01<br \/><\/td><td>NBC Division B 3.4.6.5.(5)<\/td><td>1357 (published), 1429<\/td><\/tr><tr><td>1327<\/td><td>Add a cladding material<\/td><td>Meunier, Christian, Allied Technical Sales Inc. (ATS)<\/td><td>2018-04-27<\/td><td><strong>Received<\/strong><br \/>2018-04-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.27.<\/td><td>-<\/td><\/tr><tr><td>1326<\/td><td>Expand the Application of Factory-Assembled Panels<\/td><td>Simko, Peter, IMP Systems Ltd.<\/td><td>2018-04-23<\/td><td><strong>Received<\/strong><br \/>2018-04-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-09-18<br \/><\/td><td>NBC Division B 3.1.5.7.,<br \/>NBC Division B 3.1.5.15.<\/td><td>-<\/td><\/tr><tr><td>1325<\/td><td>Add construction elements that can disrupt the continuity of the isolation<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-04-18<\/td><td><strong>Received<\/strong><br \/>2018-04-19<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 3.2.1.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1324<\/td><td>harmonization of the terminology used<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-04-18<\/td><td><strong>Received<\/strong><br \/>2018-04-19<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-17<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-09-12<br \/><\/td><td>NECB Division A 1.4.1.2.(1)<\/td><td>1650 (published)<\/td><\/tr><tr><td>1323<\/td><td>terminology used<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-04-18<\/td><td><strong>Received<\/strong><br \/>2018-04-19<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-17<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-09-12<br \/><\/td><td>NECB Division A 1.4.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1322<\/td><td>Calculation of Overall Thermal Transmittance<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-04-18<\/td><td><strong>Received<\/strong><br \/>2018-04-19<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 3.1.1.7.(3),<br \/>NECB Division B 3.1.1.7.(4)<\/td><td>-<\/td><\/tr><tr><td>1321<\/td><td>Replacing space conditioning systems with HVAC systems<\/td><td>Lessard, Nathalie, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2018-04-18<\/td><td><strong>Received<\/strong><br \/>2018-04-19<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 3.1.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1320<\/td><td>Emergency Power Supply Installation<\/td><td>Samrai, Gabriel<\/td><td>2018-04-13<\/td><td><strong>Received<\/strong><br \/>2018-04-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-12-05<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2019-08-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-06-05<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.7.5.<\/td><td>-<\/td><\/tr><tr><td>1319<\/td><td>Self-Service Storage Buildings in Part 9<\/td><td>Rogers, Joe, Office of the Fire Marshal (Nova Scotia)<\/td><td>2018-04-09<\/td><td><strong>Received<\/strong><br \/>2018-04-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 9.10.1.3.<\/td><td>1679 (published)<\/td><\/tr><tr><td>1318<\/td><td>Straw Bale Construction<\/td><td>Richards, Lawren<\/td><td>2018-04-04<\/td><td><strong>Received<\/strong><br \/>2018-04-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1317<\/td><td>Secondary Containment - Construction<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-28<\/td><td><strong>Received<\/strong><br \/>2018-04-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.3.7.2.(2)<\/td><td>1560 (published)<\/td><\/tr><tr><td>1316<\/td><td>Overfill Protection<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-26<\/td><td><strong>Received<\/strong><br \/>2018-03-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.3.1.8.<\/td><td>1559 (published)<\/td><\/tr><tr><td>1315<\/td><td>Shut-off Devices - Location and Identification<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-26<\/td><td><strong>Received<\/strong><br \/>2018-03-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.6.4.1.(2)<\/td><td>1557 (published)<\/td><\/tr><tr><td>1314<\/td><td>Shut-off Devices - Location and Identification<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-26<\/td><td><strong>Received<\/strong><br \/>2018-03-26<br \/><\/td><td>NFC Division B 4.6.4.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1313<\/td><td>Supervision and Dispensing Procedures - Self-service Outlets<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-26<\/td><td><strong>Received<\/strong><br \/>2018-03-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.6.8.2.(5)<\/td><td>1556 (published)<\/td><\/tr><tr><td>1312<\/td><td>Direct Flush Valves<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2018-03-22<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-13<br \/><\/td><td>NPC Division B 2.2.10.8.<\/td><td>1489 (published)<\/td><\/tr><tr><td>1311<\/td><td>Back-Siphonage Preventers and Backflow Preventers<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2018-03-22<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-13<br \/><\/td><td>NPC Division B 2.2.10.10.(2)<\/td><td>1488 (published)<\/td><\/tr><tr><td>1310<\/td><td>Miscellaneous Materials\/ Flexible Water Connectors<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2018-03-22<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-10-30<br \/><\/td><td>NPC Division B 2.2.10.7.(4)<\/td><td>1495 (published)<\/td><\/tr><tr><td>1309<\/td><td>Water Temperature Control<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2018-03-22<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-10-30<br \/><\/td><td>NPC Division B 2.2.10.7.(4)<\/td><td>1366 (published)<\/td><\/tr><tr><td>1308<\/td><td>Supply and Waste Fittings\/ Manually Operated Valves for Use in Plumbing Systems<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2018-03-22<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.2.10.6.<\/td><td>1491 (published)<\/td><\/tr><tr><td>1307<\/td><td>Supervision and Dispensing Procedures - Self-service Outlets<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-21<\/td><td><strong>Received<\/strong><br \/>2018-03-22<br \/><\/td><td>NFC Division B 4.6.8.2.(5)<\/td><td>-<\/td><\/tr><tr><td>1306<\/td><td>Shut-off Devices - Self-service Outlets<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-03-21<\/td><td><strong>Received<\/strong><br \/>2018-03-21<br \/><\/td><td>NFC Division B 4.6.4.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1305<\/td><td>Vapour Retarder Coatings Applied to Gypsum Board<\/td><td>Conway, Gerald D, Conway Architect Inc<\/td><td>2018-03-19<\/td><td><strong>Received<\/strong><br \/>2018-03-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-02-04<br \/><\/td><td>NBC Division B 5.5.1.2.(2)<\/td><td>1426 (published), 1427 (published)<\/td><\/tr><tr><td>1304<\/td><td>Ducts and pipes embedded in fire-resistant concrete slabs<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-03-16<\/td><td><strong>Received<\/strong><br \/>2018-03-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2020-02-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NBC Division B 6.3.2.20.,<br \/>NBC Division B 9.33.6.15.,<br \/>NBC Division B 9.33.6.15.<\/td><td>-<\/td><\/tr><tr><td>1303<\/td><td>Commissioning of Energy Using Systems<\/td><td>Lau, Toby K.W., BC Hydro<\/td><td>2018-03-07<\/td><td><strong>Received<\/strong><br \/>2018-03-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2022-07-19<br \/><\/td><td>NECB Division B 1<\/td><td>-<\/td><\/tr><tr><td>1302<\/td><td>adding two rows to the table on size and spacing of studs<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2018-03-07<\/td><td><strong>Received<\/strong><br \/>2018-03-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.23.10.1.<\/td><td>1677 (published)<\/td><\/tr><tr><td>1301<\/td><td>Installation of Spray-Applied Polyurethane (quality assurance)<\/td><td>McBain, Brian, ULC<\/td><td>2018-03-05<\/td><td><strong>Received<\/strong><br \/>2018-03-06<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.25.2.5.<\/td><td>-<\/td><\/tr><tr><td>1300<\/td><td>New Installation Standard CAN\/ULC-S573 for Ancillary Devices Actuated by a Fire Alarm System<\/td><td>McBain, Brian, ULC<\/td><td>2018-03-05<\/td><td><strong>Received<\/strong><br \/>2018-03-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.2.4.5.,<br \/>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>1299<\/td><td>\"Commercial Cooking Equipment\", the application for mobile or temporary catering units<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-03-02<\/td><td><strong>Received<\/strong><br \/>2018-03-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-08<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NBC Division B 9.10.1.4.,<br \/>NBC Division B 6.3.1.7.<\/td><td>-<\/td><\/tr><tr><td>1298<\/td><td>Add to 6.3.2.13 and 9.33.6.14 the notion of the principle of the efficiency of MERV filtration<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-26<\/td><td><strong>Received<\/strong><br \/>2018-02-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-01-30<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 6.3.2.13.,<br \/>NBC Division B 9.33.6.14.<\/td><td>-<\/td><\/tr><tr><td>1297<\/td><td>Addition and modification to Section 6.6.1.1. and 9.33.9.1 <\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-26<\/td><td><strong>Received<\/strong><br \/>2018-02-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NBC Division B 6.6.1.1.,<br \/>NBC Division B 9.33.9.1.<\/td><td>-<\/td><\/tr><tr><td>1296<\/td><td>Waiving Criteria for the Conditions of Acceptance of Metal Roof Deck Assemblies<\/td><td>McHugh, Bill, National Fireproofing Contractors Association<\/td><td>2018-02-15<\/td><td><strong>Received<\/strong><br \/>2018-02-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-09-18<br \/><\/td><td>NBC Division B 3.1.14.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1295<\/td><td>Sprayed Fire-Resistant and Intumescent Fire-Resistant Materials<\/td><td>McHugh, Bill, National Fireproofing Contractors Association<\/td><td>2018-02-15<\/td><td><strong>Received<\/strong><br \/>2018-02-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-09-18<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-02-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-13<br \/><\/td><td>NBC Division B 3.1.7.<\/td><td>-<\/td><\/tr><tr><td>1294<\/td><td>Add to Section 6.3.2.14.  an ozonator and UV rays cleaning devices<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-15<\/td><td><strong>Received<\/strong><br \/>2018-02-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 6.3.2.14.<\/td><td>-<\/td><\/tr><tr><td>1293<\/td><td>Precision on types of ventilation material and on types of installations in Part 9 and 3<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-15<\/td><td><strong>Received<\/strong><br \/>2018-02-15<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.33.6.2.,<br \/>NBC Division B 3.6.5.1.<\/td><td>-<\/td><\/tr><tr><td>1292<\/td><td>Air-purification Ozonator Systems<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-14<\/td><td><strong>Received<\/strong><br \/>2018-02-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-05-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-01-30<br \/>NMCC on Indoor Environment: <strong>Presented to NMCC<\/strong><br \/>2025-06-10<br \/><\/td><td>NBC Division B 9.33.6.14.<\/td><td>-<\/td><\/tr><tr><td>1291<\/td><td>CSA Z317.1-16 Special requirements for plumbing installations in health care facilities<\/td><td>Chow, Julianne, CSA Group<\/td><td>2018-02-12<\/td><td><strong>Received<\/strong><br \/>2018-02-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 1.3.1.2.,<br \/>NPC Division B 2.6.3.1.,<br \/>NPC Division B 2.6.2.8.,<br \/>NPC Division B 2.2.2.5.,<br \/>NPC Division B 2.2.10.7.,<br \/>NPC Division B A-2.6.2.4.,<br \/>NPC Division B A-2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1290<\/td><td>Lithium Battery Fires<\/td><td>McCairns, Jody L, The Explorer Group<\/td><td>2018-02-09<\/td><td><strong>Received<\/strong><br \/>2018-02-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B <\/td><td>-<\/td><\/tr><tr><td>1289<\/td><td>Linen and Refuse Chutes<\/td><td>Jovanovic, Milan MJ, ATH (Agence des technologies d'habitation)<\/td><td>2018-02-07<\/td><td><strong>Received<\/strong><br \/>2018-02-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-09-18<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.6.3.3.<\/td><td>-<\/td><\/tr><tr><td>1288<\/td><td>CO Detectors in lieu of CO Alarms<\/td><td>McBain, Brian, ULC<\/td><td>2018-02-06<\/td><td><strong>Received<\/strong><br \/>2018-02-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-06<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-06-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 9.32.3.9.<\/td><td>-<\/td><\/tr><tr><td>1287<\/td><td>Ventilation of Storage Garages<\/td><td>McBain, Brian, ULC<\/td><td>2018-02-06<\/td><td><strong>Received<\/strong><br \/>2018-02-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-06-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 6.3.1.4.<\/td><td>-<\/td><\/tr><tr><td>1286<\/td><td>Carbon Monoxide Alarms<\/td><td>McBain, Brian, ULC<\/td><td>2018-02-06<\/td><td><strong>Received<\/strong><br \/>2018-02-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-06<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-06-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NBC Division B 6.9.3.1.<\/td><td>-<\/td><\/tr><tr><td>1285<\/td><td>Leak Detection Testing and Monitoring of Underground Storage Tanks<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-02-06<\/td><td><strong>Received<\/strong><br \/>2018-02-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-01-29<br \/><\/td><td>NFC Division B 4.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1284<\/td><td>Overfill Protection<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2018-02-05<\/td><td><strong>Received<\/strong><br \/>2018-02-06<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-01-29<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-08<br \/><\/td><td>NFC Division B 4.3.1.8.(2)<\/td><td>1513 (published)<\/td><\/tr><tr><td>1283<\/td><td>Construction Requirements for Building under 600 sq.m. and 4 Storeys<\/td><td>Harmsworth, Andrew, GHL Consultants Ltd. SCFP<\/td><td>2018-02-04<\/td><td><strong>Received<\/strong><br \/>2018-02-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2018-09-18<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-02-28<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division A 1.3.3.3.<\/td><td>-<\/td><\/tr><tr><td>1282<\/td><td>Addition and revision of fire-resistance ratings to Table 9.10.3.1.<\/td><td>Sultan, Mohamed A., NRC-IRC (Fire Research Program)<\/td><td>2018-02-03<\/td><td><strong>Received<\/strong><br \/>2018-02-05<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-09-18<br \/><\/td><td>NBC Division B 9.10.3.1.<\/td><td>1496 (published)<\/td><\/tr><tr><td>1281<\/td><td>Revise support for nominally horizontal piping for PVC<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2018-01-26<\/td><td><strong>Received<\/strong><br \/>2018-01-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.3.4.5.,<br \/>NPC Division B <\/td><td>1693 (published)<\/td><\/tr><tr><td>1280<\/td><td>Lighting Control<\/td><td>McDonald, Pierre, Levven Electronics<\/td><td>2018-01-22<\/td><td><strong>Received<\/strong><br \/>2018-01-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.34.2.1.,<br \/>NBC Division B 9.34.2.2.,<br \/>NBC Division B 9.34.2.3.,<br \/>NBC Division B 9.34.2.4.,<br \/>NBC Division B 9.34.2.5.,<br \/>NBC Division B 9.34.2.6.,<br \/>NBC Division B 9.34.2.7.,<br \/>NBC Division B 3.2.7.1.(3),<br \/>NBC Division B 3.2.7.1.(4)<\/td><td>-<\/td><\/tr><tr><td>1279<\/td><td>Definition of \"Exposing Building Face\"<\/td><td>Saby, Darrell C, Town of Qualicum Beach<\/td><td>2018-01-05<\/td><td><strong>Received<\/strong><br \/>2018-01-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-02-28<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1278<\/td><td>Organization of F(T) Lookup Tables<\/td><td>Smith, Tyler LH, Tetra Tech ICE<\/td><td>2018-01-02<\/td><td><strong>Received<\/strong><br \/>2018-01-17<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-02-15<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-26<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1277<\/td><td>Energy Storage. Using precast or concrete floors as as a Battery<\/td><td>Laken, Jack Matis, Termobuild<\/td><td>2018-01-02<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 9.36.<\/td><td>-<\/td><\/tr><tr><td>1276<\/td><td>Press-Connect Copper and Copper Alloy Water Fittings for Copper Water Systems<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-22<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.7.8.<\/td><td>-<\/td><\/tr><tr><td>1275<\/td><td>Standard for Copper and Copper Alloy Press-Connect Pressure Fittings  for Copper Tubing<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-22<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1274<\/td><td>Press-Connect Fittings for Stainless Steel Pipe and Tube<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-22<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>1273<\/td><td>Reference Document ASTM F3226<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-22<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-01-30<br \/><\/td><td>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1272<\/td><td>Roofing Materials - Asphalt core board<\/td><td>C\u00f4t\u00e9, Jean-Fran\u00e7ois, Chair, CSA A123 Technical Committee<\/td><td>2017-12-21<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/><\/td><td>NBC Division B 5.9.1.1.<\/td><td>1483 (published)<\/td><\/tr><tr><td>1271<\/td><td>Definition of 'system' - particularly as it pertains to mechanical equipment<\/td><td>Pockar, Justin D, City of Calgary<\/td><td>2018-01-02<\/td><td><strong>Received<\/strong><br \/>2018-01-03<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2018-01-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2018-06-20<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-17<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2021-03-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-07-14<br \/><\/td><td>NECB Division A <\/td><td>1671 (published)<\/td><\/tr><tr><td>1270<\/td><td>Roofing Materials - Asphalt core board<\/td><td>C\u00f4t\u00e9, Jean-Fran\u00e7ois, Chair, CSA A123 Technical Committee<\/td><td>2017-12-21<\/td><td><strong>Received<\/strong><br \/>2018-01-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.26.2.1.<\/td><td>1467 (published)<\/td><\/tr><tr><td>1269<\/td><td>Metallic Press-Connect Fittings for Piping and Tubing Systems<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-14<\/td><td><strong>Received<\/strong><br \/>2017-12-14<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>1268<\/td><td>Stainless Steel Pipe Press Connect Fittings<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-12-14<\/td><td><strong>Received<\/strong><br \/>2017-12-14<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1267<\/td><td>Minimum Permitted Size of Fixture Outlet Pipe and Hydraulic Loads for Fixtures<\/td><td>White, Phillip S, City of Vancouver<\/td><td>2017-12-07<\/td><td><strong>Received<\/strong><br \/>2017-12-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.4.9.3.<\/td><td>1391 (published)<\/td><\/tr><tr><td>1266<\/td><td>Fire Performance of Light Diffusers and Lenses<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2017-12-05<\/td><td><strong>Received<\/strong><br \/>2017-12-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/><\/td><td>NBC Division B 3.1.13.4.<\/td><td>-<\/td><\/tr><tr><td>1265<\/td><td>Minimum Width of Doorways without a Door<\/td><td>Mulders, Roy C, ISM Architects Inc.<\/td><td>2017-11-29<\/td><td><strong>Received<\/strong><br \/>2017-11-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-12<br \/><\/td><td>NBC Division B 3.8.3.6.(1)<\/td><td>1563 (published)<\/td><\/tr><tr><td>1264<\/td><td>Uncontrolled Backfilling<\/td><td>Kimery, Clint, Gunner Corp<\/td><td>2017-11-28<\/td><td><strong>Received<\/strong><br \/>2017-11-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2018-12-10<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-03-18<br \/><\/td><td>NBC Division B 9.12.3.2.<\/td><td>-<\/td><\/tr><tr><td>1263<\/td><td>Electrical Installation Requirements for Fire Pumps<\/td><td>Samrai, Gabriel<\/td><td>2017-11-27<\/td><td><strong>Received<\/strong><br \/>2017-11-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-23<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.5.18.<\/td><td>-<\/td><\/tr><tr><td>1262<\/td><td>Roofing Materials<\/td><td>C\u00f4t\u00e9, Jean-Fran\u00e7ois, Chair, CSA A123 Technical Committee<\/td><td>2017-11-22<\/td><td><strong>Received<\/strong><br \/>2017-11-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.26.2.1.<\/td><td>-<\/td><\/tr><tr><td>1261<\/td><td>Standards Applicable to Environmental Separators and Assemblies Exposed to the Exterior<\/td><td>C\u00f4t\u00e9, Jean-Fran\u00e7ois, Chair, CSA A123 Technical Committee<\/td><td>2017-11-22<\/td><td><strong>Received<\/strong><br \/>2017-11-22<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1260<\/td><td>Reference to ASME B16.51<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-11-22<\/td><td><strong>Received<\/strong><br \/>2017-11-22<br \/><\/td><td>NPC Division B 2.2.7.<\/td><td>-<\/td><\/tr><tr><td>1259<\/td><td>Lead Waste Pipe and Fittings.<\/td><td>Fasel, Mark, Viega LLC<\/td><td>2017-11-22<\/td><td><strong>Received<\/strong><br \/>2017-11-22<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1258<\/td><td>Overfill Protection<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2017-11-20<\/td><td><strong>Received<\/strong><br \/>2017-11-21<br \/><\/td><td>NFC Division B 4.3.1.8.(2)<\/td><td>-<\/td><\/tr><tr><td>1257<\/td><td>kitchen sink<\/td><td>bolduc, yves y b<\/td><td>2017-11-14<\/td><td><strong>Received<\/strong><br \/>2017-11-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B A-2.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>1256<\/td><td>Installation of Spray-Applied Polyurethane (Thermal Insulation)<\/td><td>Birkbeck, Peter, Icynene Inc.<\/td><td>2017-11-14<\/td><td><strong>Received<\/strong><br \/>2017-11-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.25.2.5.(2)<\/td><td>1803 (published)<\/td><\/tr><tr><td>1255<\/td><td>Trap<\/td><td>bolduc, yves y b<\/td><td>2017-11-12<\/td><td><strong>Received<\/strong><br \/>2017-11-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.4.5.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1254<\/td><td>Annual Testing of Sprinkler System Backflow Prevention Assemblies<\/td><td>Kurz, Frank E, The Fire Protection Technicians Network<\/td><td>2017-11-10<\/td><td><strong>Received<\/strong><br \/>2017-11-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-09-18<br \/><\/td><td>NBC Division B 3.2.5.12.<\/td><td>-<\/td><\/tr><tr><td>1253<\/td><td>Combustible Piping as Duct Work<\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2017-11-09<\/td><td><strong>Received<\/strong><br \/>2017-11-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-02-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.6.5.1.<\/td><td>-<\/td><\/tr><tr><td>1252<\/td><td>Documents Referenced in the NFC 2015, Special Fire Suppression Systems, Fire protection Systems <\/td><td>Sideropoulos, Christos, FoamFatale Greece Ltd.<\/td><td>2017-11-09<\/td><td><strong>Received<\/strong><br \/>2017-11-09<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1251<\/td><td>Distance between a stair riser and the leading edge of a door during its swing in access to exit <\/td><td>Gupta, Avinash, Govt. of Northwest Territories<\/td><td>2017-11-07<\/td><td><strong>Received<\/strong><br \/>2017-11-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>-<\/td><td>1907, 1878 (published)<\/td><\/tr><tr><td>1250<\/td><td>Equal Distribution of Windows in the Reference House<\/td><td>Harris, John, Natural Resources Canada, Office of Energy Efficiency<\/td><td>2017-11-07<\/td><td><strong>Received<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.5.14.(5)<\/td><td>-<\/td><\/tr><tr><td>1249<\/td><td>Distance between a stair riser and the leading edge of a door during its swing in access to exit <\/td><td>Meier, Clayton W, MuniCode Services<\/td><td>2017-11-06<\/td><td><strong>Received<\/strong><br \/>2017-11-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>-<\/td><td>1878 (published)<\/td><\/tr><tr><td>1248<\/td><td>Deletion of Traditional Winders<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2017-11-06<\/td><td><strong>Received<\/strong><br \/>2017-11-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.8.4.5.<\/td><td>-<\/td><\/tr><tr><td>1247<\/td><td>Allow for a Polyurethane ICF<\/td><td>Ross, Tyler J<\/td><td>2017-10-30<\/td><td><strong>Received<\/strong><br \/>2017-10-31<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.15.4.1.<\/td><td>-<\/td><\/tr><tr><td>1246<\/td><td>Wind resistance of foam plastic insulating sheathing<\/td><td>Ahrenholz, Timothy, Applied Building Technology Group<\/td><td>2017-10-13<\/td><td><strong>Received<\/strong><br \/>2017-10-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 9,<br \/>NBC Division B 5<\/td><td>-<\/td><\/tr><tr><td>1245<\/td><td>Cladding connections through foam plastic insulating sheathing<\/td><td>Ahrenholz, Timothy, Applied Building Technology Group<\/td><td>2017-10-13<\/td><td><strong>Received<\/strong><br \/>2017-10-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-10-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 5,<br \/>NBC Division B 9<\/td><td>-<\/td><\/tr><tr><td>1244<\/td><td>unconditioned parking garages need to be insulated<\/td><td>Habashy, Nabil, Government of Alberta<\/td><td>2017-10-10<\/td><td><strong>Received<\/strong><br \/>2017-10-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.1.3.(2)<\/td><td>-<\/td><\/tr><tr><td>1243<\/td><td>removal of sentence 9.8.8.1 (6)(a) <\/td><td>Grant, Byron  J, BOABC<\/td><td>2017-10-04<\/td><td><strong>Received<\/strong><br \/>2017-10-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1242<\/td><td>Serving Water Closets<\/td><td>Rogers, Joe, Office of the Fire Marshal (Nova Scotia)<\/td><td>2017-10-04<\/td><td><strong>Received<\/strong><br \/>2017-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-11-28<br \/><\/td><td>NPC Division B 2.9.4.2.<\/td><td>1390 (published)<\/td><\/tr><tr><td>1241<\/td><td>Emergency Communication and\/or Mass Notification Systems<\/td><td>McBain, Brian, ULC<\/td><td>2017-10-03<\/td><td><strong>Received<\/strong><br \/>2017-10-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1240<\/td><td>New Installation Standard CAN\/UL 2600 for Construction Camps and Relocatable Structures<\/td><td>McBain, Brian, ULC<\/td><td>2017-10-03<\/td><td><strong>Received<\/strong><br \/>2017-10-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.10.21.1.<\/td><td>-<\/td><\/tr><tr><td>1239<\/td><td>Automatic Main-Water-Shutoff Valve<\/td><td>Tass\u00e9, Michel, Manufacturer Plumbing \/ Electrical<\/td><td>2017-10-02<\/td><td><strong>Received<\/strong><br \/>2017-10-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1238<\/td><td>9.25.4.2.(5) - Vapour Barrier Materials - standard<\/td><td>Birkbeck, Peter, Icynene Inc.<\/td><td>2017-09-29<\/td><td><strong>Received<\/strong><br \/>2017-10-02<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 5.5.1.2.(2),<br \/>NBC Division B 9.25.4.2.(5)<\/td><td>1426 (published), 1427 (published)<\/td><\/tr><tr><td>1237<\/td><td>Exterior Insulation Finish Systems, Application, Geometrically Defined Drainage Cavity<\/td><td>Rapone, Guido , Canadian EIFS Manufacturers Association (CEMA)<\/td><td>2017-09-21<\/td><td><strong>Received<\/strong><br \/>2017-09-21<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>1461 (published)<\/td><\/tr><tr><td>1236<\/td><td>Exterior Insulation Finish Systems, Application, Geometrically Defined Drainage Cavity<\/td><td>Nabhan, Fadi Nabhan E, National Research Council Canada.  Canadian Construction Materials Centre<\/td><td>2017-09-19<\/td><td><strong>Received<\/strong><br \/>2017-09-20<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>1461 (published)<\/td><\/tr><tr><td>1235<\/td><td>Definition of Continuous Vent (NPC)<\/td><td>Brewer, Bryan, NAIT<\/td><td>2017-09-18<\/td><td><strong>Received<\/strong><br \/>2017-09-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-02-28<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1234<\/td><td>FRR Calculation Method for Mass Timber Elements<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2017-09-13<\/td><td><strong>Received<\/strong><br \/>2017-09-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-02-20<br \/><\/td><td>NBC Division B D-2.11.<\/td><td>1525 (published)<\/td><\/tr><tr><td>1233<\/td><td>Photoluminescent exit signs<\/td><td>mcintosh, robert a, pl solutions inc.<\/td><td>2017-08-24<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-12<br \/><\/td><td>NBC Division B 9.9.11.3.,<br \/>NBC Division B 3.4.5.1.<\/td><td>-<\/td><\/tr><tr><td>1232<\/td><td>Step Dimensions<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2017-09-01<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.8.4.<\/td><td>1578<\/td><\/tr><tr><td>1231<\/td><td>New Standards for the Design and Installation of Special Fire Suppression System<\/td><td>Grundie, Robert, University of Calgary<\/td><td>2017-09-04<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2019-01-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-04-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-08<br \/><\/td><td>NFC Division B 2.1.3.5.(3),<br \/>NFC Division B 2.1.3.5.(4)<\/td><td>-<\/td><\/tr><tr><td>1230<\/td><td>Dynamic analysis for vibration effects<\/td><td>Eslaamizaad, Soheil, Enbridge Pipelines Inc.<\/td><td>2017-09-05<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-08<br \/><\/td><td>-<\/td><td>1191 (published)<\/td><\/tr><tr><td>1229<\/td><td>Combustible Piping Materials<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-08-31<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2018-06-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-11-26<br \/><\/td><td>NBC Division B 3.1.5.19.(3)<\/td><td>-<\/td><\/tr><tr><td>1228<\/td><td>Smoke Control in High Buildings<\/td><td>Hopley, Matthew, Jensen Hughes Consulting Canada Ltd.<\/td><td>2017-08-31<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-02-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.2.6.2.(3)<\/td><td>-<\/td><\/tr><tr><td>1227<\/td><td>Minimum Cleanout Fitting Dimension<\/td><td>Manning, Sidney C, Alberta Municipal Affairs<\/td><td>2017-08-30<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.4.7.2.<\/td><td>1507<\/td><\/tr><tr><td>1226<\/td><td>Update referenced standard ASHRAE 62.1-2001 to more recent version.<\/td><td>Howard, Clifford R, R W Howard Engineering 9065113 Canada Inc.<\/td><td>2017-08-28<\/td><td><strong>Received<\/strong><br \/>2017-09-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1223<\/td><td>Referencing CCMC as a Deemed to Comply Source of Alternative Solution<\/td><td>Di Lenardo, Bruno, Canadian Construction Materials Centre (CCMC)<\/td><td>2017-08-30<\/td><td><strong>Received<\/strong><br \/>2017-09-01<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-09-27<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-27<br \/><\/td><td>NBC Division C 2.3.1.<\/td><td>-<\/td><\/tr><tr><td>1222<\/td><td>Protection of Vapour Barriers<\/td><td>Gupta, Avinash, Govt. of Northwest Territories<\/td><td>2017-08-22<\/td><td><strong>Received<\/strong><br \/>2017-08-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-02-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-09-11<br \/><\/td><td>NBC Division B 3.1.5.2.,<br \/>NBC Division B 9.10.6.1.,<br \/>NBC Division B 3.1.5.6.<\/td><td>-<\/td><\/tr><tr><td>1221<\/td><td>Roofing drip edges<\/td><td>anderson, richard r, anders home inspection<\/td><td>2017-08-21<\/td><td><strong>Received<\/strong><br \/>2017-08-22<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.26.1.3.<\/td><td>-<\/td><\/tr><tr><td>1220<\/td><td>Air gaps permitted in a noxious environment<\/td><td>Canuel-Langlois, Emilie, Corporation des ma\u00eetre m\u00e9caniciens en tuyauterie du Qu\u00e9bec<\/td><td>2017-08-21<\/td><td><strong>Received<\/strong><br \/>2017-08-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.6.2.9.<\/td><td>1694<\/td><\/tr><tr><td>1219<\/td><td>Shoey Salt Port<\/td><td>Shoemaker, Richard D<\/td><td>2017-08-19<\/td><td><strong>Received<\/strong><br \/>2017-08-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1218<\/td><td>Introduction of a Reference to the CSA A500, \"Building Guards\" Standard<\/td><td>Vegh, Petr, Exp Services Inc.<\/td><td>2017-08-10<\/td><td><strong>Received<\/strong><br \/>2017-08-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2017-11-07<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2018-02-07<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2019-01-11<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2019-01-28<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-03-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-23<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2019-06-25<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2020-05-11<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2021-02-26<br \/><\/td><td>NBC Division B 3.3.1.18.,<br \/>NBC Division B 3.3.1.19.,<br \/>NBC Division B 3.3.4.7.,<br \/>NBC Division B 3.3.4.8.(1),<br \/>NBC Division B 3.4.6.6.,<br \/>NBC Division B 3.4.7.6.,<br \/>NBC Division B 3.8.3.5.(1),<br \/>NBC Division B 4.3.6.1.<\/td><td>-<\/td><\/tr><tr><td>1217<\/td><td>Installation of Backing for the Installation of Grab Bars in Bathrooms and Washrooms<\/td><td>Bourdeau, Suzel, R\u00e9gie du B\u00e2itment du Qu\u00e9bec<\/td><td>2017-08-09<\/td><td><strong>Received<\/strong><br \/>2017-08-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-01-30<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2025-05-16<br \/><\/td><td>NBC Division B 3.7.2.,<br \/>NBC Division B 3.1.5.8.<\/td><td>-<\/td><\/tr><tr><td>1216<\/td><td>Long-life sealed battery smoke alarms<\/td><td>Vadlja, Mike, Huntsville\/Lake of Bays Fire Dept.<\/td><td>2017-08-02<\/td><td><strong>Received<\/strong><br \/>2017-08-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>-<\/td><td>1299<\/td><\/tr><tr><td>1215<\/td><td>Introduce a New Referenced Standard CSA B125.6 (Flexible Connectors)<\/td><td>Wong, Kevin, CIPH<\/td><td>2017-08-01<\/td><td><strong>Received<\/strong><br \/>2017-08-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.2.<\/td><td>1495 (published)<\/td><\/tr><tr><td>1214<\/td><td>Lightning Protection Systems<\/td><td>Larter, Simon C, Dobbyn Lightning Protection<\/td><td>2017-08-01<\/td><td><strong>Received<\/strong><br \/>2017-08-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-02-20<br \/><\/td><td>NFC Division B 6<\/td><td>-<\/td><\/tr><tr><td>1213<\/td><td>Water Pressure Test of DWV plumbing<\/td><td>Badry, Byron, Outfitter Homes Ltd<\/td><td>2017-07-25<\/td><td><strong>Received<\/strong><br \/>2017-07-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.3.6.<\/td><td>-<\/td><\/tr><tr><td>1212<\/td><td>Construction Requirements for Building in Flood Plains or Flood Prone Areas<\/td><td>Wanless, Chad E, Stantec Engineeromg<\/td><td>2017-07-11<\/td><td><strong>Received<\/strong><br \/>2017-07-11<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2020-02-26<br \/><\/td><td>NBC Division A 2.2.1.1.,<br \/>NBC Division B 3.1.<\/td><td>-<\/td><\/tr><tr><td>1211<\/td><td>Installation of Spray-Applied Polyurethane <\/td><td>McBain, Brian, ULC<\/td><td>2017-07-06<\/td><td><strong>Received<\/strong><br \/>2017-07-10<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.25.2.5.<\/td><td>1803 (published)<\/td><\/tr><tr><td>1210<\/td><td>CAN\/ULC S712.1, Insulation Standard<\/td><td>McBain, Brian, ULC<\/td><td>2017-07-06<\/td><td><strong>Received<\/strong><br \/>2017-07-10<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.25.2.2.<\/td><td>1803 (published)<\/td><\/tr><tr><td>1209<\/td><td>Exceptions in Determining Building Height<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2017-06-29<\/td><td><strong>Received<\/strong><br \/>2017-07-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-02-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-09-22<br \/><\/td><td>NBC Division B 3.2.1.1.(1)<\/td><td>2005 (published)<\/td><\/tr><tr><td>1208<\/td><td>Major Occupancy Classification of Distilleries<\/td><td>Victor, Frankie, GHL Consultants<\/td><td>2017-06-26<\/td><td><strong>Received<\/strong><br \/>2017-06-27<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2018-02-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2020-05-12<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2020-12-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2021-09-29<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2022-02-17<br \/><\/td><td>NBC Division B A-3.1.2.1.(1)<\/td><td>1681<\/td><\/tr><tr><td>1207<\/td><td>Combustible Piping Penetrations<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-06-26<\/td><td><strong>Received<\/strong><br \/>2017-06-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-02-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.1.9.5.(5)<\/td><td>-<\/td><\/tr><tr><td>1206<\/td><td>Error in Figure A-2.6.3.4.(5)<\/td><td>Valliere, Claude  R A, Government of Alberta<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B A-2.6.3.4.(5)<\/td><td>-<\/td><\/tr><tr><td>1205<\/td><td>Harmonized use of Acronyms in Figures A-2.6.3.1.(2)-A , A-2.6.3.4.(5)-A  and A-2.6.3.4.(5)-B.<\/td><td>Valliere, Claude  R A, Government of Alberta<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B A-2.6.3.4.(5)<\/td><td>-<\/td><\/tr><tr><td>1204<\/td><td>Error in Figure A-2.6.3.4.(5)<\/td><td>Valliere, Claude  R A, Government of Alberta<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B A-2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1203<\/td><td>Sizing of Cold Water System<\/td><td>Valliere, Claude  R A, Government of Alberta<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B A-2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1202<\/td><td>Harmonized use of Acronyms in Figures A-2.6.3.1.(2)-A , A-2.6.3.4.(5)-A  and A-2.6.3.4.(5)-B.<\/td><td>Valliere, Claude  R A, Government of Alberta<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B A-2.6.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1201<\/td><td>Non-asbestos cement board as an acceptable protection<\/td><td>Hasan, Lisa N, City of Montreal<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>1949<\/td><\/tr><tr><td>1200<\/td><td>Factory-Assembled Panels and Insulation<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2017-06-20<\/td><td><strong>Received<\/strong><br \/>2017-06-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-02-20<br \/><\/td><td>NBC Division B 3.1.5.7.<\/td><td>1312 (published)<\/td><\/tr><tr><td>1199<\/td><td>Central Stations and their Fire Protective Signalling Systems<\/td><td>McBain, Brian, ULC<\/td><td>2017-06-08<\/td><td><strong>Received<\/strong><br \/>2017-06-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>NFC Division B 6.3.1.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1198<\/td><td>Signals to the Fire Department<\/td><td>McBain, Brian, ULC<\/td><td>2017-06-08<\/td><td><strong>Received<\/strong><br \/>2017-06-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.2.4.7.(4)<\/td><td>-<\/td><\/tr><tr><td>1197<\/td><td>Defined Terms - Alarm and Alert Signals<\/td><td>McBain, Brian, ULC<\/td><td>2017-06-08<\/td><td><strong>Received<\/strong><br \/>2017-06-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1196<\/td><td>Introducing New Standard NFPA 211 for the Annual Inspection of Chimneys <\/td><td>Eldridge, Ashley H, National Chimney Sweep Guild<\/td><td>2017-06-01<\/td><td><strong>Received<\/strong><br \/>2017-06-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-05-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-08<br \/><\/td><td>NFC Division B 2.6.1.4.<\/td><td>-<\/td><\/tr><tr><td>1195<\/td><td>Street access for mid-rise Group C and Group D buildings of combustible construction <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2017-05-29<\/td><td><strong>Received<\/strong><br \/>2017-05-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-07<br \/><\/td><td>NBC Division B 3.2.2.10.(3),<br \/>NBC Division B 3.1.4.8.,<br \/>NBC Division B 3.1.15.2.<\/td><td>1210 (published)<\/td><\/tr><tr><td>1194<\/td><td>Street access for mid-rise Group C and Group D buildings of combustible construction <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2017-05-29<\/td><td><strong>Received<\/strong><br \/>2017-05-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-07<br \/><\/td><td>NBC Division B 3.2.2.10.(3)<\/td><td>1209<\/td><\/tr><tr><td>1193<\/td><td>Duct and Plenum Insulation<\/td><td>Bartel, Dieter, Manitoba Hydro<\/td><td>2017-05-19<\/td><td><strong>Received<\/strong><br \/>2017-05-31<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1192<\/td><td>Aligning plumbing systems design and installation with the intent of National Energy Code of Canada <\/td><td>Clayman, Steve, Thermal Insulation Association of Canada<\/td><td>2017-05-29<\/td><td><strong>Received<\/strong><br \/>2017-05-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>1191<\/td><td>Translation of \"Duct Sealants\" from English to French<\/td><td>Ameur, Mohamed M.A, NAD Klima<\/td><td>2017-05-29<\/td><td><strong>Received<\/strong><br \/>2017-05-29<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division B 3.6.5.1.(4)<\/td><td>-<\/td><\/tr><tr><td>1190<\/td><td>Transitions for Combustible and Noncombustible Pipe<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2017-05-18<\/td><td><strong>Received<\/strong><br \/>2017-05-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B 3.1.9.5.<\/td><td>1365 (published)<\/td><\/tr><tr><td>1189<\/td><td>Duct and Plenum Insulation<\/td><td>Bartel, Dieter, Manitoba Hydro<\/td><td>2017-05-19<\/td><td><strong>Received<\/strong><br \/>2017-05-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 5.2.2.5.<\/td><td>1438 (published)<\/td><\/tr><tr><td>1188<\/td><td>Exit Signs<\/td><td>Kaye, Kevin, PLC Fire Safety Solutions<\/td><td>2017-05-16<\/td><td><strong>Received<\/strong><br \/>2017-05-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.4.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1187<\/td><td>Location of drain pipes<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-05-17<\/td><td><strong>Received<\/strong><br \/>2017-05-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.4.2.3.<\/td><td>1389<\/td><\/tr><tr><td>1186<\/td><td>Nailing Elements<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2017-05-02<\/td><td><strong>Received<\/strong><br \/>2017-05-02<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B 3.5.1.8.<\/td><td>1356 (published)<\/td><\/tr><tr><td>1185<\/td><td>Control of Corrosion for Activities Using Diesel Fuel<\/td><td>Smyth, Patrick J, DieselPure<\/td><td>2017-04-28<\/td><td><strong>Received<\/strong><br \/>2017-04-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-17<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1184<\/td><td>Expand the Protection of Distilled Beverages in Containers<\/td><td>Jardine, Matthew J, Morrison Hershfield Ltd<\/td><td>2017-04-27<\/td><td><strong>Received<\/strong><br \/>2017-04-27<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NFC Division B 3.2.3.3.(2)<\/td><td>-<\/td><\/tr><tr><td>1183<\/td><td>spatial separation table values <\/td><td>Calder, Keith D, Jensen Hughes<\/td><td>2017-04-26<\/td><td><strong>Received<\/strong><br \/>2017-04-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-05-13<br \/><\/td><td>-<\/td><td>1701, 1680 (published)<\/td><\/tr><tr><td>1182<\/td><td>Wiring for Houses with a Secondary Suite<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-04-17<\/td><td><strong>Received<\/strong><br \/>2017-04-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>1125 (published)<\/td><\/tr><tr><td>1181<\/td><td>New timber SFRS \u2013 CLT platform shearwall<\/td><td>Wang, Jasmine, Canadian Wood Council<\/td><td>2017-04-06<\/td><td><strong>Received<\/strong><br \/>2017-04-19<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-05<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1180<\/td><td>Deletion of asbestos as an acceptable material in the NPC<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2017-04-05<\/td><td><strong>Received<\/strong><br \/>2017-04-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.2.5.1.,<br \/>NPC Division B 2.2.6.3.<\/td><td>-<\/td><\/tr><tr><td>1179<\/td><td>Deletion of asbestos as an acceptable material in the NBC<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2017-04-05<\/td><td><strong>Received<\/strong><br \/>2017-04-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-20<br \/><\/td><td>NBC Division B 3.6.5.1.<\/td><td>-<\/td><\/tr><tr><td>1178<\/td><td>Flame spread and smoke development in elevator cars <\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2017-04-04<\/td><td><strong>Received<\/strong><br \/>2017-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-13<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1177<\/td><td>Protection from Backflow<\/td><td>Manning, Sidney C, Alberta Municipal Affairs<\/td><td>2017-03-29<\/td><td><strong>Received<\/strong><br \/>2017-03-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.4.6.4.(4)<\/td><td>1412 (published)<\/td><\/tr><tr><td>1176<\/td><td>Introduce a List of New Standards for Building Services Piping Valves<\/td><td>Gill, Rick, Unified Alloys<\/td><td>2017-03-29<\/td><td><strong>Received<\/strong><br \/>2017-03-30<br \/><\/td><td>NPC Division B 2.2.10.<\/td><td>-<\/td><\/tr><tr><td>1175<\/td><td>Dead-end corridors within suites and definition for \"corridor used by the public<\/td><td>Olivier, Nicole, Technorm inc.<\/td><td>2017-03-28<\/td><td><strong>Received<\/strong><br \/>2017-03-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.3.1.9.(7)<\/td><td>-<\/td><\/tr><tr><td>1174<\/td><td>Introduce a List of New Standards for Building Services Piping Valves<\/td><td>Gill, Rick, Unified Alloys<\/td><td>2017-03-27<\/td><td><strong>Received<\/strong><br \/>2017-03-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-12-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.2.10.<\/td><td>-<\/td><\/tr><tr><td>1173<\/td><td>Add References to New ASTM Standards for On-site Inspection of Firestops<\/td><td>Chauhan, Raman B, Bibby Ste. Croix Foundries<\/td><td>2017-03-27<\/td><td><strong>Received<\/strong><br \/>2017-03-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-09-13<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.1.9.1.<\/td><td>-<\/td><\/tr><tr><td>1172<\/td><td>Building Envelope Components<\/td><td>DesRoches, Zane R, City of Medicine Hat<\/td><td>2017-03-22<\/td><td><strong>Received<\/strong><br \/>2017-03-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 8.4.4.4.(3),<br \/>NECB Division B 3.2.4.1.<\/td><td>1541<\/td><\/tr><tr><td>1171<\/td><td>Installation of Windows, Doors and Skylights<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2017-03-21<\/td><td><strong>Received<\/strong><br \/>2017-03-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>-<\/td><td>1246 (published)<\/td><\/tr><tr><td>1170<\/td><td>Latch mechanism height<\/td><td>White, K Todd, +white architecture inc.<\/td><td>2017-03-16<\/td><td><strong>Received<\/strong><br \/>2017-03-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-13<br \/><\/td><td>-<\/td><td>1343 (published)<\/td><\/tr><tr><td>1169<\/td><td>door latch height maximum on Universal toilet rooms<\/td><td>White, K Todd, +white architecture inc.<\/td><td>2017-03-16<\/td><td><strong>Received<\/strong><br \/>2017-03-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-13<br \/><\/td><td>-<\/td><td>1343 (published)<\/td><\/tr><tr><td>1168<\/td><td>Capability of Support<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-03-16<\/td><td><strong>Received<\/strong><br \/>2017-03-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-11-28<br \/><\/td><td>NPC Division B 2.3.4.1.(3)<\/td><td>1387 (published)<\/td><\/tr><tr><td>1167<\/td><td>Tiny Homes - Required Facilities (Plumbing)<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.31.4.1.<\/td><td>-<\/td><\/tr><tr><td>1166<\/td><td>Tiny Homes - Requirements for High Wind and Seismic Forces<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.23.13.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1165<\/td><td>Tiny Homes - Smoke Alarms<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.10.19.3.<\/td><td>-<\/td><\/tr><tr><td>1164<\/td><td>Tiny Homes - Egress Windows or Doors for Bedrooms<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.9.10.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1163<\/td><td>Tiny Homes -Required Guards<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.8.1.<\/td><td>-<\/td><\/tr><tr><td>1162<\/td><td>Tiny Homes - Application of Section 9.8. Stairs, Ramps, Handrails and Guards<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.1.<\/td><td>-<\/td><\/tr><tr><td>1161<\/td><td>Tiny Homes -Application of Section 9.8. Stairs, Ramps, Handrails and Guards<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.1.1.<\/td><td>-<\/td><\/tr><tr><td>1160<\/td><td>Tiny Homes - Doorways to Rooms with a Bathtub, Shower or Water Closet<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.5.5.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1159<\/td><td>Tiny Homes -Doorway Opening Sizes<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.5.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1158<\/td><td>Tiny Homes -Ceiling Heights of Rooms or Spaces<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.5.3.1.(1),<br \/>NBC Division B 9.5.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1157<\/td><td>Tiny Homes - Combination Rooms<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-01<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.5.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1156<\/td><td>Tiny Homes - Defined Terms - Mezzanine<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1155<\/td><td>Tiny Homes - Defined Terms - Factory-Constructed <\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-03<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1154<\/td><td>Tiny Homes - Application of Code<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-03-14<\/td><td><strong>Received<\/strong><br \/>2017-03-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-03<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2017-06-09<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Housing Supply<br \/>2025-10-17<br \/><\/td><td>NBC Division A 1.1.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1153<\/td><td>Masonry Terminology used in Thermal Resistance Values of Common Building Materials Table<\/td><td>Banting, Bennett R., Canada Masonry Design Centre<\/td><td>2017-03-08<\/td><td><strong>Received<\/strong><br \/>2017-03-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B A-9.36.2.4.(1)<\/td><td>1657 (published), 1746 (published)<\/td><\/tr><tr><td>1152<\/td><td>Preventing the Use of a flexible connector as a branch in plumbing<\/td><td>Wong, Kevin, CIPH<\/td><td>2017-03-01<\/td><td><strong>Received<\/strong><br \/>2017-03-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.6.3.4.<\/td><td>-<\/td><\/tr><tr><td>1151<\/td><td>Determination of Wind Load (Vegetated Roof Assembly)<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2017-02-28<\/td><td><strong>Received<\/strong><br \/>2017-03-01<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-20<br \/><\/td><td>NBC Division B 5.2.2.2.<\/td><td>1754 (published)<\/td><\/tr><tr><td>1150<\/td><td>Simplification of the reference building modeling rules<\/td><td>Genest, Frederic, Durasim<\/td><td>2017-02-13<\/td><td><strong>Received<\/strong><br \/>2017-02-13<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 8.4.4.<\/td><td>-<\/td><\/tr><tr><td>1149<\/td><td>Defined Terms - Public Use<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-02-10<\/td><td><strong>Received<\/strong><br \/>2017-02-10<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>1706 (published)<\/td><\/tr><tr><td>1148<\/td><td>Height of masonry veneer before requiring an engineer<\/td><td>Ryckman, Rodd C,T, Rodds Masonry<\/td><td>2017-02-09<\/td><td><strong>Received<\/strong><br \/>2017-02-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.20.<\/td><td>-<\/td><\/tr><tr><td>1147<\/td><td>Type 1 Vertical stiffness irregularity<\/td><td>Tremblay, Robert, Polytechnique Montreal<\/td><td>2017-02-05<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2017-05-19<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-05<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1146<\/td><td>Protection Against Wildfire in Wildland-Urban Interface<\/td><td>Roos, Richard, Roxul Inc.<\/td><td>2017-02-03<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2019-08-20<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division A 2.2.1.1.(1),<br \/>NBC Division B 3.1.<\/td><td>-<\/td><\/tr><tr><td>1145<\/td><td>Acceptable Type of Insulation Materials for Insulated Wall Assembly - Fire Blocks<\/td><td>Roos, Richard, Roxul Inc.<\/td><td>2017-02-03<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/><\/td><td>NBC Division B 3.1.11.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1144<\/td><td>Acceptable Type of Insulation Materials with Exposed Construction Materials - Fire Blocks<\/td><td>Roos, Richard, Roxul Inc.<\/td><td>2017-02-03<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/><\/td><td>NBC Division B 3.1.11.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1143<\/td><td>Density of Insulation Materials within Floor or Roof Assembly - Fire Blocks<\/td><td>Roos, Richard, Roxul Inc.<\/td><td>2017-02-03<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/><\/td><td>NBC Division B 3.1.11.5.(4)<\/td><td>-<\/td><\/tr><tr><td>1142<\/td><td>Density of Insulation Materials for Openings Protection - Fire Blocks<\/td><td>Roos, Richard, Roxul Inc.<\/td><td>2017-02-03<\/td><td><strong>Received<\/strong><br \/>2017-02-06<br \/><\/td><td>NBC Division B 3.1.11.7.(5)<\/td><td>-<\/td><\/tr><tr><td>1141<\/td><td>New SFRS - Type MD plate wall<\/td><td>Driver, Robert, University of Alberta<\/td><td>2017-02-01<\/td><td><strong>Received<\/strong><br \/>2017-02-02<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2017-02-23<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-05<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1140<\/td><td>Ductile Steel Truss Moment-Resisting Frame<\/td><td>Wong, Alfred F, CSA Technical Committee S16 on Steel Structures for Buildings<\/td><td>2017-02-01<\/td><td><strong>Received<\/strong><br \/>2017-02-02<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-02-23<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-05<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1139<\/td><td>HRAI Digest<\/td><td>Bilal, Muhammad, HRAI<\/td><td>2017-01-31<\/td><td><strong>Received<\/strong><br \/>2017-02-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/><\/td><td>NBC Division B 6.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1138<\/td><td>Flame-Spread Rating and Smoke Developed Classification - Determination of Ratings<\/td><td>Paschal, James, Aquatherm<\/td><td>2017-01-30<\/td><td><strong>Received<\/strong><br \/>2017-02-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B 3.1.12.1.<\/td><td>-<\/td><\/tr><tr><td>1137<\/td><td>Defined Terms, Secondary Suite<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-01-30<\/td><td><strong>Received<\/strong><br \/>2017-02-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>1125 (published)<\/td><\/tr><tr><td>1136<\/td><td>Exemption for Single Conductor Metal Sheathed Cables More than 25 mm - Firestops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.3.(3)<\/td><td>-<\/td><\/tr><tr><td>1135<\/td><td>Combustible Piping Penetrations<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.5.(7)<\/td><td>1365 (published)<\/td><\/tr><tr><td>1134<\/td><td>50 Pa Pressure Differential for Combustible Piping Penetrations - Firestops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.5.(4),<br \/>NBC Division B 9.10.9.7.(3)<\/td><td>-<\/td><\/tr><tr><td>1133<\/td><td>50 Pa Pressure Differential for Combustible Piping Penetrations - Firestops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.5.(4),<br \/>NBC Division B 9.10.9.7.(3)<\/td><td>1501 (published)<\/td><\/tr><tr><td>1132<\/td><td>Exemption for Combustible Outlet Boxes - Firestops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.3.(5)<\/td><td>-<\/td><\/tr><tr><td>1131<\/td><td>Editorial: change Fire stops to to Firestops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B <\/td><td>1521 (published)<\/td><\/tr><tr><td>1130<\/td><td>Integrity of fire blocks <\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B A-3.1.11.7.<\/td><td>1506 (published)<\/td><\/tr><tr><td>1129<\/td><td>Fire Stops & Membrane Penetrations<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-25<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B A-3.1.9.<\/td><td>1505 (published)<\/td><\/tr><tr><td>1128<\/td><td>Fire Separation Continuity<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B A-3.1.8.3.(4)<\/td><td>1500 (published)<\/td><\/tr><tr><td>1127<\/td><td>Penetration by Outlet Boxes<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.4.(3)<\/td><td>1502 (published)<\/td><\/tr><tr><td>1126<\/td><td>Protection of penetrations through fire separations<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-05-06<br \/><\/td><td>NBC Division B 3.2.4.2.(4)<\/td><td>1697, 1698 (published)<\/td><\/tr><tr><td>1125<\/td><td>Fire Stops for Penetration by Wires, Cables and Outlet Boxes<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.3.(2),<br \/>NBC Division B 3.1.5.23.(1)<\/td><td>1499 (published)<\/td><\/tr><tr><td>1124<\/td><td>Fire Stops for Penetration by Wires, Cables and Outlet Boxes<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.(3),<br \/>NBC Division B 3.1.9.1.(6)<\/td><td>1526<\/td><\/tr><tr><td>1123<\/td><td>Fire Stops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.(3),<br \/>NFC Division B 3.1.9.1.(6)<\/td><td>1523 (published)<\/td><\/tr><tr><td>1122<\/td><td>Fire Stops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.(2),<br \/>NBC Division B 3.1.9.1.(3)<\/td><td>1508 (published)<\/td><\/tr><tr><td>1121<\/td><td>Rating of Fire Stops<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.,<br \/>NBC Division B 3.1.9.2.<\/td><td>1363 (published)<\/td><\/tr><tr><td>1120<\/td><td>Rating of Fire Stops in Fire Separation<\/td><td>Crimi, Tony, International Firestop Council<\/td><td>2017-01-24<\/td><td><strong>Received<\/strong><br \/>2017-01-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1119<\/td><td>High Speed Doors<\/td><td>Hetzel, Joseph R., DASMA<\/td><td>2017-01-23<\/td><td><strong>Received<\/strong><br \/>2017-01-24<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NECB Division B A-1.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1118<\/td><td>Rating of Fire Stops in Fire Separation<\/td><td>Scott, John, International Firestop Council<\/td><td>2017-01-20<\/td><td><strong>Received<\/strong><br \/>2017-01-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.9.1.(1)<\/td><td>1361 (published)<\/td><\/tr><tr><td>1117<\/td><td>Relief Valves<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-01-16<\/td><td><strong>Received<\/strong><br \/>2017-01-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.6.1.7.(1)<\/td><td>1371 (published)<\/td><\/tr><tr><td>1116<\/td><td>Expand the Definition of Fixture<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-01-16<\/td><td><strong>Received<\/strong><br \/>2017-01-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division A 1.4.1.2.,<br \/>NPC Division B 2<\/td><td>1959 (published)<\/td><\/tr><tr><td>1115<\/td><td>Pipe Diameter<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2017-01-13<\/td><td><strong>Received<\/strong><br \/>2017-01-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.4.9.1.(1)<\/td><td>1370 (published)<\/td><\/tr><tr><td>1114<\/td><td>ASHRAE 62 and Ventilation of Storage Garages<\/td><td>Jansen, Ian R, CTM Design Services <\/td><td>2017-01-09<\/td><td><strong>Received<\/strong><br \/>2017-01-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 6.3.1.1.<\/td><td>-<\/td><\/tr><tr><td>1113<\/td><td>Persons Qualified to Carry Out Energy Performance Calculations<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2017-01-06<\/td><td><strong>Received<\/strong><br \/>2017-01-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-05-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division C 2.2.8.2.<\/td><td>-<\/td><\/tr><tr><td>1112<\/td><td>Inclusion of the CGSB standard CAN\/CGSB 12.9, Spandrel Glass<\/td><td>Webb, Margaret, Insulating Glass Manufacturers Alliance (IGMA)<\/td><td>2017-01-04<\/td><td><strong>Received<\/strong><br \/>2017-01-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 5.9.1.1.,<br \/>NBC Division B 9.6.1.2.<\/td><td>1301 (published)<\/td><\/tr><tr><td>1111<\/td><td> Fire-Retardant Treated Wood <\/td><td>Bouwman, Menza, The Door Painters Ltd.<\/td><td>2016-12-29<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B 3.1.4.5.<\/td><td>-<\/td><\/tr><tr><td>1110<\/td><td>ASTM F876 Plastic Pressure Pipes<\/td><td>MacNevin, Lance D, Plastics Pipe Institute <\/td><td>2016-12-27<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.2.5.6.<\/td><td>-<\/td><\/tr><tr><td>1109<\/td><td> Exterior Glazed Walls<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2016-12-26<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-10-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1108<\/td><td>Interior finishes - Minimum interior light reflectances<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2016-12-26<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division A <\/td><td>-<\/td><\/tr><tr><td>1107<\/td><td>Audibility of fire alarm on roof top with mechanical equipment<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2016-12-26<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-06-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.2.4.19.,<br \/>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>1106<\/td><td>Emergency power supply for all elevators<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2016-12-26<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/><\/td><td>NBC Division B 3.2.7.9.<\/td><td>-<\/td><\/tr><tr><td>1105<\/td><td>Emergency Power for Lighting Provided by a Motor\/Generator <\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2016-12-26<\/td><td><strong>Received<\/strong><br \/>2017-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.2.7.4.(1),<br \/>NBC Division B 9.9.12.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1104<\/td><td>Expanding Scope of Sound Transmission Requirements<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2016-12-12<\/td><td><strong>Received<\/strong><br \/>2016-12-12<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-11-07<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-11-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 5.8.1.1.(1),<br \/>NBC Division B 9.11.<\/td><td>-<\/td><\/tr><tr><td>1103<\/td><td>ASHRAE 62 Reference<\/td><td>Boris, Craig O, 908 Engineering Inc<\/td><td>2016-11-28<\/td><td><strong>Received<\/strong><br \/>2016-11-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 6.3.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>1102<\/td><td>Wet Vents<\/td><td>St-gelais, louis LSTG, Commission scolaire de la Jonqui\u00e8re<\/td><td>2016-11-24<\/td><td><strong>Received<\/strong><br \/>2016-11-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2.5.6.2.(2)<\/td><td>1695<\/td><\/tr><tr><td>1101<\/td><td>Separation of Storage Garages<\/td><td>Schmeida, Michael, Gypsum Association<\/td><td>2016-11-21<\/td><td><strong>Received<\/strong><br \/>2016-11-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-11-07<br \/><\/td><td>NBC Division B 9.10.9.16.<\/td><td>-<\/td><\/tr><tr><td>1100<\/td><td>Glazed Openings in Exposing Building Face<\/td><td>Wong, Steev, GHL Consultants Ltd.<\/td><td>2016-11-18<\/td><td><strong>Received<\/strong><br \/>2016-11-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-11-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.15.4.<\/td><td>-<\/td><\/tr><tr><td>1099<\/td><td>Sentence 2.3.4.1.(2) - French Editorial (CNP)<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-11-18<\/td><td><strong>Received<\/strong><br \/>2016-11-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.3.4.1.(2)<\/td><td>1367<\/td><\/tr><tr><td>1098<\/td><td>Connection of Floor Outlet Fixtures<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-11-18<\/td><td><strong>Received<\/strong><br \/>2016-11-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.3.3.8.(1)<\/td><td>1387 (published)<\/td><\/tr><tr><td>1097<\/td><td>Required Venting for Roof Spaces<\/td><td>Bjornson, Dana G, Optimize Envelope Engineering<\/td><td>2016-11-18<\/td><td><strong>Received<\/strong><br \/>2016-11-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-11-07<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.19.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1096<\/td><td>Private Sewage Disposal System<\/td><td>Smith, Dennis<\/td><td>2016-11-18<\/td><td><strong>Received<\/strong><br \/>2016-11-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-12-03<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-06-14<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2022-10-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1095<\/td><td>Expand Application of Finish Coat for Stucco to Acrylic Finish<\/td><td>Bjornson, Dana G, Optimize Envelope Engineering<\/td><td>2016-11-16<\/td><td><strong>Received<\/strong><br \/>2016-11-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.28.6.5.<\/td><td>-<\/td><\/tr><tr><td>1094<\/td><td>Fixture Drain - Copper Tube<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-11-14<\/td><td><strong>Received<\/strong><br \/>2016-11-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.2.7.4.(3)<\/td><td>1386 (published)<\/td><\/tr><tr><td>1093<\/td><td>Correction of terminology for platform-equipped passenger-elevating device<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2016-11-07<\/td><td><strong>Received<\/strong><br \/>2016-11-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-13<br \/><\/td><td>-<\/td><td>1346<\/td><\/tr><tr><td>1092<\/td><td>Add new provision- New Building Practice that is environmentally friendly - \"Earthships\"<\/td><td>McGrath, Rodney J, Citizen of Saint John <\/td><td>2016-11-04<\/td><td><strong>Received<\/strong><br \/>2016-11-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1091<\/td><td>Required Landings<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2016-11-01<\/td><td><strong>Received<\/strong><br \/>2016-11-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.8.6.2.(2)<\/td><td>-<\/td><\/tr><tr><td>1090<\/td><td>Individually Protected Steel Beams<\/td><td>Martin, Bob, Calnitsky Associates Archtitects Inc.<\/td><td>2016-10-26<\/td><td><strong>Received<\/strong><br \/>2016-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B D-2.7.1.<\/td><td>-<\/td><\/tr><tr><td>1089<\/td><td>Doors and Doorways<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2016-10-18<\/td><td><strong>Received<\/strong><br \/>2016-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-13<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.8.3.6.<\/td><td>-<\/td><\/tr><tr><td>1088<\/td><td>Doors and doorway width<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2016-10-18<\/td><td><strong>Received<\/strong><br \/>2016-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-13<br \/><\/td><td>NBC Division B 3.8.3.6.<\/td><td>1344 (published)<\/td><\/tr><tr><td>1087<\/td><td>Alignment of 9.36.5 with the Updated ERS Standard Operating Conditions<\/td><td>Frye, Chris, Electricity and Alternative Energy, Ministry of Energy and Mines, Province of British Colombia<\/td><td>2016-10-11<\/td><td><strong>Received<\/strong><br \/>2016-10-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.5.<\/td><td>-<\/td><\/tr><tr><td>1086<\/td><td>Exceptions to Special Protection of Interconnected Floor Spaces<\/td><td>Viens, Daniel, SNC Lavalin Inc.<\/td><td>2016-09-23<\/td><td><strong>Received<\/strong><br \/>2016-09-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-06-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-13<br \/><\/td><td>NBC Division B 3.2.8.2.(6)<\/td><td>539 (published)<\/td><\/tr><tr><td>1085<\/td><td>Required Guards - Guards for stepped drop<\/td><td>Saby, Darrell C, Town of Qualicum Beach<\/td><td>2016-09-21<\/td><td><strong>Received<\/strong><br \/>2016-09-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.3.1.18.(1),<br \/>NBC Division B 9.8.8.3.<\/td><td>1422 (published), 1341 (published)<\/td><\/tr><tr><td>1084<\/td><td>Automatic Sprinkler Systems - Wires and Cables in Exits<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2016-09-21<\/td><td><strong>Received<\/strong><br \/>2016-09-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-05<br \/><\/td><td>NBC Division B 3.4.4.4.(1)<\/td><td>-<\/td><\/tr><tr><td>1083<\/td><td>Translation of the Defined Term Alteration<\/td><td>Gribbon, Anne<\/td><td>2016-09-16<\/td><td><strong>Received<\/strong><br \/>2016-09-19<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Harmonization of Alteration of Existing Buildings<br \/>2024-09-12<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1082<\/td><td>Add a New CSA-B214 Standard for Hydronic Heating Systems<\/td><td>Bouchard, Henri, CMMTQ<\/td><td>2016-09-13<\/td><td><strong>Received<\/strong><br \/>2016-09-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><\/td><td>NPC Division B 2<\/td><td>-<\/td><\/tr><tr><td>1081<\/td><td>Add a New CSA-B214 Standard for Hydronic Heating Systems<\/td><td>Bouchard, Henri, CMMTQ<\/td><td>2016-09-13<\/td><td><strong>Received<\/strong><br \/>2016-09-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-03<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-15<br \/><\/td><td>NPC Division B 2.6.2.<\/td><td>1731 (published)<\/td><\/tr><tr><td>1080<\/td><td>Heat Recovery from Ventilation Systems<\/td><td>Hoyme, Clifford, HMI Hoyme Manufacturing Inc.<\/td><td>2016-09-12<\/td><td><strong>Received<\/strong><br \/>2016-09-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-05-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.3.9.<\/td><td>-<\/td><\/tr><tr><td>1079<\/td><td>Water Temperature Control<\/td><td>Breda, Silvano, Omni Brass Inc.<\/td><td>2016-09-12<\/td><td><strong>Received<\/strong><br \/>2016-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-20<br \/><\/td><td>NPC Division B 2.2.10.7.<\/td><td>1366 (published)<\/td><\/tr><tr><td>1078<\/td><td>Type of voice communication systems required in building other than high buildings<\/td><td>baird, ken, LRI Engineering Inc<\/td><td>2016-09-07<\/td><td><strong>Received<\/strong><br \/>2016-09-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-19<br \/><\/td><td>-<\/td><td>1001 (published)<\/td><\/tr><tr><td>1077<\/td><td>Damage to Fire Separations and Fire-Resistance<\/td><td>Smiley, Jim, Nexlevel Construction, representing Firestop Contractors International Association<\/td><td>2016-09-06<\/td><td><strong>Received<\/strong><br \/>2016-09-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-13<br \/><\/td><td>NFC Division B 2.2.1.2.<\/td><td>-<\/td><\/tr><tr><td>1076<\/td><td>Words in the definition for Fire Stop <\/td><td>Smiley, Jim, Nexlevel Construction, representing Firestop Contractors International Association<\/td><td>2016-09-06<\/td><td><strong>Received<\/strong><br \/>2016-09-07<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2019-08-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-03-10<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>1075<\/td><td>Compliance Requirements for the Installation and Inspection of Firestops<\/td><td>Smiley, Jim, Nexlevel Construction, representing Firestop Contractors International Association<\/td><td>2016-09-06<\/td><td><strong>Received<\/strong><br \/>2016-09-07<br \/><\/td><td>NBC Division B 3.1.9.1.,<br \/>NBC Division B 3.1.9.1.,<br \/>NBC Division B 3.1.9.4.(4),<br \/>NBC Division B 3.1.15.16.(3),<br \/>NBC Division B 9.10.9.6.<\/td><td>-<\/td><\/tr><tr><td>1074<\/td><td>Compliance Requirements for the Installation and Inspection of Firestops<\/td><td>Smiley, Jim, Nexlevel Construction, representing Firestop Contractors International Association<\/td><td>2016-09-06<\/td><td><strong>Received<\/strong><br \/>2016-09-07<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NBC Division B 3.1.9.1.,<br \/>NBC Division B 3.1.9.1.,<br \/>NBC Division B 3.1.9.4.(4),<br \/>NBC Division B 3.1.15.16.(3),<br \/>NBC Division B 9.10.9.6.<\/td><td>-<\/td><\/tr><tr><td>1073<\/td><td>Parallel Performance-based Compliance Path as Acceptable Solution<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2016-09-02<\/td><td><strong>Received<\/strong><br \/>2016-09-02<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Performance-Based Solutions<br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.1.4.,<br \/>NBC Division B 3.1.5.,<br \/>NBC Division B 3.2.2.<\/td><td>-<\/td><\/tr><tr><td>1072<\/td><td>Factory-Assembled Panels<\/td><td>Simko, Peter , Kingspan Insulated Panels Ltd.<\/td><td>2016-08-30<\/td><td><strong>Received<\/strong><br \/>2016-08-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-25<br \/><\/td><td>NBC Division B 3.1.5.7.,<br \/>NBC Division B 3.1.5.15.<\/td><td>-<\/td><\/tr><tr><td>1071<\/td><td>Protection of Foamed Plastics<\/td><td>Di Lenardo, Bruno, Canadian Construction Materials Centre (CCMC)<\/td><td>2016-08-30<\/td><td><strong>Received<\/strong><br \/>2016-08-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 9.10.17.10.(1)<\/td><td>1476 (published), 1967 (published)<\/td><\/tr><tr><td>1070<\/td><td>Camoufage of exit doors in facilities housing people with dementia<\/td><td>Lamothe, Julie, CIUSSS MCQ<\/td><td>2016-08-30<\/td><td><strong>Received<\/strong><br \/>2016-08-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.4.6.11.(4)<\/td><td>1340 (published), 1339 (published)<\/td><\/tr><tr><td>1069<\/td><td>Room Ventilation Exhaust where Flammable and Combustible Liquids are Used or Stored<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2016-08-26<\/td><td><strong>Received<\/strong><br \/>2016-08-28<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2018-06-20<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NFC Division B 4.1.7.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1068<\/td><td>Code Restrictions on Combustible Window Frames in Noncombustible Construction<\/td><td>Jaugelis, Al S., RDH Building Science Inc., on behalf of the \"Fenestration Canada\" industry association<\/td><td>2016-08-25<\/td><td><strong>Received<\/strong><br \/>2016-08-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 3.1.5.4.(5)<\/td><td>1355 (published)<\/td><\/tr><tr><td>1067<\/td><td>Anti-Siphon Fill Valves<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2016-08-22<\/td><td><strong>Received<\/strong><br \/>2016-08-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-09-16<br \/><\/td><td>NPC Division B 2.2.10.10.(2)<\/td><td>1488 (published)<\/td><\/tr><tr><td>1066<\/td><td>Expand the List of Materials for Plumbing Fixtures<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2016-08-22<\/td><td><strong>Received<\/strong><br \/>2016-08-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2017-05-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NPC Division B 2.2.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1065<\/td><td>1.4.1.2. Div A Definitions Public Way versus Public Thoroughfare<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-08-19<\/td><td><strong>Received<\/strong><br \/>2016-08-23<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2017-06-14<br \/>EC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-09-27<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>1289 (published), 1308 (published), 1309 (published)<\/td><\/tr><tr><td>1064<\/td><td>New Standards for Service Water Heaters<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-16<\/td><td><strong>Received<\/strong><br \/>2016-08-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.2.10.13.<\/td><td>-<\/td><\/tr><tr><td>1063<\/td><td>Revise the Defined Term \"Storm Water\"<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-15<\/td><td><strong>Received<\/strong><br \/>2016-08-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2017-05-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-05-18<br \/><\/td><td>NPC Division B 1.4.1.2.<\/td><td>1393<\/td><\/tr><tr><td>1062<\/td><td>Vents for Sewage Sumps<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-15<\/td><td><strong>Received<\/strong><br \/>2016-08-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-05-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.5.7.7.<\/td><td>1384<\/td><\/tr><tr><td>1061<\/td><td>Sumps or Tanks - access for Radon<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-15<\/td><td><strong>Received<\/strong><br \/>2016-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-05-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-06<br \/><\/td><td>NPC Division B 2.4.6.3.(8),<br \/>NPC Division B 9.13.<\/td><td>1383 (published)<\/td><\/tr><tr><td>1060<\/td><td>New Standard for Trap Seal of a Floor Drain<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-12<\/td><td><strong>Received<\/strong><br \/>2016-08-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.4.5.5.(1)<\/td><td>-<\/td><\/tr><tr><td>1059<\/td><td>Insertion-type Seals<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-12<\/td><td><strong>Received<\/strong><br \/>2016-08-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-04-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-04-17<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1058<\/td><td>Enclosureless Dust Collectors<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2016-08-09<\/td><td><strong>Received<\/strong><br \/>2016-08-09<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NFC Division B 5.3.1.4.<\/td><td>-<\/td><\/tr><tr><td>1057<\/td><td>Product Standard Reference for Hardboard Cladding\/Engineered Wood Siding<\/td><td>Heroux, Gary L, Composite Panel Association<\/td><td>2016-08-05<\/td><td><strong>Received<\/strong><br \/>2016-08-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 5.9.1.1.,<br \/>NBC Division B D-1.1.2.,<br \/>NBC Division B 9.27.9.1.,<br \/>NBC Division B 9.29.7.1.,<br \/>NBC Division B 9.30.2.2.,<br \/>NBC Division B D-3.1.1.A.<\/td><td>1333 (published), 1295 (published)<\/td><\/tr><tr><td>1056<\/td><td>Referenced Standards for Backwater Valves<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-04<\/td><td><strong>Received<\/strong><br \/>2016-08-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-04-07<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.4.6.4.,<br \/>NPC Division B 2.2.10.<\/td><td>-<\/td><\/tr><tr><td>1055<\/td><td>Expand the List of Materials for Plumbing Fixtures<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-03<\/td><td><strong>Received<\/strong><br \/>2016-08-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-04-07<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NPC Division B 2.2.2.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1054<\/td><td>Sanitary T Fittings<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-03<\/td><td><strong>Received<\/strong><br \/>2016-08-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.2.4.2.(1)<\/td><td>1382<\/td><\/tr><tr><td>1053<\/td><td>Appendix - Method for Small Commercial Buildings<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-02<\/td><td><strong>Received<\/strong><br \/>2016-08-02<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1052<\/td><td>Protection from Contamination - Repeating Requirements<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-08-02<\/td><td><strong>Received<\/strong><br \/>2016-08-02<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1051<\/td><td>Trap Seal Depth<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-07-21<\/td><td><strong>Received<\/strong><br \/>2016-07-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.2.3.1.(1)<\/td><td>-<\/td><\/tr><tr><td>1050<\/td><td>Incorrect Translation for Underground Application of Compression Fittings<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-07-21<\/td><td><strong>Received<\/strong><br \/>2016-07-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.3.3.12.(2)<\/td><td>-<\/td><\/tr><tr><td>1049<\/td><td>Restriction on the use of 45\u00b0 Elbows<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-07-21<\/td><td><strong>Received<\/strong><br \/>2016-07-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.2.4.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1048<\/td><td>Standpipe Illustration for Clothes Washers<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-07-18<\/td><td><strong>Received<\/strong><br \/>2016-07-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-07<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B A-2.4.9.3.(3)<\/td><td>-<\/td><\/tr><tr><td>1047<\/td><td>Fuel Supply Installations for Diesel Driven Fire Pumps<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2016-07-13<\/td><td><strong>Received<\/strong><br \/>2016-07-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-09-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 5.6.1.10.(1),<br \/>NBC Division B 3.2.5.18.(1)<\/td><td>-<\/td><\/tr><tr><td>1046<\/td><td>Air-, cable-, and frame- membrane supported structures - Structural Design<\/td><td>Antonini, Mark H., Norseman Structures <\/td><td>2016-07-12<\/td><td><strong>Received<\/strong><br \/>2016-07-13<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-12-08<br \/><\/td><td>-<\/td><td>1182 (published)<\/td><\/tr><tr><td>1045<\/td><td>Air-, Cable-, and Frame- Membrane Supported Structures - Fabrics<\/td><td>Antonini, Mark H., Norseman Structures <\/td><td>2016-07-12<\/td><td><strong>Received<\/strong><br \/>2016-07-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.16.<\/td><td>-<\/td><\/tr><tr><td>1044<\/td><td>Air-, Cable-, and Frame- Membrane Supported Structures - Roof Coverings<\/td><td>Antonini, Mark H., Norseman Structures <\/td><td>2016-07-12<\/td><td><strong>Received<\/strong><br \/>2016-07-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.15.2.<\/td><td>-<\/td><\/tr><tr><td>1043<\/td><td>Water-Based Fire Protection Systems<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-07-11<\/td><td><strong>Received<\/strong><br \/>2016-07-11<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B A-6.4.1.1.(1)<\/td><td>1077<\/td><\/tr><tr><td>1042<\/td><td>Mobile Home \/manufactured homes plumbing facilities<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2016-07-10<\/td><td><strong>Received<\/strong><br \/>2016-07-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.7.2.4.<\/td><td>1338 (published)<\/td><\/tr><tr><td>1041<\/td><td>Inconsistency of Div A and B Application<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-07-08<\/td><td><strong>Received<\/strong><br \/>2016-07-11<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>EC: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2018-05-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-05-11<br \/><\/td><td>NFC Division A 1.1.1.1.,<br \/>NFC Division B 3.1.1.1.,<br \/>NFC Division B 4.1.1.1.<\/td><td>-<\/td><\/tr><tr><td>1040<\/td><td>Duplicate to 1039<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-07-08<\/td><td><strong>Received<\/strong><br \/>2016-07-11<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1039<\/td><td>Ventilation Measures over Flammable Liquids<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-07-08<\/td><td><strong>Received<\/strong><br \/>2016-07-08<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-16<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 4.1.7.2.<\/td><td>-<\/td><\/tr><tr><td>1038<\/td><td>Inconsistency of Hose Stations and Portable Extinguishers<\/td><td>La Rocque, Eddy , CAFC<\/td><td>2016-07-08<\/td><td><strong>Received<\/strong><br \/>2016-07-08<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.3.14.4.<\/td><td>1108 (published)<\/td><\/tr><tr><td>1037<\/td><td>Fire rating of 9.5 mm Gypsum Board above Range Hoods<\/td><td>Afseth, Laurie S, City of Saskatoon<\/td><td>2016-06-28<\/td><td><strong>Received<\/strong><br \/>2016-06-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.10.22.3.(1)<\/td><td>1247 (published)<\/td><\/tr><tr><td>1036<\/td><td>Firefighter's Manual Shutdown Switch for Photovoltaic Systems <\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2016-06-22<\/td><td><strong>Received<\/strong><br \/>2016-06-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-09-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-06-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 3.2.4.<\/td><td>-<\/td><\/tr><tr><td>1035<\/td><td>Arc Fault Circuit Interrupters Application in Single Dwelling Unites<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2016-06-02<\/td><td><strong>Received<\/strong><br \/>2016-06-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-08-27<br \/><\/td><td>NBC Division B 9.34.1.1.<\/td><td>-<\/td><\/tr><tr><td>1034<\/td><td>Arc Fault Circuit Interrupters in Single Dwelling Units<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2016-06-02<\/td><td><strong>Received<\/strong><br \/>2016-06-02<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NBC Division B 3.6.1.2.<\/td><td>-<\/td><\/tr><tr><td>1033<\/td><td>Egress signage for individuals with disability<\/td><td>Dion, Betty, Betty Dion Enterprises Lts.<\/td><td>2016-05-30<\/td><td><strong>Received<\/strong><br \/>2016-05-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-06-14<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B <\/td><td>-<\/td><\/tr><tr><td>1032<\/td><td>Removal of Asbestos and Asbestos-Related Permitted Material<\/td><td>Culbert, Ian, Canadian Public Health Association<\/td><td>2016-05-18<\/td><td><strong>Received<\/strong><br \/>2016-05-18<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2016-09-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-04-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B 3,<br \/>NBC Division B 6,<br \/>NBC Division B 9<\/td><td>-<\/td><\/tr><tr><td>1031<\/td><td>NECB15 \u2013 Prescriptive Renewable Energy Requirements<\/td><td>Genest, Frederic, Durasim<\/td><td>2016-05-10<\/td><td><strong>Received<\/strong><br \/>2016-05-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2018-01-19<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-17<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1030<\/td><td>Occupant load and sanitary facilities<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2016-05-09<\/td><td><strong>Received<\/strong><br \/>2016-05-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.1.17.<\/td><td>1349 (published)<\/td><\/tr><tr><td>1029<\/td><td>Hydronic Pumping Demand - Correction<\/td><td>Genest, Frederic, Durasim<\/td><td>2016-05-05<\/td><td><strong>Received<\/strong><br \/>2016-05-06<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 5.2.6.3.<\/td><td>-<\/td><\/tr><tr><td>1028<\/td><td>Clarification to the Definition of Noncombustible<\/td><td>Mullin, Kevin M, Manasc Isaac Architects<\/td><td>2016-05-02<\/td><td><strong>Received<\/strong><br \/>2016-05-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-27<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>1027<\/td><td>Water Supply of Automatic Sprinkler Systems<\/td><td>Ryckman, Jason, Canadian Automatic Sprinkler Association<\/td><td>2016-04-15<\/td><td><strong>Received<\/strong><br \/>2016-04-15<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.5.12.(4)<\/td><td>-<\/td><\/tr><tr><td>1026<\/td><td>Removing the radon rough-in and installing an active soil depressurization system<\/td><td>Wood, Robert  A, CARST<\/td><td>2016-04-14<\/td><td><strong>Received<\/strong><br \/>2016-04-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-08<br \/><\/td><td>NBC Division B 9.14.3.2.,<br \/>NBC Division B 9.14.4.3.<\/td><td>-<\/td><\/tr><tr><td>1025<\/td><td>Combustible Piping Penetrations<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-04-12<\/td><td><strong>Received<\/strong><br \/>2016-04-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 3.1.9.5.(2)<\/td><td>-<\/td><\/tr><tr><td>1024<\/td><td>Clarifications to Defined Terms<\/td><td>Smith, Dennis<\/td><td>2016-04-09<\/td><td><strong>Received<\/strong><br \/>2016-04-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.4.5.1.<\/td><td>-<\/td><\/tr><tr><td>1023<\/td><td>Drainage to Sumps by Gravity<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-04-06<\/td><td><strong>Received<\/strong><br \/>2016-04-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-04-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-04-17<br \/><\/td><td>NPC Division B 2.4.6.3.<\/td><td>1381<\/td><\/tr><tr><td>1022<\/td><td>Area of refuge in protection on floor areas with a barrier-free path of travel<\/td><td>Dion, Betty, Betty Dion Enterprises Lts.<\/td><td>2016-04-05<\/td><td><strong>Received<\/strong><br \/>2016-04-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-06-14<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.3.1.7.<\/td><td>-<\/td><\/tr><tr><td>1021<\/td><td>Appliances Installed Outside Buildings<\/td><td>Waldman, David I<\/td><td>2016-03-26<\/td><td><strong>Received<\/strong><br \/>2016-03-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>NBC Division B 6.2.1.5.(1)<\/td><td>-<\/td><\/tr><tr><td>1020<\/td><td>Update Standard for Mineral Fibre Thermal Insulation for Buildings<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2016-03-23<\/td><td><strong>Received<\/strong><br \/>2016-03-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 5.10.1.1.,<br \/>NECB Division B 9.23.17.2.A.,<br \/>NECB Division B 9.25.2.2.(1),<br \/>NECB Division B A-5.10.1.1.(1),<br \/>NECB Division B A-9.36.2.4.(1),<br \/>NECB Division B D-2.3.4.A.,<br \/>NECB Division B D-2.3.4.D.,<br \/>NECB Division B D-2.3.5.,<br \/>NECB Division B D-2.3.5.,<br \/>NECB Division B D-2.6.1.E.,<br \/>NECB Division B D-6.4.,<br \/>NECB Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>1019<\/td><td>Update Standard for Mineral Fibre Thermal Insulation for Buildings<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2016-03-23<\/td><td><strong>Received<\/strong><br \/>2016-03-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>1018<\/td><td>Simple Trade-off Path - Fenestration<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2016-03-23<\/td><td><strong>Received<\/strong><br \/>2016-03-23<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>-<\/td><td>1537 (published), 1536 (published)<\/td><\/tr><tr><td>1017<\/td><td> Inclusion of a Minimum Requirement for Impact Sound Insulation in Sections 5.8 and 9.11.<\/td><td>Golden, Matthew V, Pliteq, Inc.<\/td><td>2016-03-21<\/td><td><strong>Received<\/strong><br \/>2016-03-22<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.11.<\/td><td>-<\/td><\/tr><tr><td>1016<\/td><td> Acoustic Performance Criteria in Classrooms<\/td><td>Tylka, Tom<\/td><td>2016-03-16<\/td><td><strong>Received<\/strong><br \/>2016-03-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-06-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.3.4.6.<\/td><td>-<\/td><\/tr><tr><td>1015<\/td><td>Thermal Resistance Values of Common Building Materials<\/td><td>May, Zachary D., Building and Safety Standards Branch (BC Governement)<\/td><td>2016-03-15<\/td><td><strong>Received<\/strong><br \/>2016-03-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B A-9.36.2.4.D.<\/td><td>-<\/td><\/tr><tr><td>1014<\/td><td>Shut-off Valve for Water Service Pipe<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2016-03-04<\/td><td><strong>Received<\/strong><br \/>2016-03-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.6.1.3.(1)<\/td><td>-<\/td><\/tr><tr><td>1013<\/td><td>Remove limitation of noncombustible construction where the Min FRR is 1 hour<\/td><td>Hamilton, David A, Alberta association of architects also registered bc,sk on,nwt<\/td><td>2016-02-28<\/td><td><strong>Received<\/strong><br \/>2016-02-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.2.3.7.,<br \/>NBC Division B 9.10.14.5.<\/td><td>-<\/td><\/tr><tr><td>1012<\/td><td>Establishing maximum thermal transmittence levels for above-ground opaque assemblies<\/td><td>Donahoe, Gerard F.<\/td><td>2016-02-16<\/td><td><strong>Received<\/strong><br \/>2016-02-16<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>-<\/td><td>1541<\/td><\/tr><tr><td>1011<\/td><td>Safety of animals in buildings<\/td><td>Taylor-Atkinson, Judy I., N\/A<\/td><td>2016-02-14<\/td><td><strong>Received<\/strong><br \/>2016-02-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-02-09<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1010<\/td><td>Active Fire Protection Measures for Industrial Wind Turbines<\/td><td>Clark, Rebecca  S, Bulldog Turbine Systems Inc<\/td><td>2016-02-10<\/td><td><strong>Received<\/strong><br \/>2016-02-11<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-10-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-06-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3,<br \/>NFC Division B 5<\/td><td>-<\/td><\/tr><tr><td>1009<\/td><td>Tall Wood Buildings<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2016-02-10<\/td><td><strong>Received<\/strong><br \/>2016-02-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-04-16<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2017-02-23<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2018-12-10<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 3.1.,<br \/>NBC Division B 3.2.<\/td><td>-<\/td><\/tr><tr><td>1008<\/td><td>Restricting Wired Glass in circulation routes<\/td><td>Botman, Rob, Canadians for Safe Glass<\/td><td>2016-02-04<\/td><td><strong>Received<\/strong><br \/>2016-02-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-04-21<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2016-06-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B 3.3.1.19.(3),<br \/>NBC Division B 9.6.1.4.<\/td><td>1444 (published)<\/td><\/tr><tr><td>1007<\/td><td>Duct and Plenum Insulation - Clarification<\/td><td>Clayman, Steve, Thermal Insulation Association of Canada<\/td><td>2016-02-03<\/td><td><strong>Received<\/strong><br \/>2016-02-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 5.2.5.3.<\/td><td>1436 (published), 1435 (published)<\/td><\/tr><tr><td>1006<\/td><td>NSF\/ANSI 61 for Drinking Water System Components<\/td><td>Brown, Jeremy S., NSF International<\/td><td>2016-01-29<\/td><td><strong>Received<\/strong><br \/>2016-02-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.2.1.<\/td><td>1415<\/td><\/tr><tr><td>1005<\/td><td>Fasteners for Sheathing and Subflooring<\/td><td>Billings, Greg E, Fredericton Fire Department<\/td><td>2016-01-06<\/td><td><strong>Received<\/strong><br \/>2016-01-06<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B 9.23.3.5.<\/td><td>-<\/td><\/tr><tr><td>1004<\/td><td>Ensuring compliance with air tightness requirements already called for by the NBC<\/td><td>Zouari, Sonia, CanPHI, CanPHI West, Ontario Passive house Group<\/td><td>2015-12-31<\/td><td><strong>Received<\/strong><br \/>2016-01-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-10-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NBC Division B 5.4.1.2.(1),<br \/>NBC Division B 5.4.1.2.(3),<br \/>NBC Division B 9.25.3.<\/td><td>1414 (published)<\/td><\/tr><tr><td>1003<\/td><td>Fire alarm sound level measurement, clarification <\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2015-12-24<\/td><td><strong>Received<\/strong><br \/>2016-01-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-19<br \/><\/td><td>NBC Division B 3.2.4.19.<\/td><td>1097 (published)<\/td><\/tr><tr><td>1002<\/td><td>Elevator Recall System<\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2015-12-23<\/td><td><strong>Received<\/strong><br \/>2015-12-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2020-04-03<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.2.4.11.(1),<br \/>NBC Division B 3.2.4.14.<\/td><td>-<\/td><\/tr><tr><td>1001<\/td><td>Time Assigned to Double 12.7 mm Type X gypsum wallboard Membranes in Table D-2.3.4.A<\/td><td>Abele, Thomas C., Abele Architecture<\/td><td>2015-12-18<\/td><td><strong>Received<\/strong><br \/>2015-12-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B D-2.3.4.A.<\/td><td>-<\/td><\/tr><tr><td>1000<\/td><td>Direction of door swing for doors opening into an exit discharge lobby<\/td><td>Lai, Teddy, ghl consultants ltd<\/td><td>2015-12-16<\/td><td><strong>Received<\/strong><br \/>2015-12-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-07-24<br \/><\/td><td>NBC Division B 3.4.4.2.(2),<br \/>NBC Division B 9.9.8.5.<\/td><td>-<\/td><\/tr><tr><td>999<\/td><td>Direction of Door Swing for Spaces with a Low Occupant Load<\/td><td>STRICKLAND, JOHN S, Municipality of Eeast Hants<\/td><td>2015-12-16<\/td><td><strong>Received<\/strong><br \/>2015-12-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 9.9.6.5.(1),<br \/>NBC Division B 3.4.6.12.(1)<\/td><td>1817<\/td><\/tr><tr><td>998<\/td><td>Attributions for 3.2.5.7. - Water Supply<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2015-12-14<\/td><td><strong>Received<\/strong><br \/>2015-12-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.2.5.7.(1)<\/td><td>-<\/td><\/tr><tr><td>997<\/td><td>Guard exception for floor pits in repair garages<\/td><td>Habashy, Nabil, Government of Alberta<\/td><td>2015-12-11<\/td><td><strong>Received<\/strong><br \/>2015-12-11<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2017-01-01<br \/><\/td><td>NBC Division B 3.3.1.18.(5),<br \/>NBC Division B 9.8.8.1.(2)<\/td><td>1131 (published)<\/td><\/tr><tr><td>996<\/td><td>Floor and stairwell identification on both sides of stairwell doors<\/td><td>Franchuk, Don H, Winnipeg Fire Department<\/td><td>2015-12-09<\/td><td><strong>Received<\/strong><br \/>2015-12-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.4.6.19.,<br \/>NBC Division B 9.9.11.5.<\/td><td>1130 (published)<\/td><\/tr><tr><td>995<\/td><td>Polyethylene Air Barriers under Floors-on-Ground<\/td><td>Robinson, Keith A, DIALOG<\/td><td>2015-12-08<\/td><td><strong>Received<\/strong><br \/>2015-12-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-27<br \/><\/td><td>NBC Division B A-9.25.3.6.(2)<\/td><td>-<\/td><\/tr><tr><td>994<\/td><td>Grab Bar Installation for all Bathtubs and showers<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2015-12-08<\/td><td><strong>Received<\/strong><br \/>2015-12-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-04-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-09-13<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2016-10-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-03<br \/><\/td><td>NBC Division B 3.7.2.9.<\/td><td>1582, 1581<\/td><\/tr><tr><td>993<\/td><td>Laundry-drying Equipment - Collective Venting <\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2015-12-03<\/td><td><strong>Received<\/strong><br \/>2015-12-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-07<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-04-27<br \/><\/td><td>NBC Division B 6.3.2.10.(8),<br \/>NBC Division B 9.32.1.3.<\/td><td>1096 (published)<\/td><\/tr><tr><td>992<\/td><td>Ajar door for unoccupied WC stalls<\/td><td>Griffin, Michael H<\/td><td>2015-11-30<\/td><td><strong>Received<\/strong><br \/>2015-12-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-03<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>991<\/td><td>Residential Basement Ceiling Protection <\/td><td>Koo, Kenneth, FPInnovations<\/td><td>2015-11-18<\/td><td><strong>Received<\/strong><br \/>2007-01-01<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>990<\/td><td>Protection of Window Openings in Part 9 Residential Occupancies<\/td><td>Schultz, Bruce W., City of Calgary<\/td><td>2015-11-16<\/td><td><strong>Received<\/strong><br \/>2015-11-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.8.8.1.(5),<br \/>NBC Division B 9.8.8.1.(6),<br \/>NBC Division B 3.3.4.8.<\/td><td>1327 (published), 1238 (published)<\/td><\/tr><tr><td>989<\/td><td>Reference to ASTM F3128 for PVC<\/td><td>Scott, Suzanne, Royal Building Products, Pipe and Fittings Solutions<\/td><td>2015-11-12<\/td><td><strong>Received<\/strong><br \/>2015-11-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-04-06<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2017-06-01<br \/><\/td><td>NPC Division B 2.2.5.10.(1),<br \/>NPC Division B 2.2.5.12.(2)<\/td><td>1439 (published)<\/td><\/tr><tr><td>988<\/td><td>Light Metal Plate Connected Wood Trusses<\/td><td>Bunting, Brent D, Simpson Strong-Tie Canada, Ltd.<\/td><td>2015-10-20<\/td><td><strong>Received<\/strong><br \/>2015-10-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-07-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-22<br \/><\/td><td>NBC Division B 9.23.13.11.<\/td><td>-<\/td><\/tr><tr><td>987<\/td><td>Light Metal Plate Connected Wood Trusses<\/td><td>Bunting, Brent D, Simpson Strong-Tie Canada, Ltd.<\/td><td>2015-10-20<\/td><td><strong>Received<\/strong><br \/>2015-10-21<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-12-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>986<\/td><td>Accounting for Thermal Bridging Effects when Calculating Overall Thermal Transmittance of Building E<\/td><td>Lawton, Mark D, Morrison Hershfield Limited <\/td><td>2015-10-16<\/td><td><strong>Received<\/strong><br \/>2015-10-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-03-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-06-27<br \/><\/td><td>NECB Division B 3<\/td><td>958 (published)<\/td><\/tr><tr><td>985<\/td><td>Standards Applicable to Environmental Separatores and Assemblies Exposed to the Exterior<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2015-10-05<\/td><td><strong>Received<\/strong><br \/>2015-10-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 5.10.,<br \/>NBC Division B 5.10.1.1.,<br \/>NBC Division B 9.26.2.1.<\/td><td>1305 (published)<\/td><\/tr><tr><td>984<\/td><td>Application Requirements, Exit Signs<\/td><td>Kaye, Kevin, PLC Fire Safety Solutions<\/td><td>2015-10-05<\/td><td><strong>Received<\/strong><br \/>2015-10-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.4.5.1.(1),<br \/>NBC Division B 9.9.11.3.(1)<\/td><td>-<\/td><\/tr><tr><td>983<\/td><td>Contradictory Code Requirements - Unions<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-10-01<\/td><td><strong>Received<\/strong><br \/>2015-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.3.3.4.(1)<\/td><td>995 (published)<\/td><\/tr><tr><td>982<\/td><td>Standard for Vacuum-Relief Valves<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-30<\/td><td><strong>Received<\/strong><br \/>2015-09-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 2.2.10.11.<\/td><td>-<\/td><\/tr><tr><td>981<\/td><td>Vent Pipes Sizing for Neutralizing Tanks<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-24<\/td><td><strong>Received<\/strong><br \/>2015-09-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.5.7.7.(1)<\/td><td>994 (published)<\/td><\/tr><tr><td>980<\/td><td>Venting of Drain Piping of Neutralizing Tanks<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-24<\/td><td><strong>Received<\/strong><br \/>2015-09-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.5.5.3.(1)<\/td><td>993 (published)<\/td><\/tr><tr><td>979<\/td><td>Openings near Unenclosed Exterior Exit Stairs or Ramps<\/td><td>Schultz, Bruce W., City of Calgary<\/td><td>2015-09-23<\/td><td><strong>Received<\/strong><br \/>2015-09-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-02-18<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.9.4.4.<\/td><td>-<\/td><\/tr><tr><td>978<\/td><td>Location of Cleanouts<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-23<\/td><td><strong>Received<\/strong><br \/>2015-09-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.4.7.4.(5)<\/td><td>988 (published)<\/td><\/tr><tr><td>977<\/td><td>Grey Water in Care Occupancies<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-23<\/td><td><strong>Received<\/strong><br \/>2015-09-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-04-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-17<br \/><\/td><td>NPC Division B 2.7.4.<\/td><td>1413 (published)<\/td><\/tr><tr><td>976<\/td><td>Standard for Wall-Hung Water Closet Support<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-21<\/td><td><strong>Received<\/strong><br \/>2015-09-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-04-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-17<br \/><\/td><td>-<\/td><td>992 (published)<\/td><\/tr><tr><td>975<\/td><td>Heat-Recovery Systems Efficiency<\/td><td>Kebernik, Andy, TEMPEFF North America Ltd.<\/td><td>2015-09-16<\/td><td><strong>Received<\/strong><br \/>2015-09-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-03-11<br \/><\/td><td>NECB Division B 5.2.10.1.(5)<\/td><td>930 (published)<\/td><\/tr><tr><td>974<\/td><td>Minimum Size of Fixture Outlet Pipe<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-11<\/td><td><strong>Received<\/strong><br \/>2015-09-14<br \/><\/td><td>NPC Division B 2.4.9.3.<\/td><td>-<\/td><\/tr><tr><td>973<\/td><td>Size of Outlet Pipes for Clothes Washers<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-09-11<\/td><td><strong>Received<\/strong><br \/>2015-09-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NPC Division B 2.4.9.3.(3)<\/td><td>990 (published)<\/td><\/tr><tr><td>972<\/td><td>Building Envelope Simple Trade-off Path - Opaque components maximum thermal transmittance<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2015-09-10<\/td><td><strong>Received<\/strong><br \/>2015-09-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-02-03<br \/><\/td><td>NECB Division B 3.3.3.2.<\/td><td>1537 (published), 1536 (published)<\/td><\/tr><tr><td>971<\/td><td>Revised Definition Term for \"Unprotected Openings\"<\/td><td>Meier, Clayton W, MuniCode Services<\/td><td>2015-09-08<\/td><td><strong>Received<\/strong><br \/>2015-09-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2016-01-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2016-02-18<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2016-04-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2016-09-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-09-27<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-05-04<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2022-10-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>970<\/td><td>Installation and Use of Vinyl Siding Materials<\/td><td>Dobson, Matthew, Vinyl Siding Institute, Inc.<\/td><td>2015-08-14<\/td><td><strong>Received<\/strong><br \/>2015-08-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 9.27.,<br \/>NBC Division B 9.27.5.,<br \/>NBC Division B 9.27.12.,<br \/>NBC Division B 9.10.15.5.,<br \/>NBC Division B 3.2.3.7.<\/td><td>1296 (published)<\/td><\/tr><tr><td>969<\/td><td>Add CPVC to NPC 2.2.8.1<\/td><td>Brown, Jeremy S., NSF International<\/td><td>2015-07-29<\/td><td><strong>Received<\/strong><br \/>2015-07-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.2.8.1.<\/td><td>-<\/td><\/tr><tr><td>968<\/td><td>Design wind loads on roof metal edges<\/td><td>Bysice, Jason A, University of Ottawa<\/td><td>2015-07-27<\/td><td><strong>Received<\/strong><br \/>2015-07-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-12-08<br \/><\/td><td>NBC Division B <\/td><td>1175 (published), 1177 (published), 1179 (published)<\/td><\/tr><tr><td>967<\/td><td>Use of RSI value for Trade-off of Above-ground Building Envelope Components and Assemblies<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2015-07-20<\/td><td><strong>Received<\/strong><br \/>2015-07-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/><\/td><td>NBC Division B 9.36.2.11.(5)<\/td><td>1293 (published)<\/td><\/tr><tr><td>966<\/td><td>Cross-section of handrail, dimensional requirements in Part 9<\/td><td>Hao, Patrick, Enbridge Inc.<\/td><td>2015-07-10<\/td><td><strong>Received<\/strong><br \/>2015-07-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B A-9.8.7.5.(2)<\/td><td>1429<\/td><\/tr><tr><td>965<\/td><td>FDWR and Skylight Area for calculate reference building envelope <\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2015-07-01<\/td><td><strong>Received<\/strong><br \/>2015-07-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-02-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.4.(3),<br \/>NECB Division B 3.3.4.10.(2)<\/td><td>1541<\/td><\/tr><tr><td>964<\/td><td>Visitability, Visitable Homes<\/td><td>Gervais, Roger P, Accessibility and Aging at Home<\/td><td>2015-06-30<\/td><td><strong>Received<\/strong><br \/>2015-07-03<br \/>EC: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-12-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2016-03-11<br \/>Use and Egress: <strong>Reviewed (legacy) <\/strong><br \/>2016-04-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-02-08<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2017-06-09<br \/><\/td><td>NBC Division A 2.1.1.2.(5)<\/td><td>1956, 2031 (published), 2030 (published), 1880 (published), 1881 (published), 1882 (published), 1883 (published), 1884 (published), 1958 (published), 2028 (published)<\/td><\/tr><tr><td>963<\/td><td>Penetration of Electrical Components by Nails and Screws Through Roofing<\/td><td>Harris, Robert J, Roofing Contractors Association of British Columbia (RCABC)<\/td><td>2015-06-30<\/td><td><strong>Received<\/strong><br \/>2015-07-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-04-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 5.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>962<\/td><td>Flow rate for showers<\/td><td>Bartel, Dieter, Manitoba Hydro<\/td><td>2015-06-29<\/td><td><strong>Received<\/strong><br \/>2015-06-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 6.2.6.1.(1)<\/td><td>-<\/td><\/tr><tr><td>961<\/td><td>heat recovery in the Part 8 reference building<\/td><td>Mottillo, Maria, Natural Resources Canada- CanmetENERGY-Ottawa<\/td><td>2015-06-26<\/td><td><strong>Received<\/strong><br \/>2015-06-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.20.<\/td><td>-<\/td><\/tr><tr><td>960<\/td><td>Size of Outlet Pipes for Clothes Washers<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2015-06-23<\/td><td><strong>Received<\/strong><br \/>2015-06-25<br \/><\/td><td>NPC Division B 2.4.9.3.(3)<\/td><td>-<\/td><\/tr><tr><td>959<\/td><td>Animal Farm Housing<\/td><td>Berreville, Olivier, Canadians for Ethical Treatment of Food Animals<\/td><td>2015-06-04<\/td><td><strong>Received<\/strong><br \/>2015-06-08<br \/>EC: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-05-09<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-02-09<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>958<\/td><td>Roof-top Enclosures<\/td><td>May, Zachary D., Building and Safety Standards Branch (BC Governement)<\/td><td>2015-05-05<\/td><td><strong>Received<\/strong><br \/>2015-05-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-06-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 9.10.4.4.(1),<br \/>NBC Division B 3.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>957<\/td><td>Continuity of Wall Insulation at Kitchen Plumbing Vent<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2015-05-04<\/td><td><strong>Received<\/strong><br \/>2015-05-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/><\/td><td>NBC Division B 9.36.2.5.(6)<\/td><td>1292 (published)<\/td><\/tr><tr><td>956<\/td><td>Addition of Requirements for Oil\/Water Separators <\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2015-04-17<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-08<br \/><\/td><td>NFC Division B 4.1.6.1.<\/td><td>-<\/td><\/tr><tr><td>955<\/td><td>Addition of requirements for Oil\/Water Separators to the NPC<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2015-04-17<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-04<br \/><strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-02-15<br \/><\/td><td>NPC Division B 2.2.3.,<br \/>NPC Division B 2.4.<\/td><td>1377 (published)<\/td><\/tr><tr><td>954<\/td><td>Condensing boiler part-load performance curve<\/td><td>Haddad, Kamel, Natural Resources Canada<\/td><td>2015-04-16<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-11-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-03-11<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2019-02-08<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.22.A.,<br \/>NBC Division B 9.36.5.<\/td><td>1725 (published)<\/td><\/tr><tr><td>953<\/td><td>Furnace Part-load Performance Curve<\/td><td>Haddad, Kamel, Natural Resources Canada<\/td><td>2015-04-16<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-11-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-03-11<br \/><\/td><td>NECB Division B 8.4.1.22.,<br \/>NBC Division B 9.36.5.<\/td><td>-<\/td><\/tr><tr><td>952<\/td><td>9.10.10.4. Location of Fuel-Fired Appliances, 3.6.2.1. Fire Separations around Service Rooms<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2015-04-15<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 9.10.10.4.(2),<br \/>NBC Division B 3.6.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>951<\/td><td>Soil gas control (specifically radon)<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2015-04-15<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/><\/td><td>NBC Division B 9.13.4.,<br \/>NBC Division B 9.16.2.1.<\/td><td>1887, 1713 (published)<\/td><\/tr><tr><td>950<\/td><td>Supply air temperature for VAV systems in the performance path<\/td><td>Hepting, Curt, EnerSys Analytics Inc.<\/td><td>2015-04-13<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-04<br \/><\/td><td>NECB Division B 8.4.4.19.(4)<\/td><td>1549 (published)<\/td><\/tr><tr><td>949<\/td><td>use of the heat pump for space heating in the performance path<\/td><td>Hepting, Curt, EnerSys Analytics Inc.<\/td><td>2015-04-13<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-04<br \/><\/td><td>NECB Division B 8.4.4.14.<\/td><td>-<\/td><\/tr><tr><td>948<\/td><td>Reference HVAC Systems<\/td><td>Hepting, Curt, EnerSys Analytics Inc.<\/td><td>2015-04-13<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-11-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-04<br \/><\/td><td>NECB Division B 8.4.4.8.(1)<\/td><td>970 (published)<\/td><\/tr><tr><td>947<\/td><td>Temperature Rise Limits for Doors<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2015-04-09<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 3.1.8.15.<\/td><td>-<\/td><\/tr><tr><td>946<\/td><td>Change in application to renovations and existing buildings - interior improvement\/tenant fit-up<\/td><td>Marshall, Richard B, Bird Construction<\/td><td>2015-04-05<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-11-04<br \/>EC: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-05-12<br \/><\/td><td>NECB Division A 1.1.1.1.(1)<\/td><td>1409 (published)<\/td><\/tr><tr><td>945<\/td><td>Fan Ratings Compliance - Recognition of Alternative Certification using IEC Standards<\/td><td>Girdharry, Kevin, Association of Home Appliance Manufacturers Canada<\/td><td>2015-04-01<\/td><td><strong>Received<\/strong><br \/>2015-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.32.3.10.<\/td><td>-<\/td><\/tr><tr><td>944<\/td><td>Protection of Foamed Plastics<\/td><td>Glazier, Brad, International Fireproof Technologies<\/td><td>2015-03-31<\/td><td><strong>Received<\/strong><br \/>2015-04-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.1.5.12.,<br \/>NBC Division B 9.10.17.10.<\/td><td>1476 (published), 1967 (published)<\/td><\/tr><tr><td>943<\/td><td>Thermal Barriers for Foamed Plastic<\/td><td>Dalton, John, W.R.Grace<\/td><td>2015-03-27<\/td><td><strong>Received<\/strong><br \/>2015-04-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-04-02<br \/><\/td><td>NBC Division B 3.1.5.12.<\/td><td>1476 (published), 1967 (published)<\/td><\/tr><tr><td>942<\/td><td>Tapered treads in fluent stairs, and consistent angle<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2015-04-05<\/td><td><strong>Received<\/strong><br \/>2015-04-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-05-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-06-22<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-06-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.4.4.(5)<\/td><td>-<\/td><\/tr><tr><td>941<\/td><td>Storage-type Service Water Heater Drain<\/td><td>Blanchet, Normand<\/td><td>2015-03-17<\/td><td><strong>Received<\/strong><br \/>2015-03-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2019-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 2.6.1.7.<\/td><td>-<\/td><\/tr><tr><td>940<\/td><td>Spray Foam Insulated Roof Ventilation<\/td><td>Kadulski, Richard<\/td><td>2015-03-03<\/td><td><strong>Received<\/strong><br \/>2015-03-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-03-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 9.19.1.1.<\/td><td>-<\/td><\/tr><tr><td>939<\/td><td>Change the water vapor permeance test method from ASTM E96 dessicant method (dry cupt), to the ASTM <\/td><td>Mettille, Michael J., Tremco Barrier Solutions, Inc.<\/td><td>2015-02-26<\/td><td><strong>Received<\/strong><br \/>2015-03-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.25.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>938<\/td><td>FIRST-RESPONDER ACCESS WITHIN BUILDINGS<\/td><td>Payne, Brian J, Ram Canada Inc.<\/td><td>2014-04-01<\/td><td><strong>Received<\/strong><br \/>2015-02-24<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2015-04-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2019-09-11<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-11-01<br \/><\/td><td>NFC Division B 2.5.<\/td><td>-<\/td><\/tr><tr><td>937<\/td><td>Update existing requirements in accordance with new standard \"CSA A123.51-14 Asphalt Shingle Applica<\/td><td>Fraser, Wendy, Canadian Roofing Contractors Association<\/td><td>2015-02-13<\/td><td>Housing and Small Buildings: <strong>Received<\/strong><br \/>2015-02-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 9.26.1.2.<\/td><td>1291 (published)<\/td><\/tr><tr><td>936<\/td><td>Update reference standard to CAN3-A123.51<\/td><td>Fraser, Wendy, Canadian Roofing Contractors Association<\/td><td>2015-02-13<\/td><td><strong>Received<\/strong><br \/>2015-02-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>1291 (published)<\/td><\/tr><tr><td>935<\/td><td>Update standard references to the updated CSA A123.51<\/td><td>Fraser, Wendy, Canadian Roofing Contractors Association<\/td><td>2015-02-11<\/td><td><strong>Received<\/strong><br \/>2015-02-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 9.26.<\/td><td>1291 (published)<\/td><\/tr><tr><td>934<\/td><td>Cabin size exception for limited use, limited application (LULA) elevators <\/td><td>Lai, Teddy, ghl consultants ltd<\/td><td>2015-02-05<\/td><td><strong>Received<\/strong><br \/>2015-02-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.5.4.1.(1)<\/td><td>1129 (published)<\/td><\/tr><tr><td>933<\/td><td>NBC 9.36.2 Thermal Characteristics of Building Assemblies<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2015-02-04<\/td><td><strong>Received<\/strong><br \/>2015-02-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-04-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-03-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-08-10<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.2.8.(4)<\/td><td>-<\/td><\/tr><tr><td>932<\/td><td>NBC 9.36.2 Continuity of Insulation<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2015-02-04<\/td><td><strong>Received<\/strong><br \/>2015-02-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-04-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/><\/td><td>NBC Division B 9.36.2.5.(6)<\/td><td>1292 (published)<\/td><\/tr><tr><td>931<\/td><td>Insulation and coverings - Exposed temperature threshold<\/td><td>Clayman, Steve, Thermal Insulation Association of Canada<\/td><td>2015-01-25<\/td><td><strong>Received<\/strong><br \/>2015-01-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/><\/td><td>NBC Division B 6.5.1.1.(3)<\/td><td>1062 (published)<\/td><\/tr><tr><td>930<\/td><td>Application of NFPA 13D to row houses<\/td><td>Johnson, Murray, Murray Johnson Engineering Ltd.<\/td><td>2015-01-15<\/td><td><strong>Received<\/strong><br \/>2015-01-15<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2015-04-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2016-01-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-02-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-06-19<br \/><\/td><td>NBC Division B 3.2.5.12.(3),<br \/>NBC Division B 3.2.5.12.(6),<br \/>NBC Division B 9.10.1.3.(8)<\/td><td>1284 (published)<\/td><\/tr><tr><td>929<\/td><td>Default HVAC system for healthcare spaces<\/td><td>Bartel, Dieter, Manitoba Hydro<\/td><td>2015-01-15<\/td><td><strong>Received<\/strong><br \/>2015-01-15<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.8.<\/td><td>-<\/td><\/tr><tr><td>928<\/td><td>Zoning of hospital ventilation systems<\/td><td>Andre Legault, Andre, Footprint<\/td><td>2015-01-07<\/td><td><strong>Received<\/strong><br \/>2015-01-07<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.8.<\/td><td>-<\/td><\/tr><tr><td>927<\/td><td>NECB 8.4.4.19 - Supply Air system<\/td><td>Andre Legault, Andre, Footprint<\/td><td>2015-01-07<\/td><td><strong>Received<\/strong><br \/>2015-01-07<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-02-27<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-21<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 8.4.4.19.<\/td><td>-<\/td><\/tr><tr><td>926<\/td><td>ROOM FINISHES AND ENERGY CONSERVATION<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2014-12-19<\/td><td><strong>Received<\/strong><br \/>2014-12-19<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-02-27<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-11-26<br \/><\/td><td>NECB Division B 8<\/td><td>-<\/td><\/tr><tr><td>925<\/td><td>Audibility of Fire alarm on roof top with mechanical equipement<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2014-12-19<\/td><td><strong>Received<\/strong><br \/>2014-12-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.2.4.19.,<br \/>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>924<\/td><td>Glazing installed at ground level<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2014-12-19<\/td><td><strong>Received<\/strong><br \/>2014-12-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>923<\/td><td>Emergency power for lighting<\/td><td>Hall, Walter D, Hall Engineering Co. Ltd.<\/td><td>2014-12-19<\/td><td><strong>Received<\/strong><br \/>2014-12-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.2.7.4.,<br \/>NBC Division B 9.9.12.3.<\/td><td>-<\/td><\/tr><tr><td>922<\/td><td>Flame rating of data cables running out of raceways in plenum <\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2014-12-18<\/td><td><strong>Received<\/strong><br \/>2014-12-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 3.1.4.3.(3),<br \/>NBC Division B 3.1.5.18.(3)<\/td><td>-<\/td><\/tr><tr><td>921<\/td><td>Emergency power to fire pumps serving sprinklers<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2014-12-12<\/td><td><strong>Received<\/strong><br \/>2014-12-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-09-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.2.5.7.,<br \/>NBC Division B 3.2.7.9.(1)<\/td><td>1085 (published)<\/td><\/tr><tr><td>920<\/td><td>Transmission of Zoning information on Fire Signal to Receiving Centres<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2014-12-10<\/td><td><strong>Received<\/strong><br \/>2014-12-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-04-18<br \/><\/td><td>NBC Division B 3.2.4.8.,<br \/>NBC Division B 9.10.8.2.<\/td><td>-<\/td><\/tr><tr><td>919<\/td><td>Activities Related to the Use of Flammable or Combustible Liquids<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-05<\/td><td><strong>Received<\/strong><br \/>2014-12-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.7.2.(2)<\/td><td>-<\/td><\/tr><tr><td>918<\/td><td>Activities Related to the Use of Flammable or Combustible Liquids<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-05<\/td><td><strong>Received<\/strong><br \/>2014-12-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.7.2.(1)<\/td><td>-<\/td><\/tr><tr><td>917<\/td><td>Clearances between building structures and adjacent overhead power lines<\/td><td>Chen, David D, WorkSafeBC<\/td><td>2014-12-03<\/td><td><strong>Received<\/strong><br \/>2014-12-03<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2015-04-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-13<br \/><\/td><td>NBC Division C 2.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>916<\/td><td>Ventilation Measures for Enclosed Rooms\/Spaces Class II Liquids<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-02<\/td><td><strong>Received<\/strong><br \/>2014-12-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.7.2.(1)<\/td><td>-<\/td><\/tr><tr><td>915<\/td><td>Flammable and Combustible Liquids in Rooms or Enclosed Spaces<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-02<\/td><td><strong>Received<\/strong><br \/>2014-12-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.7.1.(1)<\/td><td>1076 (published)<\/td><\/tr><tr><td>914<\/td><td>Vehicle Engine Test Facilities Class I or Class II Liquid Storage Tank Systems <\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-02<\/td><td><strong>Received<\/strong><br \/>2014-12-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 4.3.13.<\/td><td>-<\/td><\/tr><tr><td>913<\/td><td>Managing Ignition Sources<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-12-01<\/td><td><strong>Received<\/strong><br \/>2014-12-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-05-11<br \/><\/td><td>NFC Division B 4.1.5.2.(1)<\/td><td>-<\/td><\/tr><tr><td>912<\/td><td>Additional Fire Protection Equipment<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-11-27<\/td><td><strong>Received<\/strong><br \/>2014-11-27<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.5.1.(1)<\/td><td>1075 (published)<\/td><\/tr><tr><td>911<\/td><td>Aircraft Engine Test Facilities Class I or Class II Liquid Storage Tank Systems <\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-11-16<\/td><td><strong>Received<\/strong><br \/>2014-11-16<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-17<br \/><\/td><td>NFC Division B 4.3.13.2.<\/td><td>-<\/td><\/tr><tr><td>910<\/td><td>Harmonize NFC Part 4 with NFPA 37<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-11-14<\/td><td><strong>Received<\/strong><br \/>2014-11-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-05-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 4.1.4.1.(1),<br \/>NFC Division B 4.3.,<br \/>NFC Division B 4.5.<\/td><td>-<\/td><\/tr><tr><td>909<\/td><td>Harmonize NFC with CSA-B139-15<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2014-11-24<\/td><td><strong>Received<\/strong><br \/>2014-11-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 4.3.13.<\/td><td>-<\/td><\/tr><tr><td>908<\/td><td>Combination of Foam Plastic and Mineral Fibre Insulation on the Interior of Foundation Walls<\/td><td>Gary Sharp, Gary, CHBA<\/td><td>2014-11-05<\/td><td><strong>Received<\/strong><br \/>2014-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.25.5.1.<\/td><td>-<\/td><\/tr><tr><td>907<\/td><td>Protection of foam plastic-performance solution<\/td><td>Gary Sharp, Gary, CHBA<\/td><td>2014-11-05<\/td><td><strong>Received<\/strong><br \/>2014-11-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-04-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.10.17.10.<\/td><td>-<\/td><\/tr><tr><td>906<\/td><td>Installation of Vapour Barriers<\/td><td>Gary Sharp, Gary, CHBA<\/td><td>2014-11-05<\/td><td><strong>Received<\/strong><br \/>2014-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/><\/td><td>NBC Division B 9.25.4.3.<\/td><td>1352 (published)<\/td><\/tr><tr><td>905<\/td><td>Vapour Barrier Materials<\/td><td>Gary Sharp, Gary, CHBA<\/td><td>2014-11-05<\/td><td><strong>Received<\/strong><br \/>2014-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-03-11<br \/><\/td><td>NBC Division B 9.25.4.2.<\/td><td>1350 (published)<\/td><\/tr><tr><td>904<\/td><td>Installation of thermal insulation<\/td><td>Gary Sharp, Gary, CHBA<\/td><td>2014-11-05<\/td><td><strong>Received<\/strong><br \/>2014-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.25.2.3.<\/td><td>1555 (published)<\/td><\/tr><tr><td>903<\/td><td>Excluding additions and alteration of existing buildings from post-disaster construction from <\/td><td>Gallant, Darrell P, Cape Breton District Health Authority<\/td><td>2014-10-29<\/td><td><strong>Received<\/strong><br \/>2014-10-29<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-01-16<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-04-13<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-12-08<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>902<\/td><td>Emergency power supply<\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2014-10-21<\/td><td><strong>Received<\/strong><br \/>2014-10-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.2.7.,<br \/>NBC Division B 9.9.12.<\/td><td>-<\/td><\/tr><tr><td>901<\/td><td>Electrical supervision of heat tracing systems<\/td><td>Tsisserev, Arkady Z., AES Engineering<\/td><td>2014-10-21<\/td><td><strong>Received<\/strong><br \/>2014-10-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-18<br \/><\/td><td>NBC Division B 3.2.4.9.,<br \/>NBC Division B 9.10.18.3.<\/td><td>1298 (published)<\/td><\/tr><tr><td>900<\/td><td>Flammable Gases<\/td><td>Van Delden, John H, University of Manitoba<\/td><td>2014-10-20<\/td><td><strong>Received<\/strong><br \/>2014-10-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 3.2.8.2.(2)<\/td><td>-<\/td><\/tr><tr><td>899<\/td><td>Earth Energy Systems<\/td><td>Genest, Frederic, Durasim<\/td><td>2014-10-16<\/td><td><strong>Received<\/strong><br \/>2014-10-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 6.2.1.4.,<br \/>NBC Division B 9.33.5.2.<\/td><td>-<\/td><\/tr><tr><td>898<\/td><td>heat recovery - no cross contamination<\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2014-10-12<\/td><td><strong>Received<\/strong><br \/>2014-10-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-02-27<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2015-06-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-03<br \/><\/td><td>NECB Division B 5.2.10.4.(5)<\/td><td>-<\/td><\/tr><tr><td>897<\/td><td>motorized damper thermal properties<\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2014-10-12<\/td><td><strong>Received<\/strong><br \/>2014-10-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-02-27<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2015-06-11<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NECB Division B 5.2.4.2.<\/td><td>1723 (published)<\/td><\/tr><tr><td>896<\/td><td>setup controls during the cooling season<\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2014-10-12<\/td><td><strong>Received<\/strong><br \/>2014-10-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-02-27<br \/><\/td><td>NECB Division B 5.2.11.<\/td><td>-<\/td><\/tr><tr><td>895<\/td><td>Radon - increase minimum solution to require passive vent<\/td><td>Chase, Andy, Building and Safety Standards Branch, Office of Housing and Construction Standards, Province of BC<\/td><td>2014-09-30<\/td><td><strong>Received<\/strong><br \/>2014-09-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2016-03-11<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 9.13.4.1.<\/td><td>1887, 1713 (published)<\/td><\/tr><tr><td>894<\/td><td>Heat alarms in attached garages<\/td><td>Dickson, Brian, Niagara Falls Fire Department<\/td><td>2014-09-29<\/td><td><strong>Received<\/strong><br \/>2014-09-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-18<br \/><\/td><td>NBC Division B 3.2.4.21.,<br \/>NBC Division B 9.10.19.<\/td><td>-<\/td><\/tr><tr><td>893<\/td><td>Intergrity of circuit serving audible signal devices withing dwelling units<\/td><td>Kurz, Frank E, The Fire Protection Technicians Network<\/td><td>2014-09-20<\/td><td><strong>Received<\/strong><br \/>2014-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-04-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-27<br \/><\/td><td>NBC Division B 3.2.4.19.(8),<br \/>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>892<\/td><td>Clarification of Application for Automatic Sprinkler Systems<\/td><td>Johnson, Murray, Murray Johnson Engineering Ltd.<\/td><td>2014-09-18<\/td><td><strong>Received<\/strong><br \/>2014-09-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-05-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-04<br \/><\/td><td>NBC Division B 3.2.5.12.(2)<\/td><td>2038<\/td><\/tr><tr><td>891<\/td><td>Review Lateral Loads on foundation walls<\/td><td>Mazerolle, Claude CM, Les Entreprises Claude Mazerolle, inc.<\/td><td>2014-09-19<\/td><td><strong>Received<\/strong><br \/>2014-09-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.15.4.2.<\/td><td>-<\/td><\/tr><tr><td>890<\/td><td>Elevator dimensions - application of provision related to access to elevator<\/td><td>Maier, Ovidiu OM, GLT+<\/td><td>2014-09-15<\/td><td><strong>Received<\/strong><br \/>2014-09-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.5.4.1.(1),<br \/>NBC Division B 9.10.1.3.(1)<\/td><td>1128 (published)<\/td><\/tr><tr><td>889<\/td><td>Projections exempted from braced wall requirements<\/td><td>Jonkman, Robert, Canadian Wood Council<\/td><td>2014-07-28<\/td><td><strong>Received<\/strong><br \/>2014-07-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.23.13.5.<\/td><td>1303 (published)<\/td><\/tr><tr><td>888<\/td><td>Allow combustible construction, three-storey buildings, Group A-2 <\/td><td>Frye, Murray John, University of Manitoba<\/td><td>2013-10-31<\/td><td><strong>Received<\/strong><br \/>2014-07-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-09-20<br \/><\/td><td>NBC Division B 3.2.2.26.<\/td><td>-<\/td><\/tr><tr><td>887<\/td><td>Table 9.23.14.8. Rafter and Joist connections<\/td><td>Klassen, Fred E, British Columbia Institute of Technology<\/td><td>2013-10-31<\/td><td><strong>Received<\/strong><br \/>2014-07-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-02-18<br \/><\/td><td>NBC Division B 9.23.14.8.<\/td><td>1281 (published)<\/td><\/tr><tr><td>886<\/td><td>Fire emergency procedures for areas where persons are anesthetized in Group D<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2014-03-14<\/td><td><strong>Received<\/strong><br \/>2014-07-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/><\/td><td>NFC Division B 2.8.1.1.(1)<\/td><td>1243 (published)<\/td><\/tr><tr><td>885<\/td><td>Relocation of the requirement of emergency lighting for doors with EMLs<\/td><td>Jenken, Shirley J, City of Winnipeg<\/td><td>2014-04-23<\/td><td><strong>Received<\/strong><br \/>2014-07-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.2.7.3.(1),<br \/>NBC Division B 9.9.12.3.(1)<\/td><td>1127 (published)<\/td><\/tr><tr><td>884<\/td><td>Sizing of Water Distribution Systems<\/td><td>Gunn, Daniel R, Ontario Plumbing Inspectors Association<\/td><td>2014-07-23<\/td><td><strong>Received<\/strong><br \/>2014-07-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2016-02-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-05-09<br \/><\/td><td>NPC Division B 2.6.3.4.<\/td><td>-<\/td><\/tr><tr><td>883<\/td><td>Allowable Fenestration and Door Area by Archetype Space Use<\/td><td>Wilson, Keith, Keith E. Wilson Consulting Services<\/td><td>2014-06-12<\/td><td><strong>Received<\/strong><br \/>2014-06-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-03<br \/><\/td><td>NECB Division B 3.2.1.4.(1)<\/td><td>-<\/td><\/tr><tr><td>882<\/td><td>Heading change from \"Roof Snow\" to \"Specified Snow load\"<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2014-06-05<\/td><td><strong>Received<\/strong><br \/>2014-06-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2014-07-21<br \/><\/td><td>NBC Division B 9.23.13.A.<\/td><td>1281 (published)<\/td><\/tr><tr><td>881<\/td><td>Openings in walls - sound transmission<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2014-06-06<\/td><td><strong>Received<\/strong><br \/>2014-06-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2014-07-21<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 9.11.,<br \/>NBC Division B A-9.10.3.1.<\/td><td>1276 (published), 1275 (published)<\/td><\/tr><tr><td>879<\/td><td>Add reference to material standard for asphalt coated glass base sheets <\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2014-05-13<\/td><td><strong>Received<\/strong><br \/>2014-05-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2014-12-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-11<br \/><\/td><td>NBC Division B 9.26.2.1.<\/td><td>1133 (published), 1302 (published)<\/td><\/tr><tr><td>878<\/td><td>Required Ventilation Rates of Outdoor Air Intake<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2014-05-13<\/td><td><strong>Received<\/strong><br \/>2014-05-26<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>877<\/td><td>1.4.1.2. Defined Terms - Ramps<\/td><td>Destroismaisons, Sylvie, Sylvie Destroismaisons architecte<\/td><td>2014-05-08<\/td><td><strong>Received<\/strong><br \/>2014-05-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2017-05-03<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-13<br \/><\/td><td>NBC Division A 1.4.1.2.,<br \/>NBC Division B 3.8.3.4.(3)<\/td><td>1063 (published)<\/td><\/tr><tr><td>876<\/td><td>Increased design snow loading for garages and carports<\/td><td>Luhowy, Dylan<\/td><td>2014-04-15<\/td><td><strong>Received<\/strong><br \/>2014-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-07-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-09<br \/><\/td><td>-<\/td><td>1290 (published)<\/td><\/tr><tr><td>875<\/td><td>Firewalls between stalls in farm buildings<\/td><td>Morrell-Bellai, Jasmien<\/td><td>2014-04-08<\/td><td><strong>Received<\/strong><br \/>2014-04-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-08-20<br \/><\/td><td>NFBC Division B 3.1.1.<\/td><td>-<\/td><\/tr><tr><td>874<\/td><td>Adhesives, sealants and ductwork for vents in contact with fat, oil and greas (FOG)<\/td><td>Midgley, Titus W, Parray Innovations<\/td><td>2014-03-28<\/td><td><strong>Received<\/strong><br \/>2014-04-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-07-21<br \/><\/td><td>NBC Division B 9.32.3.9.<\/td><td>-<\/td><\/tr><tr><td>873<\/td><td> Elements of Structures, Non-structural Components and Equipment<\/td><td>Shek, Patrick K, Building Department, City of Burnaby, 4949 Canada Way, Burnaby, BC, V5G 1M2<\/td><td>2014-03-08<\/td><td><strong>Received<\/strong><br \/>2014-03-13<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2017-02-23<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>872<\/td><td>Spatial Separation - Carports<\/td><td>Shek, Patrick K, Building Department, City of Burnaby, 4949 Canada Way, Burnaby, BC, V5G 1M2<\/td><td>2014-02-23<\/td><td><strong>Received<\/strong><br \/>2014-02-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2014-07-21<br \/><\/td><td>NBC Division B 9.10.14.1.(1),<br \/>NBC Division B 9.10.15.1.(1)<\/td><td>-<\/td><\/tr><tr><td>871<\/td><td>Application of Glass in Guards<\/td><td>Shek, Patrick K, Building Department, City of Burnaby, 4949 Canada Way, Burnaby, BC, V5G 1M2<\/td><td>2014-02-23<\/td><td><strong>Received<\/strong><br \/>2014-02-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-04-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-07-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-07-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.6.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>870<\/td><td>2 1\/2\" nominal pipe sizes<\/td><td>Wirachowsky, Greg N., Okanagan College<\/td><td>2014-02-13<\/td><td><strong>Received<\/strong><br \/>2014-02-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2015-03-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-04-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.4.10.2.<\/td><td>-<\/td><\/tr><tr><td>869<\/td><td>Definition of \"soil-or-waste stack\" and \"soil-or-waste pipe\"<\/td><td>Wirachowsky, Greg N., Okanagan College<\/td><td>2014-02-12<\/td><td><strong>Received<\/strong><br \/>2014-02-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/>EC: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-13<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2017-06-09<br \/><\/td><td>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>868<\/td><td>Location of Exhaust Discharge<\/td><td>Marinkovic, Vinko, Croatian Gentleman Roofing<\/td><td>2014-02-06<\/td><td><strong>Received<\/strong><br \/>2014-02-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-04-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-07-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2018-11-19<br \/><\/td><td>NBC Division B 6.2.3.8.(5)<\/td><td>1468 (published)<\/td><\/tr><tr><td>867<\/td><td>Polyethylene of Raised Temperature Tube and Fittings (PE-RT)<\/td><td>Brown, Jeremy S., NSF International<\/td><td>2014-01-27<\/td><td><strong>Received<\/strong><br \/>2014-01-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-03-11<br \/><\/td><td>NPC Division B 2.2.5.<\/td><td>-<\/td><\/tr><tr><td>866<\/td><td>Limitation of the FAS Exemption for Small Apartment Buildings with Large Suites<\/td><td>Dueck, Stan, Yukon Government<\/td><td>2014-01-17<\/td><td><strong>Received<\/strong><br \/>2014-01-27<br \/><\/td><td>NBC Division B 3.2.4.1.(5),<br \/>NBC Division B 3.2.4.1.(6)<\/td><td>-<\/td><\/tr><tr><td>865<\/td><td>Limiting Fire Alarm System Exemption<\/td><td>Dueck, Stan, Yukon Government<\/td><td>2014-01-17<\/td><td><strong>Received<\/strong><br \/>2014-01-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2014-07-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-04-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 9.10.18.2.(5)<\/td><td>1345 (published)<\/td><\/tr><tr><td>864<\/td><td>Limitation of the FAS Exemption for Small Apartment Buildings with Large Suites<\/td><td>Dueck, Stan, Yukon Government<\/td><td>2014-01-17<\/td><td><strong>Received<\/strong><br \/>2014-01-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-04-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-14<br \/><\/td><td>NBC Division B 3.2.4.1.(5),<br \/>NBC Division B 3.2.4.1.(6)<\/td><td>1345 (published)<\/td><\/tr><tr><td>863<\/td><td>Limitation of the FAS Exemption for Small Apartment Buildings with Large Suites<\/td><td>Dueck, Stan, Yukon Government<\/td><td>2014-01-17<\/td><td><strong>Received<\/strong><br \/>2014-01-27<br \/><\/td><td>NBC Division B 3.2.4.1.(5),<br \/>NBC Division B 3.2.4.1.(6)<\/td><td>-<\/td><\/tr><tr><td>862<\/td><td>Exemption for Fire Detector on sprinklered buildings<\/td><td>Duggan, Patricia, Fire Detection Devices Ltd.<\/td><td>2013-12-19<\/td><td><strong>Received<\/strong><br \/>2013-12-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2014-07-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-04-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-27<br \/><\/td><td>NBC Division B 3.2.4.11.(3),<br \/>NBC Division B 9.10.18.4.(3)<\/td><td>-<\/td><\/tr><tr><td>861<\/td><td>Clarification of what is a parking structure.<\/td><td>DiZazzo, Gina GDZ, Garantie Habitation des Ma\u00eetres B\u00e2tisseurs<\/td><td>2013-12-18<\/td><td><strong>Received<\/strong><br \/>2013-12-20<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-04-02<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>860<\/td><td> FT1-rated Wires and Cables in Noncombustible Construction<\/td><td>DiZazzo, Gina GDZ, Garantie Habitation des Ma\u00eetres B\u00e2tisseurs<\/td><td>2013-12-18<\/td><td><strong>Received<\/strong><br \/>2013-12-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-07-11<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2023-06-02<br \/><\/td><td>NBC Division B 3.1.5.18.<\/td><td>-<\/td><\/tr><tr><td>859<\/td><td>Polyethylene of Raised Temperature Tube and Fittings (PE-RT)<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2013-12-16<\/td><td><strong>Received<\/strong><br \/>2013-12-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-03-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-04-17<br \/><\/td><td>NPC Division B 2.2.5.<\/td><td>-<\/td><\/tr><tr><td>858<\/td><td>Minimum height of door released harware<\/td><td>Morin, Pierre, Agence Cl\u00e9 Inc.<\/td><td>2013-12-13<\/td><td><strong>Received<\/strong><br \/>2013-12-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2014-07-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-05-09<br \/><\/td><td>NBC Division B 3.3.1.13.(5),<br \/>NBC Division B 3.4.6.16.(5),<br \/>NBC Division B 9.9.6.7.(3)<\/td><td>1126 (published), 1310 (published)<\/td><\/tr><tr><td>857<\/td><td>Minimum dimensions of push plate of panic hardware<\/td><td>Morin, Pierre, Agence Cl\u00e9 Inc.<\/td><td>2013-12-13<\/td><td><strong>Received<\/strong><br \/>2013-12-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-20<br \/><\/td><td>NBC Division B 3.3.2.7.,<br \/>NBC Division B 3.4.6.16.(2)<\/td><td>1105 (published)<\/td><\/tr><tr><td>856<\/td><td>Low Frequency Audible Alarm Signal<\/td><td>Chass\u00e9, Yvan, Minist\u00e8re de la S\u00e9curit\u00e9 publique du Qu\u00e9bec<\/td><td>2013-12-12<\/td><td><strong>Received<\/strong><br \/>2013-12-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-18<br \/><\/td><td>NBC Division B 3.2.4.18.,<br \/>NBC Division B 3.2.4.20.<\/td><td>-<\/td><\/tr><tr><td>855<\/td><td>Required Ventilation Rates of Outdoor Air Intake<\/td><td>Smith, Aaron R, M&amp;R Engineering<\/td><td>2013-12-08<\/td><td><strong>Received<\/strong><br \/>2013-12-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-03-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-04-17<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>854<\/td><td>Oil-Burning Equipment, emergency generators and fire Pumps within rooms for storage tanks<\/td><td>Gauthier, Pierre, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2013-12-05<\/td><td><strong>Received<\/strong><br \/>2013-12-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-08-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-05-11<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2021-05-11<br \/><\/td><td>NFC Division B 4.3.14.1.(1)<\/td><td>-<\/td><\/tr><tr><td>853<\/td><td>Flame-spread rating of foamed plastic insulation<\/td><td>Eidnani, Samir L, CFT Engineering Inc<\/td><td>2013-11-15<\/td><td><strong>Received<\/strong><br \/>2013-11-18<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-15<br \/><\/td><td>NBC Division B 3.1.12.1.(1)<\/td><td>-<\/td><\/tr><tr><td>852<\/td><td>Combustible projections to property line<\/td><td>Tober, Lucas, City of Winnipeg<\/td><td>2013-11-14<\/td><td><strong>Received<\/strong><br \/>2013-11-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2014-07-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-05-04<br \/><\/td><td>NBC Division B 3.2.3.6.(4)<\/td><td>1787<\/td><\/tr><tr><td>851<\/td><td>Use of Elevated Riser Clamp at Slab Penetrations<\/td><td>Vaughan, James A., JV-Industries LLC<\/td><td>2013-11-05<\/td><td><strong>Received<\/strong><br \/>2013-11-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2020-10-09<br \/><\/td><td>NPC Division B 2.3.4.4.<\/td><td>-<\/td><\/tr><tr><td>850<\/td><td>Back-siphonage<\/td><td>Milne, Jay B., n\/a<\/td><td>2013-11-06<\/td><td><strong>Received<\/strong><br \/>2013-11-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-03-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/><\/td><td>NPC Division B 2.6.2.2.<\/td><td>-<\/td><\/tr><tr><td>849<\/td><td>Exit Signs - Color and Visibility<\/td><td>Shulman, Michael, UL LLC<\/td><td>2013-10-07<\/td><td><strong>Received<\/strong><br \/>2013-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-02-20<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.4.5.1.(2)<\/td><td>-<\/td><\/tr><tr><td>848<\/td><td>Defining types of \"illumination\" for exit signs<\/td><td>Shulman, Michael, UL LLC<\/td><td>2013-10-07<\/td><td><strong>Received<\/strong><br \/>2013-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-07-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-02-20<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.4.5.1.,<br \/>NBC Division B 9.9.11.3.<\/td><td>-<\/td><\/tr><tr><td>847<\/td><td>Size of Stairs<\/td><td>Simard, Guy G.S., APCHQ r\u00e9gion de Qu\u00e9bec<\/td><td>2013-10-24<\/td><td><strong>Received<\/strong><br \/>2013-10-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-07-21<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>846<\/td><td>Flame-spread rating of foamed plastic insulation<\/td><td>Eidnani, Samir L, CFT Engineering Inc<\/td><td>2013-10-22<\/td><td><strong>Received<\/strong><br \/>2013-10-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-15<br \/><\/td><td>NBC Division B 3.1.12.1.<\/td><td>-<\/td><\/tr><tr><td>845<\/td><td>Change Defined Term for \"Vapour Barrier\" to \"Vapour Diffusion Retarder\"<\/td><td>Kadulski, Richard<\/td><td>2013-10-14<\/td><td><strong>Received<\/strong><br \/>2013-10-15<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2014-07-21<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-26<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-04-20<br \/><\/td><td>NBC Division B 9.25.4.<\/td><td>1248 (published), 1249 (published)<\/td><\/tr><tr><td>844<\/td><td>Change the term \"Visual Signals\" by \"Visible Signals\" for fire alarm devices<\/td><td>Boynowski, Donald<\/td><td>2013-10-09<\/td><td><strong>Received<\/strong><br \/>2013-10-15<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-02-20<br \/><\/td><td>NBC Division B 3.2.4.20.<\/td><td>434 (published)<\/td><\/tr><tr><td>843<\/td><td>Preventing birds from hitting widows<\/td><td>Green, Catherine F<\/td><td>2013-09-20<\/td><td><strong>Received<\/strong><br \/>2013-09-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2013-11-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-06-09<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>842<\/td><td>Specified rain load - scuppers<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2013-09-13<\/td><td><strong>Received<\/strong><br \/>2013-09-19<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-10<br \/><\/td><td>-<\/td><td>957 (published)<\/td><\/tr><tr><td>841<\/td><td>Application of NECB Part 4 (site lighting)<\/td><td>Marshall, Richard B, Bird Construction<\/td><td>2013-09-02<\/td><td><strong>Received<\/strong><br \/>2013-09-03<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-01-19<br \/><\/td><td>NECB Division B 4.1.1.2.(1)<\/td><td>1724 (published)<\/td><\/tr><tr><td>840<\/td><td>Introduction of a new referenced standard for storage tank spray system protection<\/td><td>Sanati Foroush, Sam, Fluor Canada<\/td><td>2013-08-29<\/td><td><strong>Received<\/strong><br \/>2013-09-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2014-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-17<br \/><\/td><td>NFC Division B 4.3.2.5.(2)<\/td><td>-<\/td><\/tr><tr><td>839<\/td><td>Loadbearing signs on structural elements<\/td><td>St Denis, Dennis  R.<\/td><td>2013-08-26<\/td><td><strong>Received<\/strong><br \/>2013-08-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2013-11-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-01-15<br \/><\/td><td>NBC Division B 9.23.<\/td><td>-<\/td><\/tr><tr><td>838<\/td><td>Soft conversion of 600mm vs 610mm<\/td><td>Baynit, Robert A., TPIC<\/td><td>2013-08-20<\/td><td><strong>Received<\/strong><br \/>2013-08-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-11<br \/><\/td><td>NBC Division B 9.23.<\/td><td>-<\/td><\/tr><tr><td>837<\/td><td>Add Boiestown to climatic data - Appendix C<\/td><td>McCormick, Mark J, exp Services Inc.<\/td><td>2013-08-19<\/td><td><strong>Received<\/strong><br \/>2013-08-20<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2014-04-02<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>836<\/td><td>Granular drainage below footings<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2013-08-14<\/td><td><strong>Received<\/strong><br \/>2013-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-11-20<br \/><\/td><td>-<\/td><td>810<\/td><\/tr><tr><td>835<\/td><td>Protection from snow sliding off roofs<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2013-08-14<\/td><td><strong>Received<\/strong><br \/>2013-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-11-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>834<\/td><td>90 degree elbows<\/td><td>Blundel, Rainier R, Ontario Plumbing Inspectors Association<\/td><td>2013-07-27<\/td><td><strong>Received<\/strong><br \/>2013-07-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-03-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/><\/td><td>NPC Division B 2.2.4.3.(1)<\/td><td>-<\/td><\/tr><tr><td>833<\/td><td>ICF - secondary suites<\/td><td>DeRosier, Lara, D-Code Engineering Ltd.<\/td><td>2013-07-23<\/td><td><strong>Received<\/strong><br \/>2013-07-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.15.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>832<\/td><td>Roof Trusses<\/td><td>Baynit, Robert A., TPIC<\/td><td>2013-07-19<\/td><td><strong>Received<\/strong><br \/>2013-07-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.23.14.11.<\/td><td>1462 (published)<\/td><\/tr><tr><td>831<\/td><td>Required RSI Values for Cathedral Ceilings and Flat Roofs<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2013-07-12<\/td><td><strong>Received<\/strong><br \/>2013-07-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.2.6.<\/td><td>1923 (published)<\/td><\/tr><tr><td>830<\/td><td>Doorways Requirements in Means of Egress<\/td><td>Baker, Jeff, Fenestration Canada<\/td><td>2013-06-26<\/td><td><strong>Received<\/strong><br \/>2013-07-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-20<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.3.1.5.<\/td><td>-<\/td><\/tr><tr><td>829<\/td><td>Minimum Clear Opening Dimensions for Egress Doorways<\/td><td>Baker, Jeff, Fenestration Canada<\/td><td>2013-06-26<\/td><td><strong>Received<\/strong><br \/>2013-07-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-20<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.3.1.3.(2)<\/td><td>-<\/td><\/tr><tr><td>828<\/td><td>Precipitation Proctection and Doors in Section 9.7.<\/td><td>Baker, Jeff, Fenestration Canada<\/td><td>2013-06-26<\/td><td><strong>Received<\/strong><br \/>2013-07-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.7.3.<\/td><td>881 (published)<\/td><\/tr><tr><td>827<\/td><td>Performance of Main entrance doors (9.7.)<\/td><td>Baker, Jeff, Fenestration Canada<\/td><td>2013-06-26<\/td><td><strong>Received<\/strong><br \/>2013-07-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.7.2.<\/td><td>881 (published)<\/td><\/tr><tr><td>826<\/td><td>Use of the term \"Main entrance doors\"<\/td><td>Baker, Jeff, Fenestration Canada<\/td><td>2013-06-26<\/td><td><strong>Received<\/strong><br \/>2013-07-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.7.1.1.,<br \/>NBC Division B 9.7.2.1.<\/td><td>881 (published)<\/td><\/tr><tr><td>825<\/td><td>Insulation for Heated Floors<\/td><td>Murray, Trevor A, Town of Quispamsis<\/td><td>2013-06-11<\/td><td><strong>Received<\/strong><br \/>2013-06-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.36.2.8.(7)<\/td><td>-<\/td><\/tr><tr><td>824<\/td><td>Protection Birds through UV visible glazing in buildings<\/td><td>Green, Catherine F<\/td><td>2013-05-19<\/td><td><strong>Received<\/strong><br \/>2013-05-21<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-11-26<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>823<\/td><td>Withdrawal of ULC Technical Supplements for reuse of storage tanks<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2013-05-16<\/td><td><strong>Received<\/strong><br \/>2013-05-21<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-04-07<br \/><\/td><td>NFC Division B 4.3.1.10.<\/td><td>900 (published)<\/td><\/tr><tr><td>822<\/td><td>Spill control and drainage systems<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2013-05-14<\/td><td><strong>Received<\/strong><br \/>2013-05-21<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2014-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-16<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-05-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-08<br \/><\/td><td>NFC Division B 4.1.6.1.<\/td><td>1564 (published)<\/td><\/tr><tr><td>821<\/td><td>Anchorage of Columns and Posts<\/td><td>Thistlethwaite, Jason A, Institute for Catastrophic Loss Reduction<\/td><td>2013-03-22<\/td><td><strong>Received<\/strong><br \/>2013-04-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-06-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-07-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2014-05-22<br \/><\/td><td>NBC Division B 9.23.6.2.<\/td><td>-<\/td><\/tr><tr><td>820<\/td><td>Roof connection to resist uplift<\/td><td>Thistlethwaite, Jason A, Institute for Catastrophic Loss Reduction<\/td><td>2013-03-22<\/td><td><strong>Received<\/strong><br \/>2013-04-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-07-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-05-22<br \/><\/td><td>NBC Division B 9.23.3.4.<\/td><td>-<\/td><\/tr><tr><td>819<\/td><td>Roof sheathing nailing requirements<\/td><td>Thistlethwaite, Jason A, Institute for Catastrophic Loss Reduction<\/td><td>2013-03-22<\/td><td><strong>Received<\/strong><br \/>2013-04-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-07-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-05-22<br \/><\/td><td>NBC Division B 9.23.3.5.<\/td><td>-<\/td><\/tr><tr><td>818<\/td><td>Revise 9.14.5.1 Drainage Disposal to harmonize and reduce risk<\/td><td>Thistlethwaite, Jason A, Institute for Catastrophic Loss Reduction<\/td><td>2013-03-01<\/td><td><strong>Received<\/strong><br \/>2013-04-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 9.14.5.1.<\/td><td>-<\/td><\/tr><tr><td>817<\/td><td>Protection from Backflow<\/td><td>Thistlethwaite, Jason A, Institute for Catastrophic Loss Reduction<\/td><td>2013-03-01<\/td><td><strong>Received<\/strong><br \/>2013-04-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-03-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NPC Division B 2.4.6.4.<\/td><td>2137<\/td><\/tr><tr><td>816<\/td><td>Non-Metallic Aboveground Storage Tanks for Oil-Burning Fuel and Combustible Liquids<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2013-03-27<\/td><td><strong>Received<\/strong><br \/>2013-04-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.3.1.2.(1)<\/td><td>720 (published)<\/td><\/tr><tr><td>815<\/td><td>Convalescent homes and children's custodial homes vs. ambulatory<\/td><td>Everton, Brian R., Design For All Inc.<\/td><td>2013-03-22<\/td><td><strong>Received<\/strong><br \/>2013-04-04<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-04-26<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2014-01-02<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2022-11-09<br \/><\/td><td>NBC Division B 3.1.2.5.(1)<\/td><td>1313 (published), 1320 (published), 1208, 1323 (published), 2123<\/td><\/tr><tr><td>814<\/td><td>Integrity of the fire separation between scissor\/contiguous exit stairs<\/td><td>Brown, Randal, Randal Brown &amp; Associates Ltd.<\/td><td>2013-03-12<\/td><td><strong>Received<\/strong><br \/>2013-04-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-04-24<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-10-21<br \/><\/td><td>NBC Division B 3.4.4.4.<\/td><td>780<\/td><\/tr><tr><td>813<\/td><td>Clarification of the application of automatic sprinkler system when installed throughout<\/td><td>Johnson, Murray, Murray Johnson Engineering Ltd.<\/td><td>2013-02-26<\/td><td><strong>Received<\/strong><br \/>2013-02-28<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.2.2.18.(2)<\/td><td>776<\/td><\/tr><tr><td>812<\/td><td>Sizing of potable water to water heaters<\/td><td>Donahoe, Gerard F.<\/td><td>2012-12-20<\/td><td><strong>Received<\/strong><br \/>2013-01-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-03-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-06-16<br \/><\/td><td>NPC Division B 02.06.03.04.(4)<\/td><td>977 (published)<\/td><\/tr><tr><td>811<\/td><td>Recognize exception for insulation under ducts (factory-constructed buildings)<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2012-12-19<\/td><td><strong>Received<\/strong><br \/>2013-01-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-05-17<br \/><\/td><td>NBC Division B 9.36.2.11.<\/td><td>1664 (published)<\/td><\/tr><tr><td>810<\/td><td>Fire Protection Systems Requirement for AST vs. Storage Tank Dia<\/td><td>Senez, Peter L., Sereca Fire Consulting Ltd.<\/td><td>2012-12-11<\/td><td><strong>Received<\/strong><br \/>2013-01-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-05-17<br \/><\/td><td>NFC Division B 4.3.2.5.<\/td><td>-<\/td><\/tr><tr><td>809<\/td><td>Allowable Fenestration and Door Area by Occupancy Type <\/td><td>Wilson, Keith, Keith E. Wilson Consulting Services<\/td><td>2012-12-08<\/td><td><strong>Received<\/strong><br \/>2013-01-02<br \/><\/td><td>NECB Division B 3.2.1.4.(1)<\/td><td>-<\/td><\/tr><tr><td>808<\/td><td>Portable Extinguishers on Aerial Work Platforms<\/td><td>Reti, Alan B., Alberta Onsite Fire &amp; Safety Inspections Inc.<\/td><td>2012-11-21<\/td><td><strong>Received<\/strong><br \/>2012-11-21<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2016-10-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-06-14<br \/><\/td><td>NFC Division B 2.1.5.1.<\/td><td>-<\/td><\/tr><tr><td>807<\/td><td>-<\/td><td>Mistry, Bhana D<\/td><td>2012-11-15<\/td><td><strong>Received<\/strong><br \/>2013-01-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>806<\/td><td>Required Ventilation Rates of Outdoor Air Intake<\/td><td>Ghanem, Jean<\/td><td>2012-11-13<\/td><td><strong>Received<\/strong><br \/>2012-11-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-11<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-03-12<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>805<\/td><td>High-Intensity Residential Fires <\/td><td>Tye, Chris, Government<\/td><td>2009-04-16<\/td><td><strong>Received<\/strong><br \/>2012-11-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-09-22<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>804<\/td><td>Load on Openable Windows in Dwelling Units<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2012-11-01<\/td><td><strong>Received<\/strong><br \/>2012-11-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-12-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2015-03-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-19<br \/><\/td><td>NBC Division B 3.3.1.19.(6),<br \/>NBC Division B 3.3.4.8.<\/td><td>-<\/td><\/tr><tr><td>803<\/td><td>Floor Drains in Laundry Rooms<\/td><td>Foxall, Matt A., APEGBC &amp; BCIPI<\/td><td>2012-10-31<\/td><td><strong>Received<\/strong><br \/>2012-11-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-12-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-07-17<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2015-03-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-05-23<br \/><\/td><td>NBC Division B 9.31.<\/td><td>-<\/td><\/tr><tr><td>802<\/td><td>-<\/td><td>Ciarlo, Salvatore, Owens Corning Canada LP<\/td><td>2012-10-28<\/td><td><strong>Received<\/strong><br \/>2012-10-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-05-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2014-05-13<br \/><\/td><td>-<\/td><td>887 (published)<\/td><\/tr><tr><td>801<\/td><td>-<\/td><td>Popovski, Marjan, FPInnovations<\/td><td>2012-10-23<\/td><td><strong>Received<\/strong><br \/>2012-10-24<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>800<\/td><td>Include Amendment 1 of ULC S702-09 for use or Type 4 Pouring Wool<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-10-22<\/td><td><strong>Received<\/strong><br \/>2012-10-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-11-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-07-17<br \/><\/td><td>NBC Division B 9.25.2.2.<\/td><td>-<\/td><\/tr><tr><td>799<\/td><td>Liners for Secondary Containment of Aboveground Flammable and Combustible Liquid Storage Tanks <\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-10-23<\/td><td><strong>Received<\/strong><br \/>2012-10-23<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.3.7.2.<\/td><td>728 (published)<\/td><\/tr><tr><td>798<\/td><td>Factored compressive resistance of the composite column (steel-concrete)<\/td><td>Frater, George S., Canadian Steel Construction Council<\/td><td>2012-10-12<\/td><td><strong>Received<\/strong><br \/>2012-10-12<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B D-2.6.6.<\/td><td>785 (published)<\/td><\/tr><tr><td>797<\/td><td>A-9.10.3.1. Table Note (6) vs. Fastening of douple-ply gypsum board<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2012-10-10<\/td><td><strong>Received<\/strong><br \/>2012-10-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2014-11-14<br \/><\/td><td>NBC Division B A-9.10.3.1.<\/td><td>1274 (published), 1277 (published), 1278 (published)<\/td><\/tr><tr><td>796<\/td><td>A-9.10.3.1. Gypsum Board Attachment for Compliance with Fire and Sound Resistance of Walls vs. <\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2012-10-10<\/td><td><strong>Received<\/strong><br \/>2012-10-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-11-14<br \/><\/td><td>NBC Division B A-9.10.3.1.<\/td><td>1274 (published), 1277 (published), 1278 (published)<\/td><\/tr><tr><td>795<\/td><td>9.29.5. Single and Double Layer Application of Gyspum Board <\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2012-10-10<\/td><td><strong>Received<\/strong><br \/>2012-10-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-07-17<br \/><\/td><td>NBC Division B 9.29.5.2.<\/td><td>1274 (published), 1277 (published), 1278 (published)<\/td><\/tr><tr><td>794<\/td><td>Illustration of Handrails Sections in Apendix Note A-9.8.7.5.(2) and Graspable Portion<\/td><td>Kucharski, Keith, Prestige Railings &amp; Stairs Ltd<\/td><td>2012-10-09<\/td><td><strong>Received<\/strong><br \/>2012-10-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-06<br \/><\/td><td>NBC Division B 3.4.6.5.(3),<br \/>NBC Division B 9.8.7.5.(2)<\/td><td>365 (published)<\/td><\/tr><tr><td>793<\/td><td>Maximum Roof Truss Deflection<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2012-09-21<\/td><td><strong>Received<\/strong><br \/>2012-09-21<br \/><\/td><td>NBC Division B 9.4.3.1.,<br \/>NBC Division B 9.23.14.11.<\/td><td>-<\/td><\/tr><tr><td>792<\/td><td>Spacing Between Individual Unprotected Openings (Single Room or Space Application)<\/td><td>Mitta, Dan, Ministry of Municipal Affairs and Housing<\/td><td>2012-08-17<\/td><td><strong>Received<\/strong><br \/>2012-08-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.2.3.7.(1)<\/td><td>-<\/td><\/tr><tr><td>791<\/td><td>Water Closet Personal Hygiene Devices<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2012-07-12<\/td><td><strong>Received<\/strong><br \/>2012-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-08-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-03-11<br \/><\/td><td>NPC Division B 2.2.10.17.<\/td><td>1010 (published)<\/td><\/tr><tr><td>790<\/td><td>Flushing Devices \/ Fixture Trim<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2012-07-09<\/td><td><strong>Received<\/strong><br \/>2012-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NPC Division B 2.6.1.6.(3)<\/td><td>-<\/td><\/tr><tr><td>789<\/td><td>Fixtures\/ Conformance to Standards<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2012-07-09<\/td><td><strong>Received<\/strong><br \/>2012-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-03-11<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NPC Division B 2.2.2.2.(9)<\/td><td>-<\/td><\/tr><tr><td>788<\/td><td>Water Temperature Control<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2012-07-09<\/td><td><strong>Received<\/strong><br \/>2012-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.10.7.(1)<\/td><td>-<\/td><\/tr><tr><td>787<\/td><td>Miscellaneous Materials\/ Flexible Water Connectors<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2012-07-09<\/td><td><strong>Received<\/strong><br \/>2012-07-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-03-12<br \/><\/td><td>NPC Division B 2.2.10.17.(1)<\/td><td>-<\/td><\/tr><tr><td>786<\/td><td>Fire-Resistance Rating, Working Stress Method and Limit States Design<\/td><td>MacKinnon, David H,, Canadian Institute of Steel Construction<\/td><td>2012-10-09<\/td><td><strong>Received<\/strong><br \/>2012-10-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-04-29<br \/><\/td><td>NBC Division B 3.1.7.1.(1)<\/td><td>-<\/td><\/tr><tr><td>785<\/td><td>Require CSA Certification of Windows Installation<\/td><td>McLauchlan, Richard, BEC Window and Envelope Consulting ltd<\/td><td>2012-10-02<\/td><td><strong>Received<\/strong><br \/>2012-10-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-07-17<br \/><\/td><td>NBC Division B 9.27.4.2.<\/td><td>-<\/td><\/tr><tr><td>784<\/td><td>Fire Safety Plan Diagrams in French and English<\/td><td>Lanthier, Lucie LL, Ville de Montr\u00e9al<\/td><td>2012-08-27<\/td><td><strong>Received<\/strong><br \/>2012-08-28<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-26<br \/><\/td><td>NFC Division B 2.8.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>783<\/td><td>Temperature Control<\/td><td>Leins, Bernard J., Supportive Living, Alberta Health Edmonton Zone<\/td><td>2012-06-12<\/td><td><strong>Received<\/strong><br \/>2012-06-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-03-12<br \/><\/td><td>NPC Division B 2.2.10.7.<\/td><td>1366 (published)<\/td><\/tr><tr><td>782<\/td><td>LNG Fuel-Dispensing Stations<\/td><td>Trussler, William, ShipsPoint Consulting<\/td><td>2012-06-07<\/td><td><strong>Received<\/strong><br \/>2012-06-08<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2017-05-17<br \/><\/td><td>NBC Division B 4.6.1.1.<\/td><td>-<\/td><\/tr><tr><td>781<\/td><td>Asbestos-Cement Drainage Pipe and Fittings<\/td><td>Lefort, Gordon<\/td><td>2012-06-02<\/td><td><strong>Received<\/strong><br \/>2012-06-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.5.1.,<br \/>NPC Division B 2.2.5.2.<\/td><td>-<\/td><\/tr><tr><td>780<\/td><td>Combustible piping materials and their insulation<\/td><td>Lefort, Gordon<\/td><td>2012-06-02<\/td><td><strong>Received<\/strong><br \/>2012-06-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.5.12.,<br \/>NBC Division B 3.1.5.16.<\/td><td>768<\/td><\/tr><tr><td>779<\/td><td>Use of combustible piping materials in vertical service space<\/td><td>Lefort, Gordon<\/td><td>2012-06-02<\/td><td><strong>Received<\/strong><br \/>2012-06-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-04<br \/><\/td><td>NBC Division B 3.1.5.16.(1)<\/td><td>-<\/td><\/tr><tr><td>778<\/td><td>Combustible sprinkler piping<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2012-05-25<\/td><td><strong>Received<\/strong><br \/>2012-05-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.2.5.13.<\/td><td>766 (published)<\/td><\/tr><tr><td>777<\/td><td>User's Guide \u2013 NBC 2010 Structural Commentaries (Part 4 of Division B), Commentary B <\/td><td>Torrey, Dwayne, CSA Group<\/td><td>2012-05-24<\/td><td><strong>Received<\/strong><br \/>2012-05-24<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2014-04-02<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>776<\/td><td>Permit residential fire warning systems <\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-05-21<\/td><td><strong>Received<\/strong><br \/>2012-05-22<br \/><\/td><td>NBC Division B 9.10.19.4.<\/td><td>411 (published)<\/td><\/tr><tr><td>775<\/td><td>Residential Fire Warning Systems<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-05-21<\/td><td><strong>Received<\/strong><br \/>2012-05-22<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-06<br \/><\/td><td>NBC Division B 3.2.4.21.(7)<\/td><td>410 (published)<\/td><\/tr><tr><td>774<\/td><td>Required Ventilation Rates of Outdoor Air Intake<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2012-05-09<\/td><td><strong>Received<\/strong><br \/>2012-05-10<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>773<\/td><td>Glass Fixtures<\/td><td>Pilla, Lauro, CSA Group<\/td><td>2012-05-03<\/td><td><strong>Received<\/strong><br \/>2012-05-04<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Referenced Documents<br \/>2025-06-02<br \/><\/td><td>NPC Division B 2.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>772<\/td><td>Air Economizers in 5.2.2.8.<\/td><td>Castro, Vanessa, Belimo Air Controls<\/td><td>2012-05-03<\/td><td><strong>Received<\/strong><br \/>2012-05-04<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-19<br \/><\/td><td>NECB Division B 5.2.2.8.<\/td><td>831 (published)<\/td><\/tr><tr><td>771<\/td><td>Protection of Electrical Conductors<\/td><td>Tabet, Antoine, Technorm Inc<\/td><td>2012-04-15<\/td><td><strong>Received<\/strong><br \/>2012-04-30<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.2.7.10.<\/td><td>769 (published)<\/td><\/tr><tr><td>770<\/td><td>Stacks illustrated in NPC<\/td><td>Wirachowsky, Greg N., Okanagan College<\/td><td>2012-04-24<\/td><td><strong>Received<\/strong><br \/>2012-04-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-13<br \/><\/td><td>NPC Division B 2.0.<\/td><td>-<\/td><\/tr><tr><td>769<\/td><td>Definitions of \"Fresh Air Inlet\" to \"Building Trap Vent\"<\/td><td>Wirachowsky, Greg N., Okanagan College<\/td><td>2012-04-23<\/td><td><strong>Received<\/strong><br \/>2012-04-25<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-09-14<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-01-30<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>768<\/td><td>Defined term \"soil-or-waste stack\" <\/td><td>Wirachowsky, Greg N., Okanagan College<\/td><td>2012-04-23<\/td><td><strong>Received<\/strong><br \/>2012-04-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-09-14<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2012-10-10<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-01-30<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>767<\/td><td>Flame-spread ratings for public corridor ceilings in sprinklered buildings<\/td><td>Bortolussi, Rick, Townline Group of Companies<\/td><td>2012-04-13<\/td><td><strong>Received<\/strong><br \/>2012-04-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.13.6.(6)<\/td><td>779 (published)<\/td><\/tr><tr><td>766<\/td><td>Fire resistance performance of grease duct assemblies<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-09-13<br \/><\/td><td>NBC Division B 6.2.2.7.<\/td><td>-<\/td><\/tr><tr><td>765<\/td><td>Continuity of Ceiling Membranes of a Horizontal Fire Separation with a FRR<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-05-22<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-07-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.9.6.<\/td><td>-<\/td><\/tr><tr><td>764<\/td><td>New defined term for joint firestop system<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-14<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-10-10<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>763<\/td><td>Penetration of rated fire separations with electrical outlet boxes<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.9.3.(6),<br \/>NBC Division B 3.1.9.3.(7)<\/td><td>-<\/td><\/tr><tr><td>762<\/td><td>Combustible Piping Penetrations<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.9.4.(4),<br \/>NBC Division B 9.10.9.7.(3)<\/td><td>544<\/td><\/tr><tr><td>761<\/td><td>Required Rating for Firestop Systems<\/td><td>Valiulis, John, International Firestop Council  c\/o Hilti North America<\/td><td>2012-03-29<\/td><td><strong>Received<\/strong><br \/>2012-04-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.9.1.(1)<\/td><td>542<\/td><\/tr><tr><td>760<\/td><td>Fire-Rated Glazing vs. Wired Glass and Glass Block<\/td><td>Davidson, Robert J., Davidson Code Concepts, LLC<\/td><td>2012-03-30<\/td><td><strong>Received<\/strong><br \/>2012-04-03<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-05-27<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 3.1.7.1.(1),<br \/>NBC Division B 3.1.8.4.(1),<br \/>NBC Division B 3.1.8.14.,<br \/>NBC Division B 3.1.8.15.,<br \/>NBC Division B 3.1.8.16.,<br \/>NBC Division B 3.1.8.17.(1),<br \/>NBC Division B 3.2.3.13.(4),<br \/>NBC Division B 3.4.4.4.(1),<br \/>NBC Division B 5.10.2.1.(3),<br \/>NBC Division B 9.9.4.3.(1),<br \/>NBC Division B 9.9.4.4.(1),<br \/>NBC Division B 9.9.4.5.(1),<br \/>NBC Division B 9.9.4.6.(1),<br \/>NBC Division B 9.10.13.5.,<br \/>NBC Division B 9.10.13.7.(1),<br \/>NBC Division B 3.1.8.16.(1),<br \/>NBC Division B D-2.3.14.<\/td><td>-<\/td><\/tr><tr><td>759<\/td><td>Introduction of Safety Glazing<\/td><td>Davidson, Robert J., Davidson Code Concepts, LLC<\/td><td>2012-03-30<\/td><td><strong>Received<\/strong><br \/>2012-04-03<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-05-27<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.6.1.<\/td><td>-<\/td><\/tr><tr><td>758<\/td><td>Emergency Egress Assistance (Wayguidance) in High-Building Stairwells<\/td><td>Michaud, Serge, Thomas and Betts<\/td><td>2012-03-28<\/td><td><strong>Received<\/strong><br \/>2012-04-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-29<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>757<\/td><td>Performance of Heat-recovery Ventilators in Table 5.2.10.4.<\/td><td>L\u00e9vesque, R\u00e9my, TPSGC<\/td><td>2012-03-23<\/td><td><strong>Received<\/strong><br \/>2012-03-26<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-12<br \/><\/td><td>NECB Division B 5.2.10.4.<\/td><td>-<\/td><\/tr><tr><td>756<\/td><td>Materials for Piping, Valves and Fittings, Metallic Underground Piping for Flammable and Combustible Liquids<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-06-12<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.5.2.1.<\/td><td>166 (published)<\/td><\/tr><tr><td>755<\/td><td>Provision for Expansion and Contraction<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.5.6.14.(1)<\/td><td>165 (published)<\/td><\/tr><tr><td>754<\/td><td>ICF - 9.15.2.5. Reference ULC S717.1<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-17<br \/><\/td><td>NBC Division B 9.25.2.5.<\/td><td>-<\/td><\/tr><tr><td>753<\/td><td>Make code consistent with ULC Standard - Flat Wall Insulating Concrete Forms<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-17<br \/><\/td><td>NBC Division B 9.20.17.1.<\/td><td>-<\/td><\/tr><tr><td>752<\/td><td>Flat Wall Insulating Concrete Forms<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-06-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-17<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>751<\/td><td>Flat Wall Insulating Concrete Forms<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.20.2.2.<\/td><td>-<\/td><\/tr><tr><td>750<\/td><td>Flat Wall Insulating Concrete Form Units<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2012-02-29<\/td><td><strong>Received<\/strong><br \/>2012-03-01<br \/><\/td><td>NBC Division B 9.15.4.1.<\/td><td>-<\/td><\/tr><tr><td>749<\/td><td>Limits on Unreinforced Masonry and \"Other Masonry\" structures<\/td><td>Metten, Andrew W. F., Bush, Bohlman &amp; Partners<\/td><td>2012-02-22<\/td><td><strong>Received<\/strong><br \/>2012-02-22<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-08-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 4.1.8.9.(1)<\/td><td>-<\/td><\/tr><tr><td>748<\/td><td>Tripping hazard by downspouts<\/td><td>Elliott, Jon, Health Canada<\/td><td>2012-02-21<\/td><td><strong>Received<\/strong><br \/>2012-02-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-24<br \/><\/td><td>NBC Division B 9.26.18.2.<\/td><td>-<\/td><\/tr><tr><td>747<\/td><td>Cogeneration or combined heat and power for commecial buildings<\/td><td>Cloutier, Dan, Power Ecosystems Inc<\/td><td>2012-02-19<\/td><td><strong>Received<\/strong><br \/>2012-02-22<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-10-10<br \/><\/td><td>NBC Division B 9.36.1.1.,<br \/>NECB Division B <\/td><td>-<\/td><\/tr><tr><td>746<\/td><td>Loads on Guards - Houses with Secondary Suites<\/td><td>Chown, Adaire, Consultant<\/td><td>2012-02-17<\/td><td><strong>Received<\/strong><br \/>2012-02-22<br \/><\/td><td>NBC Division B 9.8.8.2.(1),<br \/>NBC Division B 9.8.8.2.(4)<\/td><td>717 (published)<\/td><\/tr><tr><td>745<\/td><td>Design and Attachment of Handrails - Houses with Secondary Suites<\/td><td>Chown, Adaire, Consultant<\/td><td>2012-02-17<\/td><td><strong>Received<\/strong><br \/>2012-02-22<br \/><\/td><td>NBC Division B 9.8.7.7.(2)<\/td><td>716 (published)<\/td><\/tr><tr><td>744<\/td><td>Clearances from Gas, Propane and Electric Ranges <\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2012-02-16<\/td><td><strong>Received<\/strong><br \/>2012-02-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2012-03-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B A-9.20.22.2.<\/td><td>641 (published), 642 (published)<\/td><\/tr><tr><td>743<\/td><td>Furnace\/Chimney Dilemma<\/td><td>Baker, Peter W., FoNTRA<\/td><td>2012-02-03<\/td><td><strong>Received<\/strong><br \/>2012-02-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-17<br \/><\/td><td>NBC Division B 9.21.4.4.(1)<\/td><td>-<\/td><\/tr><tr><td>742<\/td><td>Automatic Shut-Off Sensors or Valves Serving Lavatories<\/td><td>Chown, Adaire, Consultant<\/td><td>2012-01-27<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-20<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-01-13<br \/><\/td><td>NPC Division B 2.2.10.8.<\/td><td>-<\/td><\/tr><tr><td>741<\/td><td>Automatic Shut-Off Sensors or Valves Serving Lavatories <\/td><td>Chown, Adaire, Consultant<\/td><td>2012-01-27<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-15<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-01-13<br \/><\/td><td>NECB Division B 6.2.6.2.(2)<\/td><td>-<\/td><\/tr><tr><td>740<\/td><td>Application of objectives in referenced code documents<\/td><td>Chown, Adaire, Consultant<\/td><td>2012-01-27<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-20<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2012-10-10<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2014-01-14<br \/><\/td><td>NBC Division A 1.5.1.1.<\/td><td>-<\/td><\/tr><tr><td>739<\/td><td>Handrails in indoor and outdoor places of assembly with fixed seats<\/td><td>Harper, Tammy, Office of the Fire Commissioner<\/td><td>2012-01-26<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-29<br \/><\/td><td>-<\/td><td>462 (published)<\/td><\/tr><tr><td>738<\/td><td>Cooking Stoves in High Risk Occupancies<\/td><td>Callahan,  Kevin, Pioneering Technology Corp<\/td><td>2012-01-24<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-26<br \/><\/td><td>NFC Division B 2.4.8.<\/td><td>-<\/td><\/tr><tr><td>737<\/td><td>Masonry Veneer of Hollow Units<\/td><td>Kelly, Patrick J., Hanson Brick<\/td><td>2012-01-16<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-28<br \/><\/td><td>NBC Division B 9.20.8.5.(1)<\/td><td>-<\/td><\/tr><tr><td>736<\/td><td>Ties for masonry veneer<\/td><td>Hatzinikolas, Michael A., Technical Committee on Connectors for Masonry (CSA A370)<\/td><td>2012-01-13<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-07-17<br \/><\/td><td>NBC Division B 9.20.9.5.,<br \/>NBC Division B 9.20.16.1.<\/td><td>1463 (published)<\/td><\/tr><tr><td>735<\/td><td>Test for Surface Burning Characteristics of Building Materials and Assemblies<\/td><td>Gunn, John, John C. Gunn Consulting<\/td><td>2012-01-12<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>734<\/td><td>Modification to the listing of cladding assemblies that are deemed to have a capillary break as required by sentence 5) of Article 9.27.2.2. in Division B<\/td><td>Owen, Nicholas  P. L. , Mitten Incorporated<\/td><td>2012-01-09<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-24<br \/><\/td><td>NBC Division B 9.27.2.2.<\/td><td>-<\/td><\/tr><tr><td>733<\/td><td>Fire Stops at Penetrations in Fire Separations and Fire Rated Assemblies<\/td><td>Lefort, Gordon<\/td><td>2012-01-08<\/td><td><strong>Received<\/strong><br \/>2012-02-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.9.1.<\/td><td>542<\/td><\/tr><tr><td>732<\/td><td>Add minimum Sound Transmission Class (STC) rating for windows and exterior doors to address noise generated outside of the building<\/td><td>Makaveev, Peter T., SNC-LAVALIN Inc.<\/td><td>2012-01-05<\/td><td><strong>Received<\/strong><br \/>2012-01-05<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-05-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.11.,<br \/>NBC Division B 5.9.<\/td><td>-<\/td><\/tr><tr><td>731<\/td><td>Insect Infestation Control Between Dwelling Units<\/td><td>Paris, Armando, Ultimate Bedding Company of Canada<\/td><td>2011-12-01<\/td><td><strong>Received<\/strong><br \/>2012-01-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-05-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-09-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-04-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>730<\/td><td>Water Temperature Control<\/td><td>Remedios, Sally<\/td><td>2011-12-15<\/td><td><strong>Received<\/strong><br \/>2012-01-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.10.7.(2)<\/td><td>482 (published)<\/td><\/tr><tr><td>729<\/td><td>Table A-9.10.3.1A Fire and Sound Resistance of Walls<\/td><td>Ciarlo, Salvatore, Owens Corning Canada LP<\/td><td>2011-12-14<\/td><td><strong>Received<\/strong><br \/>2011-12-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-02-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-05-07<br \/><\/td><td>NBC Division B A-9.10.3.1.A.<\/td><td>890 (published)<\/td><\/tr><tr><td>728<\/td><td>Burn prevention<\/td><td>Leins, Bernard J., Supportive Living, Alberta Health Edmonton Zone<\/td><td>2011-12-16<\/td><td><strong>Received<\/strong><br \/>2011-12-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B <\/td><td>-<\/td><\/tr><tr><td>727<\/td><td>Clarification of terminology for air-supported structure<\/td><td>Guilbeault, Jean-Fran\u00e7ois, Les Industries Harnois Inc<\/td><td>2011-12-13<\/td><td><strong>Received<\/strong><br \/>2011-12-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.15.2.(2),<br \/>NBC Division B 4.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>726<\/td><td>Alternative Standard for Mineral Wool Insulation for Roofing Applications - Part 5 and Part 9<\/td><td>Scott, John, International Firestop Council<\/td><td>2011-11-17<\/td><td><strong>Received<\/strong><br \/>2011-11-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-04-20<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2012-04-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-28<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.25.2.,<br \/>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>725<\/td><td>3.11.1.10. CCR 725 Fire Resistance and Sound Transmission Rating Tables for Wood-Frame Construction<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-11-14<\/td><td><strong>Received<\/strong><br \/>2011-11-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.1.7.1.(2)<\/td><td>743<\/td><\/tr><tr><td>724<\/td><td>Impact of Chimney height and location on adjacent buildings<\/td><td>Borooah, Ann, City of Toronto<\/td><td>2011-11-09<\/td><td><strong>Received<\/strong><br \/>2011-11-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-17<br \/><\/td><td>NBC Division B 9.21.4.4.(1)<\/td><td>-<\/td><\/tr><tr><td>723<\/td><td>Combustion Air Vents<\/td><td>Mitchinson, Vern, Home Choice Inspections Ltd.<\/td><td>2011-11-08<\/td><td><strong>Received<\/strong><br \/>2011-11-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-24<br \/><\/td><td>NBC Division B 9.32.,<br \/>NBC Division B 9.33.<\/td><td>-<\/td><\/tr><tr><td>722<\/td><td>Piping Going through Various Fire-Resistance Ratings without Protection<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-11-08<\/td><td><strong>Received<\/strong><br \/>2011-11-08<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-03-05<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-03-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-04-16<br \/><\/td><td>NPC Division B 2.4.2.3.<\/td><td>-<\/td><\/tr><tr><td>721<\/td><td>Polybutylene Pipes and Fittings <\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-11-04<\/td><td><strong>Received<\/strong><br \/>2011-11-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.4.<\/td><td>-<\/td><\/tr><tr><td>720<\/td><td>Commissioning of Life Safety and Fire Protection Systems (NFC)<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2011-10-30<\/td><td><strong>Received<\/strong><br \/>2011-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/><\/td><td>NFC Division B 2.1.3.8.<\/td><td>381 (published)<\/td><\/tr><tr><td>719<\/td><td>Commissioning of Life Safety and Fire Protection Systems (NBC)<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2011-10-30<\/td><td><strong>Received<\/strong><br \/>2011-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.2.4.6.,<br \/>NBC Division B 3.2.1.7.,<br \/>NBC Division B 9.10.1.2.<\/td><td>380 (published), 382 (published)<\/td><\/tr><tr><td>718<\/td><td> Firesttopping of Horizontal Service Spaces<\/td><td>May, Bill<\/td><td>2011-10-26<\/td><td><strong>Received<\/strong><br \/>2011-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-24<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 3.1.9.1.(3),<br \/>NBC Division B 9.10.9.6.<\/td><td>-<\/td><\/tr><tr><td>717<\/td><td>Protection of Underground Piping<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-10-18<\/td><td><strong>Received<\/strong><br \/>2011-10-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-09-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.3.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>716<\/td><td>Combustible Construction Up to 6 Storeys Group E Occupancy-#5 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.2.3.17.<\/td><td>-<\/td><\/tr><tr><td>715<\/td><td>Combustible Construction Up to 6 Storeys Group E Occupancy-#4<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.1.11.5.<\/td><td>-<\/td><\/tr><tr><td>714<\/td><td>Combustible Construction CWC Proposed Change #3<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.1.3.2.<\/td><td>-<\/td><\/tr><tr><td>713<\/td><td>Combustible Construction CWC Proposed Change #2 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>712<\/td><td>Combustible Construction CWC Proposed Change #1 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.63.<\/td><td>-<\/td><\/tr><tr><td>711<\/td><td>Combustible Construction Up to 6 Storeys Group D Occupancy-#6<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.2.3.17.<\/td><td>-<\/td><\/tr><tr><td>710<\/td><td>Combustible Construction Up to 6 Storeys Group D Occupancy-#5<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.1.11.5.<\/td><td>-<\/td><\/tr><tr><td>709<\/td><td>Combustible Construction CWC Proposed Change #4 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.1.3.2.<\/td><td>332 (published)<\/td><\/tr><tr><td>708<\/td><td>Combustible Construction CWC Proposed Change #3 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>707<\/td><td>Combustible Construction CWC Proposed Change #2<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>156 (published)<\/td><\/tr><tr><td>706<\/td><td>Combustible Construction CWC Proposed Change #1<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.<\/td><td>161 (published)<\/td><\/tr><tr><td>705<\/td><td>Combustible Construction Up to 6 Storeys Group C Occupancy-#10 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-01<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.2.3.17.<\/td><td>-<\/td><\/tr><tr><td>704<\/td><td>Combustible Construction CWC Proposed Change #9 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.2.1.4.<\/td><td>150<\/td><\/tr><tr><td>703<\/td><td>Combustible Construction CWC Proposed Change #8  <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.11.5.<\/td><td>148 (published)<\/td><\/tr><tr><td>702<\/td><td>Combustible Construction CWC Proposed Change #7<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.1.3.2.<\/td><td>147 (published)<\/td><\/tr><tr><td>701<\/td><td>Combustible Construction CWC Proposed Change #6 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.3.4.2.<\/td><td>160<\/td><\/tr><tr><td>700<\/td><td>Combustible Construction CWC Proposed Change #5<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.8.<\/td><td>-<\/td><\/tr><tr><td>699<\/td><td>Combustible Construction CWC Proposed Change #4<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.1.6.<\/td><td>-<\/td><\/tr><tr><td>698<\/td><td>Combustible Construction CWC Proposed Change #3 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>697<\/td><td>Combustible Construction CWC Proposed Change #2 <\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.50.<\/td><td>154 (published)<\/td><\/tr><tr><td>696<\/td><td>Combustible Construction CWC Proposed Change #1<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2011-03-21<\/td><td><strong>Received<\/strong><br \/>2011-03-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 3.2.2.48.<\/td><td>146 (published), 153 (published)<\/td><\/tr><tr><td>695<\/td><td>Walls supporting solid masonry superstructure<\/td><td>Antonio, Allan, ACA Engineering Services<\/td><td>2011-10-13<\/td><td><strong>Received<\/strong><br \/>2011-10-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-25<br \/><\/td><td>NBC Division B 9.15.4.3.(2)<\/td><td>-<\/td><\/tr><tr><td>694<\/td><td>Exit Signs - Interpretation of Codes and CAN\/ULC-S572 Standard<\/td><td>Farley, Michele, FCS Fire Consulting Services Ltd.<\/td><td>2011-10-05<\/td><td><strong>Received<\/strong><br \/>2011-10-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-29<br \/><\/td><td>NBC Division B 3.4.5.1.,<br \/>NBC Division B 9.9.11.3.<\/td><td>236, 237<\/td><\/tr><tr><td>693<\/td><td>Allowable Fenestration and Door Area by Building Type<\/td><td>Wilson, Keith, Keith E. Wilson Consulting Services<\/td><td>2011-09-29<\/td><td><strong>Received<\/strong><br \/>2011-09-29<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-20<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-15<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2016-02-03<br \/><\/td><td>NECB Division B 3.2.1.4.(1)<\/td><td>-<\/td><\/tr><tr><td>692<\/td><td>Sheet Steel Material Provisions<\/td><td>Fox, Steven R., Canadian Sheet Steel Building Institute<\/td><td>2011-09-28<\/td><td><strong>Received<\/strong><br \/>2011-09-28<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-06-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-09-17<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.27.11.1.(2),<br \/>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>691<\/td><td>CGSB 93.4-M91 out of date - reference CSSBI 23M-11, Standard for Residential Steel Cladding.\"<\/td><td>Fox, Steven R., Canadian Sheet Steel Building Institute<\/td><td>2011-09-28<\/td><td><strong>Received<\/strong><br \/>2011-09-28<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-06-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-09-17<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.27.11.1.(2),<br \/>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>690<\/td><td>Drinking Fountain Accessibility<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-03-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-02-19<br \/><\/td><td>NBC Division B 3.8.3.16.<\/td><td>1533 (published), 1551 (published)<\/td><\/tr><tr><td>689<\/td><td>Universal Change Rooms<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-19<br \/><\/td><td>-<\/td><td>1554 (published)<\/td><\/tr><tr><td>688<\/td><td>Lavatories<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-02-19<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>687<\/td><td>Doorway and Maneuvering Space<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-19<br \/><\/td><td>-<\/td><td>1344 (published)<\/td><\/tr><tr><td>686<\/td><td>Barrier Free Access to Raised and Sunken Levels<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-19<br \/><\/td><td>-<\/td><td>1481 (published)<\/td><\/tr><tr><td>685<\/td><td>Unobstructed Width, Interior Barrier Free Paths of Travel<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-19<br \/><\/td><td>-<\/td><td>1532 (published), 1563 (published), 1565 (published), 1765<\/td><\/tr><tr><td>684<\/td><td>Protection on Floor Areas in a Barrier Free Path of Travel<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2015-02-19<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.3.1.7.<\/td><td>-<\/td><\/tr><tr><td>683<\/td><td>Description of Fire Alarm Systems - mandatory visual signaling<\/td><td>Seward, Ulrik, City of Calgary<\/td><td>2011-09-27<\/td><td><strong>Received<\/strong><br \/>2011-09-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-29<br \/><\/td><td>NBC Division B 3.2.4.4.,<br \/>NBC Division B 9.10.18.2.<\/td><td>434 (published)<\/td><\/tr><tr><td>682<\/td><td>Protection of Adjacent Buildings<\/td><td>Schultz, Bruce W., City of Calgary<\/td><td>2011-09-23<\/td><td><strong>Received<\/strong><br \/>2011-09-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-11-21<br \/><\/td><td>NFC Division B 5.6.1.2.<\/td><td>-<\/td><\/tr><tr><td>681<\/td><td>Spatial Separation\u2013Remove the Reference to Fire Department Response Time for Houses<\/td><td>Schultz, Bruce W., City of Calgary<\/td><td>2011-09-23<\/td><td><strong>Received<\/strong><br \/>2011-09-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-02-22<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 9.10.15.<\/td><td>791 (published), 856 (published), 894<\/td><\/tr><tr><td>680<\/td><td>Change Footnote 22 to replace minimum thickness of truss plates from 1 mm to 0.90 mm.<\/td><td>Baynit, Robert A., TPIC<\/td><td>2011-09-22<\/td><td><strong>Received<\/strong><br \/>2011-09-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-25<br \/><\/td><td>NBC Division B A-9.10.3.1.<\/td><td>-<\/td><\/tr><tr><td>679<\/td><td>Number of fixtures served on a wet vented system <\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-09-19<\/td><td><strong>Received<\/strong><br \/>2011-09-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2015-03-12<br \/><\/td><td>NPC Division B 2.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>678<\/td><td>Required Ventilation Rates of Outdoor Air Intake<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2011-09-19<\/td><td><strong>Received<\/strong><br \/>2011-09-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-08-24<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>677<\/td><td>Fire Protection of Clean Rooms<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.3.6.10.,<br \/>NBC Division B 9.10.<\/td><td>-<\/td><\/tr><tr><td>676<\/td><td>Fire Damper Maintenance<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-02-22<br \/><\/td><td>NBC Division B 3.1.8.7.(1),<br \/>NBC Division B 3.1.8.9.,<br \/>NBC Division B 9.10.13.1.(1),<br \/>NBC Division B 3.1.8.9.(5),<br \/>NFC Division B 2.2.2.4.(5)<\/td><td>391 (published)<\/td><\/tr><tr><td>675<\/td><td>High Challenge Firewalls<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.10.<\/td><td>-<\/td><\/tr><tr><td>674<\/td><td>Combustible Dust<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-06-12<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-05-12<br \/><\/td><td>NFC Division B 5.3.<\/td><td>164<\/td><\/tr><tr><td>673<\/td><td>Safety within Floor Areas-Repair and Storage Garages<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.3.5.4.,<br \/>NBC Division B 3.3.5.5.,<br \/>NBC Division B 3.3.5.6.,<br \/>NFC Division B 3.3.5.7.<\/td><td>-<\/td><\/tr><tr><td>672<\/td><td>3.11.1.4 CCR 672 Roller Latches in Group B Occupancy<\/td><td>Tracey, Sean, NFPA<\/td><td>2011-09-16<\/td><td><strong>Received<\/strong><br \/>2011-09-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.3.3.5.(12)<\/td><td>-<\/td><\/tr><tr><td>671<\/td><td>Exception for photluminescent exit signs <\/td><td>Troughton, Martin, PNA Group Inc.<\/td><td>2011-09-09<\/td><td><strong>Received<\/strong><br \/>2011-09-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-29<br \/><\/td><td>NBC Division B 9.9.11.3.<\/td><td>236, 237<\/td><\/tr><tr><td>670<\/td><td>Illuminate exit signs only during occupied time<\/td><td>Troughton, Martin, PNA Group Inc.<\/td><td>2011-09-09<\/td><td><strong>Received<\/strong><br \/>2011-09-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-29<br \/><\/td><td>NBC Division B 9.9.11.,<br \/>NBC Division B 3.4.5.1.(4)<\/td><td>236, 237<\/td><\/tr><tr><td>669<\/td><td>Lead content<\/td><td>Par\u00e9, Pierre, Watts Water Technologies (Canada) Inc.<\/td><td>2011-09-09<\/td><td><strong>Received<\/strong><br \/>2011-09-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.1.<\/td><td>-<\/td><\/tr><tr><td>668<\/td><td>Assess Increased Insulation Thickness for Attic Hatches<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2011-01-17<\/td><td><strong>Received<\/strong><br \/>2011-01-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-02-14<br \/><\/td><td>NBC Division B 9.19.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>667<\/td><td>Safe Working Access<\/td><td>Antoniow, Greg M.<\/td><td>2011-08-26<\/td><td><strong>Received<\/strong><br \/>2011-08-26<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-08-24<br \/>HVAC and Plumbing: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-04-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 6.2.1.8.<\/td><td>-<\/td><\/tr><tr><td>666<\/td><td>Protection against thermal expansion<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-08-05<\/td><td><strong>Received<\/strong><br \/>2011-08-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-09-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-03-12<br \/><\/td><td>NPC Division B 2.6.1.11.(1)<\/td><td>-<\/td><\/tr><tr><td>665<\/td><td>Oil Interceptors<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-08-05<\/td><td><strong>Received<\/strong><br \/>2011-08-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.5.5.2.(5)<\/td><td>-<\/td><\/tr><tr><td>664<\/td><td>Fire Drills in Laboratories<\/td><td>Burns, Michael J.<\/td><td>2011-07-19<\/td><td><strong>Received<\/strong><br \/>2011-07-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-06<br \/><\/td><td>NFC Division B 5.5.3.1.(2)<\/td><td>513 (published)<\/td><\/tr><tr><td>663<\/td><td>CPVC Pipe, Fittings and Solvent Cements<\/td><td>Gill, Larry J., IPEX Management Inc.<\/td><td>2011-11-29<\/td><td><strong>Received<\/strong><br \/>2011-11-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.5.9.<\/td><td>199 (published)<\/td><\/tr><tr><td>662<\/td><td>Control of Static Electric Charge<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2011-07-04<\/td><td><strong>Received<\/strong><br \/>2011-07-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.1.8.2.<\/td><td>-<\/td><\/tr><tr><td>661<\/td><td>Revisions to Drainage and Venting System Figures <\/td><td>Charney, Robert, Red River College<\/td><td>2011-06-27<\/td><td><strong>Received<\/strong><br \/>2011-06-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division B 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>660<\/td><td>Vent Size for Building Drain<\/td><td>Charney, Robert, Red River College<\/td><td>2011-06-27<\/td><td><strong>Received<\/strong><br \/>2011-06-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.5.8.4.(5)<\/td><td>-<\/td><\/tr><tr><td>659<\/td><td>Traps for Sanitary Drainage Systems<\/td><td>Kuhl, Len, Red River College<\/td><td>2011-06-23<\/td><td><strong>Received<\/strong><br \/>2011-06-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.5.1.<\/td><td>-<\/td><\/tr><tr><td>658<\/td><td>Update to Referenced Standards for Packaged Solar Domestic Hot Water Systems<\/td><td>Singlehurst, Robert, Singlehurst Solar<\/td><td>2011-06-22<\/td><td><strong>Received<\/strong><br \/>2011-06-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2012-02-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy) <\/strong><br \/>2012-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2012-09-20<br \/><\/td><td>NPC Division B 2.2.10.13.(1),<br \/>NPC Division B 2.6.1.8.(1),<br \/>NECB Division B 6.2.2.3.(1)<\/td><td>-<\/td><\/tr><tr><td>657<\/td><td>Require Load Bearing Warning Sign<\/td><td>St Denis, Dennis  R.<\/td><td>2011-06-21<\/td><td><strong>Received<\/strong><br \/>2011-06-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-14<br \/><\/td><td>NBC Division B 9.23.<\/td><td>-<\/td><\/tr><tr><td>656<\/td><td>Harmonize number of required exits with Part 3<\/td><td>LeLacheur, Glen, Halifax Regional Municipality<\/td><td>2011-06-21<\/td><td><strong>Received<\/strong><br \/>2011-06-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-25<br \/><\/td><td>NBC Division B 9.9.7.4.(1)<\/td><td>-<\/td><\/tr><tr><td>655<\/td><td>Exterior Guard Loads Serving Dwelling Units of Non-Part 9 Buildings<\/td><td>Taraschuk, Cathy, NRC<\/td><td>2011-06-16<\/td><td><strong>Received<\/strong><br \/>2011-06-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-05-29<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-04<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.3.4.7.(2)<\/td><td>-<\/td><\/tr><tr><td>654<\/td><td>Guard Loads Serving Dwelling Units of Non-Part 9 Buildings<\/td><td>Taraschuk, Cathy, NRC<\/td><td>2011-06-16<\/td><td><strong>Received<\/strong><br \/>2011-06-16<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-05-29<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-04<br \/><\/td><td>NBC Division B 3.3.4.7.(1)<\/td><td>-<\/td><\/tr><tr><td>653<\/td><td>Attachment of water closet<\/td><td>Rawalpindiwala, Shabbir , Kohler Co.<\/td><td>2011-05-17<\/td><td><strong>Received<\/strong><br \/>2011-05-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.10.2.,<br \/>NPC Division B 2.3.3.8.<\/td><td>675 (published), 676 (published)<\/td><\/tr><tr><td>652<\/td><td>Air Leakage of Doors<\/td><td>Hetzel, Joseph R., DASMA<\/td><td>2011-05-09<\/td><td><strong>Received<\/strong><br \/>2011-05-09<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-09-20<br \/>Energy Efficiency: <strong>Reviewed (legacy) <\/strong><br \/>2013-02-28<br \/><\/td><td>NECB Division B 3.2.4.4.<\/td><td>1414 (published)<\/td><\/tr><tr><td>651<\/td><td>Solar Collectors<\/td><td>Terhove, Dennis C, City of Calgary<\/td><td>2011-04-18<\/td><td><strong>Received<\/strong><br \/>2011-04-18<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-10-10<br \/><\/td><td>NFC Division B 2.6.,<br \/>NFC Division A 1.4.1.2.(1)<\/td><td>163, 169<\/td><\/tr><tr><td>650<\/td><td>Definition of \"storey\"<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-04-15<\/td><td><strong>Received<\/strong><br \/>2011-04-15<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2013-10-25<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-01<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>933, 932 (published)<\/td><\/tr><tr><td>649<\/td><td>Backwater Valve in the Discharge Pipe from every Pumped Sump<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2011-04-14<\/td><td><strong>Received<\/strong><br \/>2011-04-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.6.3.(6)<\/td><td>-<\/td><\/tr><tr><td>648<\/td><td>Permitted Size and Spacing of Cleanouts<\/td><td>Coates, Aaron<\/td><td>2011-04-06<\/td><td><strong>Received<\/strong><br \/>2011-04-06<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.7.<\/td><td>440 (published)<\/td><\/tr><tr><td>647<\/td><td>Atmospheric Storage Tanks<\/td><td>Hamel, Denis, Canadian Association of Chemical Distributors Western Chapter<\/td><td>2011-04-01<\/td><td><strong>Received<\/strong><br \/>2011-04-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.3.1.2.<\/td><td>750 (published)<\/td><\/tr><tr><td>646<\/td><td>Metal, Material Standards - Replace CGSB 93.1 with CSSBI-23M, \"Standard for Residential Steel Cladding.<\/td><td>Fox, Steven R., Canadian Sheet Steel Building Institute<\/td><td>2011-03-25<\/td><td><strong>Received<\/strong><br \/>2011-03-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-26<br \/><\/td><td>NBC Division B 9.27.11.1.(2),<br \/>NBC Division B 9.27.11.1.(4)<\/td><td>-<\/td><\/tr><tr><td>645<\/td><td>3.11.1.3.  9.25.2.2. Update to Latest CAN\/ULC S703-09 CCR 645 <\/td><td>Holzscherer, Craig, Therm-O-Comfort Co. Ltd<\/td><td>2011-02-28<\/td><td><strong>Received<\/strong><br \/>2011-02-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-01<br \/><\/td><td>NBC Division B 1.3.1.2.,<br \/>NBC Division B 9.25.2.2.,<br \/>NBC Division B 5.10.1.1.,<br \/>NBC Division B D<\/td><td>-<\/td><\/tr><tr><td>644<\/td><td>Grease Interceptors Compliance Standards<\/td><td>Par\u00e9, Pierre, Watts Water Technologies (Canada) Inc.<\/td><td>2011-02-25<\/td><td><strong>Received<\/strong><br \/>2011-02-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.3.2.<\/td><td>478 (published)<\/td><\/tr><tr><td>643<\/td><td>Fire Separation between Suites of Group D Occupancy<\/td><td>Sadafi, Asma, City of Surrey<\/td><td>2011-02-25<\/td><td><strong>Received<\/strong><br \/>2011-02-25<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2011-11-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2012-04-25<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2022-05-04<br \/><\/td><td>NBC Division B 3.3.1.1.(1),<br \/>NBC Division B 9.10.9.13.(1)<\/td><td>-<\/td><\/tr><tr><td>642<\/td><td>Clearances<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.7.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>641<\/td><td>Card or Key-Activated Dispensers<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.6.8.4.<\/td><td>-<\/td><\/tr><tr><td>640<\/td><td>Outside Aboveground Storage Tanks<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-17<br \/><\/td><td>NFC Division B 4.6.2.1.(4)<\/td><td>498 (published)<\/td><\/tr><tr><td>639<\/td><td>Piping Systems in Fuel-Dispensing Stations<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2019-08-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2020-07-16<br \/><\/td><td>NFC Division B 4.5.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>638<\/td><td>Notes to Table 4.4.1.2.C.<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.4.1.2.C.<\/td><td>640 (published)<\/td><\/tr><tr><td>637<\/td><td>Notes to Table 4.4.1.2.B.<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.4.1.2.B.<\/td><td>288 (published)<\/td><\/tr><tr><td>636<\/td><td>Notes to Table 4.4.1.2.A <\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 4.4.1.2.A.<\/td><td>-<\/td><\/tr><tr><td>635<\/td><td>Frequency and Methods of Leak Detection Testing and Monitoring<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 4.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>634<\/td><td>Dispenser and Spill Containment Sumps Construction and Leak Detection Monitoring<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2017-06-30<br \/><\/td><td>NFC Division B 4.3.10.2.,<br \/>NFC Division B 4.3.10.3.<\/td><td>-<\/td><\/tr><tr><td>633<\/td><td>Individual Storage Tank Capacity<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 4.3.7.4.(2)<\/td><td>71 (published)<\/td><\/tr><tr><td>632<\/td><td>Overfill Protection<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 4.3.1.8.(2)<\/td><td>-<\/td><\/tr><tr><td>631<\/td><td>Atmospheric Storage Tanks<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.3.1.2.(2)<\/td><td>172 (published)<\/td><\/tr><tr><td>630<\/td><td>3.11.1. CCR 630 - Application Statement<\/td><td>Edgecombe, Don, Petroleum Tank Management Association of Alberta<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-07-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-18<br \/><\/td><td>NFC Division B 4.1.1.1.(3)<\/td><td>1109 (published)<\/td><\/tr><tr><td>629<\/td><td>CCR 629 Roof Covering Classification<\/td><td>Frater, George S., Canadian Steel Construction Council<\/td><td>2010-12-14<\/td><td><strong>Received<\/strong><br \/>2010-12-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.15.2.<\/td><td>312 (published)<\/td><\/tr><tr><td>628<\/td><td>Combustible DWV Piping Penetrations<\/td><td>Scott, John, International Firestop Council<\/td><td>2011-03-24<\/td><td><strong>Received<\/strong><br \/>2011-03-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-05<br \/><\/td><td>NBC Division B 3.1.9.4.(4),<br \/>NBC Division B 9.10.7.3.(3)<\/td><td>-<\/td><\/tr><tr><td>627<\/td><td>Air Admittance Valves<\/td><td>Beuschel, Jack, Studor, Inc.<\/td><td>2011-01-27<\/td><td><strong>Received<\/strong><br \/>2011-01-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.5.9.<\/td><td>-<\/td><\/tr><tr><td>626<\/td><td>Reference CSA-B651 Accessibility Design<\/td><td>Smart, Catherine<\/td><td>2011-01-10<\/td><td><strong>Received<\/strong><br \/>2011-02-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2014-04-10<br \/><\/td><td>NBC Division B 9.5.2.1.<\/td><td>836 (published)<\/td><\/tr><tr><td>625<\/td><td>Energy efficient ventilation and dryer traps <\/td><td>Blanchard, Normand N.B<\/td><td>2011-01-06<\/td><td><strong>Received<\/strong><br \/>2011-01-06<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-12-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-02-14<br \/><\/td><td>NBC Division B 9.36.<\/td><td>-<\/td><\/tr><tr><td>624<\/td><td>9.8.8.6. Design to Prevent Climbing<\/td><td>Bezdan, Margaret, Geo. Bezdan Sales Ltd.<\/td><td>2011-01-10<\/td><td><strong>Received<\/strong><br \/>2011-01-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-12-20<br \/>Use and Egress: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.8.8.6.<\/td><td>558 (published), 453<\/td><\/tr><tr><td>623<\/td><td>Moving Plumbing related NBC provisions into the NPC<\/td><td>Gagnier, Eric, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2010-12-09<\/td><td><strong>Received<\/strong><br \/>2010-12-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-09-12<br \/><\/td><td>NBC Division B 9.14.5.2.<\/td><td>-<\/td><\/tr><tr><td>622<\/td><td>Introduction of One Plant Unit for Every 100 sq. ft. of Occupied Space in Buildings<\/td><td>Klose, Liz, Canadian Nursery Landscape Association<\/td><td>2010-12-01<\/td><td><strong>Received<\/strong><br \/>2010-12-01<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-01-17<br \/><\/td><td>NBC Division B 6.3.1.6.<\/td><td>-<\/td><\/tr><tr><td>621<\/td><td>Introduction of One Plant Unit for Every 100 sq. ft. of Occupied Space in Buildings<\/td><td>Klose, Liz, Canadian Nursery Landscape Association<\/td><td>2010-11-24<\/td><td><strong>Received<\/strong><br \/>2010-11-24<br \/><\/td><td>NBC Division B 63.1.6.<\/td><td>-<\/td><\/tr><tr><td>620<\/td><td>Introduction of One Plant Unit for Every 100 sq. ft. of Occupied Space in Buildings<\/td><td>Klose, Liz, Canadian Nursery Landscape Association<\/td><td>2010-11-24<\/td><td><strong>Received<\/strong><br \/>2010-11-24<br \/><\/td><td>NBC Division B 6.3.1.6.<\/td><td>-<\/td><\/tr><tr><td>619<\/td><td>Introduction of One Plant Unit for Every 100 sq. ft. of Occupied Space in Buildings<\/td><td>Klose, Liz, Canadian Nursery Landscape Association<\/td><td>2010-11-24<\/td><td><strong>Received<\/strong><br \/>2010-11-24<br \/><\/td><td>NBC Division B 6.3.1.6.<\/td><td>-<\/td><\/tr><tr><td>618<\/td><td>Shut-off valves <\/td><td>Bartlett, Sean, RJ Bartlett Engineering Ltd<\/td><td>2010-11-16<\/td><td><strong>Received<\/strong><br \/>2010-11-16<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.6.1.3.<\/td><td>-<\/td><\/tr><tr><td>617<\/td><td>Cabling in Air Plenums<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2010-11-12<\/td><td><strong>Received<\/strong><br \/>2010-11-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.1.5.18.<\/td><td>765 (published)<\/td><\/tr><tr><td>616<\/td><td>Minimum Fire Rating of Cables<\/td><td>Kapuscinski, Marek, NAIMA Canada<\/td><td>2010-11-12<\/td><td><strong>Received<\/strong><br \/>2010-11-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.1.5.18.<\/td><td>765 (published)<\/td><\/tr><tr><td>615<\/td><td>Standardize the openings between balusters of guards installed in \"INDUSTRIAL\"  buildings.<\/td><td>Delisle, Sebastien<\/td><td>2010-10-26<\/td><td><strong>Received<\/strong><br \/>2010-10-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-05<br \/><\/td><td>-<\/td><td>334 (published), 337 (published)<\/td><\/tr><tr><td>614<\/td><td>Mid-Rise 5- to 6-Storeys Combustible Construction<\/td><td>Vasey, Jeff, MSD - Building and Safety Standards Branch<\/td><td>2010-10-22<\/td><td><strong>Received<\/strong><br \/>2010-10-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3<\/td><td>-<\/td><\/tr><tr><td>613<\/td><td>Spatial Separation - Unprotected openings <\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2010-10-12<\/td><td><strong>Received<\/strong><br \/>2010-10-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-25<br \/><\/td><td>NBC Division B 9.10.15.4.(1)<\/td><td>-<\/td><\/tr><tr><td>612<\/td><td>Fire Blocks in Concealed Spaces <\/td><td>Nowlan, Mark A, City of Fredericton Fire Department<\/td><td>2010-04-10<\/td><td><strong>Received<\/strong><br \/>2010-04-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.1.11.5.<\/td><td>-<\/td><\/tr><tr><td>611<\/td><td>Add a new section 4.3.7: Roofing Coverings<\/td><td>Baskaran, Bas, NRC<\/td><td>2010-10-12<\/td><td><strong>Received<\/strong><br \/>2010-10-12<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2010-11-12<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-08<br \/><\/td><td>NBC Division B 4.3.<\/td><td>-<\/td><\/tr><tr><td>610<\/td><td>Add SFRS: Ductile Friction-Damped Braced Frames under Steel Structures as well as under Concrete Structures<\/td><td>Pall, Avtar, Pall Dynamics Limited<\/td><td>2010-09-14<\/td><td><strong>Received<\/strong><br \/>2010-09-15<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-11-29<br \/><\/td><td>NBC Division B 4.1.8.9.(1)<\/td><td>-<\/td><\/tr><tr><td>609<\/td><td>Electrical wiring, conduit and outlet boxes penetrating required fire separation<\/td><td>Bortolussi, Rick, Townline Group<\/td><td>2010-08-26<\/td><td><strong>Received<\/strong><br \/>2010-08-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-07-16<br \/><\/td><td>NBC Division B 9.10.9.6.(1)<\/td><td>-<\/td><\/tr><tr><td>608<\/td><td>Review Appendix D for Fire-resistance and Fire-protection Ratings<\/td><td>Bortolussi, Rick, Townline Group<\/td><td>2010-08-26<\/td><td><strong>Received<\/strong><br \/>2010-08-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2010-08-26<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.3.1.,<br \/>NBC Division B D-2.3.<\/td><td>-<\/td><\/tr><tr><td>607<\/td><td>Address foundation drainage for small detached garages<\/td><td>Bortolussi, Rick, Townline Group<\/td><td>2010-08-26<\/td><td><strong>Received<\/strong><br \/>2010-08-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-18<br \/><\/td><td>NBC Division B 9.35.1.1.<\/td><td>807 (published)<\/td><\/tr><tr><td>606<\/td><td>Wind on Tall Buildings<\/td><td>Chan, Peter K.S., City of Toronto<\/td><td>2010-08-27<\/td><td><strong>Received<\/strong><br \/>2010-08-27<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-08-29<br \/><\/td><td>NBC Division B 4.1.7.<\/td><td>-<\/td><\/tr><tr><td>605<\/td><td>Vibration and Dynamic Effects of Wind<\/td><td>Chan, Peter K.S., City of Toronto<\/td><td>2010-08-16<\/td><td><strong>Received<\/strong><br \/>2010-08-16<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-08-29<br \/><\/td><td>NBC Division B 4.1.7.2.<\/td><td>-<\/td><\/tr><tr><td>604<\/td><td>Smoke control and mechanical ventilation from storage garages<\/td><td>Collins, Marsh, Winnipeg Fire Paramedic Services<\/td><td>2010-08-14<\/td><td><strong>Received<\/strong><br \/>2010-08-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NFC Division B 2.15.<\/td><td>-<\/td><\/tr><tr><td>603<\/td><td>Guard Height<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>1993-06-04<\/td><td><strong>Received<\/strong><br \/>1993-06-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-09<br \/><\/td><td>-<\/td><td>472 (published)<\/td><\/tr><tr><td>602<\/td><td>Angled\/tapered\/Winder Treads<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>1993-06-04<\/td><td><strong>Received<\/strong><br \/>1993-06-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2010-11-09<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-05<br \/><\/td><td>-<\/td><td>700 (published), 701 (published), 702 (published), 703 (published)<\/td><\/tr><tr><td>601<\/td><td>Step Dimensions in Dwelling Units<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>1993-06-04<\/td><td><strong>Received<\/strong><br \/>1993-06-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>1993-06-30<br \/><\/td><td>NBC Division B 9.8.<\/td><td>-<\/td><\/tr><tr><td>600<\/td><td>Electronmagnetic Locks in Care Occupancies and Standards<\/td><td>Nobes, Tim, B. D. Stevens Limited<\/td><td>2010-07-21<\/td><td><strong>Received<\/strong><br \/>2010-07-21<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-11-16<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>599<\/td><td>solar water heating systems<\/td><td>Singlehurst, Robert, EnerWorks Inc.<\/td><td>2010-06-18<\/td><td><strong>Received<\/strong><br \/>2010-06-18<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-04-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.10.13.(1),<br \/>NPC Division B 2.6.1.8.(1)<\/td><td>-<\/td><\/tr><tr><td>598<\/td><td>Stainless Steel Pipe and Fitting<\/td><td>Ouellette, Francis, Groupe Beaudoin inc,<\/td><td>2010-05-18<\/td><td><strong>Received<\/strong><br \/>2010-05-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>597<\/td><td>Capacity and Sound Ratings for Residential Fans<\/td><td>Orris, Tim, Air Movement &amp; Control Association International Inc.<\/td><td>2010-05-13<\/td><td><strong>Received<\/strong><br \/>2010-05-13<br \/><\/td><td>NBC Division B 9.32.3.10.<\/td><td>-<\/td><\/tr><tr><td>596<\/td><td>Green Exit Signs<\/td><td>Greenidge, Frank, Greensco Marketing<\/td><td>2010-05-12<\/td><td><strong>Received<\/strong><br \/>2010-05-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>595<\/td><td>Re-Structuring of the Sentences in Article 3.3.1.3 <\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2010-04-22<\/td><td><strong>Received<\/strong><br \/>2010-04-22<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>594<\/td><td>Protection of Fire Fighters<\/td><td>Marks, Scott, International Association of Fire Fighters (IAFF)<\/td><td>2010-04-12<\/td><td><strong>Received<\/strong><br \/>2010-04-12<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-12-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>593<\/td><td>Combustible Insulation and Its Protection<\/td><td>Boyer, Rockford, Roxul Inc<\/td><td>2010-03-30<\/td><td><strong>Received<\/strong><br \/>2010-03-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.1.5.12.<\/td><td>-<\/td><\/tr><tr><td>592<\/td><td>Metal Roof Deck Assemblies<\/td><td>Boyer, Rockford, Roxul Inc<\/td><td>2010-03-30<\/td><td><strong>Received<\/strong><br \/>2010-03-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.1.14.2.<\/td><td>-<\/td><\/tr><tr><td>591<\/td><td>Roof Coverings<\/td><td>Boyer, Rockford, Roxul Inc<\/td><td>2010-03-30<\/td><td><strong>Received<\/strong><br \/>2010-03-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.1.15.2.<\/td><td>-<\/td><\/tr><tr><td>590<\/td><td>Exhaust Duct Systems from More than One Fire Compartment<\/td><td>Wagner, Jim, Parks Canada<\/td><td>2010-03-23<\/td><td><strong>Received<\/strong><br \/>2010-03-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-04-15<br \/><\/td><td>NBC Division B 6.2.3.8.(13)<\/td><td>-<\/td><\/tr><tr><td>589<\/td><td>Safe Working Access<\/td><td>Chafe, Ron<\/td><td>2010-03-22<\/td><td><strong>Received<\/strong><br \/>2010-04-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-08-24<br \/>HVAC and Plumbing: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-04-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 6.2.1.8.<\/td><td>-<\/td><\/tr><tr><td>588<\/td><td>Doors in fire separations<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-03-01<\/td><td><strong>Received<\/strong><br \/>2010-03-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NFC Division B 2.2.2.1.<\/td><td>-<\/td><\/tr><tr><td>587<\/td><td>Section 4.6 Application  to Class 2.1 gases<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-03-22<\/td><td><strong>Received<\/strong><br \/>2010-03-22<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2011-03-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.6.1.1.<\/td><td>-<\/td><\/tr><tr><td>586<\/td><td>Visual Fire Alarm Signal Devices<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-02-25<\/td><td><strong>Received<\/strong><br \/>2010-02-25<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-28<br \/><\/td><td>NBC Division B 3.2.4.21.<\/td><td>488 (published)<\/td><\/tr><tr><td>585<\/td><td>Mens Washroom Privacy<\/td><td>Suzara, Imelda Ortega, http:\/\/immortalinvestmentsinternational.com<\/td><td>2010-02-25<\/td><td><strong>Received<\/strong><br \/>2010-02-25<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-05-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>584<\/td><td>National Farm Building Code of Canada<\/td><td>Yeoman, Leslie<\/td><td>2010-03-09<\/td><td><strong>Received<\/strong><br \/>2010-03-09<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-02<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-10-01<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-02-09<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>583<\/td><td>Referenced Standard for Nails<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2010-04-12<\/td><td><strong>Received<\/strong><br \/>2010-04-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2010-04-12<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.23.3.1.<\/td><td>67 (published)<\/td><\/tr><tr><td>582<\/td><td>Exemption for food and pharmaceutical products in closed containers<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-04-27<\/td><td><strong>Received<\/strong><br \/>2010-05-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-17<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2016-10-19<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-08-20<br \/><\/td><td>NFC Division B 4.2.1.1.(2)<\/td><td>-<\/td><\/tr><tr><td>581<\/td><td>Slope of Drain Pipe<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2010-01-18<\/td><td><strong>Received<\/strong><br \/>2010-01-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.8.1.<\/td><td>-<\/td><\/tr><tr><td>580<\/td><td>Maximum Permitted Hydraulic Load Drained to a Sanitary Building Drain or Sewer<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2010-01-18<\/td><td><strong>Received<\/strong><br \/>2010-01-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.10.6.<\/td><td>-<\/td><\/tr><tr><td>579<\/td><td>Slope of Drain Pipe<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2010-01-18<\/td><td><strong>Received<\/strong><br \/>2010-01-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-09-12<br \/><\/td><td>NPC Division B 2.4.8.1.(1)<\/td><td>-<\/td><\/tr><tr><td>578<\/td><td>erosol vapour mist with fluorescent dye<\/td><td>Checkel, David, Mechanical Engineering Department. University of Alberta<\/td><td>2010-02-12<\/td><td><strong>Received<\/strong><br \/>2010-02-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-09-12<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2016-10-04<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-07<br \/><\/td><td>NPC Division B 3.6.5.,<br \/>NPC Division B 3.6.6.<\/td><td>-<\/td><\/tr><tr><td>577<\/td><td>electromagnetic locks in impeded egress zones and contained use areas<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-01-22<\/td><td><strong>Received<\/strong><br \/>2010-01-22<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-28<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-29<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>576<\/td><td>electromagnetic locks on access to exit doors<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2010-01-22<\/td><td><strong>Received<\/strong><br \/>2010-01-22<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-28<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-28<br \/><\/td><td>-<\/td><td>194 (published)<\/td><\/tr><tr><td>575<\/td><td>Drainage Piping<\/td><td>Warnecke, Don, Integra Mechanical Services<\/td><td>2009-11-24<\/td><td><strong>Received<\/strong><br \/>2009-11-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-08-24<br \/><\/td><td>NPC Division B 2.4.9.3.,<br \/>NPC Division B 2.4.10.2.<\/td><td>-<\/td><\/tr><tr><td>574<\/td><td>Lavatory - Domestic Type<\/td><td>Warnecke, Don, Integra Mechanical Services<\/td><td>2009-11-24<\/td><td><strong>Received<\/strong><br \/>2009-11-24<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-08-24<br \/><\/td><td>NPC Division B 2.4.9.3.(1)<\/td><td>-<\/td><\/tr><tr><td>573<\/td><td>Remove Application limit for Anchorage of Smaller Buildings<\/td><td>Chown, G. Adaire, Canadian Home Builders' Association<\/td><td>2010-01-19<\/td><td><strong>Received<\/strong><br \/>2010-01-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-04-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-05-07<br \/><\/td><td>NBC Division B 9.23.6.3.<\/td><td>-<\/td><\/tr><tr><td>572<\/td><td>Mandatory Residential Sprinklers in Homes<\/td><td>Deans, Diane, City of Ottawa<\/td><td>2009-12-03<\/td><td><strong>Received<\/strong><br \/>2009-12-03<br \/>EC: <strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>571<\/td><td>Fire Rating of Seismic Structural Members<\/td><td>Vorell, Khash<\/td><td>2009-11-18<\/td><td><strong>Received<\/strong><br \/>2009-11-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2012-10-10<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-04-21<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-09-27<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>570<\/td><td>Elements of Structures and Non-structural Components and Equipment, Forming  Part of Sentence 4.1.8.17.(1)<\/td><td>Nemade, Shashikant, Canadian Process Technologies Inc<\/td><td>2009-11-18<\/td><td><strong>Received<\/strong><br \/>2009-11-18<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-18<br \/><\/td><td>NBC Division B 4.1.8.17.(1)<\/td><td>-<\/td><\/tr><tr><td>569<\/td><td>Referenced Standards for Dust Collection Systems<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2009-11-05<\/td><td><strong>Received<\/strong><br \/>2009-11-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 5.3.1.3.(2)<\/td><td>72 (published)<\/td><\/tr><tr><td>568<\/td><td>Need to designate a minimum number of persons in an Assembly Occupancy<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2009-11-04<\/td><td><strong>Received<\/strong><br \/>2009-11-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2011-04-07<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2011-04-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2011-05-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2012-06-13<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.2.6.<\/td><td>781 (published), 782<\/td><\/tr><tr><td>567<\/td><td>Emergency Plan Requirement for Small A-2 with few occupants<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2009-11-04<\/td><td><strong>Received<\/strong><br \/>2009-11-04<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-10-19<br \/><\/td><td>NFC Division B 2.8.1.1.<\/td><td>781 (published), 782<\/td><\/tr><tr><td>566<\/td><td>Terminology and Consistency for Straight and Curved Runs in Stairs<\/td><td>Kucharski, Keith, Prestige Railings &amp; Stairs Ltd<\/td><td>2009-10-20<\/td><td><strong>Received<\/strong><br \/>2009-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2010-04-29<br \/><\/td><td>NBC Division B 9.8.3.1.<\/td><td>700 (published), 701 (published), 702 (published)<\/td><\/tr><tr><td>565<\/td><td>Self-Service Storage Buildings<\/td><td>Brown, Randal, Randal Brown &amp; Associates Ltd.<\/td><td>2009-10-16<\/td><td><strong>Received<\/strong><br \/>2009-10-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-02-23<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-23<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3<\/td><td>-<\/td><\/tr><tr><td>564<\/td><td>Small enclosureless dust collectors for woodshops inside of buildings<\/td><td>Stasynec, Garry, G. D. Stasynec and Associates Ltd.<\/td><td>2009-10-09<\/td><td><strong>Received<\/strong><br \/>2009-10-09<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 5.3.<\/td><td>73 (published)<\/td><\/tr><tr><td>563<\/td><td>Provide clarity for metal liners (chimney)<\/td><td>Cautillo, Tony, CSA Standards<\/td><td>2009-10-01<\/td><td><strong>Received<\/strong><br \/>2009-10-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-04-29<br \/><\/td><td>NBC Division B 9.21.3.6.,<br \/>NBC Division B 9.33.5.2.<\/td><td>-<\/td><\/tr><tr><td>562<\/td><td>Design of Air Barrier System<\/td><td>Di Lenardo, Bruno, Canadian Construction Materials Centre (CCMC)<\/td><td>2009-08-02<\/td><td><strong>Received<\/strong><br \/>2009-08-02<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-03<br \/><\/td><td>NECB Division B 3.2.4.3.<\/td><td>-<\/td><\/tr><tr><td>561<\/td><td>Add guidance on metric conversion of frame spacing dimensions<\/td><td>Lohmann, Frank, NRC-IRC Canadian Codes Centre<\/td><td>2009-09-17<\/td><td><strong>Received<\/strong><br \/>2009-09-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-02-16<br \/><\/td><td>NBC Division B A-9.1.1.1.<\/td><td>474 (published)<\/td><\/tr><tr><td>560<\/td><td>Fire Flow Requirements<\/td><td>Tracey, Sean, NFPA<\/td><td>2009-08-25<\/td><td><strong>Received<\/strong><br \/>2009-08-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2018-05-01<br \/><\/td><td>NBC Division B A-3.2.5.7.(1)<\/td><td>1282<\/td><\/tr><tr><td>559<\/td><td>Add Special Construction Requirements Wildfire Prone Areas<\/td><td>Tracey, Sean, NFPA<\/td><td>2009-08-25<\/td><td><strong>Received<\/strong><br \/>2009-08-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-13<br \/>EC: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2010-10-01<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-12-11<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 9.10.23.1.<\/td><td>-<\/td><\/tr><tr><td>558<\/td><td>Mandatory Residential Sprinklers in Lieu of Fire-Resistance Rating of Assemblies<\/td><td>Tracey, Sean, NFPA<\/td><td>2009-08-25<\/td><td><strong>Received<\/strong><br \/>2009-08-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-12<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2009-11-17<br \/><strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.8.2.,<br \/>NBC Division B 9.10.8.8.(3),<br \/>NBC Division B 9.10.8.10.,<br \/>NBC Division B 9.10.9.4.(2)<\/td><td>-<\/td><\/tr><tr><td>557<\/td><td>Include Emergency Responders in Objectives and Functional Statements<\/td><td>Tracey, Sean, NFPA<\/td><td>2009-08-25<\/td><td><strong>Received<\/strong><br \/>2009-08-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-17<br \/>EC: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2021-08-11<br \/><\/td><td>NBC Division A 2.1.1.1.,<br \/>NBC Division A 3.1.1.1.<\/td><td>1998<\/td><\/tr><tr><td>556<\/td><td>Mandatory Sprinklers in Residential Occupancy<\/td><td>Tracey, Sean, NFPA<\/td><td>2009-08-25<\/td><td><strong>Received<\/strong><br \/>2009-08-25<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-17<br \/>EC: <strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.<\/td><td>-<\/td><\/tr><tr><td>555<\/td><td>Protect foam plastics in attics and crawls spaces <\/td><td>Romanuk, Robert, Chief Building Official<\/td><td>2009-08-19<\/td><td><strong>Received<\/strong><br \/>2009-08-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-13<br \/><\/td><td>NBC Division B 9.10.17.10.<\/td><td>-<\/td><\/tr><tr><td>554<\/td><td>Potable Water Treatment Systems<\/td><td>Gould, Stephen, Ontario Plumbing Inspectors Association Inc.<\/td><td>2009-09-09<\/td><td><strong>Received<\/strong><br \/>2009-09-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-22<br \/><\/td><td>NPC Division B 2.2.11.<\/td><td>-<\/td><\/tr><tr><td>553<\/td><td>Permit Spiral Stairs<\/td><td>Thurston, Josh<\/td><td>2009-08-07<\/td><td><strong>Received<\/strong><br \/>2009-08-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-04-29<br \/><\/td><td>NBC Division B 9.8.1.1.<\/td><td>693 (published)<\/td><\/tr><tr><td>552<\/td><td>Inconsistent calculation of area of exposing building face<\/td><td>Dohmeier, Richard, District of North Vancouver<\/td><td>2009-09-04<\/td><td><strong>Received<\/strong><br \/>2009-09-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.10.15.1.<\/td><td>393 (published), 824 (published)<\/td><\/tr><tr><td>551<\/td><td>Add ANSI S12.60-2002 Acoustical Performance Criteria, Design Requirements, and Guidelines for Schools to 2005 National Building Code.<\/td><td>Love, Ondina, Canadian Association of Speech-Language Pathologists and Audiologists (CASLPA)<\/td><td>2009-05-21<\/td><td><strong>Received<\/strong><br \/>2009-05-21<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-01-14<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>550<\/td><td>Application of 3.3.2.13. should be limited to \"theatres\" as defined.<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2009-05-15<\/td><td><strong>Received<\/strong><br \/>2009-05-15<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 3.3.2.13.<\/td><td>-<\/td><\/tr><tr><td>549<\/td><td>Control of Static Electric Charge<\/td><td>Grundie, Robert, University of Calgary<\/td><td>2009-04-10<\/td><td><strong>Received<\/strong><br \/>2009-04-10<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-02<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-07<br \/><\/td><td>NFC Division B 4.1.8.2.(1)<\/td><td>162 (published)<\/td><\/tr><tr><td>548<\/td><td>Water-Resistant Gypsum Board over Vapour Barrier<\/td><td>Horvath, Steve C., Inspection and consulting firm<\/td><td>2009-04-25<\/td><td><strong>Received<\/strong><br \/>2009-04-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-13<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.25.4.1.,<br \/>NBC Division B 9.29.10.4.<\/td><td>-<\/td><\/tr><tr><td>547<\/td><td>Residential Sprinklers: The application of NFPA 13R<\/td><td>Johnson, Murray, Murray Johnson Engineering Ltd.<\/td><td>2009-06-04<\/td><td><strong>Received<\/strong><br \/>2009-06-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.2.5.13.(2)<\/td><td>-<\/td><\/tr><tr><td>546<\/td><td>3.4.6.10 - Doors - The height of a threshold  for an exit door<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2009-04-03<\/td><td><strong>Received<\/strong><br \/>2009-04-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-29<br \/><\/td><td>-<\/td><td>390 (published)<\/td><\/tr><tr><td>545<\/td><td>Emergency Eyewash and Shower Equipment.<\/td><td>Perreault, Martin, Dessau<\/td><td>2009-03-17<\/td><td><strong>Received<\/strong><br \/>2009-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.6.1.13.<\/td><td>-<\/td><\/tr><tr><td>544<\/td><td>screeching or piercing sound from the fire alarms<\/td><td>Navratil, Betty<\/td><td>2009-03-05<\/td><td><strong>Received<\/strong><br \/>2009-03-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-05-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>543<\/td><td>Indoor hockey arenas - Dasher Boards<\/td><td>Henhoeffer, Chris, Sport Systems Unlimited<\/td><td>2009-02-24<\/td><td><strong>Received<\/strong><br \/>2009-02-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-12-06<br \/><\/td><td>NBC Division B 4.1.5.15.<\/td><td>-<\/td><\/tr><tr><td>542<\/td><td>New Code provision for Bead-Applied Air Sealant Foam<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2009-02-19<\/td><td><strong>Received<\/strong><br \/>2009-02-19<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2010-04-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-08<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>541<\/td><td>New Code provision for Bead-Applied Air Sealant Foam<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2009-02-19<\/td><td><strong>Received<\/strong><br \/>2009-02-19<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2010-04-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-08<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>540<\/td><td>New Code provision for Bead-Applied Air Sealant Foam<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2009-02-19<\/td><td><strong>Received<\/strong><br \/>2009-02-19<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2010-04-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-08<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>539<\/td><td>New Code provision for Bead-Applied Air Sealant Foam<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2009-02-19<\/td><td><strong>Received<\/strong><br \/>2009-02-19<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2010-04-04<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-04-08<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>538<\/td><td>Minimum Insulation\/Vapour Barrier Installation during Renovation<\/td><td>Ivanyi, John<\/td><td>2009-02-05<\/td><td><strong>Received<\/strong><br \/>2009-02-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-04-29<br \/><\/td><td>NBC Division B 9.25.4.1.<\/td><td>-<\/td><\/tr><tr><td>537<\/td><td>Grease Recovery Device<\/td><td>Sowerby, Richard, Goslyn Environmental Systems<\/td><td>2009-05-02<\/td><td><strong>Received<\/strong><br \/>2009-05-02<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.4.<\/td><td>-<\/td><\/tr><tr><td>536<\/td><td>Correct the formula for Basic Footing Widths and Areas<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2009-02-05<\/td><td><strong>Received<\/strong><br \/>2009-02-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2010-04-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-10-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.15.3.4.,<br \/>NBC Division B A-9.15.3.4.<\/td><td>1490 (published)<\/td><\/tr><tr><td>535<\/td><td>Clarification of Structure Supported for the Determination of Minimum Footing Sizes<\/td><td>Steen, Andrew, Ontario, Muncipal Affairs and Housing<\/td><td>2009-01-30<\/td><td><strong>Received<\/strong><br \/>2009-01-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2010-04-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-11-21<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.15.3.4.<\/td><td>-<\/td><\/tr><tr><td>534<\/td><td>Emergency access to floor area<\/td><td>Broadhead, Doug<\/td><td>2009-01-27<\/td><td><strong>Received<\/strong><br \/>2009-01-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-27<br \/><\/td><td>-<\/td><td>218 (published), 220 (published)<\/td><\/tr><tr><td>533<\/td><td>Inspection, Maintenance and Testing of Fire Safety Devices<\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2009-01-26<\/td><td><strong>Received<\/strong><br \/>2009-01-26<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-05-14<br \/><\/td><td>NBC Division B 2.1.3.7.<\/td><td>302 (published)<\/td><\/tr><tr><td>532<\/td><td>Heating and Electricity<\/td><td>LeGrand, Kevin, HRAC<\/td><td>2009-01-23<\/td><td><strong>Received<\/strong><br \/>2009-01-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NBC Division B 6.2.1.1.<\/td><td>-<\/td><\/tr><tr><td>531<\/td><td>cast iron frames and covers for maintenance holes and catch basins.<\/td><td>Gunn, John, John C. Gunn Consulting<\/td><td>2008-10-14<\/td><td><strong>Received<\/strong><br \/>2008-10-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NPC Division B 2.0.<\/td><td>480 (published), 481<\/td><\/tr><tr><td>530<\/td><td>mandate exterior gypsum board on all new homes - Duplicate<\/td><td>McNaughton, Duncan, Ottawa Fire Service<\/td><td>2008-11-27<\/td><td><strong>Received<\/strong><br \/>2008-11-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 9.10.15.1.<\/td><td>-<\/td><\/tr><tr><td>529<\/td><td>Mandate exterior gypsum board on all new residential homes<\/td><td>McNaughton, Duncan, Ottawa Fire Service<\/td><td>2008-11-27<\/td><td><strong>Received<\/strong><br \/>2008-11-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-11-27<br \/><\/td><td>NBC Division B 9.10.15.1.<\/td><td>-<\/td><\/tr><tr><td>528<\/td><td>Mandatory Residential Sprinklers in Homes<\/td><td>McNaughton, Duncan, Ottawa Fire Service<\/td><td>2008-11-27<\/td><td><strong>Received<\/strong><br \/>2008-11-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-23<br \/>EC: <strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>527<\/td><td>Update the Referenced Standard to the Current Edition<\/td><td>Hunt, Barry, Class1 Inc.<\/td><td>2008-11-27<\/td><td><strong>Received<\/strong><br \/>2008-11-27<br \/><\/td><td>NBC Division B 3.7.5.1.(1)<\/td><td>-<\/td><\/tr><tr><td>526<\/td><td>Make Handrail Heights Consistent with Volute Design<\/td><td>Vigliatore, Vince, STAIR AND RAILING ASSOCIATION OF CANADA<\/td><td>2008-11-25<\/td><td><strong>Received<\/strong><br \/>2008-11-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-13<br \/><\/td><td>NBC Division B 9.8.7.4.(3)<\/td><td>-<\/td><\/tr><tr><td>525<\/td><td>Snow Load Accumulation Figures<\/td><td>Allen, David E, NRC-IRC (retired)<\/td><td>2008-11-24<\/td><td><strong>Received<\/strong><br \/>2008-11-24<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-04-26<br \/><\/td><td>NBC Division B 4.1.6.<\/td><td>-<\/td><\/tr><tr><td>524<\/td><td>Seismic Terminology<\/td><td>Allen, David E, NRC-IRC (retired)<\/td><td>2008-11-24<\/td><td><strong>Received<\/strong><br \/>2008-11-24<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-10-18<br \/><\/td><td>NBC Division B 4.1.8.2.(1)<\/td><td>-<\/td><\/tr><tr><td>523<\/td><td>Seismic design of elevated composite storage tanks<\/td><td>Pogorzelski, Wes, WP Engineering Inc.<\/td><td>2008-11-20<\/td><td><strong>Received<\/strong><br \/>2008-11-20<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-11-20<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-11-20<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 4.1.8.17.<\/td><td>-<\/td><\/tr><tr><td>522<\/td><td>Seismic design of elevated composite storage tanks<\/td><td>Pogorzelski, Wes, WP Engineering Inc.<\/td><td>2008-11-20<\/td><td><strong>Received<\/strong><br \/>2008-11-20<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-11-20<br \/>Earthquake Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-11-20<br \/><\/td><td>NBC Division B 4.1.9.17.<\/td><td>-<\/td><\/tr><tr><td>521<\/td><td>3.1.9. Buildinq Services in Fire Separations and Fire-Rated Assemblies<\/td><td>Gunn, John, John C. Gunn Consulting<\/td><td>2008-11-20<\/td><td><strong>Received<\/strong><br \/>2006-11-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-14<br \/><\/td><td>NBC Division B 3.1.9.4.(5)<\/td><td>-<\/td><\/tr><tr><td>520<\/td><td>Sanitary Drainage Systems<\/td><td>Elliott, Harold, Northern Alberta Institute of Technology<\/td><td>2008-11-10<\/td><td><strong>Received<\/strong><br \/>2008-11-10<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.4.2.1.(3)<\/td><td>-<\/td><\/tr><tr><td>519<\/td><td>Exemption for Vented Roofs and Cathedral Ceilings Roofs<\/td><td>Kacki, James, James Kacki - Architect &amp; Planner Inc.<\/td><td>2007-11-05<\/td><td><strong>Received<\/strong><br \/>2007-11-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-04-29<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.19.1.1.<\/td><td>-<\/td><\/tr><tr><td>518<\/td><td>Direction of door swing for egress from sprinkler room service spaces<\/td><td>Baxter, Robert, Vancouver Fire &amp; Security<\/td><td>2008-10-31<\/td><td><strong>Received<\/strong><br \/>2008-10-31<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-30<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>517<\/td><td>Unprotected Openings and Limiting Distance<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2008-10-30<\/td><td><strong>Received<\/strong><br \/>2008-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.2.3.1.<\/td><td>-<\/td><\/tr><tr><td>516<\/td><td>Garage Floor in an attached\/built in garage serving a single dwelling in a Part 3 building<\/td><td>Silva, Robert, Regional District of Kootenay Boundary<\/td><td>2008-10-30<\/td><td><strong>Received<\/strong><br \/>2008-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-23<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-04-06<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.3.4.<\/td><td>-<\/td><\/tr><tr><td>515<\/td><td>emergency floor drain<\/td><td>Rattray, Gary, SAIT<\/td><td>2008-10-01<\/td><td><strong>Received<\/strong><br \/>2008-10-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.4.<\/td><td>-<\/td><\/tr><tr><td>514<\/td><td>Premise Isolation<\/td><td>Balfour, Bill, Ontario Water Works Association<\/td><td>2008-10-01<\/td><td><strong>Received<\/strong><br \/>2008-10-01<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-08-24<br \/><\/td><td>NPC Division B 2.6.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>513<\/td><td>Expand Selection of Backflow Preventers<\/td><td>Balfour, Bill, Ontario Water Works Association<\/td><td>2008-09-30<\/td><td><strong>Received<\/strong><br \/>2008-09-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-08-24<br \/><\/td><td>NPC Division B 2.6.2.4.<\/td><td>-<\/td><\/tr><tr><td>512<\/td><td>Premise Isolation<\/td><td>Gould, Stephen, Ontario Plumbing Inspectors Association Inc.<\/td><td>2008-09-30<\/td><td><strong>Received<\/strong><br \/>2008-09-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-08-24<br \/><\/td><td>NPC Division B 2.6.2.6.(1)<\/td><td>-<\/td><\/tr><tr><td>511<\/td><td>Self-Contained Heating-Season Mechanical Ventilation Systems<\/td><td>Roy, Christian R., Christian R. Roy Inc.<\/td><td>2008-10-02<\/td><td><strong>Received<\/strong><br \/>2008-10-02<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-08-24<br \/><\/td><td>NBC Division B 6.2.2.1.(3),<br \/>NBC Division B 6.3.1.1.(4)<\/td><td>-<\/td><\/tr><tr><td>510<\/td><td>Operational Requirements of Doors Used as Closure in a Required Fire Separation after a Fire<\/td><td>Woestman, John, Builders Hardware Manufacturers Association (BHMA), The Kellen Company<\/td><td>2008-09-26<\/td><td><strong>Received<\/strong><br \/>2008-09-26<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.4.6.15.<\/td><td>-<\/td><\/tr><tr><td>509<\/td><td>Minimum Clearance from Combustible Materials to Hot Work Area<\/td><td>Verbeek, Frank, Aon Reed Stenhouse Inc<\/td><td>2008-09-26<\/td><td><strong>Received<\/strong><br \/>2008-09-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-04-06<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-07-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-07-04<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2012-07-04<br \/><\/td><td>NFC Division B 5.2.3.1.(2)<\/td><td>-<\/td><\/tr><tr><td>508<\/td><td>Corrosion resistance of metal connectors with preservative treated wood<\/td><td>Tai, Fred, Simpson Strong-Tie Canada<\/td><td>2008-09-17<\/td><td><strong>Received<\/strong><br \/>2008-09-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2013-06-25<br \/><\/td><td>NBC Division B 9.3.1.<\/td><td>1469 (published), 1512 (published), 1464<\/td><\/tr><tr><td>507<\/td><td>Dwelling Units<\/td><td>L\u00e9gar\u00e9, Michel, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2008-09-19<\/td><td><strong>Received<\/strong><br \/>2008-09-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-23<br \/><\/td><td>NBC Division B 6.2.8.<\/td><td>-<\/td><\/tr><tr><td>506<\/td><td>Dwelling Units<\/td><td>L\u00e9gar\u00e9, Michel, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2008-09-19<\/td><td><strong>Received<\/strong><br \/>2008-09-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-23<br \/><\/td><td>NBC Division B 6.2.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>505<\/td><td>Air Flow Rates<\/td><td>L\u00e9gar\u00e9, Michel, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2008-09-19<\/td><td><strong>Received<\/strong><br \/>2008-09-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-23<br \/><\/td><td>NBC Division B 6.2.2.1.(3)<\/td><td>-<\/td><\/tr><tr><td>504<\/td><td>Protection from Contamination<\/td><td>LaRose, Carey, Alberta Municipal Affairs and Housing<\/td><td>2008-09-18<\/td><td><strong>Received<\/strong><br \/>2008-09-18<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2019-04-17<br \/><\/td><td>NPC Division B 2.6.2.1.<\/td><td>-<\/td><\/tr><tr><td>503<\/td><td>Air Barrier System Properties<\/td><td>Dalgleish, Laverne, bpc Building Performance Consortium Inc.<\/td><td>2008-09-13<\/td><td><strong>Received<\/strong><br \/>2008-09-13<br \/>Environmental Separation: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-24<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-08<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2017-10-20<br \/><\/td><td>NBC Division B 5.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>502<\/td><td>Safe Working Access<\/td><td>Nagus, Judy, Mechanical Contractors Association of Saskatchewan Inc.<\/td><td>2008-09-10<\/td><td><strong>Received<\/strong><br \/>2008-09-10<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-26<br \/>HVAC and Plumbing: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-04-30<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 6.2.1.8.<\/td><td>-<\/td><\/tr><tr><td>501<\/td><td>Vent Size for Building Drain<\/td><td>Jensen, Gordon, City of Coquitlam<\/td><td>2008-09-13<\/td><td><strong>Received<\/strong><br \/>2008-09-13<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.5.8.4.(5)<\/td><td>-<\/td><\/tr><tr><td>500<\/td><td>Expand Requirements to Install Fire Protection Systems<\/td><td>Green, Ross R., Syncrude Canada Ltd.<\/td><td>2008-09-05<\/td><td><strong>Received<\/strong><br \/>2008-09-05<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/><\/td><td>NFC Division B 2.1.3.1.,<br \/>NFC Division B 2.1.3.5.,<br \/>NFC Division B 2.1.3.6.,<br \/>NFC Division B 6.1.1.2.<\/td><td>128 (published)<\/td><\/tr><tr><td>499<\/td><td>Masonry Heaters <\/td><td>Chernov, Alex, Stovemaster<\/td><td>2008-08-31<\/td><td><strong>Received<\/strong><br \/>2008-08-31<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-11-26<br \/><\/td><td>NBC Division B 9.21.<\/td><td>-<\/td><\/tr><tr><td>498<\/td><td>Water Distribution Systems<\/td><td>Charney, Robert, Red River College<\/td><td>2008-08-21<\/td><td><strong>Received<\/strong><br \/>2008-08-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.1.2.3.<\/td><td>-<\/td><\/tr><tr><td>497<\/td><td>Classroom Accoustic<\/td><td>Tylka, Tom<\/td><td>2008-08-26<\/td><td><strong>Received<\/strong><br \/>2008-08-26<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-08-26<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2010-11-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>496<\/td><td>Scent-Free Environment<\/td><td>Lantz, Nelson<\/td><td>2008-03-05<\/td><td><strong>Received<\/strong><br \/>2008-03-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2010-11-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-20<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>495<\/td><td>Limit the Capacity of Exhaust-Only Ventilation Systems<\/td><td>Fugler, Don, Canada Mortgage and Housing Corporation, Policy and Research<\/td><td>2008-08-05<\/td><td><strong>Received<\/strong><br \/>2008-08-05<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-13<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.32.3.6.(1)<\/td><td>-<\/td><\/tr><tr><td>494<\/td><td>Explosion<\/td><td>Malhotra, Ashok, Halsall Associates Limited<\/td><td>2008-07-31<\/td><td><strong>Received<\/strong><br \/>2008-07-31<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-10-10<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>493<\/td><td>Clarify the Location of Fuel-fired Appliances <\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2008-07-29<\/td><td><strong>Received<\/strong><br \/>2008-07-29<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.10.4.<\/td><td>-<\/td><\/tr><tr><td>492<\/td><td>Hydraulic Loads Draining to Wet Vents<\/td><td>Burk, Richard, Alberta Mechanical Officials Society\/City of Calgary<\/td><td>2008-07-09<\/td><td><strong>Received<\/strong><br \/>2008-07-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-26<br \/><\/td><td>NPC Division B 2.5.8.1.<\/td><td>-<\/td><\/tr><tr><td>491<\/td><td>Permit foam plastic insulation on ducts<\/td><td>Birkbeck, Peter, Icynene Inc.<\/td><td>2008-07-28<\/td><td><strong>Received<\/strong><br \/>2008-07-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-14<br \/><\/td><td>NBC Division B 9.33.6.4.(5)<\/td><td>536 (published)<\/td><\/tr><tr><td>490<\/td><td>Stainless Steel Pipe and Fitting<\/td><td>Burk, Richard, Alberta Mechanical Officials Society\/City of Calgary<\/td><td>2008-07-08<\/td><td><strong>Received<\/strong><br \/>2008-07-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-15<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>489<\/td><td>Copper Tube<\/td><td>Burk, Richard, Alberta Mechanical Officials Society\/City of Calgary<\/td><td>2008-07-08<\/td><td><strong>Received<\/strong><br \/>2008-07-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-14<br \/><\/td><td>NPC Division B 2.2.7.4.(3)<\/td><td>74 (published)<\/td><\/tr><tr><td>488<\/td><td>Individual vent <\/td><td>Jensen, Gordon, City of Coquitlam<\/td><td>2008-07-08<\/td><td><strong>Received<\/strong><br \/>2008-07-08<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-21<br \/><\/td><td>NPC Division B 2.4.5.1.<\/td><td>-<\/td><\/tr><tr><td>487<\/td><td>Thermal Insulation<\/td><td>Clayman, Steve, Thermal Insulation Association of Canada<\/td><td>2008-07-03<\/td><td><strong>Received<\/strong><br \/>2008-07-03<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-15<br \/><\/td><td>NBC Division B 6.2.3.4.,<br \/>NPC Division B 2.3.5.4.<\/td><td>197 (published), 206 (published)<\/td><\/tr><tr><td>486<\/td><td>Defined terms, Day Care<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2008-06-27<\/td><td><strong>Received<\/strong><br \/>2008-06-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-09-30<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>485<\/td><td>Delete \"mechanically cooled\"<\/td><td>Currie, Colin, Hawk-eye Design &amp; Inspection Services<\/td><td>2008-06-03<\/td><td><strong>Received<\/strong><br \/>2008-06-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-02-13<br \/><\/td><td>NBC Division B 9.32.2.1.<\/td><td>-<\/td><\/tr><tr><td>484<\/td><td>Greywater Use System Design, Construction and Installation<\/td><td>McLeod, Christopher Adam, Oakville Stamping &amp; Bending Ltd.<\/td><td>2008-05-21<\/td><td><strong>Received<\/strong><br \/>2008-05-21<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-10-21<br \/><\/td><td>NPC Division B 2.7.<\/td><td>-<\/td><\/tr><tr><td>483<\/td><td>90 degree Elbows Use in Sanitary Drainage Systems<\/td><td>Jensen, Gordon, City of Coquitlam<\/td><td>2008-05-14<\/td><td><strong>Received<\/strong><br \/>2008-05-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-14<br \/><\/td><td>NPC Division B 2.2.4.3.(2)<\/td><td>-<\/td><\/tr><tr><td>482<\/td><td>Continuous Vents<\/td><td>Brewer, Bryan, NAIT<\/td><td>2008-05-14<\/td><td><strong>Received<\/strong><br \/>2008-05-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-21<br \/><\/td><td>NPC Division B 2.5.<\/td><td>-<\/td><\/tr><tr><td>481<\/td><td>Safe Drinking Water<\/td><td>Russell, Jamie, Hydrastone Inc.<\/td><td>2008-05-09<\/td><td><strong>Received<\/strong><br \/>2008-05-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-21<br \/><\/td><td>NPC Division B 2.0.<\/td><td>-<\/td><\/tr><tr><td>480<\/td><td>Wet Vent Dimension Limitation<\/td><td>Elliott, Harold, Northern Alberta Institute of Technology<\/td><td>2008-04-25<\/td><td><strong>Received<\/strong><br \/>2008-04-25<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-14<br \/><\/td><td>NPC Division B 2.5.4.5.(1)<\/td><td>-<\/td><\/tr><tr><td>479<\/td><td>9.8.8.6. Design to Prevent Climbing <\/td><td>Bezdan, Margaret, Geo. Bezdan Sales Ltd.<\/td><td>2008-04-01<\/td><td><strong>Received<\/strong><br \/>2008-04-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-11-04<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.8.8.6.<\/td><td>-<\/td><\/tr><tr><td>478<\/td><td>Snow Load, Ss, for Hamilton, Ontario<\/td><td>Simmons, Lisa, City of Hamilton, Building Services Division<\/td><td>2008-04-01<\/td><td><strong>Received<\/strong><br \/>2008-04-01<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-10-26<br \/><\/td><td>NBC Division B C-2<\/td><td>-<\/td><\/tr><tr><td>477<\/td><td>Mezzanines and Openings through Floor Assemblies Construction Requirements<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.2.8.3.<\/td><td>127 (published), 168 (published), 557 (published)<\/td><\/tr><tr><td>476<\/td><td>Exceptions to Special Protection for Interconnected Floor Space<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.2.8.2.(6)<\/td><td>127 (published), 168 (published), 557 (published)<\/td><\/tr><tr><td>475<\/td><td>Design of Sprinkler System for Storage Garage Considered as Separate Building<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.2.1.2.<\/td><td>775 (published)<\/td><\/tr><tr><td>474<\/td><td>Design of Sprinkler Systems in Single- and Multi-Family Residential Buildings 4 Storeys or Less<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.2.5.13.<\/td><td>-<\/td><\/tr><tr><td>473<\/td><td>Flame-Spread Rating of Heavy Timber Elements in Noncombustible Buildings<\/td><td>McPhee, Rodney A., Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 3.1.5.10.(3)<\/td><td>-<\/td><\/tr><tr><td>472<\/td><td>Referencing Current Edition of the NPC<\/td><td>Burk, Richard, Alberta Mechanical Officials Society\/City of Calgary<\/td><td>2008-03-24<\/td><td><strong>Received<\/strong><br \/>2008-03-24<br \/>Energy Efficiency: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-04-03<br \/><\/td><td>NECB Division B 6.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>471<\/td><td>Add a definition for \"roofing\"<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2008-03-26<\/td><td><strong>Received<\/strong><br \/>2008-03-26<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-04-29<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-03<br \/><\/td><td>NBC Division B 9.26.6.1.,<br \/>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>470<\/td><td>Add a definition for roofing<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2008-03-26<\/td><td><strong>Received<\/strong><br \/>2008-03-26<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-10-10<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>469<\/td><td>Require Underlay Beneath Shingles<\/td><td>Lodge, Andy, Canadian Asphalt Shingle Manufacturers Association<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-04-29<br \/><\/td><td>NBC Division B 9.26.6.1.<\/td><td>-<\/td><\/tr><tr><td>468<\/td><td>OSB and Waferboard Material as Acceptable Material for Table D-2.3.5. of the NBC<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-14<\/td><td><strong>Received<\/strong><br \/>2008-03-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2009-02-28<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B D-2.3.5.<\/td><td>310 (published)<\/td><\/tr><tr><td>467<\/td><td>Fire Resistance Requirements for Some Arena-Type Roof Assemblies<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-11<\/td><td><strong>Received<\/strong><br \/>2008-03-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2019-04-04<br \/><\/td><td>NBC Division B 3.2.2.17.,<br \/>NBC Division B 3.2.2.26.,<br \/>NBC Division B 3.2.2.30.,<br \/>NBC Division B 3.2.2.32.<\/td><td>1314 (published)<\/td><\/tr><tr><td>466<\/td><td>Generic Combustible Components for Exterior Walls of Noncombustible Building<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-13<\/td><td><strong>Received<\/strong><br \/>2008-03-13<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.1.5.5.<\/td><td>-<\/td><\/tr><tr><td>465<\/td><td>Include Other Wood Products that Perform as Well as Fire Stop Materials<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-11<\/td><td><strong>Received<\/strong><br \/>2008-03-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2013-04-27<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.11.7.(4)<\/td><td>760 (published)<\/td><\/tr><tr><td>464<\/td><td>Decorative Wood Cladding Provisions for Noncombustible Construction<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-11<\/td><td><strong>Received<\/strong><br \/>2008-03-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.5.21.(1)<\/td><td>777 (published)<\/td><\/tr><tr><td>463<\/td><td>Clarification of Information Contained in Note (8) of Table A-9.10.3.1.A.<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-11<\/td><td><strong>Received<\/strong><br \/>2008-03-11<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B A-9.10.3.1.A.<\/td><td>-<\/td><\/tr><tr><td>462<\/td><td>Fixture Outlet Pipe Figure A-1.4.1.2.(1)-H<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division A 1.4.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>461<\/td><td>Revise Figures for Consistency of Representation<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division A 1.4.1.2.(1),<br \/>NPC Division B 2.4.2.1.,<br \/>NPC Division B 2.4.5.1.(3),<br \/>NPC Division B 2.4.5.4.(1),<br \/>NPC Division B 2.4.5.5.(1),<br \/>NPC Division B 2.4.6.4.(6),<br \/>NPC Division B 2.4.7.1.(9),<br \/>NPC Division B 2.4.8.2.(1),<br \/>NPC Division B 2.4.9.3.(3),<br \/>NPC Division B 2.5.1.1.(3),<br \/>NPC Division B 2.5.1.1.(4),<br \/>NPC Division B 2.5.2.1.,<br \/>NPC Division B 2.5.3.1.,<br \/>NPC Division B 2.5.4.4.(1),<br \/>NPC Division B 2.5.6.3.,<br \/>NPC Division B 2.5.8.1.(2),<br \/>NPC Division B 2.5.8.3.,<br \/>NPC Division B 2.5.8.4.<\/td><td>-<\/td><\/tr><tr><td>460<\/td><td>Revise Figures for Consistency of Application<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division A 1.4.1.2.,<br \/>NPC Division B 2.5.8.<\/td><td>-<\/td><\/tr><tr><td>459<\/td><td>Cleanouts for Drainage Systems<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-25<br \/><\/td><td>NPC Division B 2.4.7.1.<\/td><td>-<\/td><\/tr><tr><td>458<\/td><td>Hydraulic Loads and Location of Scuppers<\/td><td>Doyle, M. Gerard, DUMAC ENERGY LIMITED<\/td><td>2008-03-17<\/td><td><strong>Received<\/strong><br \/>2008-03-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division B 2.4.10.4.(2)<\/td><td>-<\/td><\/tr><tr><td>457<\/td><td>Building Size Dimension and Occupancy Types for 4-Story Building<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2008-03-11<\/td><td><strong>Received<\/strong><br \/>2008-03-11<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-02-13<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-26<br \/><\/td><td>NBC Division A 1.3.3.4.(2)<\/td><td>903 (published)<\/td><\/tr><tr><td>456<\/td><td>WHMIS and Segregation of Dangerous Goods (Strong Acid and Strong Base)<\/td><td>Gagn\u00e9, Michel, CSST<\/td><td>2008-11-03<\/td><td><strong>Received<\/strong><br \/>2008-11-03<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-02-13<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2017-06-30<br \/><\/td><td>NFC Division B 3.2.7.1.,<br \/>NFC Division B 3.2.7.6.<\/td><td>-<\/td><\/tr><tr><td>455<\/td><td>Maximum Aggregate Area of Unprotected Openings and Limiting Distance<\/td><td>Chown, G. Adaire, Codes Centre, Institute for Research in Construction, National Research Council Canada<\/td><td>2008-03-10<\/td><td><strong>Received<\/strong><br \/>2008-03-10<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/><\/td><td>NBC Division B 9.10.14.4.(1),<br \/>NBC Division B 9.10.15.4.(1)<\/td><td>-<\/td><\/tr><tr><td>454<\/td><td>Single trap for fixture groups.<\/td><td>Dover, Tony<\/td><td>2008-03-05<\/td><td><strong>Received<\/strong><br \/>2008-03-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-18<br \/><\/td><td>NPC Division B 2.4.5.1.<\/td><td>-<\/td><\/tr><tr><td>453<\/td><td>Stainless Steel Pipe and Fitting<\/td><td>Gill, Rick, Unified Alloys<\/td><td>2008-03-05<\/td><td><strong>Received<\/strong><br \/>2008-03-05<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-22<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>452<\/td><td>Marking of Treated Wood Products<\/td><td>Lepper, Peggy, Canadian Wood Council<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-18<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.3.2.9.(7)<\/td><td>-<\/td><\/tr><tr><td>451<\/td><td>Revision of the Termite and Decay Protection<\/td><td>Lepper, Peggy, Canadian Wood Council<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/><\/td><td>NBC Division B 9.3.2.9.<\/td><td>-<\/td><\/tr><tr><td>450<\/td><td>CSA O80 series<\/td><td>Lepper, Peggy, Canadian Wood Council<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-08<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>449<\/td><td>Preservation Treatment of Wood<\/td><td>Lepper, Peggy, Canadian Wood Council<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2018-12-24<br \/><\/td><td>NBC Division B 4.2.3.2.<\/td><td>1497 (published)<\/td><\/tr><tr><td>448<\/td><td>CSA O80 series<\/td><td>Lepper, Peggy, Canadian Wood Council<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-06-07<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-06-07<br \/><\/td><td>NBC Division B 5.10.1.1.,<br \/>NBC Division B 4.2.3.<\/td><td>-<\/td><\/tr><tr><td>447<\/td><td>Clarification of Application for Division B<\/td><td>Donahoe, Gerard F.<\/td><td>2007-06-19<\/td><td><strong>Received<\/strong><br \/>2007-06-19<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-11-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-02-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-06-07<br \/>EC: <strong>Reviewed (legacy) <\/strong><br \/>2012-10-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2013-01-15<br \/><\/td><td>NBC Division A 1.3.3.<\/td><td>-<\/td><\/tr><tr><td>446<\/td><td>Definition of Mechanically Vented Appliances<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-10-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-26<br \/><\/td><td>NBC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>445<\/td><td>Location of Smoke Alarms in Existing Buildings<\/td><td>Burky, Patrick, Canadian Association of Fire Chiefs<\/td><td>2008-02-18<\/td><td><strong>Received<\/strong><br \/>2008-02-18<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-11-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-20<br \/><\/td><td>NFC Division B 2.1.3.1.<\/td><td>-<\/td><\/tr><tr><td>444<\/td><td>Lightning Protection Systems<\/td><td>Roy, Christian R., Christian R. Roy Inc.<\/td><td>2008-02-14<\/td><td><strong>Received<\/strong><br \/>2008-02-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NBC Division B 6.3.1.4.<\/td><td>-<\/td><\/tr><tr><td>443<\/td><td>Storage Garage<\/td><td>Roy, Christian R., Christian R. Roy Inc.<\/td><td>2008-02-14<\/td><td><strong>Received<\/strong><br \/>2008-02-14<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-21<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-08-29<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2015-11-26<br \/><\/td><td>NBC Division A 1.4.1.2.(1)<\/td><td>447 (published)<\/td><\/tr><tr><td>442<\/td><td>PVC Cellular Core Pipe <\/td><td>Brenier, Bruce, Rocky Mountain Colby Pipe Company<\/td><td>2008-02-17<\/td><td><strong>Received<\/strong><br \/>2008-02-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-22<br \/><\/td><td>NPC Division B 2.5.10.<\/td><td>-<\/td><\/tr><tr><td>441<\/td><td>Drainage systems<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2007-10-23<\/td><td><strong>Received<\/strong><br \/>2007-10-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NPC Division B 2.2.5.10.<\/td><td>200 (published)<\/td><\/tr><tr><td>440<\/td><td>Add Canadian Hydraulic Handbook as a Good Practice Document<\/td><td>Bourque, Jason, Canadian Institute of Plumbing and Heating<\/td><td>2008-03-03<\/td><td><strong>Received<\/strong><br \/>2008-03-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-13<br \/><\/td><td>NBC Division B 9.33.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>439<\/td><td>Clarification on Applicable Jointing Materials<\/td><td>Knapp, Arnold, A Knapp &amp; Associates<\/td><td>2008-02-28<\/td><td><strong>Received<\/strong><br \/>2008-02-28<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-10-21<br \/><\/td><td>NPC Division B 2.2.9.2.,<br \/>NPC Division B 2.3.3.<\/td><td>-<\/td><\/tr><tr><td>438<\/td><td>Inconsistency Between NBC and CAN\/CGSB-93.2<\/td><td>Fr\u00e9chette, Nadine, Duchesne et fils<\/td><td>2008-02-08<\/td><td><strong>Received<\/strong><br \/>2008-02-08<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-08<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/><\/td><td>NBC Division B 9.20.13.1.,<br \/>NBC Division B 9.26.4.2.<\/td><td>-<\/td><\/tr><tr><td>437<\/td><td>Exposure Protection for Adjacent Walls Meeting at an Angle <\/td><td>Bailey, Kim, Office of the Fire Marshal and Emergency Management of Ontario<\/td><td>2008-02-08<\/td><td><strong>Received<\/strong><br \/>2008-02-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.1.10.6.<\/td><td>167<\/td><\/tr><tr><td>436<\/td><td>Atmospheric Storage Tanks<\/td><td>Trussler, William, ShipsPoint Consulting<\/td><td>2008-02-05<\/td><td><strong>Received<\/strong><br \/>2008-02-05<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-06<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-13<br \/><\/td><td>NFC Division B 4.3.1.2.(2)<\/td><td>172 (published)<\/td><\/tr><tr><td>435<\/td><td>Minimum Window Dimensions in Houses to Accommodate Firefighters<\/td><td>Lee, Jim, International Association of Fire Fighters (IAFF)<\/td><td>2008-02-01<\/td><td><strong>Received<\/strong><br \/>2008-02-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-02-13<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-02-13<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-03-07<br \/><\/td><td>NBC Division B 9.10.20.<\/td><td>-<\/td><\/tr><tr><td>434<\/td><td>Use of an Exit as a Plenum for Heating, Ventilation or Air-Conditioning<\/td><td>Hill, Duncan, CMHC<\/td><td>1999-05-05<\/td><td><strong>Received<\/strong><br \/>1999-05-05<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2006-05-08<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2006-05-29<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-20<br \/><\/td><td>NBC Division B 3.4.4.4.(5)<\/td><td>-<\/td><\/tr><tr><td>433<\/td><td>Required Landings within Dwelling Units<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2008-01-16<\/td><td><strong>Received<\/strong><br \/>2008-01-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.6.2.(3)<\/td><td>-<\/td><\/tr><tr><td>432<\/td><td>Greywater Use System Design, Construction and Installation<\/td><td>Ott, Trevor, Private residence and rental property owner<\/td><td>2008-01-09<\/td><td><strong>Received<\/strong><br \/>2008-01-09<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/><\/td><td>NPC Division B 2.7.<\/td><td>-<\/td><\/tr><tr><td>431<\/td><td>Inspection of Doors Equipped with Closers in Fire Separations<\/td><td>Watt, Stephen, BC Office of the Fire Commissioner<\/td><td>2007-12-12<\/td><td><strong>Received<\/strong><br \/>2007-12-12<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-22<br \/><\/td><td>-<\/td><td>301 (published)<\/td><\/tr><tr><td>430<\/td><td>Limit Reference to ULC S705.x<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2007-09-04<\/td><td><strong>Received<\/strong><br \/>2007-09-04<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-18<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-10-24<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>429<\/td><td>Non-potable Water Systems<\/td><td>Audet, Johanne, ACi Distributing Inc.<\/td><td>2007-11-30<\/td><td><strong>Received<\/strong><br \/>2007-11-30<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/><\/td><td>NPC Division B 2.7.<\/td><td>-<\/td><\/tr><tr><td>428<\/td><td>Built-Up Roofs \u2013 Increase number of required layers<\/td><td>Lalonde, Guy, Association des ma\u00eetres couvreurs du Qu\u00e9bec (AMCQ)<\/td><td>2007-11-30<\/td><td><strong>Received<\/strong><br \/>2007-11-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-02-23<br \/><\/td><td>NBC Division B 9.26.11.6.<\/td><td>-<\/td><\/tr><tr><td>427<\/td><td>Hydraulic Loads for Commercial Clothes Washer<\/td><td>Myers, Doug<\/td><td>2007-11-29<\/td><td><strong>Received<\/strong><br \/>2007-11-29<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-18<br \/><\/td><td>NPC Division B 2.4.9.3.<\/td><td>-<\/td><\/tr><tr><td>426<\/td><td>Delete section on sheathing membrane material standard (9.27.3.2.)<\/td><td>Bazley, B. Ian<\/td><td>2007-11-23<\/td><td><strong>Received<\/strong><br \/>2007-11-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-18<br \/><\/td><td>NBC Division B 9.27.3.2.<\/td><td>-<\/td><\/tr><tr><td>425<\/td><td>Delete low permeance requirements<\/td><td>Bazley, B. Ian<\/td><td>2007-11-23<\/td><td><strong>Received<\/strong><br \/>2007-11-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-18<br \/><\/td><td>NBC Division B 9.25.1.2.<\/td><td>-<\/td><\/tr><tr><td>424<\/td><td>Add reference to CSA A123.21<\/td><td>Tremblay, Marc, Teknika HBA inc.<\/td><td>2007-11-26<\/td><td><strong>Received<\/strong><br \/>2007-11-26<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-08<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2009-02-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-07<br \/><\/td><td>NBC Division B 5.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>423<\/td><td>Heat Detector in Attached Storage Garage <\/td><td>Kloos, Peter W., Winnipeg Fire Department<\/td><td>2007-11-15<\/td><td><strong>Received<\/strong><br \/>2007-11-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-02-13<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 9.10.18.3.(4),<br \/>NBC Division B 9.10.19.4.(2)<\/td><td>-<\/td><\/tr><tr><td>422<\/td><td>Separation of Storage Garage from a Dwelling Unit<\/td><td>Kloos, Peter W., Winnipeg Fire Department<\/td><td>2007-11-15<\/td><td><strong>Received<\/strong><br \/>2007-11-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-13<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-11-21<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.9.16.(3)<\/td><td>-<\/td><\/tr><tr><td>421<\/td><td>Add control joints in residential foundation walls<\/td><td>Parizeau, Richard, Association B\u00e9ton Qu\u00e9bec<\/td><td>2007-11-22<\/td><td><strong>Received<\/strong><br \/>2007-11-22<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-02-13<br \/><\/td><td>NBC Division B 9.15.4.9.<\/td><td>-<\/td><\/tr><tr><td>420<\/td><td>Add Reference to CSA A123.21<\/td><td>Charron, Eric, Les Laboratoires Shermont inc.<\/td><td>2007-11-19<\/td><td><strong>Received<\/strong><br \/>2007-11-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-08<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2009-02-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-07<br \/><\/td><td>NBC Division B 5.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>419<\/td><td>Add a New Objective: Resource Conservation<\/td><td>Huzar, Joan, Consumers Council of Canada<\/td><td>2007-11-14<\/td><td><strong>Received<\/strong><br \/>2007-11-14<br \/>EC: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-01-17<br \/><\/td><td>NBC Division A 2.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>418<\/td><td>Inspection, Testing and Maintenance of Portable Fire Extinguishers<\/td><td>Mark, Hubert, SNC Lavalin ProFac<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-03-23<br \/><\/td><td>NFC Division B 6.2.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>417<\/td><td>Harmonize Requirements for Care Facilities in Part 9 with Part 3<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2007-11-02<\/td><td><strong>Received<\/strong><br \/>2007-11-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-04-18<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-01-30<br \/><\/td><td>NBC Division B 9.10.2.2.(2)<\/td><td>-<\/td><\/tr><tr><td>416<\/td><td>Additional Option to Exceed the Travel Limits to an Exit or Egress Door<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2007-11-01<\/td><td><strong>Received<\/strong><br \/>2007-11-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-13<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 9.9.9.1.(3)<\/td><td>-<\/td><\/tr><tr><td>415<\/td><td>Documentation of Potable water testing<\/td><td>Guay, Reg<\/td><td>2007-11-16<\/td><td><strong>Received<\/strong><br \/>2007-11-16<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-01-15<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>414<\/td><td>Any Type of Building Construction, Increased Area-Residential Occupancies up to 3 Storeys<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 3.2.2.46.<\/td><td>-<\/td><\/tr><tr><td>413<\/td><td>Any Type of Building Construction-Residential Occupancies up to 3 Storeys<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 3.2.2.47.<\/td><td>-<\/td><\/tr><tr><td>412<\/td><td>Hose Connection Requirement when a Building is Sprinklered<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2009-03-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.2.5.10.(5)<\/td><td>-<\/td><\/tr><tr><td>411<\/td><td>Installation of Fire Department Connections<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.2.5.16.<\/td><td>-<\/td><\/tr><tr><td>410<\/td><td>Noncombustible Construction-Residential Occupancies up to 3 Storeys<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/><strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 3.2.2.44.<\/td><td>-<\/td><\/tr><tr><td>409<\/td><td>Required Minimum FRR of Floor and Roofs in Houses<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-04-18<br \/>CBHCC: <strong>Triaged &mdash; Requires policy discussion<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.10.8.10.<\/td><td>-<\/td><\/tr><tr><td>408<\/td><td>Mandatory Residential Sprinklers in Homes<\/td><td>Osburn, Matthew, Canadian Automatic Sprinkler Association<\/td><td>2007-11-09<\/td><td><strong>Received<\/strong><br \/>2007-11-09<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-04-18<br \/>EC: <strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>407<\/td><td>Add a requirement in the National Building Code to mandate that elevators and escalators are designed and installed for seismic requirements as per ASME A17.1-2007\/CSA B44-07 'Safety Code for Elevators and Escalators'<\/td><td>Rehman, Aziz, Schindler Elevator Corporation<\/td><td>2007-10-16<\/td><td><strong>Received<\/strong><br \/>2007-01-01<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-26<br \/><\/td><td>NBC Division B 4.1.8.17.<\/td><td>-<\/td><\/tr><tr><td>406<\/td><td>Standardization of Nominal Dimension between Imperial and Metric Measurement for Plywood Products<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2007-11-01<\/td><td><strong>Received<\/strong><br \/>2007-11-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>405<\/td><td>Update to Referenced Standard for Air Ducts Test<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-11-01<\/td><td><strong>Received<\/strong><br \/>2007-11-01<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.6.5.1.(2),<br \/>NBC Division B 3.6.5.1.(5),<br \/>NBC Division B 9.33.6.2.(2),<br \/>NBC Division B 9.33.6.2.(4)<\/td><td>-<\/td><\/tr><tr><td>404<\/td><td>Minimum Exit Stair Width<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2007-10-30<\/td><td><strong>Received<\/strong><br \/>2007-10-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-11-27<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-02-22<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Accessibility<br \/>2025-10-17<br \/>NMCC on Accessibility: <strong>Presented to NMCC<\/strong><br \/>2026-01-09<br \/><\/td><td>NBC Division B 3.4.3.2.<\/td><td>-<\/td><\/tr><tr><td>403<\/td><td>Handrail reachability<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2007-10-30<\/td><td><strong>Received<\/strong><br \/>2007-10-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-11-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-05<br \/><\/td><td>-<\/td><td>346 (published), 347 (published)<\/td><\/tr><tr><td>402<\/td><td>Handrail height when part of a guard<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2007-10-30<\/td><td><strong>Received<\/strong><br \/>2007-10-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-11-27<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-12-05<br \/><\/td><td>-<\/td><td>340 (published), 341 (published)<\/td><\/tr><tr><td>401<\/td><td>Assembly Occupancy Aisles<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2007-10-30<\/td><td><strong>Received<\/strong><br \/>2007-10-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-28<br \/><\/td><td>-<\/td><td>462 (published)<\/td><\/tr><tr><td>400<\/td><td>Assembly Occupancy<\/td><td>Pauls, Jake, Jake Pauls Consulting Services<\/td><td>2007-10-30<\/td><td><strong>Received<\/strong><br \/>2007-10-30<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-28<br \/><\/td><td>-<\/td><td>1751, 1752 (published)<\/td><\/tr><tr><td>399<\/td><td>Clarification of Application for Devices Connected to Sanitary Drainage Systems<\/td><td>LaRose, Carey, Alberta Municipal Affairs and Housing<\/td><td>2007-08-01<\/td><td><strong>Received<\/strong><br \/>2007-08-01<br \/>HVAC and Plumbing: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2010-11-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/>CBHCC: <strong>Triaged &mdash; Minor task<\/strong><br \/>2025-10-17<br \/><\/td><td>NPC Division B 2.4.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>398<\/td><td>Gaskets in Flanged Connections<\/td><td>Roosdahl, Larrie, Roosdahl Engineering Enterprises<\/td><td>2007-10-26<\/td><td><strong>Received<\/strong><br \/>2007-10-26<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2008-11-25<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-04-06<br \/><\/td><td>NFC Division B 4.5.5.5.<\/td><td>-<\/td><\/tr><tr><td>397<\/td><td>Wind Load and Other Air Pressure Loads<\/td><td>Bradet, Yves, Soprema Inc.<\/td><td>2007-10-23<\/td><td><strong>Received<\/strong><br \/>2007-10-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-04-08<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2009-02-23<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-07<br \/><\/td><td>NBC Division B 5.2.2.2.<\/td><td>-<\/td><\/tr><tr><td>396<\/td><td>Door release hardware<\/td><td>Kuffner, William, Zenix Engineering Ltd.<\/td><td>2007-10-11<\/td><td><strong>Received<\/strong><br \/>2007-10-11<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2009-05-12<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-28<br \/><\/td><td>-<\/td><td>218 (published)<\/td><\/tr><tr><td>395<\/td><td>Firefighter Emergency Operation<\/td><td>Rehman, Aziz, Schindler Elevator Corporation<\/td><td>2007-09-26<\/td><td><strong>Received<\/strong><br \/>2007-09-26<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2021-10-26<br \/><\/td><td>NBC Division B 3.2.5.<\/td><td>-<\/td><\/tr><tr><td>394<\/td><td>Grease Interceptors Compliance Standards<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2007-10-23<\/td><td><strong>Received<\/strong><br \/>2007-10-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NPC Division B 2.2.3.2.<\/td><td>-<\/td><\/tr><tr><td>393<\/td><td>Vacuum Breakers<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2007-10-23<\/td><td><strong>Received<\/strong><br \/>2007-10-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NPC Division B 2.2.10.10.(1)<\/td><td>443 (published), 444 (published), 445 (published)<\/td><\/tr><tr><td>392<\/td><td>Potable Water Treatment Systems<\/td><td>Murra, Abraham I., Canadian Standards Association<\/td><td>2007-10-23<\/td><td><strong>Received<\/strong><br \/>2007-10-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2010-11-23<br \/><\/td><td>NPC Division B 2.6.2.1.(2)<\/td><td>-<\/td><\/tr><tr><td>391<\/td><td>Heat Detector in Close Proximity to Kitchen Stoves<\/td><td>Chandra, Niraj<\/td><td>2007-10-11<\/td><td><strong>Received<\/strong><br \/>2007-10-11<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-11-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-02-13<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>390<\/td><td>Heat Detectors in Storage Garages & Interconnection with Smoke Alarms<\/td><td>Tracey, Sean, NFPA<\/td><td>2007-10-24<\/td><td><strong>Received<\/strong><br \/>2007-10-24<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-02-13<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-16<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 9.10.18.3.<\/td><td>-<\/td><\/tr><tr><td>389<\/td><td>Protect Attached Garages<\/td><td>Tracey, Sean, NFPA<\/td><td>2007-03-23<\/td><td><strong>Received<\/strong><br \/>2007-03-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-04-16<br \/>Housing and Small Buildings: <strong>Reviewed (legacy) <\/strong><br \/>2010-04-28<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-11-20<br \/><\/td><td>NBC Division B 9.10.9.15.<\/td><td>-<\/td><\/tr><tr><td>388<\/td><td>Cross-Over Emergency Access<\/td><td>Pudelko, John<\/td><td>2007-10-01<\/td><td><strong>Received<\/strong><br \/>2007-10-01<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-11-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-29<br \/><\/td><td>-<\/td><td>218 (published), 220 (published)<\/td><\/tr><tr><td>387<\/td><td>-<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-10-19<\/td><td><strong>Received<\/strong><br \/>2007-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-29<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2024-09-12<br \/><\/td><td>NBC Division B 3.4.6.15.<\/td><td>-<\/td><\/tr><tr><td>386<\/td><td>Update to Referenced Standard for Light Diffusers and Lenses Fire Test<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-10-19<\/td><td><strong>Received<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.1.13.4.(1)<\/td><td>-<\/td><\/tr><tr><td>385<\/td><td>Update to Referenced Standard for the Test for Surface Burning Characteristics of Misc. Materials<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-10-19<\/td><td><strong>Received<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.1.12.1.(2),<br \/>NBC Division B 3.1.13.4.(1)<\/td><td>-<\/td><\/tr><tr><td>384<\/td><td>Update to Referenced Standard for the Test for Surface Burning Characteristics of Bldg. Materials<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-10-19<\/td><td><strong>Received<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.1.5.21.(1),<br \/>NBC Division B 3.1.12.1.(1)<\/td><td>-<\/td><\/tr><tr><td>383<\/td><td>Update to Referenced Standard for the Fire Endurance of Bldg. Construction and Materials<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-10-19<\/td><td><strong>Received<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.1.5.12.,<br \/>NBC Division B 3.1.7.1.(1),<br \/>NBC Division B 3.1.11.7.(1),<br \/>NBC Division B 3.2.3.8.(1),<br \/>NBC Division B 3.2.6.5.(6)<\/td><td>-<\/td><\/tr><tr><td>382<\/td><td>Structural design of glass<\/td><td>Webb, Margaret, Insulating Glass Manufacturers Alliance (IGMA)<\/td><td>2007-10-11<\/td><td><strong>Received<\/strong><br \/>2007-10-11<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-02-13<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.6.1.2.,<br \/>NBC Division B 9.6.1.3.(1)<\/td><td>496 (published)<\/td><\/tr><tr><td>381<\/td><td>Section 9.7 Windows and Skylights; Sub section 9.7.3, Glass<\/td><td>Webb, Margaret, Insulating Glass Manufacturers Alliance (IGMA)<\/td><td>2007-10-11<\/td><td><strong>Received<\/strong><br \/>2007-10-11<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-22<br \/><\/td><td>NBC Division B 4.3.6.1.(1)<\/td><td>496 (published)<\/td><\/tr><tr><td>380<\/td><td>New Standard for the Design and Installation of Water-Mist Fire Suppression System<\/td><td>Th\u00e9or\u00eat, Jacques, J.A.V.Distribution inc.<\/td><td>2007-09-21<\/td><td><strong>Received<\/strong><br \/>2007-09-21<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NFC Division B 2.1.3.5.<\/td><td>-<\/td><\/tr><tr><td>379<\/td><td>Climatic Data for the City of Elliot Lake, Ontario<\/td><td>Allard, Syl, City of Elliot Lake<\/td><td>2007-09-10<\/td><td><strong>Received<\/strong><br \/>2007-09-10<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-22<br \/><\/td><td>NBC Division B C-2<\/td><td>-<\/td><\/tr><tr><td>378<\/td><td>Structural Requirements for Sprinklers in NFPA 13 Standard<\/td><td>Watts, Ralph D<\/td><td>2007-10-09<\/td><td><strong>Received<\/strong><br \/>2007-10-09<br \/>Earthquake Design: <strong>Reviewed (legacy) <\/strong><br \/>2007-11-24<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.2.5.13.<\/td><td>512 (published)<\/td><\/tr><tr><td>377<\/td><td>Power Supply for Fire Pumps<\/td><td>Feeney, Kevin, H. H. Angus &amp; Associates Ltd., Consulting Engineers<\/td><td>2000-06-01<\/td><td><strong>Received<\/strong><br \/>2000-06-01<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-20<br \/><\/td><td>NBC Division B 3.2.5.19.<\/td><td>-<\/td><\/tr><tr><td>376<\/td><td>Elevator Car Dimensions<\/td><td>Migneault, Yvon, R\u00e9gie du b\u00e2timent du Qu\u00e9bec<\/td><td>2001-12-20<\/td><td><strong>Received<\/strong><br \/>2001-12-20<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-11-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-28<br \/><\/td><td>-<\/td><td>1480 (published)<\/td><\/tr><tr><td>375<\/td><td>Revision to the Current Canada Action Level of Radon<\/td><td>Griffith, Helen, Radiation surveillance and Health Assessment Division. Health Canada<\/td><td>2007-09-19<\/td><td><strong>Received<\/strong><br \/>2007-09-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.6.<\/td><td>-<\/td><\/tr><tr><td>374<\/td><td>Subfloor Depressurization<\/td><td>Johnson, Harry M., Radonmatters<\/td><td>2007-09-17<\/td><td><strong>Received<\/strong><br \/>2007-09-17<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-25<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.6.<\/td><td>-<\/td><\/tr><tr><td>373<\/td><td>Composite Slim-Floor Steel Beams<\/td><td>Lemieux, Dominic, Peikko Canada Inc. &amp; Logisbourg inc.<\/td><td>2007-09-17<\/td><td><strong>Received<\/strong><br \/>2007-09-17<br \/>Fire Protection: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2008-03-31<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-03-22<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2011-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-05-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2012-11-21<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2013-04-30<br \/><\/td><td>NBC Division B 3.1.7.1.<\/td><td>-<\/td><\/tr><tr><td>372<\/td><td>Appliances installed outside a building<\/td><td>Kuffner, William, Zenix Engineering Ltd.<\/td><td>2007-09-17<\/td><td><strong>Received<\/strong><br \/>2007-09-17<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-05-12<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-22<br \/><\/td><td>NBC Division B 6.2.5.2.<\/td><td>-<\/td><\/tr><tr><td>371<\/td><td>New Referenced Standard for Fire Stop Flaps<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-09-18<\/td><td><strong>Received<\/strong><br \/>2007-09-18<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.6.4.3.(2),<br \/>NBC Division B 9.10.13.14.(1),<br \/>NBC Division B D-5.3.,<br \/>NBC Division B D-2.3.10.,<br \/>NBC Division B D-2.3.11.<\/td><td>383 (published)<\/td><\/tr><tr><td>370<\/td><td>Update to Referenced Standard for Air Filter Units Fire Test<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-09-07<\/td><td><strong>Received<\/strong><br \/>2007-09-07<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-19<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-26<br \/><\/td><td>NBC Division B 6.2.3.13.(1),<br \/>NBC Division B 9.33.6.15.(1)<\/td><td>-<\/td><\/tr><tr><td>369<\/td><td>Use of fingerjoined lumber in wood-frame wall assemblies described in Table A-9.10.3.1.A. Fire and Sound Resistance of Walls<\/td><td>Van Zeeland, Ineke, Canadian Wood Council<\/td><td>2007-09-12<\/td><td><strong>Received<\/strong><br \/>2007-09-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B A-9.10.3.1.A.<\/td><td>-<\/td><\/tr><tr><td>368<\/td><td>Fastening of Gypsum Board<\/td><td>Monsour, Ross, Canadian ICF Standard Task Group<\/td><td>2007-09-12<\/td><td><strong>Received<\/strong><br \/>2007-09-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.29.5.1.<\/td><td>-<\/td><\/tr><tr><td>367<\/td><td>Air Barrier System Properties for ICF<\/td><td>Monsour, Ross, Canadian ICF Standard Task Group<\/td><td>2007-09-12<\/td><td><strong>Received<\/strong><br \/>2007-09-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.25.3.2.<\/td><td>-<\/td><\/tr><tr><td>366<\/td><td>Structural Design Requirements for Concrete Structure in Part 9<\/td><td>Monsour, Ross, Canadian ICF Standard Task Group<\/td><td>2007-09-12<\/td><td><strong>Received<\/strong><br \/>2007-09-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.4.1.1.(1)<\/td><td>-<\/td><\/tr><tr><td>365<\/td><td>Exemption from Vapour Barrier Protection for some Sprayed Foamed Plastic Insulation<\/td><td>Monsour, Ross, Canadian ICF Standard Task Group<\/td><td>2007-09-12<\/td><td><strong>Received<\/strong><br \/>2007-09-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.25.1.2.<\/td><td>-<\/td><\/tr><tr><td>364<\/td><td>Required Soil Gas Control<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2004-08-30<\/td><td><strong>Received<\/strong><br \/>2004-08-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.13.4.1.(1)<\/td><td>-<\/td><\/tr><tr><td>363<\/td><td>Clarification of Subfloor Depressurization Applications<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2004-08-30<\/td><td><strong>Received<\/strong><br \/>2004-08-30<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.13.4.6.(6)<\/td><td>-<\/td><\/tr><tr><td>362<\/td><td>Protection of Electrical Wiring Underneath Metal Roof Decks<\/td><td>Kalinger, Peter, Canadian Roofing Contractors Association<\/td><td>2008-09-04<\/td><td><strong>Received<\/strong><br \/>2008-09-04<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.1.6.2.<\/td><td>-<\/td><\/tr><tr><td>361<\/td><td>Wind Load for Toronto<\/td><td>Chan, Peter K.S., City of Toronto<\/td><td>2007-09-04<\/td><td><strong>Received<\/strong><br \/>2007-09-04<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-22<br \/><\/td><td>NBC Division B C-2<\/td><td>-<\/td><\/tr><tr><td>360<\/td><td>9.15.4.4. Foundation Walls Laterally Supported - Sentence unclear<\/td><td>Bellerose, Richard, APCHQ<\/td><td>2007-08-15<\/td><td><strong>Received<\/strong><br \/>2007-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.15.4.4.<\/td><td>-<\/td><\/tr><tr><td>359<\/td><td>Use of Radon Test Results to Establish Application of Protection Against Depressurization<\/td><td>Fugler, Don, Canada Mortgage and Housing Corporation, Policy and Research<\/td><td>2007-08-21<\/td><td><strong>Received<\/strong><br \/>2007-08-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/>CBHCC: <strong>Triaged &mdash; Forward to national model codes committee<\/strong> &mdash; NMCC on Indoor Environment<br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.32.3.8.(1)<\/td><td>-<\/td><\/tr><tr><td>358<\/td><td>Provision for an exhaust-only ventilation in a house without a forced-air circulation system<\/td><td>Fugler, Don, Canada Mortgage and Housing Corporation, Policy and Research<\/td><td>2007-08-21<\/td><td><strong>Received<\/strong><br \/>2007-08-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.32.3.6.(1)<\/td><td>-<\/td><\/tr><tr><td>357<\/td><td>Self-Closing Devices Hardware Performance Criteria on Swinging Doors<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-08-14<\/td><td><strong>Received<\/strong><br \/>2007-08-14<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.1.8.11.(2),<br \/>NBC Division B 9.10.13.1.(2)<\/td><td>311<\/td><\/tr><tr><td>356<\/td><td>Revision to the Fire and Sound Resistance of Floors, Ceilings and Roofs<\/td><td>Sultan, Mohamed A., NRC-IRC (Fire Research Program)<\/td><td>2007-08-15<\/td><td><strong>Received<\/strong><br \/>2007-08-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.10.3.1.A.<\/td><td>-<\/td><\/tr><tr><td>355<\/td><td>Passive Subfloor Depressurization<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2007-08-03<\/td><td><strong>Received<\/strong><br \/>2007-08-03<br \/><\/td><td>NBC Division B 9.13.4.8.<\/td><td>-<\/td><\/tr><tr><td>354<\/td><td>Providing for Subfloor Depressurization \u2013 Make up Air<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2007-08-03<\/td><td><strong>Received<\/strong><br \/>2007-08-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-25<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.6.(10)<\/td><td>-<\/td><\/tr><tr><td>353<\/td><td>Providing for Subfloor Depressurization \u2013 Active Systems<\/td><td>Johnston, Don, Canadian Home Builders' Association<\/td><td>2007-08-03<\/td><td><strong>Received<\/strong><br \/>2007-08-03<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-25<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.6.(6)<\/td><td>-<\/td><\/tr><tr><td>352<\/td><td>Mandatory automatic sprinkler protection for residential buildings up to three storeys in building height.<\/td><td>Levesque, Dail, Ontario Fire Marshal's Public Fire Safety Council<\/td><td>2007-07-25<\/td><td><strong>Received<\/strong><br \/>2007-07-25<br \/><strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>351<\/td><td>Mandatory Sprinklers in Residential Occupancy<\/td><td>Levesque, Dail, Ontario Fire Marshal's Public Fire Safety Council<\/td><td>2007-07-25<\/td><td><strong>Received<\/strong><br \/>2007-07-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.10.8.2.<\/td><td>-<\/td><\/tr><tr><td>350<\/td><td>Ground Snow Load - Hamilton<\/td><td>Spolnik, John, Ontario Ministry of Municipal Affairs and Housing<\/td><td>2007-06-25<\/td><td><strong>Received<\/strong><br \/>2007-06-25<br \/>Structural Design: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-22<br \/><\/td><td>NBC Division B C-2<\/td><td>-<\/td><\/tr><tr><td>349<\/td><td>Recirculation loop<\/td><td>L\u00e9vesque, Andr\u00e9, L'Association de protection de l'environnement du Lac \u00e0 l'Anguille inc<\/td><td>2007-06-27<\/td><td><strong>Received<\/strong><br \/>2007-06-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-18<br \/><\/td><td>NBC Division B 6.1.1.3.<\/td><td>-<\/td><\/tr><tr><td>348<\/td><td>Water closet<\/td><td>L\u00e9vesque, Andr\u00e9, L'Association de protection de l'environnement du Lac \u00e0 l'Anguille inc<\/td><td>2007-06-27<\/td><td><strong>Received<\/strong><br \/>2007-06-27<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-04-18<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>347<\/td><td>Update the Referenced Standard to the Current Edition<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-07-20<\/td><td><strong>Received<\/strong><br \/>2007-07-20<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy) <\/strong><br \/>2009-09-30<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-28<br \/><\/td><td>NFC Division B 4.5.7.1.(2),<br \/>NFC Division B 4.6.5.2.(1)<\/td><td>-<\/td><\/tr><tr><td>346<\/td><td>Performance Standards for Portable Fire Extinguishers<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-07-09<\/td><td><strong>Received<\/strong><br \/>2005-06-02<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-04-14<br \/><\/td><td>NFC Division B 6.2.1.2.(1)<\/td><td>-<\/td><\/tr><tr><td>345<\/td><td>10-Min Firefighter Response Time<\/td><td>Ligenza, Ray, Municipal Affairs &amp; Housing<\/td><td>2007-06-21<\/td><td><strong>Received<\/strong><br \/>2007-06-21<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-11-21<br \/><\/td><td>NBC Division B 3.2.3.1.(5),<br \/>NBC Division B 9.10.14.3.,<br \/>NBC Division B 9.10.15.3.<\/td><td>-<\/td><\/tr><tr><td>344<\/td><td>Continuous Vent Definition<\/td><td>Roberts, Rhonda, SAIT Polytechnic<\/td><td>2007-06-20<\/td><td><strong>Received<\/strong><br \/>2007-06-20<br \/><\/td><td>NPC Division A 1.4.1.2.<\/td><td>-<\/td><\/tr><tr><td>343<\/td><td>Sizing of Continuous Vent Serving a Wet Vent<\/td><td>Roberts, Rhonda, SAIT Polytechnic<\/td><td>2007-06-20<\/td><td><strong>Received<\/strong><br \/>2007-06-20<br \/><\/td><td>NPC Division B 2.5.2.1.(1)<\/td><td>-<\/td><\/tr><tr><td>342<\/td><td>Carbon Monoxide Alarm <\/td><td>Donahoe, Gerard F.<\/td><td>2007-06-19<\/td><td><strong>Received<\/strong><br \/>2007-06-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-03-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2010-11-22<br \/><\/td><td>NBC Division B 6.2.4.1.(5)<\/td><td>-<\/td><\/tr><tr><td>341<\/td><td>Clarification for Emergency Power Installations<\/td><td>Donahoe, Gerard F.<\/td><td>2007-06-19<\/td><td><strong>Received<\/strong><br \/>2007-06-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.6.2.8.(1)<\/td><td>-<\/td><\/tr><tr><td>340<\/td><td>Adding Reference to ASTM C1658<\/td><td>Davidson, Chris, GAPAC<\/td><td>2007-06-15<\/td><td><strong>Received<\/strong><br \/>2007-06-15<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-04-07<br \/><\/td><td>NBC Division B 5.10.1.1.<\/td><td>-<\/td><\/tr><tr><td>339<\/td><td>Glass Mat Gypsum Options as Thermal Barrier Protection for Combustible Insulation<\/td><td>Davidson, Chris, GAPAC<\/td><td>2007-06-15<\/td><td><strong>Received<\/strong><br \/>2007-06-15<br \/>Fire Protection: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2008-03-31<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-03-22<br \/><\/td><td>NBC Division B 3.1.5.12.(4)<\/td><td>299 (published)<\/td><\/tr><tr><td>338<\/td><td>Add reference to ASTM C1658 for Glass Mat Gypsum panels<\/td><td>Davidson, Chris, GAPAC<\/td><td>2007-06-15<\/td><td><strong>Received<\/strong><br \/>2007-06-15<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.23.16.1.<\/td><td>-<\/td><\/tr><tr><td>337<\/td><td>Update to Referenced Standard for 20-Min Fire-Rated Wood Core Doors<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-06-11<\/td><td><strong>Received<\/strong><br \/>2007-06-11<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2007-10-30<br \/><\/td><td>NBC Division B 9.10.13.2.(1)<\/td><td>-<\/td><\/tr><tr><td>336<\/td><td>Fast Response Sprinklers<\/td><td>Robertson, Jack, Underwriters Laboratories<\/td><td>2007-05-23<\/td><td><strong>Received<\/strong><br \/>2007-05-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2009-11-17<br \/><\/td><td>NBC Division B 3.2.5.13.(7)<\/td><td>-<\/td><\/tr><tr><td>335<\/td><td>Fire Pump Testing in Accordance with new Referenced Standards<\/td><td>Robertson, Jack, Underwriters Laboratories<\/td><td>2007-05-23<\/td><td><strong>Received<\/strong><br \/>2007-05-23<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2008-10-20<br \/><\/td><td>NBC Division B 3.2.5.19.<\/td><td>-<\/td><\/tr><tr><td>334<\/td><td>Stainless Steel Pipe and Fitting<\/td><td>Surgeoner, Chuck<\/td><td>2003-05-23<\/td><td><strong>Received<\/strong><br \/>2003-05-23<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-26<br \/><\/td><td>NPC Division B 2.2.6.<\/td><td>-<\/td><\/tr><tr><td>333<\/td><td>Application for Automatic Sprinkler Systems Designed to NFPA 13D<\/td><td>Saj, Julian, City of Winnipeg<\/td><td>2006-01-03<\/td><td><strong>Received<\/strong><br \/>2006-01-03<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-08-15<br \/><\/td><td>NBC Division B 3.2.5.13.(3)<\/td><td>-<\/td><\/tr><tr><td>332<\/td><td>Exemption for Fire Detectors in Elevator Hoistways and Dumbwaiter Shafts<\/td><td>Mitchell, Peter R., Association of Professional Engineers and Geoscientists of BC<\/td><td>2007-05-10<\/td><td><strong>Received<\/strong><br \/>2007-05-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-08-15<br \/><\/td><td>NBC Division B 3.2.4.10.(2)<\/td><td>-<\/td><\/tr><tr><td>331<\/td><td>Smoke Detectors in Elevator Machine Rooms<\/td><td>Mitchell, Peter R., Association of Professional Engineers and Geoscientists of BC<\/td><td>2007-05-10<\/td><td><strong>Received<\/strong><br \/>2007-05-10<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-08-01<br \/><\/td><td>NBC Division B 3.2.4.11.(1)<\/td><td>-<\/td><\/tr><tr><td>330<\/td><td>Clarification of Application for Residential Sprinklers and Part 9<\/td><td>Mitchell, Peter R., Association of Professional Engineers and Geoscientists of BC<\/td><td>2007-05-10<\/td><td><strong>Received<\/strong><br \/>2007-05-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.2.5.13.(2)<\/td><td>-<\/td><\/tr><tr><td>329<\/td><td>Reference to NFPA 80 and Hold-Open Devices<\/td><td>Mitchell, Peter R., Association of Professional Engineers and Geoscientists of BC<\/td><td>2007-05-10<\/td><td><strong>Received<\/strong><br \/>2007-05-10<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-04-14<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2011-11-17<br \/><\/td><td>NBC Division B 3.1.8.12.(2),<br \/>NBC Division B 3.1.8.12.(3)<\/td><td>-<\/td><\/tr><tr><td>328<\/td><td>Protection between urinals<\/td><td>Chang, Paul, Alberta Municipal Affairs &amp; Housing<\/td><td>2007-05-07<\/td><td><strong>Received<\/strong><br \/>2007-05-07<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>327<\/td><td>Adoption of CSA Medical Gas Standards Z7396.1 and 7396.2<\/td><td>Mitta, Dan, Ministry of Municipal Affairs and Housing<\/td><td>2007-05-08<\/td><td><strong>Received<\/strong><br \/>2007-05-08<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2008-11-24<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-09-30<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-02<br \/><\/td><td>NBC Division B 3.7.3.1.(1)<\/td><td>41 (published)<\/td><\/tr><tr><td>326<\/td><td>Opening in Guards Protecting low entry porch<\/td><td>Walker, John<\/td><td>2007-04-25<\/td><td><strong>Received<\/strong><br \/>2007-04-25<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-12-05<br \/><\/td><td>NBC Division B 3.4.6.6.(5),<br \/>NBC Division B 3.3.1.18.(3),<br \/>NBC Division B 9.8.8.6.<\/td><td>-<\/td><\/tr><tr><td>325<\/td><td>Withdrawn Referenced Standard CAN\/CSA B182.7<\/td><td>Cook, Peter J.<\/td><td>2007-04-20<\/td><td><strong>Received<\/strong><br \/>2007-04-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division B 2.2.5.10.(1)<\/td><td>-<\/td><\/tr><tr><td>324<\/td><td>\"Normally open\" backwater valves <\/td><td>Cook, Peter J.<\/td><td>2007-04-20<\/td><td><strong>Received<\/strong><br \/>2007-04-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division B 2.4.6.4.<\/td><td>-<\/td><\/tr><tr><td>323<\/td><td>Withdrawn Referenced Standard CAN\/CSA B182.7<\/td><td>Cook, Peter J.<\/td><td>2007-04-20<\/td><td><strong>Received<\/strong><br \/>2007-04-20<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division B 1.3.1.2.<\/td><td>-<\/td><\/tr><tr><td>322<\/td><td>Secondary Containment Clearances Waived for Aboveground Storage Tanks<\/td><td>Ligenza, Ray, Municipal Affairs &amp; Housing<\/td><td>2006-10-23<\/td><td><strong>Received<\/strong><br \/>2006-10-23<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-08-01<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-06-28<br \/><\/td><td>NFC Division B 4.3.7.4.(2)<\/td><td>-<\/td><\/tr><tr><td>321<\/td><td>Sizing of Wet Vents<\/td><td>Roberts, Rhonda, SAIT Polytechnic<\/td><td>2007-04-17<\/td><td><strong>Received<\/strong><br \/>2007-04-17<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2012-09-18<br \/><\/td><td>NPC Division B 2.5.2.1.(1),<br \/>NPC Division B 2.5.2.1.<\/td><td>-<\/td><\/tr><tr><td>320<\/td><td>Require 45 min FRR or Sprinklers in Houses<\/td><td>Tracey, Sean, NFPA<\/td><td>2007-04-03<\/td><td><strong>Received<\/strong><br \/>2007-03-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Further Analysis<\/strong><br \/>2007-10-19<br \/><strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 9.10.8.8.(3)<\/td><td>-<\/td><\/tr><tr><td>319<\/td><td>Mandatory Sprinklers in Residential Occupancy<\/td><td>Tracey, Sean, NFPA<\/td><td>2007-03-23<\/td><td><strong>Received<\/strong><br \/>2007-03-23<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-10-20<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2009-03-23<br \/>EC: <strong>CCBFC Decision (legacy) <\/strong><br \/>2018-12-03<br \/><\/td><td>NBC Division B 3.3.4.<\/td><td>-<\/td><\/tr><tr><td>318<\/td><td>Mandatory Sprinklers in Residential Occupancy<\/td><td>Tracey, Sean, NFPA<\/td><td>2007-03-23<\/td><td><strong>Received<\/strong><br \/>2007-03-23<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.10.<\/td><td>-<\/td><\/tr><tr><td>317<\/td><td>Add a New Referenced Standard for Mattresses and Mattress Sets in B2 Major Occupancies<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-03-19<\/td><td><strong>Received<\/strong><br \/>2007-03-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2008-04-14<br \/>Fire Protection: <strong>Reviewed (legacy) <\/strong><br \/>2009-11-17<br \/><\/td><td>NFC Division B 2.3.2.3.<\/td><td>-<\/td><\/tr><tr><td>316<\/td><td>Adding reference to CAN\/ULC-S716.1-07 Standard for Exterior Insulation and Finish Systems (EIFS) \u2013 Materials and Systems<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-03-15<\/td><td><strong>Received<\/strong><br \/>2007-03-15<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-03-20<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-19<br \/>Environmental Separation: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2008-02-25<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-11-09<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.27.1.1.,<br \/>NBC Division B 5.10.1.1.<\/td><td>535 (published)<\/td><\/tr><tr><td>315<\/td><td>Expansion of Application for Hold-Open Devices<\/td><td>Fritz, Al, Alvin Reinhard Fritz Architect Inc.<\/td><td>2007-03-13<\/td><td><strong>Received<\/strong><br \/>2007-03-13<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2008-08-01<br \/><\/td><td>NBC Division B 3.1.8.12.<\/td><td>-<\/td><\/tr><tr><td>314<\/td><td>Angle Size Dimensions<\/td><td>Inglis, Michael, Atomic Energy of Canada Limited<\/td><td>2007-03-12<\/td><td><strong>Received<\/strong><br \/>2007-03-12<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-19<br \/><\/td><td>NBC Division B 9.20.5.2.<\/td><td>-<\/td><\/tr><tr><td>313<\/td><td>Rack Storage Requirement in Earthquake Zone<\/td><td>Inglis, Michael, Atomic Energy of Canada Limited<\/td><td>2007-03-12<\/td><td><strong>Received<\/strong><br \/>2007-03-12<br \/>Hazardous Materials and Activities: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-09<br \/>EC: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2012-06-28<br \/><\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>312<\/td><td>Seismic Support of Mechanical Equipment<\/td><td>Inglis, Michael, Atomic Energy of Canada Limited<\/td><td>2007-03-12<\/td><td><strong>Received<\/strong><br \/>2007-03-12<br \/>Structural Design: <strong>Reviewed (legacy) <\/strong><br \/>2007-07-07<br \/>HVAC and Plumbing: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-27<br \/><\/td><td>NBC Division B 6.2.1.3.,<br \/>NBC Division B 7<\/td><td>-<\/td><\/tr><tr><td>311<\/td><td>Update to Referenced Standard for the Installation of Fire Alarm Systems<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-03-13<\/td><td><strong>Received<\/strong><br \/>2007-03-13<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-09-30<br \/><\/td><td>NBC Division B 3.2.4.5.(1),<br \/>NBC Division B 3.2.4.18.(10)<\/td><td>-<\/td><\/tr><tr><td>310<\/td><td>Reference CAN\/ULC-S319<\/td><td>Dulmage, G. Rae, Underwriters Laboratories of Canada<\/td><td>2007-03-13<\/td><td><strong>Received<\/strong><br \/>2007-03-13<br \/>Use and Egress: <strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2007-10-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Referred<\/strong><br \/>2007-10-19<br \/>Use and Egress: <strong>Reviewed (legacy)  &mdash; Rejected<\/strong><br \/>2011-03-29<br \/><\/td><td>NBC Division B 9.6.9.1.<\/td><td>-<\/td><\/tr><tr><td>309<\/td><td>Clarification for the Protection of Structural Wood Elements from Moisture and Decay<\/td><td>Chown, G. Adaire, Codes Centre, Institute for Research in Construction, National Research Council Canada<\/td><td>2007-03-01<\/td><td><strong>Received<\/strong><br \/>2007-03-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-20<br \/><\/td><td>NBC Division B 9.3.2.9.(3)<\/td><td>-<\/td><\/tr><tr><td>308<\/td><td>Construction of Exterior Decking for Houses and Small Buildings<\/td><td>Roche, H\u00e9l\u00e8ne, Canadian Commission for Construction Material Evaluation<\/td><td>2007-03-02<\/td><td><strong>Received<\/strong><br \/>2007-03-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-04-20<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.8.<\/td><td>-<\/td><\/tr><tr><td>307<\/td><td>Minimum Window Area in Buildings of Residential Occupancy<\/td><td>Wilson, Bob<\/td><td>2007-02-19<\/td><td><strong>Received<\/strong><br \/>2007-02-19<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-04-20<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/>CBHCC: <strong>Triaged &mdash; Defer for future consideration<\/strong><br \/>2025-10-17<br \/><\/td><td>NBC Division B 9.7.1.<\/td><td>-<\/td><\/tr><tr><td>306<\/td><td>Combustible Raceways in Plenums<\/td><td>Kendall, David, Carlon, Lamson &amp; Sessions Inc.<\/td><td>2007-02-17<\/td><td><strong>Received<\/strong><br \/>2007-02-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.6.4.3.(1)<\/td><td>-<\/td><\/tr><tr><td>305<\/td><td>Nonmetallic Raceways<\/td><td>Kendall, David, Carlon, Lamson &amp; Sessions Inc.<\/td><td>2007-02-17<\/td><td><strong>Received<\/strong><br \/>2007-02-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.1.5.20.(1)<\/td><td>-<\/td><\/tr><tr><td>304<\/td><td>Protection for non-Fire-Rated Cables in Nonmetallic Raceways<\/td><td>Kendall, David, Carlon, Lamson &amp; Sessions Inc.<\/td><td>2007-02-17<\/td><td><strong>Received<\/strong><br \/>2007-02-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.1.5.18.(1)<\/td><td>-<\/td><\/tr><tr><td>303<\/td><td>Raceway Protection for Non-fire-rated Wires and Cables<\/td><td>Kendall, David, Carlon, Lamson &amp; Sessions Inc.<\/td><td>2007-02-17<\/td><td><strong>Received<\/strong><br \/>2007-02-17<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-04-19<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2007-10-30<br \/>Fire Protection: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-03-23<br \/><\/td><td>NBC Division B 3.1.4.3.(1)<\/td><td>-<\/td><\/tr><tr><td>302<\/td><td>Soil Gas control and Indoor air quality<\/td><td>Jagam, Pillalamarri, The NORM Group<\/td><td>2007-03-01<\/td><td><strong>Received<\/strong><br \/>2007-03-01<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-25<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.1.<\/td><td>-<\/td><\/tr><tr><td>301<\/td><td>Soil Gas control<\/td><td>Jagam, Pillalamarri, The NORM Group<\/td><td>2007-03-02<\/td><td><strong>Received<\/strong><br \/>2007-03-02<br \/>Housing and Small Buildings: <strong>Reviewed (legacy)  &mdash; Requested Approval<\/strong><br \/>2007-10-19<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-25<br \/><strong>CCBFC Decision (legacy)  &mdash; Approved<\/strong><br \/>2013-10-18<br \/><\/td><td>NBC Division B 9.13.4.1.<\/td><td>-<\/td><\/tr><tr><td>300<\/td><td>Vapour Barriers<\/td><td>Jagam, Pillalamarri, The NORM Group<\/td><td>2007-03-01<\/td><td><strong>Received<\/strong><br \/>2007-03-01<br \/>Environmental Separation: <strong>Reviewed (legacy)  &mdash; Develop<\/strong><br \/>2009-02-25<br \/><\/td><td>NBC Division B 5.5.1.<\/td><td>-<\/td><\/tr><\/tbody><\/table>\n\n\n\n\n","protected":false},"excerpt":{"rendered":"<p>Every code change request is entered into the database below where it is given a unique identification (ID) number for tracking purposes. The code change request then follows the path outlined in the code development process. This code change request tracking database can be used by proponents to follow the progress of their code change request and its status. Information in the database can be accessed using the filter option or toggle arrows to sort by: Please direct any questions to CBHCC code change request. &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"class_list":["post-848","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/comments?post=848"}],"version-history":[{"count":33,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/848\/revisions"}],"predecessor-version":[{"id":7462,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/848\/revisions\/7462"}],"wp:attachment":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/media?parent=848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}