{"id":2511,"date":"2023-07-11T17:01:15","date_gmt":"2023-07-11T21:01:15","guid":{"rendered":"https:\/\/cbhcc-cchcc.ca\/?page_id=2511"},"modified":"2025-12-12T12:55:13","modified_gmt":"2025-12-12T17:55:13","slug":"proposed-changes-tracking-database","status":"publish","type":"page","link":"https:\/\/cbhcc-cchcc.ca\/en\/proposed-changes-tracking-database\/","title":{"rendered":"Proposed changes &#8211; Tracking database"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Once a code change request becomes a minor or CBHCC approved task, it transitions to a proposed change that follows the path outlined in the <a href=\"https:\/\/cbhcc-cchcc.ca\/en\/code-development-process\/\">code development process<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This proposed change tracking database can be used by code change request proponents to follow the progress of proposed changes for a task linked to their code change request. Information in the database can be accessed using the filter option or toggle arrows to sort by:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ID number (the number assigned when a code development committee has started its work on the issue and created a proposed change form for potential publication),<\/li>\n\n\n\n<li>title,<\/li>\n\n\n\n<li>description,<\/li>\n\n\n\n<li>code reference,<\/li>\n\n\n\n<li>status (the progress of the proposed change through the system), and<\/li>\n\n\n\n<li>code change request (the corresponding code change request number assigned when it was originally submitted by a proponent, see the <a href=\"\/en\/code-change-request-tracking-database\/\" data-type=\"link\" data-id=\"\/en\/code-change-request-tracking-database\/\">code change request tracking database<\/a>).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Please direct any questions related to code change requests to <a href=\"mailto:CONSTCodesChangeReq@nrc-cnrc.gc.ca\">CBHCC code change request.<\/a><\/p>\n\n\n<p class=\"show-entry\">&nbsp;<\/p>\n<table id='example' class='display' style='table-layout:auto;width:100%;'><thead><tr><th>ID<\/th><th>Title<\/th><th>Description<\/th><th>Code Reference<\/th><th>Status<\/th><th>Code Change Requests<\/th><\/tr><\/thead><tbody><tr><td>2312<\/td><td>Option for a peninsular toilet in universal washrooms<\/td><td>This proposed change prescribes technical requirements for a peninsular toilet option in universal washrooms<\/td><td>NBC25 Div.B 3.8.3.13.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2311<\/td><td>Transfer space adjacent to adult change tables in universal washrooms<\/td><td>The proposed change increases the minimum dimensions for transfer space adjacent to adult change tables in universal washrooms to align with analogous requirements for benches in universal changing facilities.<\/td><td>NBC25 Div.B 3.8.3.13.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2310<\/td><td>Updated Separation Chart for Storage of Dangerous Goods<\/td><td>This proposed change edits the separation chart for the storage of dangerous goods in the NFC.<\/td><td>NFC25 Div.B 3.2.7.6.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2309<\/td><td>Updated Dangerous Goods Storage Classifications and Exemptions<\/td><td>This proposed change changes the storage classifications for dangerous goods in the NFC.<\/td><td>NFC25 Div.B 3.2.7.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2308<\/td><td>Updates to TDGR, WHMIS and NFC Class Descriptors for Dangerous Goods<\/td><td>This proposed change updates the table on TDGR, WHMIS and NFC class descriptors to be more specific to each dangerous good.<\/td><td>NBC25 Div.A 1.4.1.2.(1),<br \/>NFC25 Div.A 1.4.1.2.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2306<\/td><td>Electrical rough-in for a reachable GFCI-protected outlet in the kitchen<\/td><td>This PCF introduces a new requirement for electrical rough-in for a GFCI outlet by kitchen counters that is easily reachable from a seated or standing position.<\/td><td>NBC25 Div.B 9.34.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2305<\/td><td>Proximity of sinks and stovetops for the provision of a continuous counter in multi-unit residential buildings<\/td><td>This proposed change would require that sinks and stovetops in multi-unit residential buildings be positioned for continuous connection by a counter<\/td><td>NBC25 Div.B 9.5.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2302<\/td><td>Fire Watch Requirements<\/td><td>This proposed change clarifies the responsibilities and activities of fire monitoring the hot work area during hot work.<\/td><td>NFC25 Div.B 5.2.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2026-08-11<br \/><\/td><td>-<\/td><\/tr><tr><td>2301<\/td><td>Expanded Definition for Dangerous Goods for Waste Materials in NBC<\/td><td>This proposed change expands the defined term \"dangerous goods\" to include waste materials and addresses dangerous good storage in the NBC.<\/td><td>NBC25 Div.A 1.4.1.2.(1),<br \/>NBC25 Div.B 3.3.6.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2298<\/td><td>New Section for Hazardous Waste Operations<\/td><td>This proposed change adds a section on hazardous processing operations.<\/td><td>NFC25 Div.B 5<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2296<\/td><td>Expanded Definition for Dangerous Goods for Waste Materials in NFC<\/td><td>This proposed change expands the defined term \"dangerous goods\" to include waste materials in the NFC.<\/td><td>NFC25 Div.A 1.4.1.2.(1)<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2026-08-04<br \/><\/td><td>-<\/td><\/tr><tr><td>2295<\/td><td>Means of Egress for Housing and Small Buildings<\/td><td>This proposed change provides relaxations for the means of egress requirements for housing and small buildings under alterations. <\/td><td>NBC25 Div.B 10.9.<\/td><td>NMCC on Harmonization of Alteration of Existing Buildings: Draft<br \/>2026-07-27<br \/><\/td><td>-<\/td><\/tr><tr><td>2294<\/td><td>Scope and application of Section 10.9. Housing and Small Buildings<\/td><td>This proposed change introduces NBC Section 10.9. and states the scope and application of this proposed Section to the alteration of existing building in housing and small building.<\/td><td>NBC25 Div.B 10.9.<\/td><td>NMCC on Harmonization of Alteration of Existing Buildings: Draft<br \/>2026-07-27<br \/><\/td><td>-<\/td><\/tr><tr><td>2292<\/td><td>Relocate adaptable dwelling unit requirements from NBC Part 3 to NBC Part 9<\/td><td>This PCF modifies the NBC framework such that the adaptable dwelling unit requirements currently in NBC Part 3 are positioned in NBC Part 9<\/td><td>NBC25 Div.B 3.8.2.1.,<br \/>NBC25 Div.B 3.8.4.,<br \/>NBC25 Div.B 9.5.5.1.,<br \/>NBC25 Div.B 9.34.1.,<br \/>NBC25 Div.B 9.31.2.3.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2291<\/td><td>Electrical and structural rough-in for the future installation of power door operators in dwelling units<\/td><td>The proposed change introduces a requirement for electrical and structural rough-in to facilitate the future installation of power door operators in dwelling units, focusing on an exterior entrance, the door connecting the interior of the home to the garage, and a washroom<\/td><td>NBC25 Div.B 9.5.,<br \/>NBC25 Div.B 9.34.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2288<\/td><td>Minimum area of dwelling unit kitchens<\/td><td>The proposed change prescribes minimum areas in dwelling unit kitchens to provide access to essential cooking fixtures and the sink in the home<\/td><td>NBC25 Div.B 9.5.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2287<\/td><td>Minimum area of dwelling unit washrooms<\/td><td>The proposed change prescribes minimum dimensions for at least one washroom in a dwelling unit<\/td><td>NBC25 Div.B 9.5.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2285<\/td><td>Minimum widths of doors and corridors in dwelling units<\/td><td>This proposed change increases the minimum width of doors and corridors in dwelling units to enable the passage of modern wheelchairs<\/td><td>NBC25 Div.B 9.5.4.1.,<br \/>NBC25 Div.B 9.5.5.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2284<\/td><td>Requirement for a GFCI receptacle near the water closet in dwelling unit washrooms<\/td><td>This proposed change would require a GFCI receptacle near the water closet in at least one dwelling unit washroom to facilitate the future installation of bidets and other assistive technologies for independence in toileting<\/td><td>NBC25 Div.B 9.34.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2283<\/td><td>Plumbing systems for adaptable bathing facilities in dwelling units<\/td><td>This proposed change requires that plumbing systems for bathing facilities in dwelling units be designed to accommodate the future installation of low\/no-threshold showers without the need for major modifications to plumbing systems<\/td><td>NBC25 Div.B 9.31.4.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2282<\/td><td>Building's electrical energy consumption and on-site renewable energy systems <\/td><td>This proposed change provides a methodology for calculating building's electrical energy consumption to determine credits attributable to on-site renewable energy systems for compliance with the energy efficiency requirements. <\/td><td>NECB25 Div.B 7.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2278<\/td><td>TEST PCF<\/td><td>Test description<\/td><td>NBC25 Div.B 9.32.1.3.<\/td><td>Energy Efficiency: Draft<br \/>2026-07-02<br \/><\/td><td>-<\/td><\/tr><tr><td>2277<\/td><td>Defined Term - Tiny House<\/td><td>This proposed change introduces the defined term \"tiny house\" in the NBC <\/td><td>NBC25 Div.A 1.4.1.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2276<\/td><td>Editorial Change - Storage of Oxidizers in Mercantile Occupancies<\/td><td>This editorial change originated from an inquiry submitted by Ontario Office of the Fire Marshal. It was decided that the current language in NFC Articles 3.2.7.1. and 3.2.7.18. is confusing. Therefore, an exception is inserted in Sentence 3.2.7.1.(2). <\/td><td>NFC25 Div.B 3.2.7.1.,<br \/>NFC25 Div.B 3.2.7.18.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2275<\/td><td>Determination of Compliance for Unmet Cooling Load Hours in Energy modeling<\/td><td>Revise the NECB compliance requirement for unmet cooling load hours used to compare the proposed building and reference building energy models.<\/td><td>NECB25 Div.B 8.4.1.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2273<\/td><td>Potable Water Systems<\/td><td>Introduce requirements for domestic hot water systems to maintain intended temperatures, including provisions for minimum temperature. <\/td><td>NPC25 Div.B 2.6.3.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2272<\/td><td>Provisions for concrete members reinforced with fibre-reinforced polymer to conform to CSA S806<\/td><td>This proposed change adds provisions requiring building structural members reinforced with fibre-reinforced polymer to be designed in accordance with CSA S806.<\/td><td>NBC25 Div.B 4.3.3.1.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2271<\/td><td>Single egress for multi-unit residential buildings <\/td><td>The propose changed relates to the addition of a new code provision regarding the single egress in the residential buildings up to 18m in building height.<\/td><td>NBC25 Div.B 3.4.2.<\/td><td>NMCC on Fire and Life Safety: Draft<br \/>2026-05-13<br \/><\/td><td>-<\/td><\/tr><tr><td>2269<\/td><td>Updates the title of Note A-8.4.5.13.<\/td><td>Improves the accuracy of the note title<\/td><td>NECB25 Div.B 8.4.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Climate Change Mitigation: Review &mdash; Editorial Revision\/Errata (No Public Review)<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2268<\/td><td>\"Thermal Bridge\" as a Defined Term<\/td><td>This proposed change adds a defined term by moving the definition for the term \"thermal bridge\" from Div. B to Div. A of the NECB.<\/td><td>NECB25 Div.A 1.4.1.2.,<br \/>NECB25 Div.B 3.1.1.4.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2267<\/td><td>Minimum Thermal Resistance Value for Duct Insulation<\/td><td>This proposed change increases the minimum thermal resistance value (RSI) for duct insulation.<\/td><td>NBC25 Div.B 9.32.3.11.<\/td><td>Energy Efficiency: Review<br \/>2026-06-04<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-04<br \/>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2266<\/td><td>Add Requirements for MURBs with Energy Storage Systems (ESS) in Part 9 of NBC<\/td><td>This proposed change introduces requirements to Part 9 of NBC to address the potential fire and life safety hazards associated with battery-based energy storage systems (ESS) in multi-unit residential buildings (MURBs).<\/td><td>-<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2265<\/td><td>Defined Terms related to Operational Greenhouse Gas (GHG) Emissions<\/td><td>This proposed change adds two defined terms to the NBC and NECB by relocating the definitions for the terms \u201cannual operational GHG emissions\u201d and \u201coperational GHG emissions target\u201d from Div. B to Div. A.<\/td><td>NECB25 Div.A 1.4.1.2.(1),<br \/>NECB25 Div.B 11.1.1.3.,<br \/>NBC25 Div.A 1.4.1.2.(1),<br \/>NBC25 Div.B 9.36.15.3.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2263<\/td><td>Adding New Cross-Reference that Points to the Defined Terms<\/td><td>This proposed change adds a new Article to NECB Part&nbsp;10 to cross-reference the defined terms in Article&nbsp;1.4.1.2. of Division A, thus aligning Part&nbsp;10 with the other Parts of the Code.<\/td><td>NECB25 Div.B 10.1.1.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2262<\/td><td>Addition of NFPA 105 for Inspection and Testing of Smoke Dampers<\/td><td>This request is to add NFPA 105, \u201cStandard for Smoke Door Assemblies and Other Opening Protectives,\u201d as the test standard for smoke dampers and combination smoke\/fire dampers in the National Fire Code (NFC).<\/td><td>NFC25 Div.B 2.2.2.4.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2261<\/td><td>PT-Led Changes on EMTC - Fire Code Provisions (Consolidated)<\/td><td>This proposed change consolidates the PT-led changes on EMTC (re: fire code) into a dedicated form, and updates the baseline 'existing provisions' to reflect the first printing of the 2025 edition of the National Fire Code (NFC); the 'rationale' section provided by the PT-led group is maintained.<\/td><td>NFC25 Div.B 5.6.3.,<br \/>NFC25 Div.B 5.6.4.<\/td><td>TG\/WG Development<br \/>2026-02-19<br \/><\/td><td>-<\/td><\/tr><tr><td>2260<\/td><td>PT-Led Changes on EMTC - Building Code Provisions (Consolidated)<\/td><td>This proposed change consolidates the PT-led changes on EMTC (re: building code) into a dedicated form, and updates the baseline 'existing provisions' to reflect the first printing of the 2025 edition of the National Building Code (NFC); the 'rationale' section provided by the PT-led group is maintained.<\/td><td>NBC25 Div.B 3.1.3.1.(1),<br \/>NBC25 Div.B 3.1.3.1. Table ,<br \/>NBC25 Div.B 3.1.6.4.,<br \/>NBC25 Div.B 3.1.6.6.,<br \/>NBC25 Div.B 3.1.6.9.,<br \/>NBC25 Div.B 3.1.6.14.,<br \/>NBC25 Div.B 3.1.7.5.(1),<br \/>NBC25 Div.B 3.1.11.5.(4),<br \/>NBC25 Div.B 3.1.15.2.(5),<br \/>NBC25 Div.B 3.2.1.4.(1),<br \/>NBC25 Div.B 3.2.1.6.(1),<br \/>NBC25 Div.B 3.2.2.2.(1),<br \/>NBC25 Div.B 3.2.2.6.,<br \/>NBC25 Div.B 3.2.2.7.,<br \/>NBC25 Div.B 3.2.2.11.,<br \/>NBC25 Div.B 3.2.2.12.(1),<br \/>NBC25 Div.B 3.2.2.13.(1),<br \/>NBC25 Div.B 3.2.2.14.,<br \/>NBC25 Div.B 3.2.2.16.(1),<br \/>NBC25 Div.B 3.2.2.18.,<br \/>NBC25 Div.B 3.2.2.19.(1),<br \/>NBC25 Div.B 3.2.2.23.(1),<br \/>NBC25 Div.B 3.2.2.42.(1),<br \/>NBC25 Div.B 3.2.2.47.(1),<br \/>NBC25 Div.B 3.2.2.48.,<br \/>NBC25 Div.B 3.2.2.56.(1),<br \/>NBC25 Div.B 3.2.2.57.,<br \/>NBC25 Div.B 3.2.2.66.(1),<br \/>NBC25 Div.B 3.2.2.76.(1),<br \/>NBC25 Div.B 3.2.2.82.(1),<br \/>NBC25 Div.B 3.2.3.7.(2),<br \/>NBC25 Div.B 3.2.3.7. Table ,<br \/>NBC25 Div.B 3.2.3.9.(1),<br \/>NBC25 Div.B 3.2.5.12.(7),<br \/>NBC25 Div.B 3.2.6.1.(2),<br \/>NBC25 Div.B 3.3.3.7.(4)<\/td><td>TG\/WG Development<br \/>2026-02-19<br \/><\/td><td>-<\/td><\/tr><tr><td>2259<\/td><td>Replace the withdrawn existing reference for gypsum board application with a new standard that is already referenced in NBC<\/td><td>This request is to replace CSA A82.31-M, \u201cGypsum Board Application,\u201d with ASTM C840, \u201cStandard Specification for Application and Finishing of Gypsum Board,\u201d as the standard for gypsum board application.<\/td><td>NBC25 Div.B 3.1.5.14.(6),<br \/>NBC25 Div.B 9.10.9.2.(5),<br \/>NBC25 Div.B 9.10.12.4.(3),<br \/>NBC25 Div.B 9.10.14.5.(8),<br \/>NBC25 Div.B 9.10.15.5.(7),<br \/>NBC25 Div.B 9.10.15.5.(11),<br \/>NBC25 Div.B 9.29.5.1.(2),<br \/>NBC25 Div.B 9.10.3.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2257<\/td><td>Carbon monoxide (CO) detectors installed in lieu of CO alarms<\/td><td>Adds requirements for carbon monoxide detectors that are connected to a building fire alarm system in lieu of carbon monoxide alarms.<\/td><td>NBC25 Div.B 6.9.3.,<br \/>NBC25 Div.B 9.32.3.9.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1286, 1288<\/td><\/tr><tr><td>2256<\/td><td>Acceptable monitoring devices for ventilation of storage garages<\/td><td>Requires carbon monoxide, nitrogen dioxide and other acceptable monitoring devices required by NBC Sentence 6.3.1.3.(2) to conform to CAN\/ULC 588 \u201cStandard for Gas and Vapour Detectors and Sensors, Including Accessories\u201d.<\/td><td>NBC25 Div.B 6.3.1.3.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1287<\/td><\/tr><tr><td>2255<\/td><td>Domestic Hot Water Temperature Maintenance<\/td><td>Introduce design requirements for domestic hot water systems to maintain intended temperatures, including provisions for minimum temperature, recirculation performance, and measures to limit heat loss.<\/td><td>-<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2254<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2253<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2252<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2251<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2250<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2249<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2248<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2247<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2246<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2245<\/td><td>HP<\/td><td>-<\/td><td>NPC25 Div.B 2.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2244<\/td><td>Addition of Requirements for Mechanical Tee Fittings<\/td><td>This proposed change adds requirements for mechanical tee fittings to be used in potable water systems and introduces a reference to NSF\/ANSI\/CAN 372-2024, \u201cDrinking Water System Components \u2013 Lead Content.\u201d<\/td><td>NPC25 Div.B 2.2.10.5.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1365, 1366, 1367<\/td><\/tr><tr><td>2243<\/td><td>Installation of Emergency Eye Wash and Shower Fixtures<\/td><td>This proposed change adds a new provision and reference to ANSI\/ISEA Z358.1-2014, \u201cAmerican National Standard for Emergency Eyewash and Shower Equipment,\u201d to the NPC.<\/td><td>NPC25 Div.B 2.2.2.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1379<\/td><\/tr><tr><td>2242<\/td><td>Adds Requirements for Press-Connect Water Fittings<\/td><td>This proposed change introduces references to IAPMO\/ANSI\/CAN Z1117-2022, \u201cStandard for Press Connections,\u201d ASME B16.51-2021, \u201cCopper and Copper Alloy Press-Connect Pressure Fittings,\u201d and ASTM F3226\/F3226M-19, \u201cStandard Specification for Metallic Press-Connect Fittings for Pipe and Tubing Systems,\u201d in the NPC. <\/td><td>NPC25 Div.B 2.2.7.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1273, 1274, 1275, 1276, 1796<\/td><\/tr><tr><td>2241<\/td><td>Deletion of a Withdrawn CSA Standard and Introduction of Requirements for Additional Plumbing Fixtures<\/td><td>This proposed change deletes the withdrawn CAN\/CSA-B45 Series, \u201cPlumbing Fixtures,\u201d from the NPC and introduces references to CSA B45.8:23\/IAPMO Z403-2023, \u201cTerrazzo, concrete, composite stone, and natural stone plumbing fixtures,\u201d CSA B45.11:17\/IAPMO Z401-2017, \u201cGlass plumbing fixtures,\u201d and CSA B45.12:23\/IAPMO Z402-2023, \u201cAluminum and copper plumbing fixtures.\u201d<\/td><td>NPC25 Div.B 2.2.2.2.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>773, 789, 1055, 1066, 2179<\/td><\/tr><tr><td>2240<\/td><td>Replacement of a Withdrawn Standard with New Standards for Fans<\/td><td>This proposed change updates the referenced standards for the testing of fans by replacing CAN\/CSA-C260-M, \u201cRating the Performance of Residential Mechanical Ventilating Equipment,\u201d with ANSI\/ASHRAE 51-25 (ANSI\/AMCA 210-25), \u201cLaboratory Methods of Testing Fans for Certified Aerodynamic Performance Rating,\u201d and ANSI\/AMCA 300-24, \u201cReverberation Room Methods of Sound Testing of Fans.\u201d<\/td><td>NBC25 Div.B 9.32.3.10.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>597<\/td><\/tr><tr><td>2239<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2238<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2237<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2236<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2235<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2234<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2233<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2232<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2231<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2230<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2229<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2228<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2227<\/td><td>ES<\/td><td>-<\/td><td>NBC25 Div.B 5.1.1.1.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2226<\/td><td>Fibre-reinforced Gypsum Panels<\/td><td>This proposed change introduces ASTM C1278\/C1278M-24, \u201cStandard Specification for Fiber-Reinforced Gypsum Panel,\u201d in the NBC.<\/td><td>NBC25 Div.B 5.9.1.1.,<br \/>NBC25 Div.B 9.29.5.2.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1834<\/td><\/tr><tr><td>2225<\/td><td>Introduction of References to CAN\/ULC 743.1:2020 and CAN\/ULC 743.2:2021<\/td><td>This proposed change introduces references to CAN\/ULC 743.1:2020, \u201cStandard for Thermal Insulation \u2013 Low Pressure Applied Two Component Spray Polyurethane Foam, Part 1: Material Specification,\u201d and CAN\/ULC 743.2:2021, \u201cStandard for Thermal Insulation \u2013 Low Pressure Applied Two Component Spray Polyurethane Foam, Part 2: Installation,\u201d to the NBC.<\/td><td>NBC25 Div.B 5.9.1.1.,<br \/>NBC25 Div.B 9.25.2.2.(1),<br \/>NBC25 Div.B 9.25.2.5.(1),<br \/>NBC25 Div.B 9.36.2.4.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1656, 1657<\/td><\/tr><tr><td>2222<\/td><td>Fire-Resistance Rating of File Storage Room in Detention Occupancies<\/td><td>This proposed change sets a minimum fire-resistance rating for rooms used to store files, evident and firearms in detention occupancies.<\/td><td>NBC25 Div.B 3.3.3.5.<\/td><td>Draft<br \/>2026-04-08<br \/><\/td><td>-<\/td><\/tr><tr><td>2221<\/td><td>Updates to Referenced Documents<\/td><td>-<\/td><td>NBC25 Div.B 1.3.1.2.,<br \/>NFC25 Div.B 1.3.1.2.,<br \/>NPC25 Div.B 1.3.1.2.,<br \/>NECB25 Div.B 1.3.1.2.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-23<br \/><\/td><td>-<\/td><\/tr><tr><td>2220<\/td><td>Energy intensity-based targets for retail and warehouse<\/td><td>This proposed change establishes intensity-based energy targets for retail and warehouse archetypes.<\/td><td>NECB25 Div.B 8.4.5.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2219<\/td><td>Section 10.7 Alteration of Existing Plumbing Systems<\/td><td>Establish requirements for alterations to existing plumbing systems and criteria for determining the extent of alterations and applicable provisions.<\/td><td>NBC25 Div.B 10<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2217<\/td><td>Scope and Application<\/td><td>This proposed change defines Scope and application of a new Section establishing specific requirements to address the unique characteristics of tiny houses.<\/td><td>NBC25 Div.B 9.38.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2216<\/td><td>Roof load transfer to braced wall panels<\/td><td>The proposed change addresses the transfer of loads from roof rafters or roof trusses to braced wall panels.<\/td><td>NBC25 Div.B 9.23.13.<\/td><td>NMCC on Climate Change Adaptation: Review<br \/>2026-05-20<br \/>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/>NMCC on Climate Change Adaptation: Review &mdash; Recommended for Public Review<br \/>2026-06-24<br \/><\/td><td>-<\/td><\/tr><tr><td>2215<\/td><td>TEST - EMTC 01 (TEMPLATE)<\/td><td>This proposal is for the addition of a new construction Article in 3.2.2. covering a set of entirely new building types of EMTC, all in one consolidated place (i.e., Article\/Table 3.2.2.93.), for the sake of simplicity and minimizing downstream effects (i.e., re-numbering) elsewhere in the Code. All new allowances match those suggested by the Transferability Report and generally mirror the IBC. Maximum permitted building heights in the Table reflect the 4.2m\/floorplate allowance that is more conducive to EMTC assembly thicknesses, whose adoption is currently before the Standing Committees (SC) for acceptance into the current Code. Sprinklers are required for all proposed buildings. Maximum permitted building areas are determined in a similar fashion to those determined for the original two EMTC construction Articles. While using a Table to summarize new building types is not the typical way to add allowances to 3.2.2., this approach is surmised to be the least disruptive and most streamlined way to add nearly 20 new building archetypes. As research and pplication of EMTC continues to rapidly progress, this approach also enables easy advancement of EMTC allowances in the future.<\/td><td>NBC25 Div.B 3.2.2.48.(1),<br \/>NBC25 Div.B 3.2.2.57.(1),<br \/>NBC25 Div.B 3.1.7.5.(1),<br \/>NBC25 Div.B 3.1.11.5.(4),<br \/>NBC25 Div.B 3.1.15.2.(5),<br \/>NBC25 Div.B 3.2.1.4.(1),<br \/>NBC25 Div.B 3.2.1.6.(1),<br \/>NBC25 Div.B 3.2.3.9.(1),<br \/>NBC25 Div.B 3.2.5.12.(7),<br \/>NBC25 Div.B 3.2.6.1.(2),<br \/>NBC25 Div.B 3.3.3.7.(4)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2210<\/td><td>Update intent statements from \"without the assistance of another person\" to \"independently\"<\/td><td>This PCF changes terminology in the intent statements related to accessibility, from \"without the assistance of another person\" to \"independently\". <\/td><td>NBC25 Div.B 3.3.1.13.(5),<br \/>NBC25 Div.B 3.4.6.5.(10),<br \/>NBC25 Div.B 3.4.6.16.(7),<br \/>NBC25 Div.B 3.4.6.19.(1),<br \/>NBC25 Div.B 3.5.2.1.(3),<br \/>NBC25 Div.B 3.5.4.2.(1),<br \/>NBC25 Div.B 3.7.2.3.(4),<br \/>NBC25 Div.B 3.7.2.8.(1),<br \/>NBC25 Div.B 3.8.2.,<br \/>NBC25 Div.B 3.8.3.,<br \/>NBC25 Div.B 9.5.5.3.(2),<br \/>NBC25 Div.B 9.9.11.5.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2209<\/td><td>Cane detectable barricades on construction sites<\/td><td>This PCF clarifies the need for cane detectable barricades at construction sites<\/td><td>NBC25 Div.B 8.2.3.3.<\/td><td>NMCC on Accessibility: Draft<br \/>2026-01-28<br \/><\/td><td>-<\/td><\/tr><tr><td>2207<\/td><td>AVAILABLE PCF<\/td><td>This proposed change <\/td><td>-<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2206<\/td><td>Welding and Cutting Requirements for Farm Buildings<\/td><td>This proposed change introduces the requirements of Sentence 3.3.1.26.(1) of Division B of the NBC into Sentence 2.2.8.4.(1).<\/td><td>NBC25 Div.B 2.2.8.4.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2205<\/td><td>New Section 9.37.-2030 on Operational GHG Emissions<\/td><td>This proposed change moves the provisions in Subsections 9.36.15. and 9.36.16. to a new Section to separate requirements for operational greenhouse gas emissions from those for energy efficiency.<\/td><td>NBC25 Div.B 9.36.1.3.,<br \/>NBC25 Div.B 9.36.1.4.,<br \/>NBC25 Div.B 9.36.15.,<br \/>NBC25 Div.B 9.36.16.,<br \/>NBC25 Div.B 9.37.<\/td><td>NMCC on Climate Change Mitigation: Draft<br \/>2026-01-20<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-02-11<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>-<\/td><\/tr><tr><td>2204<\/td><td>Power door operators when fire alarm is activated<\/td><td>The proposed change clarifies how power door operators should be disconnected when fire alarms are activated. <\/td><td>NBC25 Div.B 3.4.6.16.<\/td><td>NMCC on Accessibility: Draft<br \/>2026-01-20<br \/><\/td><td>1812<\/td><\/tr><tr><td>2203<\/td><td>Minimum number of exits for spaces with doors directly to the exterior<\/td><td>This proposed change clarifies the number of exits that is required for suites, service rooms, and other spaces at ground level with direct access to the exterior. <\/td><td>NBC25 Div.B 3.4.2.1.<\/td><td>Draft<br \/>2026-01-20<br \/><\/td><td>2090<\/td><\/tr><tr><td>2202<\/td><td>Visible fire\/smoke alarm signals in additional locations<\/td><td>This PCF proposes to require visible signals for fire alarm systems and smoke alarms in more locations so that people with low\/no hearing can get the same information as anyone else. <\/td><td>NBC25 Div.B 3.2.4.19.,<br \/>NBC25 Div.B 3.2.4.20.,<br \/>NBC25 Div.B 9.10.19.<\/td><td>NMCC on Accessibility: Draft<br \/>2026-01-07<br \/><\/td><td>2252<\/td><\/tr><tr><td>2199<\/td><td>New Abbreviations Related to Heating, Ventilating and Air-conditioning Systems - Other<\/td><td>This proposed change updates the list of symbols and abbreviations in the NBC and NECB.<\/td><td>NECB25 Div.A 1.4.2.1.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2197<\/td><td>Clarification - Ramps in \"cold climates\"<\/td><td>This PCF clarifies a note about difficulty of navigating ramps in \"cold climates\" to specify this means wet and icy conditions. <\/td><td>NBC25 Div.B 3.8.3.5.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2025-11-20<br \/>NMCC on Accessibility: Review<br \/>2026-01-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2196<\/td><td>Defined Terms<\/td><td>This proposed change introduce new defined terms in the NECB <\/td><td>NECB25 Div.A 1.4.1.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2195<\/td><td>Referencing the NPC for Hot Service Water Flow Rates and Shut-off<\/td><td>This proposed change introduces references to the NPC requirements related to maximum water flow rates and automatic shut\u2011off devices.<\/td><td>NECB25 Div.B 6.2.6.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2192<\/td><td>Simplifying minimum technical requirements for accessibility in Subsection 3.8.3.<\/td><td>This PCF removes the CSA B651 compliance option so that only one set of minimum requirements is established. It also updates the CSA B651 standard, where it is still referenced in the NBC, to the latest (2023) edition.<\/td><td>NBC25 Div.B 3.3.1.19.,<br \/>NBC25 Div.B 3.8.2.10.,<br \/>NBC25 Div.B 3.8.3.1.,<br \/>NBC25 Div.B 3.8.3.3.,<br \/>NBC25 Div.B 3.8.3.9.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2025-11-20<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2026-04-09<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>2149<\/td><\/tr><tr><td>2191<\/td><td>Ceiling lifts in accessible change spaces<\/td><td>This PCF requires that if provided, lifts for the transfer of persons in accessible change spaces should be installed according to published standards and not impede on certain clear floor spaces<\/td><td>NBC25 Div.B 3.8.3.13.(2)<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-04-30<br \/><\/td><td>-<\/td><\/tr><tr><td>2190<\/td><td>Signage for accessible change space location<\/td><td>The proposed change would require that signage be provided to locate universal washrooms that contain accessible change spaces <\/td><td>NBC25 Div.B 3.8.2.10.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-05-01<br \/><\/td><td>-<\/td><\/tr><tr><td>2189<\/td><td>Requirement for grab bars on both sides of the water closet in universal washroom<\/td><td>This PCF introduces a requirement that grab bars be provided on both sides of the water closet in universal washrooms<\/td><td>NBC25 Div.B 3.8.3.13.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-04-30<br \/><\/td><td>-<\/td><\/tr><tr><td>2188<\/td><td>Emergency call buttons in universal washrooms<\/td><td>The proposed change introduces a new requirement for emergency call buttons in universal washrooms<\/td><td>NBC25 Div.B 3.8.3.13.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-04-30<br \/><\/td><td>-<\/td><\/tr><tr><td>2187<\/td><td>Accessible change spaces - table properties<\/td><td>This proposed change prescribes minimum requirements for the design of adult change tables in universal change spaces<\/td><td>NBC25 Div.B 3.8.3.13.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-04-30<br \/><\/td><td>-<\/td><\/tr><tr><td>2186<\/td><td>Width of a barrier-free path of travel over long intervals<\/td><td>-<\/td><td>NBC25 Div.B 3.8.<\/td><td>NMCC on Accessibility: Draft<br \/>2026-01-13<br \/><\/td><td>-<\/td><\/tr><tr><td>2185<\/td><td>Increase width of barrier-free path of travel<\/td><td>-<\/td><td>NBC25 Div.B 3.8.<\/td><td>NMCC on Accessibility: Draft<br \/>2026-01-13<br \/><\/td><td>-<\/td><\/tr><tr><td>2183<\/td><td>Updates compliance for Subsection 9.36.16.<\/td><td>Adds tier 2 prescriptive requirements as a compliance option in Sentence 9.36.16.3.(2)<\/td><td>NBC25 Div.B 9.36.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2182<\/td><td>Energy Modeling Rules for Heat Pumps<\/td><td>Updates energy modeling rules for heat pumps for the reference house and energy performance tier 1; and adds a percent heat loss reduction requirement for tier 1.<\/td><td>NBC25 Div.B 9.36.6.15.(2),<br \/>NBC25 Div.B 9.36.6.16.(1),<br \/>NBC25 Div.B 9.36.7.2. Table ,<br \/>NBC25 Div.B 9.36.7.3.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2181<\/td><td>Minimum Energy Performance Compliance Level<\/td><td>This proposed change removes \"base code\" requirements as a compliance path option and sets Energy Performance Tier 1 as the minimum performance level.<\/td><td>NBC25 Div.B 9.36.1.3.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2179<\/td><td>Designated Hot Work Area<\/td><td>This proposed change refines the requirements applicable to a designated area where hot work could be performed without a permit.<\/td><td>NBC25 Div.B 3.3.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-12-16<br \/><\/td><td>-<\/td><\/tr><tr><td>2178<\/td><td>Add Requirements for Energy Storage Systems (ESS) for Part 3 Buildings<\/td><td>This proposed change introduces requirements to address the potential fire and life safety hazards associated with battery-based energy storage systems (ESS) installed in Part 3 Buildings.<\/td><td>NBC25 Div.B 3.6.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2177<\/td><td>New Defined Term of Energy Storage Systems (ESS)<\/td><td>This proposed change introduces a new defined term of Energy Storage Systems (ESS) to NBC<\/td><td>NBC25 Div.A 1.4.1.2.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2175<\/td><td>Hot Works Safety Check<\/td><td>This proposed change lists the safety checks required to assess prior to initiate hot work.<\/td><td>NFC25 Div.B 5.2.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-12-08<br \/><\/td><td>-<\/td><\/tr><tr><td>2174<\/td><td>Use of the IAPMO Water Demand Calculator in the Design of Potable Water Systems<\/td><td>This proposed change adds the IAPMO Water Demand Calculator as an acceptable tool in the design of potable water systems.<\/td><td>NPC25 Div.B 2.6.3.1.(2)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Indoor Environment: Review &mdash; Recommended for Public Review<br \/>2026-06-10<br \/><\/td><td>2052<\/td><\/tr><tr><td>2173<\/td><td>New Standard for Plenum Requirements<\/td><td>Adds CAN\/ULC S-142, \"Standard Method of Fire Test for Heat and Visible Smoke Release for Discrete Products\", as a test method for discrete stand-alone non-continuous products installed in concealed spaces used as plenums.<\/td><td>NBC25 Div.B 3.6.4.3.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1793<\/td><\/tr><tr><td>2172<\/td><td>Intensity-based compliance for operational GHG emissions<\/td><td>-<\/td><td>NBC25 Div.B 9.36.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>-<\/td><\/tr><tr><td>2170<\/td><td>Intensity-based compliance for operational GHG emissions and energy efficiency<\/td><td>This proposed change introduces an intensity-based approach in the NECB for complying with operational GHG emissions requirements. It also establishes intensity-based energy targets for retail and warehouse archetypes.<\/td><td>NECB25 Div.B 8.4.4.,<br \/>NECB25 Div.B 11<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2169<\/td><td>no title<\/td><td>-<\/td><td>NBC25 Div.B 3.3.1.5.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2168<\/td><td>Minimum number of exits for spaces with doors directly to the exterior<\/td><td>This proposed change clarifies the number of exits that is required for suites, service rooms, and other spaces at ground level with direct access to the exterior. <\/td><td>NBC25 Div.B 3.4.2.1.<\/td><td>Draft<br \/>2025-11-13<br \/><\/td><td>2090<\/td><\/tr><tr><td>2167<\/td><td>Garages with EV charging stations<\/td><td>This proposed change introduce requirements for parking garages with EV charging stations.<\/td><td>NBC25 Div.B 3.2.4.1.(1)<\/td><td>-<\/td><td>2167<\/td><\/tr><tr><td>2166<\/td><td>Defined Term of EV<\/td><td>This proposed change introduces defined term \"Electric Vehicle (EV)\" to Division A of NBC.<\/td><td>NBC25 Div.A 1.4.1.2.(1)<\/td><td>-<\/td><td>2167<\/td><\/tr><tr><td>2162<\/td><td>Add Requirements for Houses with Energy Storage Systems (ESS) in Part 9 of NBC<\/td><td>This proposed change introduces requirements to Part 9 of NBC to address the potential fire and life safety hazards associated with battery-based energy storage systems (ESS) in houses.<\/td><td>-<\/td><td>NMCC on Fire and Life Safety: Draft<br \/>2025-11-04<br \/><\/td><td>2057<\/td><\/tr><tr><td>2161<\/td><td>Addition of Reference to CAN\/CSA-B138.1-17\/CAN\/CSA-B138.2-17 <\/td><td>This proposed change adds a reference to CAN\/CSA-B138.1-17\/CAN\/CSA-B138.2-17, \"Portable oil-burning equipment - Packaged equipment requirements\/Installation requirements.\"<\/td><td>NFC25 Div.B 5.6.1.9.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1581<\/td><\/tr><tr><td>2160<\/td><td>Active Side Wall Radon Stack<\/td><td>Adds requirements for radon mitigation by use of an optional active side wall radon stack in dwelling units and home-type care occupancies that have a wall, roof or floor assembly in contact with the ground.<\/td><td>NBC25 Div.B 9.13.4.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>NMCC on Indoor Environment: Review &mdash; Recommended for Public Review<br \/>2026-02-18<br \/><\/td><td>-<\/td><\/tr><tr><td>2157<\/td><td>Moving the Reference to CSA A277, \"Procedure for certification of prefabricated buildings, modules, and panels,\" from a Division A Note to a Division C Provision<\/td><td>This proposed change permits a certificate to CSA A277, \"Procedure for certification of prefabricated buildings, modules, and panels,\" to be considered as third-party Code compliance approval to facilitate the approval of factory-constructed buildings, modules and panels. <\/td><td>NBC25 Div.A 1.1.1.1.,<br \/>NBC25 Div.C 2.2.7.5.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>NMCC on Housing Supply: Review &mdash; Recommended for Public Review<br \/>2025-12-11<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2153<\/td><td>Classification of Additional Water Miscible Liquid Mixtures<\/td><td>This proposed change provides classification for additional four water-miscible liquid mixtures.<\/td><td>NFC25 Div.B 4.1.2.2.<\/td><td>Draft<br \/>2025-08-20<br \/>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2026-01-20<br \/>NMCC on Fire and Life Safety: Review &mdash; Recommended for Public Review<br \/>2026-02-02<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>-<\/td><\/tr><tr><td>2148<\/td><td>BERS IT - TEST FILE<\/td><td>Test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test<\/td><td>NBC25 Div.B 9.13.4.3.<\/td><td>NMCC on Performance-Based Solutions: Draft<br \/>2025-11-01<br \/><\/td><td>-<\/td><\/tr><tr><td>2147<\/td><td>Door hardware in door clear width considerations<\/td><td>Clarification of explanatory note on clear width of doorways in relation to door hardware<\/td><td>NBC25 Div.B 3.8.3.6.(2)<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-05-01<br \/><\/td><td>2171<\/td><\/tr><tr><td>2146<\/td><td>Door hardware in door clear width considerations<\/td><td>This PCF clarifies wording around door closers and exit devices and how they are considered for the clear width of doorways<\/td><td>NBC25 Div.B 3.8.3.6.(2)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2145<\/td><td>Classification of Water-Miscible Liquid Mixtures<\/td><td>This proposed change updates the test method for and subsequent fire hazard classification of water-miscible liquid mixtures in the NFC.<\/td><td>NFC25 Div.B 4.1.2.1.,<br \/>NFC25 Div.B 4.1.2.2.<\/td><td>NMCC on Fire and Life Safety: Draft<br \/>2025-07-17<br \/>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2026-01-20<br \/>NMCC on Fire and Life Safety: Review &mdash; Recommended for Public Review<br \/>2026-02-02<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>-<\/td><\/tr><tr><td>2141<\/td><td>Requirements for Circuit Venting in NPC <\/td><td>This proposed change includes consistent fixture units to be referenced for stack within Article 2.5.3.1. and Figure A-2.5.3.1.-E Example 2<\/td><td>NPC25 Div.B 2.5.3.1.<\/td><td>-<\/td><td>2134<\/td><\/tr><tr><td>2140<\/td><td>Requirements for the Upper Design Supply Temperature of Hydronic Heating Systems<\/td><td>This proposed change includes requirements for an upper limit to the allowable design supply temperature of hydronic heating systems in NECB Articles 5.2.1.1., 5.4.1.2. and 8.4.4.9. <\/td><td>NECB25 Div.B 5.2.1.1.,<br \/>NECB25 Div.B 5.4.1.2.,<br \/>NECB25 Div.B 8.4.5.9.<\/td><td>-<\/td><td>2128<\/td><\/tr><tr><td>2138<\/td><td>Requirements for Floor Drains in NBC Part 3 and 9 Buildings<\/td><td>Include consistent requirements for floor drains, to be provided in Sentences 3.7.2.6.(1) to (4), proposed Note A-3.7.2.6.(1) to 3.7.2.6.(4), Table 3.10.1.1., Sentences 9.31.4.3.(1) and 9.35.2.2.(2), Note A-9.35.2.2.(2), and Article 9.37.1.1. of Division B of NBC and Sentence 2.6.1.7.(10) of Division B of NPC.<\/td><td>NBC25 Div.B 3.7.2.6.,<br \/>NBC25 Div.B 9.31.4.3.,<br \/>NBC25 Div.B 9.35.2.2.,<br \/>NBC25 Div.B 9.39.1.1.<\/td><td>-<\/td><td>2066<\/td><\/tr><tr><td>2137<\/td><td> Installation of a Backwater Valve for Plumbing Fixtures Located Below the Upstream Sanitary Manhole<\/td><td>This proposed change clarifies requirements for the installation of a backwater valve to protect plumbing fixtures from backflow.<\/td><td>NPC25 Div.B 2.4.6.4.<\/td><td>TG\/WG Development<br \/>2025-11-03<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Deferred<br \/>2026-01-22<br \/>TG\/WG Development<br \/>2026-02-04<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-02-23<br \/><\/td><td>817<\/td><\/tr><tr><td>2133<\/td><td>Installation of Drainage Piping Without Depressions<\/td><td>This proposed change introduces requirements for the installation of drainage piping to prevent sagging and depression.<\/td><td>NPC25 Div.B 2.3.4.5.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>Review &mdash; Recommended for Public Review<br \/>2026-06-26<br \/><\/td><td>1942<\/td><\/tr><tr><td>2132<\/td><td>Maximum Cleanout Distance Interval in Vertical Pipes of a Drainage System<\/td><td>Includes requirements for cleanout and access at maximum distance interval for vertical sink wastes.<\/td><td>NPC25 Div.B 2.4.7.2.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>Review &mdash; Recommended for Public Review<br \/>2026-06-26<br \/><\/td><td>1941<\/td><\/tr><tr><td>2131<\/td><td>Requirements for the Minimum Number of Baffles in a Grease Interceptor<\/td><td>This proposed change includes requirements for the minimum number of baffles in a grease interceptor in Article 2.5.5.2.<\/td><td>NPC25 Div.B 2.5.5.2.<\/td><td>Draft<br \/>2026-03-17<br \/><\/td><td>-<\/td><\/tr><tr><td>2130<\/td><td>Device Connections to Sanitary Drainage Systems <\/td><td>This proposed change clarifies the termination requirements for the connection of certain devices to the sanitary drainage system by explicitly requiring air breaks for indirect drainage in order to prevent backflow and protect potable water.<\/td><td>NPC25 Div.B 2.4.2.1.(2)<\/td><td>TG\/WG Development<br \/>2026-02-17<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>Review &mdash; Recommended for Public Review<br \/>2026-06-26<br \/><\/td><td>1821<\/td><\/tr><tr><td>2129<\/td><td>Clarification of numbers of stalls and urinals for people with limited mobility<\/td><td>This PCF clarifies how to interpret the requirements for numbers of required stalls for people with limited mobility. <\/td><td>NBC25 Div.B 3.8.2.8.,<br \/>NBC25 Div.B 3.7.2.2.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2025-09-16<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-11-20<br \/><\/td><td>-<\/td><\/tr><tr><td>2128<\/td><td>Separation from Other Dangerous Goods<\/td><td>This proposed change update the separation table for the storage of dangerous goods and controlled products.<\/td><td>NFC25 Div.B 3.2.7.6.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-08-13<br \/><\/td><td>-<\/td><\/tr><tr><td>2127<\/td><td>Accessible change spaces in B3 occupancies (care occupancy)<\/td><td>This proposed change requires at least one accessible change space in care occupancy buildings. These can be part of universal washrooms. <\/td><td>NBC25 Div.B 3.8.2.8.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-05-01<br \/><\/td><td>1757<\/td><\/tr><tr><td>2125<\/td><td>Accessible fitting rooms<\/td><td>This PCF proposes to require that where fitting rooms are provided (ex: in a clothing store), at least one should be accessible. <\/td><td>NBC25 Div.B 3.8.2.3.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2026-05-01<br \/><\/td><td>1687<\/td><\/tr><tr><td>2123<\/td><td>Removal of the term \"ambulatory\"<\/td><td>The PCF proposes to remove the reference to \"ambulatory\" in describing the building's occupants, as it is not a defined and set state of being. <\/td><td>NBC25 Div.B 3.1.2.5.,<br \/>NBC25 Div.B 3.3.1.7.,<br \/>NBC25 Div.B 9.10.2.2.<\/td><td>Draft<br \/>2025-01-24<br \/><\/td><td>815, 2220<\/td><\/tr><tr><td>2122<\/td><td>Clarifying what \"Pedestrian Entrance\" Means<\/td><td>This proposed change explains what a \"pedestrian entrance\" means for accessibility purposes.<\/td><td>NBC25 Div.B 3.8.2.2.<\/td><td>Draft<br \/>2025-01-24<br \/><\/td><td>1752<\/td><\/tr><tr><td>2120<\/td><td>Updating the Defined Term \"Barrier-free\"<\/td><td>This proposed change revises the definition of the term \"barrier-free\", the associated objectives and functional statements to align with current legislation, standards and other codes. <\/td><td>NBC25 Div.A 1.4.1.2.,<br \/>NBC25 Div.A 2.2.1.1.,<br \/>NBC25 Div.A 3.2.1.1.(1)<\/td><td>Draft<br \/>2025-01-17<br \/><\/td><td>1527, 2233, 2238, 2244, 2235<\/td><\/tr><tr><td>2116<\/td><td>Addition of Reference to ANSI\/CAN\/UL\/ULC 2152:2021<\/td><td>This proposed change adds reference to ANSI\/CAN\/UL\/ULC 2152:2021, \u201cSpecial Purpose Nonmetallic Containers and Tanks for Specific Combustible or Noncombustible Liquids\u201d to permit the use of special purpose nonmetallic containers and tanks intended for combustible or noncombustible liquids.<\/td><td>NFC25 Div.B 4.3.1.2.(1)<\/td><td>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1646<\/td><\/tr><tr><td>2112<\/td><td>Introduction of a New Standard for Aboveground Piping Systems<\/td><td>This proposed change adds a reference to ANSI\/CAN\/UL\/ULC 1369:2020, \"Standard for Aboveground Piping for Flammable and Combustible Liquids,\" to ensure conformance of metallic and non-metallic piping systems used in aboveground installations.<\/td><td>NFC25 Div.B 4.5.2.1.(3)<\/td><td>NMCC on Referenced Documents: TG\/WG Development<br \/>2026-02-09<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/>NMCC on Referenced Documents: Review &mdash; Recommended for Public Review<br \/>2026-06-22<br \/><\/td><td>1541<\/td><\/tr><tr><td>2109<\/td><td>Fan Motor Power Threshold for the Application of Prescriptive Requirements<\/td><td>This proposed change lowers the threshold for total fan motor power for the application of prescriptive requirements.<\/td><td>NECB25 Div.B 5.2.3.1.<\/td><td>Energy Efficiency: Review &mdash; Recommended for Public Review<br \/>2024-12-18<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1437<\/td><\/tr><tr><td>2108<\/td><td>Revision of Attributions and Intent Statements in Parts 2 and 3 of Division B of NBC<\/td><td>Revise attributions and intent statements in Parts 2 and 3 of Division B of the NBC following an assessment of the provisions, intents, relevant objectives and functional statements.<\/td><td>NBC25 Div.B 2.2.1.14.(1),<br \/>NBC25 Div.B 2.2.1.15.(2),<br \/>NBC25 Div.B 2.2.2.3.,<br \/>NBC25 Div.B 2.2.2.5.,<br \/>NBC25 Div.B 2.2.3.3.(1),<br \/>NBC25 Div.B 2.2.3.7.(2),<br \/>NBC25 Div.B 2.2.6.5.(2),<br \/>NBC25 Div.B 2.2.6.9.(1),<br \/>NBC25 Div.B 2.2.8.3.(2),<br \/>NBC25 Div.B 2.2.8.3.(3),<br \/>NBC25 Div.B 2.2.8.3.(4),<br \/>NBC25 Div.B 3.1.6.3.(3),<br \/>NBC25 Div.B 3.1.6.4.(1),<br \/>NBC25 Div.B 3.1.6.4.(2),<br \/>NBC25 Div.B 3.1.6.5.(1),<br \/>NBC25 Div.B 3.1.6.9.(1),<br \/>NBC25 Div.B 3.1.11.5.(4),<br \/>NBC25 Div.B 3.1.12.1.(1),<br \/>NBC25 Div.B 3.2.7.1.(1),<br \/>NBC25 Div.B 3.2.7.1.(2),<br \/>NBC25 Div.B 3.2.7.3.(1),<br \/>NBC25 Div.B 3.2.7.3.(2),<br \/>NBC25 Div.B 3.2.7.3.(3),<br \/>NBC25 Div.B 3.2.7.3.(4),<br \/>NBC25 Div.B 3.2.7.4.(1),<br \/>NBC25 Div.B 3.2.7.4.(2),<br \/>NBC25 Div.B 3.2.7.7.(1)<\/td><td>Hazardous Materials and Activities: Draft<br \/>2024-10-15<br \/><\/td><td>-<\/td><\/tr><tr><td>2107<\/td><td>Revision of Attributions and Intent Statements in Division B of NFC<\/td><td>Revise attributions and intent statements in Division B of the NFC following an assessment of the provisions, intents, relevant objectives and functional statements.<\/td><td>NFC25 Div.B 2.8.2.1.(3),<br \/>NFC25 Div.B 2.14.1.1.(4),<br \/>NFC25 Div.B 2.14.2.1.(1),<br \/>NFC25 Div.B 3.3.2.9.(1),<br \/>NFC25 Div.B 4.3.7.4.(1),<br \/>NFC25 Div.B 4.4.1.2.(6),<br \/>NFC25 Div.B 4.5.6.10.(1),<br \/>NFC25 Div.B 4.12.1.2.(1),<br \/>NFC25 Div.B 4.12.1.2.(3),<br \/>NFC25 Div.B 4.12.1.3.(1),<br \/>NFC25 Div.B 5.6.3.4.(1),<br \/>NFC25 Div.B 5.6.4.2.(5)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2105<\/td><td>Change SCOP to \"Net Sensible COP\" in Table 5.2.12.1.-H as the Metric Used for Computer Room Air Conditioners<\/td><td>This proposed change replaces the minimum performance metric \"sensible coefficient of performance (SCOP)\" with the \"net sensible COP (NSenCOP)\" in Table 5.2.12.1.-H to harmonize with the metric used in AHRI 1360 (I-P), AHRI 1361 (SI) and ANSI\/ASHRAE\/IES 90.1-2022.<\/td><td>NECB25 Div.B 5.2.12.1. Table H<\/td><td>Energy Efficiency: Review &mdash; Recommended for Public Review<br \/>2025-11-18<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1873<\/td><\/tr><tr><td>2101<\/td><td>Fibrocement pipe and fittings<\/td><td>This proposed change prohibits the use of fibrocement pipes an fittings to covey sewage. <\/td><td>NPC25 Div.B 2.2.5.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2100<\/td><td>Direct Flush Valves<\/td><td>This proposed change eliminates duplicated requirements for direct flush valves by only keeping the referenced standards.<\/td><td>NPC25 Div.B 2.2.10.8.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2097<\/td><td>This PCF can be re-purposed by TA<\/td><td>-<\/td><td>-<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2095<\/td><td>Explanatory Notes on impact of thermal insulation on fire performance of envelope assemblies and cladding support <\/td><td>This proposed change adds explanatory Notes to raise awareness of the impact of increased thermal insulation on fire resistive performance of envelope assemblies and structural support for cladding. <\/td><td>NBC25 Div.B 9.25.2.1.,<br \/>NBC25 Div.B 9.27.5.1.<\/td><td>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>NMCC on Climate Change Mitigation: Review &mdash; Withdrawn<br \/>2026-07-17<br \/><\/td><td>-<\/td><\/tr><tr><td>2090<\/td><td>Reference to the CSA-Z32, \"Electrical Safety and Essential Electrical Systems in Health Care Facilities\"<\/td><td>This proposed change clarifies the application of the referenced standard CSA-Z32, \"Electrical Safety and Essential Electrical Systems in Health Care Facilities\" in both NBC and NFC.<\/td><td>NBC25 Div.B 3.2.7.5.,<br \/>NBC25 Div.B 3.2.7.6.,<br \/>NFC25 Div.B 6.5.1.1.<\/td><td>Use and Egress: Draft<br \/>2024-07-05<br \/><\/td><td>-<\/td><\/tr><tr><td>2089<\/td><td>Clear Floor Space on the Non-Latch Side of Sliding Doors<\/td><td>This proposed change expands the application of a clear floor space to either sides of a sliding door in a barrier-free path of travel.<\/td><td>NBC25 Div.B 3.8.3.6.(11)<\/td><td>Use and Egress: Draft<br \/>2024-07-04<br \/><\/td><td>1700<\/td><\/tr><tr><td>2088<\/td><td>Clarify the Intent of \"Clear Floor Space\" in Barrier-Free Design<\/td><td>This proposed change clarifies the intent behind the reference to \"clear floor space\" when used in barrier-free design.<\/td><td>NBC25 Div.B 3.3.2.8.(3),<br \/>NBC25 Div.B 3.8.<\/td><td>Use and Egress: Draft<br \/>2024-06-26<br \/><\/td><td>1701<\/td><\/tr><tr><td>2086<\/td><td>Reference the individual standards within the CSA B108:23 package<\/td><td>Reference individual standards CSA B108.1:23, \"Compressed natural gas refuelling stations installation code\" and CSA B108.2:23, \"Liquefied natural gas refuelling stations installation code\" within the CSA B108:23 Package.<\/td><td>NFC25 Div.B 4.6.1.1.(2)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-08-21<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-10-25<br \/><\/td><td>-<\/td><\/tr><tr><td>2085<\/td><td>Replace Existing ULC\/ORD-C842-84 and CAN\/ULC-S651:2016 with ANSI\/CAN\/UL\/ULC 842:2020<\/td><td>This proposed change replaces the reference to ULC\/ORD-C842-84, \"Guide for the Investigation of Valves for Flammable and Combustible Liquids,\" and CAN\/ULC-S651:2016, \"Standard for Emergency Valves for Flammable and Combustible Liquids,\" with a reference to ANSI\/CAN\/UL\/ULC 842:2020, \u201cStandard for Valves for Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.5.7.1.(1),<br \/>NFC25 Div.B 4.5.7.1.(3),<br \/>NFC25 Div.B 4.6.6.3.(1)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2081<\/td><td>Replace Existing ULC\/ORD C107.21-92 with CAN\/ULC S664:2017 <\/td><td>This proposed change replaces the reference to ULC\/ORD C107.21-92, \u201cUnder Dispenser Sumps,\" with a reference to CAN\/ULC S664:2017, \"Standard for Containment Sumps, Sump fittings, and Accessories for Flammable and Combustible Liquids\"<\/td><td>NFC25 Div.B 4.6.3.2.(1)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2080<\/td><td>Replace Existing CAN\/ULC-S612:2016 with ANSI\/CAN\/UL 330:2024<\/td><td>This proposed change replaces the reference to CAN\/ULC-S612:2016, \u201cStandard for Hose and Hose Assemblies for Flammable and Combustible Liquids,\" with a reference to ANSI\/CAN\/UL 330:2024, \u201cStandard for Hose and Hose Assemblies for Dispensing Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.6.5.1.(1)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2078<\/td><td>Replace Existing CAN\/ULC-S620:2016 with ANSI\/CAN\/UL\/ULC 2586:2022<\/td><td>This proposed change replaces the reference to CAN\/ULC-S620:2016, \"Standard for Hose Nozzle Valves for Flammable and Combustible Liquids,\" with a reference to ANSI\/CAN\/UL\/ULC 2586:2022, \u201cStandard for Hose Nozzle Valves.\"<\/td><td>NFC25 Div.B 4.5.7.1.(2),<br \/>NFC25 Div.B 4.6.5.2.(1)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2077<\/td><td>Replace Existing CAN\/ULC-S615-14 with ANSI\/CAN\/UL\/ULC 1316:2018<\/td><td>This proposed change replaces the reference to CAN\/ULC-S615-14, \"Standard for Fibre Reinforced Plastic Underground Tanks for Flammable and Combustible Liquids,\" with a reference to ANSI\/CAN\/UL\/ULC 1316:2018, \u201cStandard for Fibre Reinforced Underground Tanks for Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.3.1.2.(1),<br \/>NFC25 Div.B 4.3.8.6.(2),<br \/>NFC25 Div.B 4.4.3.2.(4)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>1523<\/td><\/tr><tr><td>2076<\/td><td>Replace Existing CAN\/ULC-S661-10 and CAN\/ULC-S663-11 with ANSI\/CAN\/UL\/ULC 2583:2021<\/td><td>This proposed change replaces the reference to CAN\/ULC-S661-10, \u201cStandard for Overfill Protection Devices for Flammable and Combustible Liquid Storage Tanks,\" and CAN\/ULC-S663-11, \"Standard for Spill Containment Devices for Flammable and Combustible Liquid Aboveground Storage Tanks,\" with a reference to ANSI\/CAN\/UL\/ULC 2583:2021, \u201cStandard for Fuel Tank Accessories for Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.3.1.8.(1),<br \/>NFC25 Div.B 4.3.1.8.(2),<br \/>NFC25 Div.B 4.3.6.4.(4)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2073<\/td><td>Replace Existing CSA B306-M1977 to CSA B306:23<\/td><td>This proposed change replaces the reference to CSA B306-M1977, \"Portable Fuel Tanks for Marine Use,\" to a reference to CSA B306:23, \u201cPortable engine fueling system for marine use.\"<\/td><td>NFC25 Div.B 4.2.3.1.(1)<\/td><td>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2072<\/td><td>Replace Existing CAN\/ULC-S633:2017 with ANSI\/CAN\/UL\/ULC 2039:2023<\/td><td>This proposed change replaces the reference to CAN\/ULC-S633:2017, \"Standard for Flexible Connector Piping for Fuels,\" with a reference to ANSI\/CAN\/UL\/ULC 2039:2023, \u201cStandard for Flexible Connector Piping for Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.5.6.14.(2)<\/td><td>Hazardous Materials and Activities: Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2065<\/td><td>Replace Existing ULC\/ORD-C30-95 to ANSI\/CAN\/UL\/ULC 30:2022<\/td><td>This proposed change replaces the reference to ULC\/ORD-C30-95, \"Safety Containers,\u201d to a reference to ANSI\/CAN\/UL\/ULC 30:2022, \"Standard for Metallic and Nonmetallic Safety Cans for Flammable and Combustible Liquids.\"<\/td><td>NFC25 Div.B 4.1.5.8.(2),<br \/>NFC25 Div.B 4.2.3.1.(1),<br \/>NFC25 Div.B 4.2.6.4.(1),<br \/>NFC25 Div.B 5.5.5.2.(2)<\/td><td>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-05-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2064<\/td><td>Replace Existing ULC\/ORD-C1275-84 to ANSI\/CAN\/UL\/ULC 1275:2024<\/td><td>This proposed change replaces the reference to ULC\/ORD-C1275-84, \u201cGuide for the Investigation of Storage Cabinets for Flammable Liquid Containers,\" to a reference to ANSI\/CAN\/UL\/ULC 1275:2024, \u201cStandard for Flammable Liquid Storage Cabinets.\"<\/td><td>NFC25 Div.B 4.2.10.5.(1)<\/td><td>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-05-22<br \/>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2024-08-21<br \/><\/td><td>-<\/td><\/tr><tr><td>2061<\/td><td>Overheating in New Dwelling Units  <\/td><td>This proposed change requires new dwelling units to be provided with mechanical cooling in locations where the outside summer design temperature exceeds 26\u00b0C.<\/td><td>NBC25 Div.B 1.1.3.1.,<br \/>NBC25 Div.B 6.2.1.,<br \/>NBC25 Div.B 9.33.2.1.,<br \/>NBC25 Div.B 9.33.3.,<br \/>NBC25 Div.B 9.33.5.<\/td><td>Housing and Small Buildings: TG\/WG Development<br \/>2024-02-28<br \/>Housing and Small Buildings: TG\/WG Development<br \/>2024-03-14<br \/>Housing and Small Buildings: TG\/WG Development<br \/>2024-04-03<br \/>Housing and Small Buildings: Review &mdash; Recommended for Public Review<br \/>2024-04-09<br \/>HVAC and Plumbing: Review &mdash; Recommended for Public Review<br \/>2024-04-15<br \/>Use and Egress: Review<br \/>2024-04-16<br \/>SC Div AC: Pre-Public Review<br \/>2024-04-22<br \/>Earthquake Design: Review<br \/>2024-04-23<br \/>Energy Efficiency: Review<br \/>2024-04-24<br \/>Structural Design: Review<br \/>2024-04-24<br \/>Environmental Separation: Review<br \/>2024-04-24<br \/>Fire Protection: Review<br \/>2024-04-24<br \/>Hazardous Materials and Activities: Review<br \/>2024-04-29<br \/>Housing and Small Buildings: Review<br \/>2024-04-29<br \/>SC Div AC: Review &mdash; Recommended for Public Review<br \/>2024-04-29<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2024-04-30<br \/>Energy Efficiency: Review<br \/>2024-06-06<br \/>Housing and Small Buildings: Review of PR Comments<br \/>2024-09-04<br \/>Housing and Small Buildings: Review<br \/>2024-09-11<br \/>Housing and Small Buildings: TG\/WG Development<br \/>2024-09-17<br \/>Use and Egress: Review of PR Comments<br \/>2024-09-18<br \/>Housing and Small Buildings: TG\/WG Development<br \/>2024-09-26<br \/>HVAC and Plumbing: Review<br \/>2024-10-03<br \/>Housing and Small Buildings: Analysis of PR Comments &mdash; Recommend to proceed with technical revisions<br \/>2024-10-09<br \/>Housing and Small Buildings: TG\/WG Development<br \/>2024-10-11<br \/>Housing and Small Buildings: Review of PR Comments &mdash; Proceed with technical revisions<br \/>2024-10-23<br \/>SC Div AC: Review of PR Comments &mdash; Proceed as proposed &mdash; <br \/>2024-10-29<br \/>Housing and Small Buildings: Review of PR Comments &mdash; Proceed with technical revisions<br \/>2024-10-29<br \/>Housing and Small Buildings: Review of PR Comments<br \/>2024-11-13<br \/>Housing and Small Buildings: Review of PR Comments &mdash; Resubmit for Public Review<br \/>2024-11-21<br \/>HVAC and Plumbing: Review of PR Comments &mdash; Proceed with technical revisions<br \/>2024-11-25<br \/>CBHCC: Review of PR Comments &mdash; Resubmit for Public Review<br \/>2024-12-05<br \/><\/td><td>-<\/td><\/tr><tr><td>2057<\/td><td>Requirements for Energy Modeling Software <\/td><td>This proposed change updates ANSI\/ASHRAE 140, \u201cMethod of Test for Evaluating Building Performance Simulation Software,\u201d to the 2023 edition, adds a new Article on the testing of energy modeling software, and harmonizes terminology.<\/td><td>NBC25 Div.B 9.36.2.4.,<br \/>NBC25 Div.B 9.36.6.,<br \/>NBC25 Div.B 9.36.7.3.(3)<\/td><td>Energy Efficiency: Review<br \/>2024-06-06<br \/>Energy Efficiency: Review &mdash; Withdrawn<br \/>2024-06-06<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-12<br \/><\/td><td>-<\/td><\/tr><tr><td>2054<\/td><td>Clarification of Installation Location for Accessible Controls<\/td><td>This proposed change clarifies that the prescribed height range for accessible controls should be determined in relation to the finished floor and the centre line of the controls.<\/td><td>NBC25 Div.B 3.8.3.8.(1)<\/td><td>Use and Egress: Draft<br \/>2024-05-10<br \/>Use and Egress: Review &mdash; Further Review<br \/>2024-06-05<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2025-05-16<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2050<\/td><td>Egress Windows or Doors for Bedrooms in Part 3 Residential Buildings<\/td><td>The proposed change requires egress window or door from bedrooms in Group C, Part 3 buildings that are not sprinklered.<\/td><td>NBC25 Div.B 3.3.4.<\/td><td>Use and Egress: Draft<br \/>2023-12-13<br \/><\/td><td>1591, 2095<\/td><\/tr><tr><td>2049<\/td><td>Specified Wind and Snow Loads in Part 9<\/td><td>-<\/td><td>NBC25 Div.B 9.4.2.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2047<\/td><td>Performance Path <\/td><td>-<\/td><td>NECB25 Div.B 13.8.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2045<\/td><td>Tier 4 Prescriptive Requirements<\/td><td>This proposed change provides the energy efficiency requirements for compliance with tier 4 of the energy performance compliance prescriptive path.<\/td><td>NBC25 Div.B 9.36.13.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2044<\/td><td>Tier 3 Prescriptive Requirements<\/td><td>Provides the energy efficiency requirements for compliance with tier 3 of the energy performance compliance prescriptive path.<\/td><td>NBC25 Div.B 9.36.12.<\/td><td>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2026-06-04<br \/>Standing Codes Coordination Committee: Review<br \/>2026-06-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2043<\/td><td>Tiered Energy Compliance: Tier 2 Prescriptive Path<\/td><td>This proposed change provides energy-efficiency requirements for compliance with Energy Performance Tier 2 of the energy performance compliance prescriptive path.<\/td><td>NBC25 Div.B 9.36.11.<\/td><td>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2025-11-18<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2038<\/td><td>Application of Automatic Sprinkler Systems and NFPA 13R<\/td><td>This proposed change clarifies the application of NFPA 13R, \"Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies,\" for mixed occupancies.<\/td><td>NBC25 Div.B 3.2.5.12.<\/td><td>Fire Protection: TG\/WG Development<br \/>2024-07-31<br \/>Fire Protection: Review<br \/>2024-09-03<br \/>Fire Protection: TG\/WG Development<br \/>2024-11-18<br \/>Fire Protection: Review &mdash; Recommended for Public Review<br \/>2024-11-27<br \/>NMCC on Fire and Life Safety: Review &mdash; Recommended for Public Review<br \/>2025-09-15<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>892<\/td><\/tr><tr><td>2033<\/td><td>Ventilation Systems in Existing Buildings Subjected to Alteration<\/td><td>This proposed change introduces requirements for ventilation systems in existing buildings subjected to alteration.<\/td><td>NBC25 Div.B 10.9.<\/td><td>Energy Efficiency: Review<br \/>2023-09-27<br \/>Housing and Small Buildings: Review<br \/>2023-12-06<br \/>Housing and Small Buildings: Review &mdash; Recommended for Public Review<br \/>2024-02-08<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2024-04-30<br \/>Housing and Small Buildings: Review of PR Comments<br \/>2024-09-11<br \/><\/td><td>-<\/td><\/tr><tr><td>2029<\/td><td>Accessible Menstrual Product Dispensers: Control Design<\/td><td>This proposed change requires accessible control designs for menstrual product dispensers where such dispensers are provided so that they may be accessed by persons with disabilities related to dexterity.<\/td><td>NBC25 Div.B 3.8.3.16.<\/td><td>Use and Egress: Draft<br \/>2023-09-14<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2025-05-16<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1441<\/td><\/tr><tr><td>2023<\/td><td>Fire and Sound Resistance Table Updates<\/td><td>The proposed change updates the description of the external wall assembly EW2 and EW3, and associated Table Notes.<\/td><td>NBC25 Div.B 9.10.3.1. Table A<\/td><td>NMCC on Fire and Life Safety: Draft<br \/>2025-07-16<br \/><\/td><td>-<\/td><\/tr><tr><td>2022<\/td><td>Clarification of OS Safety Sub-Objective for Firefighter Safety<\/td><td>This proposed change distinguishes firefighters when performing their duties from the \"persons\" in the definition of sub-objective OS1 Fire Safety.<\/td><td>NPC25 Div.A 2.2.1.1.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>2020<\/td><td>Reference House Modeling of Service Water Heating equipment not listed in Table 9.36.4.2<\/td><td>This proposed change closes a loophole where the requirements in Table 9.36.5.16 were not aligned with Table 9.36.4.2<\/td><td>NBC25 Div.B 9.36.6.16.<\/td><td>Energy Efficiency: Draft<br \/>2023-08-09<br \/><\/td><td>-<\/td><\/tr><tr><td>2019<\/td><td>Reference House Modeling of HVAC equipment not addressed in Table 9.36.3.10.<\/td><td>This proposed change closes a loophole where the requirements in Clause 9.36.5.15.(7)(b) were not aligned with Table 9.36.3.10 in NBC 2020.<\/td><td>NBC25 Div.B 9.36.6.15.<\/td><td>Energy Efficiency: Draft<br \/>2023-08-04<br \/><\/td><td>-<\/td><\/tr><tr><td>2015<\/td><td>Defined Term of Distillery<\/td><td>This proposed change suggested to revise the defined term \"Distillery\" to avoid confusion between the property and the building on the property.<\/td><td>NBC25 Div.A 1.4.1.2.(1)<\/td><td>Hazardous Materials and Activities: Draft<br \/>2023-07-31<br \/><\/td><td>-<\/td><\/tr><tr><td>2012<\/td><td>Indoor Design Temperatures for Residential Buildings<\/td><td>-<\/td><td>NBC25 Div.B 6.2.1.1.<\/td><td>HVAC and Plumbing: Review<br \/>2023-09-13<br \/>HVAC and Plumbing: Review<br \/>2023-11-22<br \/><\/td><td>-<\/td><\/tr><tr><td>2007<\/td><td>Lavatory Supply Fittings in Public Washrooms<\/td><td>This proposed change adds a Note to Sentence 3.7.2.3.(4) of the NBC to direct Code users to Article 2.2.10.6. of the NPC for requirements for lavatory supply fittings in public washrooms.<\/td><td>NBC25 Div.B 3.7.2.3.<\/td><td>HVAC and Plumbing: Review &mdash; Recommended for Public Review<br \/>2023-09-13<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2024-04-30<br \/>HVAC and Plumbing: Review of PR Comments &mdash; Proceed as proposed &mdash; <br \/>2024-06-19<br \/>CBHCC: Post-Public Review &mdash; Deferred<br \/>2025-04-23<br \/>NMCC on Indoor Environment: Review &mdash; Further Review<br \/>2025-06-10<br \/>NMCC on Indoor Environment: Review &mdash; Recommended for Public Review<br \/>2025-11-04<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>1998<\/td><td>Introduction of New OS Safety Sub-Objective for Firefighter Safety<\/td><td>This proposed change adds a new sub-objective OS6 Firefighter Safety that clarifies which existing requirements are intended to address firefighter safety by distinguishing firefighters from the \"persons\" in the definition of sub-objective OS1 Fire Safety. <\/td><td>NBC25 Div.A 2.2.1.1.(1),<br \/>NFC25 Div.A 2.2.1.1.(1)<\/td><td>CBHCC: Draft<br \/>2023-06-27<br \/>Environmental Separation: Review<br \/>2023-08-29<br \/>Energy Efficiency: Review<br \/>2023-09-01<br \/>Earthquake Design: Review<br \/>2023-09-07<br \/>Hazardous Materials and Activities: Review<br \/>2023-09-08<br \/>Review<br \/>2023-09-08<br \/>HVAC and Plumbing: Review<br \/>2023-09-11<br \/>Fire Protection: Review<br \/>2023-09-14<br \/>Structural Design: Review<br \/>2023-09-20<br \/>Housing and Small Buildings: Review<br \/>2023-09-26<br \/>Use and Egress: Review<br \/>2023-09-26<br \/>Fire Protection: Review<br \/>2023-10-03<br \/>Housing and Small Buildings: Review<br \/>2023-10-03<br \/>Housing and Small Buildings: Review<br \/>2023-11-01<br \/>CBHCC: Review<br \/>2024-01-24<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2024-04-30<br \/>CBHCC: CBHCC Decision<br \/>2024-10-03<br \/><\/td><td>1857, 557<\/td><\/tr><tr><td>1992<\/td><td>palce holder for 13.8<\/td><td>-<\/td><td>NECB25 Div.B 13.8.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1987<\/td><td>Outpatient Clinics<\/td><td>New requirements related to operation of outpatient clinics.<\/td><td>NFC25 Div.B 2.1.2.2.,<br \/>NFC25 Div.B 2.8.1.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1986<\/td><td>Outpatient Clinics<\/td><td>New requirements related to construction of outpatient clinics.<\/td><td>NBC25 Div.B 3.2.7.4.,<br \/>NBC25 Div.B 3.2.7.8.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1985<\/td><td>Outpatient Clinics<\/td><td>Signpost to Part 3 from Part 9<\/td><td>NBC25 Div.B 9.10.1.3.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1984<\/td><td>Outpatient Clinics<\/td><td>New requirements related to construction of outpatient clinics.<\/td><td>NBC25 Div.B 3.3.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1983<\/td><td>Introduce Testing Standards for Air Barriers for Roof Assemblies<\/td><td>This proposed change introduces two testing standards to the NECB for air leakage through roof assemblies.<\/td><td>NECB25 Div.B 3.2.4.3.<\/td><td>-<\/td><td>1997<\/td><\/tr><tr><td>1982<\/td><td>Outpatient Clinics<\/td><td>The proposed change introduces a new defined term for outpatient clinics.<\/td><td>NBC25 Div.A 1.4.1.2.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1966<\/td><td>Withdrawing the flexibility in designation of a structure as regular from earthquake design perspective<\/td><td>This proposed change deletes the Sentence 4.1.8.6.(2) which permits that a structure which does not have any of the irregularities specified in the NBC may be considered as regular. <\/td><td>NBC25 Div.B 4.1.8.6.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1961<\/td><td>Plumbing for adaptable washroom sinks<\/td><td>This PCF introduces new requirements for plumbing in washroom sinks to reduce the expense of lowering the height for use by wheelchair users<\/td><td>NBC25 Div.B 3.8.<\/td><td>HVAC and Plumbing: Review<br \/>2023-10-12<br \/><\/td><td>-<\/td><\/tr><tr><td>1956<\/td><td>Plumbing for adaptable kitchens<\/td><td>This PCF introduces new requirements for plumbing in kitchens to reduce the expense of adapting the space for use by wheelchair users<\/td><td>NBC25 Div.B 3.8.<\/td><td>Use and Egress: Draft<br \/>2023-05-23<br \/>Housing and Small Buildings: Review<br \/>2023-05-31<br \/>Use and Egress: Review<br \/>2023-06-07<br \/>Use and Egress: Review<br \/>2023-07-14<br \/>Use and Egress: TG\/WG Development<br \/>2023-07-24<br \/>Use and Egress: Review<br \/>2023-08-22<br \/>Use and Egress: TG\/WG Development<br \/>2023-09-27<br \/>HVAC and Plumbing: Review<br \/>2023-10-12<br \/><\/td><td>964, 1429<\/td><\/tr><tr><td>1955<\/td><td>Clarification of span limitation for wood-frame construction<\/td><td>This proposed change intends to clarify that the limitation for the span of any structural member not to exceed 12.20 m in wood-frame construction refers to the clear span.<\/td><td>NBC25 Div.B 9.23.1.1.(1)<\/td><td>-<\/td><td>1696<\/td><\/tr><tr><td>1953<\/td><td>Clarification of requirement for panel-type underlay beneath adhesive-applied ceramic tile<\/td><td>This proposed change seeks to clarify the requirement for panel-type underlay to be provided under ceramic tile applied with adhesive per 9.30.2.1.(3), in addition to the subfloor having its edges supported per 9.30.6.1.(2) (i.e. ceramic tile cannot be applied with adhesive directly to the subfloor).<\/td><td>NBC25 Div.B 9.30.6.1.(2)<\/td><td>-<\/td><td>1533<\/td><\/tr><tr><td>1949<\/td><td>Addition of Non-asbestos Cement Board as an acceptable protection.<\/td><td>This proposed change seeks to include 12 mm non- asbestos cement board as an acceptable material for the protection of insulation.<\/td><td>NBC25 Div.B 9.25.2.3.(6)<\/td><td>-<\/td><td>1201<\/td><\/tr><tr><td>1948<\/td><td>Removal of \"unreinforced concrete\" and \"nominally reinforced concrete\" in Part 9<\/td><td>This proposed change seeks to provide clarification of Part 9 requirements for concrete by removing the term \"nominally reinforced concrete\" and replacing \"unreinforced concrete\" with \"concrete\".<\/td><td>NBC25 Div.B 9.3.1.1.(1),<br \/>NBC25 Div.B 9.3.1.1.(2),<br \/>NBC25 Div.B 9.3.1.6.(1),<br \/>NBC25 Div.B 9.3.1.7.(2)<\/td><td>-<\/td><td>1466<\/td><\/tr><tr><td>1947<\/td><td>(CCR 2010) Adding Pointer to Relevant Requirements on Farm Buildings<\/td><td>This proposed change suggested to revise Sentence 3.3.6.6.(1) of Division B of NBC to raise Code users' awareness on relevant requirements in Sentence 2.2.8.1.(4) on the classification of farm buildings used for the storage of ammonium nitrate. <\/td><td>NBC25 Div.B 2.2.8.1.(4),<br \/>NBC25 Div.B 3.3.6.6.(1),<br \/>NFC25 Div.B 3.2.9.2.(1)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1943<\/td><td>Harmonizing the Standard for Whole Building Air Leakage Testing<\/td><td>This proposed change harmonizes the standard for whole building air leakage testing referenced in the prescriptive and modeling requirements in the NECB by only referring to ASTM E3158, the newer, more accurate and more reproducible testing procedure. <\/td><td>NECB25 Div.B 8.4.2.9.(2)<\/td><td>NMCC on Climate Change Mitigation: Review &mdash; Recommended for Public Review<br \/>2025-11-18<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1989<\/td><\/tr><tr><td>1941<\/td><td>Door-Swing Area within a Universal Washroom<\/td><td>This proposed change clarifies that the 1700 mm diameter turning space within a universal washroom does not overlap with the space occupied by an inward swinging door.<\/td><td>NBC25 Div.B 3.8.3.13.(1)<\/td><td>Use and Egress: Draft<br \/>2024-06-10<br \/><\/td><td>1782<\/td><\/tr><tr><td>1937<\/td><td>Exhaust Ducts Serving Laundry-drying Equipment <\/td><td>This change will provide clarification of the requirements for exhaust ducts referenced in Sentence 9.32.1.3.(2) by directly stating in the body of the code the practicality that Note A-9.32.1.3 provides and will ensure consistency between Sentences 6.3.2.10(7) and 9.32.1.3.(2).<\/td><td>NBC25 Div.B 9.32.1.3.(2),<br \/>NBC25 Div.B 6.3.2.10.(7)<\/td><td>-<\/td><td>1355<\/td><\/tr><tr><td>1908<\/td><td>Modernizing the language in washroom provisions<\/td><td>The proposed change modernizes the language in washroom provisions in the NBC to include gender-based terms instead of sex-based terms<\/td><td>NBC25 Div.B 3.7.2.2.<\/td><td>Use and Egress: Draft<br \/>2024-04-17<br \/>Use and Egress: Review &mdash; Further Review<br \/>2024-06-04<br \/><\/td><td>-<\/td><\/tr><tr><td>1907<\/td><td>Width of doorways around non-exit stairs<\/td><td>Expanding the application of Sentence 3.4.3.3.(1) to doorways around non-exit stairs<\/td><td>NBC25 Div.B 3.3.1.14.(1)<\/td><td>-<\/td><td>1251<\/td><\/tr><tr><td>1906<\/td><td>Application of Dampproofing Material<\/td><td>This code change is to clarify the proper application of dampproofing material to foundation walls as found in Sentence 9.13.2.1.(1).<\/td><td>NBC25 Div.B 9.13.2.1.(1)<\/td><td>-<\/td><td>1547<\/td><\/tr><tr><td>1902<\/td><td>Clarifications for Artcile 4.1.8.3.<\/td><td>-<\/td><td>NBC25 Div.B 4.1.8.3.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1893<\/td><td>In-factory Airtightness Testing of Factory-constructed Buildings<\/td><td>This proposed change introduces the in-factory airtightness testing requirement for single-section, single-story, factory-constructed buildings.<\/td><td>NBC25 Div.B 9.36.5.3.<\/td><td>-<\/td><td>1871<\/td><\/tr><tr><td>1891<\/td><td>(split from PCF 1819) Harmonize Airtightness Requirements in NBC Section 9.36.<\/td><td>This proposed change (1) aligns the airtightness requirements in the Tiered Performance Path with the Performance Path, and (2) allow the use of 3.0 or 2.5 ACH50 for proposed house modelling without conducting an airtightness test for attached and detached houses, respectively .<\/td><td>-<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1885<\/td><td>Location of Water-bottle Filling Stations and Drinking Fountains in a Building Required to be Barrier-free<\/td><td>This proposed change clarifies where a water-bottle filling station and a drinking fountain complying with Subsection 3.8.3. should be provided in a barrier-free building.<\/td><td>NBC25 Div.B 3.8.2.8.(11),<br \/>NBC25 Div.B 3.8.2.8.(12)<\/td><td>Use and Egress: Draft<br \/>2024-05-29<br \/><\/td><td>1822<\/td><\/tr><tr><td>1854<\/td><td>Rooftop Enclosures as a Storey<\/td><td>This proposed change clarifies whether a rooftop enclosure provided for elevator machinery, a stairway or a service room is intended to be considered as a storey in certain fire safety applications.<\/td><td>NBC25 Div.B 3.2.5.8.,<br \/>NBC25 Div.B 3.2.6.1.<\/td><td>Fire Protection: Draft<br \/>2023-02-14<br \/>Fire Protection: Review &mdash; Recommended for Public Review<br \/>2023-03-16<br \/>Use and Egress: Review<br \/>2023-06-07<br \/>TG\/WG Development<br \/>2023-07-11<br \/>Fire Protection: Review<br \/>2024-03-27<br \/>CBHCC: Review &mdash; Deferred<br \/>2024-04-30<br \/>Fire Protection: Review<br \/>2024-06-03<br \/><\/td><td>1568, 1569<\/td><\/tr><tr><td>1849<\/td><td>Hot Works General Requirements<\/td><td>This proposed change introduces pre-work safety activities when planning hot works.<\/td><td>NFC25 Div.B 5.2.1.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-12-08<br \/><\/td><td>-<\/td><\/tr><tr><td>1848<\/td><td>Hot Works Prevention of Fires<\/td><td>This proposed change sets the parameters to define the hot work area.<\/td><td>NFC25 Div.B 5.2.3.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-12-08<br \/><\/td><td>-<\/td><\/tr><tr><td>1837<\/td><td>Prescriptive Trade-off Path - Heat Pump Water Heaters<\/td><td>This proposed change updates the energy conservation points assigned to heat pump water heaters<\/td><td>NBC25 Div.B 9.36.9.10.<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1817<\/td><td>Direction of Door Swing with Low Occupant Load<\/td><td>This proposed change permits an exit door serving an area with a low occupant load to swing inward.<\/td><td>NBC25 Div.B 3.4.6.12.<\/td><td>Use and Egress: Draft<br \/>2024-05-27<br \/><\/td><td>999<\/td><\/tr><tr><td>1816<\/td><td>Small Quantity Exemptions for Dangerous Goods<\/td><td>This proposed change simplifies the requirements for the small quantity exemptions of dangerous goods.<\/td><td>NFC25 Div.B 3.2.7.1.<\/td><td>NMCC on Fire and Life Safety: TG\/WG Development<br \/>2025-08-13<br \/><\/td><td>-<\/td><\/tr><tr><td>1806<\/td><td>Fabrics, Films and Membranes Used in Farm Building Envelope Construction<\/td><td>This proposed change introduces flame-spread rating requirements for fabrics, films and membranes when used in building envelope construction and provides an exemption for Group G, Division 4 major occupancy.<\/td><td>NBC25 Div.B 2.2.1.14.<\/td><td>Hazardous Materials and Activities: TG\/WG Development<br \/>2022-09-12<br \/>Hazardous Materials and Activities: Review<br \/>2023-08-15<br \/>Fire Protection: Review &mdash; Deferred<br \/>2023-11-20<br \/>Fire Protection: Review<br \/>2024-03-01<br \/>Fire Protection: Review &mdash; Deferred<br \/>2024-06-03<br \/><\/td><td>1611, 1661<\/td><\/tr><tr><td>1783<\/td><td>Identification of Sanitary Drainage System<\/td><td>This CCR aims to add color requirements for the identification of the sanitary drainage system to Article 2.2.1.3. Identification<\/td><td>NPC25 Div.B 2.2.1.3.<\/td><td>-<\/td><td>1630<\/td><\/tr><tr><td>1781<\/td><td>Fire Test Method for Firestops at Perimeter Joints<\/td><td>This proposed change replaces the referenced standard for fire test method, ASTM E2307, \"Standard Test Method for Determining Fire Resistance of Perimeter Fire Barriers Using Intermediate-Scale, Multi-story Test Apparatus,\" with CAN\/ULC-S115:2023, \"Standard Method of Fire Tests of Firestop Systems.\"<\/td><td>NBC25 Div.B 3.1.8.3.(2),<br \/>NBC25 Div.B 3.1.8.3.(4),<br \/>NBC25 Div.B 9.10.9.2.(4)<\/td><td>Fire Protection: Draft<br \/>2024-05-06<br \/>Fire Protection: Review &mdash; Recommended for Public Review<br \/>2024-06-03<br \/>Housing and Small Buildings: Review<br \/>2024-06-19<br \/>Housing and Small Buildings: Review &mdash; Recommended for Public Review<br \/>2024-08-14<br \/>Fire Protection: Review<br \/>2024-09-03<br \/>NMCC on Fire and Life Safety: Review &mdash; Recommended for Public Review<br \/>2025-09-15<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>1780<\/td><td>Benches in Universal Dressing and Shower Rooms<\/td><td>This proposed change requires minimum loading and maintenance quality requirements for benches in universal dressing and shower rooms.<\/td><td>NBC25 Div.B 3.8.3.17.<\/td><td>Use and Egress: Draft<br \/>2022-08-11<br \/>Use and Egress: Review &mdash; Further Review<br \/>2024-06-04<br \/><\/td><td>1690<\/td><\/tr><tr><td>1779<\/td><td>Location of Toilet Paper Dispenser within an Accessible Water-Closet Stall<\/td><td>This proposed change sets the location of a toilet paper dispenser within an accessible water-closet stall.<\/td><td>NBC25 Div.B 3.8.3.12.(1)<\/td><td>Use and Egress: Draft<br \/>2024-06-21<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2026-04-30<br \/><\/td><td>1780<\/td><\/tr><tr><td>1778<\/td><td>Replace the Term \"Hearing Impairment\" with \"People with Low or No Hearing\"<\/td><td>This proposed change replaces the term \"hearing impaired\" with \"people with low or no hearing\" in Part 3. <\/td><td>NBC25 Div.B 3.2.4.19.,<br \/>NBC25 Div.B 3.8.<\/td><td>Use and Egress: Draft<br \/>2022-08-10<br \/>Use and Egress: Review &mdash; Further Review<br \/>2024-06-04<br \/>Draft<br \/>2025-02-27<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2025-05-16<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1528<\/td><\/tr><tr><td>1774<\/td><td>no title<\/td><td>-<\/td><td>NBC25 Div.B Appendix C<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1769<\/td><td>Lighting within an Occupied Washroom<\/td><td>This proposed change introduces a minimal reasonable timeframe of illumination in an occupied washroom.<\/td><td>NBC25 Div.B 9.34.2.7.<\/td><td>Use and Egress: Draft<br \/>2021-12-21<br \/>Use and Egress: Review<br \/>2022-05-25<br \/>Housing and Small Buildings: Review<br \/>2022-06-08<br \/>Energy Efficiency: Review<br \/>2022-07-20<br \/>Use and Egress: Review<br \/>2022-11-09<br \/>Use and Egress: Review<br \/>2023-09-26<br \/>Housing and Small Buildings: Review &mdash; Recommended for Public Review<br \/>2024-02-08<br \/>Energy Efficiency: Review<br \/>2024-04-04<br \/>Housing and Small Buildings: Review &mdash; Deferred<br \/>2024-04-12<br \/>Use and Egress: Review<br \/>2024-06-05<br \/><\/td><td>1545<\/td><\/tr><tr><td>1765<\/td><td>Projection of Protruding Building Elements<\/td><td>This proposed change extends the Part 9 requirements on the projection of protruding building elements to most paths of travel. <\/td><td>NBC25 Div.B 9.5.,<br \/>NBC25 Div.B 9.9.5.3.,<br \/>NBC25 Div.B 3.3.1.8.(2),<br \/>NBC25 Div.B 3.3.1.8.(3)<\/td><td>Use and Egress: Draft<br \/>2022-01-04<br \/>Use and Egress: TG\/WG Development<br \/>2022-08-11<br \/>Use and Egress: Review<br \/>2022-09-28<br \/>Housing and Small Buildings: Review<br \/>2022-10-06<br \/>TG\/WG Development<br \/>2022-12-12<br \/>Housing and Small Buildings: Review &mdash; Further Review<br \/>2023-01-18<br \/>TG\/WG Development<br \/>2023-02-06<br \/>Use and Egress: Review<br \/>2023-05-02<br \/>Housing and Small Buildings: Review &mdash; Recommended for Public Review<br \/>2023-05-31<br \/>CBHCC: Review &mdash; Recommended for Public Review<br \/>2023-08-17<br \/>Housing and Small Buildings: Review of PR Comments<br \/>2024-01-30<br \/>Use and Egress: Review of PR Comments<br \/>2024-03-08<br \/>Housing and Small Buildings: Review of PR Comments &mdash; Defer<br \/>2024-06-19<br \/><\/td><td>685<\/td><\/tr><tr><td>1764<\/td><td>Tactile Attention Indicator Surfaces<\/td><td>This proposed change introduces requirements on the provision of tactile attention indicator surfaces at certain changes in elevation.<\/td><td>NBC25 Div.B 3.3.1.19.,<br \/>NBC25 Div.B 9.8.6.<\/td><td>Use and Egress: Draft<br \/>2022-03-01<br \/>Use and Egress: TG\/WG Development<br \/>2022-08-11<br \/>Use and Egress: Review<br \/>2022-09-28<br \/>Use and Egress: TG\/WG Development<br \/>2022-12-12<br \/><\/td><td>-<\/td><\/tr><tr><td>1710<\/td><td>Washrooms\/bathroom and other interchangeable terms<\/td><td>Coordinate the identification and replacement of multiple terms that have been used interchangeably in the NBC with the term \"washroom\"<\/td><td>NBC25 Div.B 3.1.13.3.,<br \/>NBC25 Div.B 3.2.2.21.(1),<br \/>NBC25 Div.B 3.3.3.5.,<br \/>NBC25 Div.B 3.4.4.4.(8),<br \/>NBC25 Div.B 3.8.3.6.(3),<br \/>NBC25 Div.B 3.2.6.2.(5),<br \/>NBC25 Div.B 3.2.4.20.(9),<br \/>NBC25 Div.B 3.2.2.35.(4)<\/td><td>-<\/td><td>-<\/td><\/tr><tr><td>1708<\/td><td>Maximum length of barrier-free ramps<\/td><td>Provide guidance for overall length of barrier-free ramps recognizing that travel in either direction on a barrier-free ramp requires increased strength and stamina by all users.<\/td><td>NBC25 Div.B 3.8.3.5.<\/td><td>Use and Egress: TG\/WG Development<br \/>2021-12-10<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-09-16<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-11-20<br \/><\/td><td>1544<\/td><\/tr><tr><td>1705<\/td><td>L-shaped grab bar for water-closet stalls for persons with limited mobility<\/td><td>This PCF requires an L-shaped grab bar instead of a horizontal grab bar at water-closets for stalls for people with limited mobility. <\/td><td>NBC25 Div.B 3.8.3.15.,<br \/>NBC25 Div.B 3.8.3.12.<\/td><td>Use and Egress: TG\/WG Development<br \/>2021-12-10<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-07-04<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-09-16<br \/><\/td><td>-<\/td><\/tr><tr><td>1696<\/td><td>Drains Serving Elevator Pits<\/td><td>-<\/td><td>NPC25 Div.B 2.4.3.7.<\/td><td>HVAC and Plumbing: Draft<br \/>2021-09-27<br \/><\/td><td>1420<\/td><\/tr><tr><td>1695<\/td><td>Wet Vents<\/td><td>-<\/td><td>NPC25 Div.B 2.5.6.2.<\/td><td>-<\/td><td>1102<\/td><\/tr><tr><td>1685<\/td><td>Reference CAN\/ULC-S134 for protection of foamed plastic <\/td><td>This proposed change modifies the test requirements for protection of foamed plastic in exterior walls.<\/td><td>NBC25 Div.B 3.2.3.8.<\/td><td>TG\/WG Development<br \/>2021-04-12<br \/>Fire Protection: Review<br \/>2021-05-06<br \/><\/td><td>-<\/td><\/tr><tr><td>1684<\/td><td>Revision of Intent Statements and Attributions for NBC Sentences 3.2.3.7.(3) and (4)<\/td><td>This proposed change deletes the attributions and revises the intent statements for Sentences 3.2.3.7.(3) and (4) of Division B of the NBC. <\/td><td>NBC25 Div.B 3.2.3.7.(3),<br \/>NBC25 Div.B 3.2.3.7.(4)<\/td><td>Fire Protection: TG\/WG Development<br \/>2021-05-07<br \/>Fire Protection: Review &mdash; Recommended for Public Review<br \/>2021-05-13<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>-<\/td><\/tr><tr><td>1681<\/td><td>Distillery as a medium-hazard industrial occupancy<\/td><td>This proposed change adds distilleries as an example of medium-hazard industrial occupancy in the NBC and NFC. <\/td><td>NBC25 Div.B 3.1.2.1.(1),<br \/>NFC25 Div.B 4.10.2.1.<\/td><td>TG\/WG Development<br \/>2021-04-17<br \/>Fire Protection: Review &mdash; Further Review<br \/>2021-05-13<br \/>Hazardous Materials and Activities: Review &mdash; Further Review<br \/>2021-09-29<br \/><\/td><td>1208<\/td><\/tr><tr><td>1666<\/td><td>Barrier-free path of travel connecting barrier-free facilities<\/td><td>This proposed change requires that where clear floor spaces are required for barrier-free facilities, that they be connected to the barrier-free path of travel. <\/td><td>NBC25 Div.B 3.8.2.3.<\/td><td>NMCC on Accessibility: TG\/WG Development<br \/>2025-06-23<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-09-16<br \/>NMCC on Accessibility: TG\/WG Development<br \/>2025-11-20<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2026-01-09<br \/>Standing Codes Coordination Committee: Review<br \/>2026-04-29<br \/><\/td><td>1781, 1783<\/td><\/tr><tr><td>1644<\/td><td>Replace the Term \"Visually Impaired Persons\" with \"People with Low or No Vision\"<\/td><td>This proposed change replaces the terms \"visually impaired persons\" and \"people with vision loss\" with \"people with low or no vision\" in Parts 3 and 9.<\/td><td>NBC25 Div.B 3.3.1.8.(2),<br \/>NBC25 Div.B 3.8.,<br \/>NBC25 Div.B 9.8.7.3.(1),<br \/>NBC25 Div.B 9.8.7.3.(2),<br \/>NBC25 Div.B 9.9.5.3.(1)<\/td><td>Use and Egress: Draft<br \/>2020-02-04<br \/>Use and Egress: Review<br \/>2024-06-04<br \/>Draft<br \/>2025-02-27<br \/>NMCC on Accessibility: Review &mdash; Recommended for Public Review<br \/>2025-05-16<br \/>Standing Codes Coordination Committee: Review<br \/>2025-11-21<br \/>CBHCC: Pre-Public Review &mdash; Proceed<br \/>2026-01-22<br \/><\/td><td>1528<\/td><\/tr><tr><td>1589<\/td><td>Vision glass in doors in primary horizontal routes<\/td><td>This change proposes to require that doors in primary horizontal routes be provided with a vision panel.<\/td><td>NBC25 Div.B 3.3.1.20.<\/td><td>Use and Egress: TG\/WG Development<br \/>2019-05-07<br \/>Use and Egress: TG\/WG Development<br \/>2019-06-12<br \/>Use and Egress: Review &mdash; Further Review<br \/>2019-06-18<br \/>Use and Egress: TG\/WG Development<br \/>2022-05-11<br \/><\/td><td>2049<\/td><\/tr><tr><td>1585<\/td><td>Handrail Colour Contrast <\/td><td>This proposed change adds a requirement of colour contrast for handrails compared to the adjacent background and wall surfaces. <\/td><td>NBC25 Div.B 3.4.6.5.<\/td><td>Use and Egress: Draft<br \/>2019-04-29<br \/>Use and Egress: TG\/WG Development<br \/>2019-05-07<br \/>Use and Egress: TG\/WG Development<br \/>2022-11-07<br \/><\/td><td>-<\/td><\/tr><tr><td>1583<\/td><td>Accessible Parking <\/td><td>This proposed change introduces requirements for accessible parking areas in the NBC. <\/td><td>NBC25 Div.B 3.8.2.5.,<br \/>NBC25 Div.B 3.8.3.<\/td><td>Use and Egress: TG\/WG Development<br \/>2019-04-29<br \/>Use and Egress: Review &mdash; Further Review<br \/>2019-05-29<br \/>Use and Egress: TG\/WG Development<br \/>2019-06-12<br \/>Use and Egress: Review &mdash; Further Review<br \/>2019-06-18<br \/>Use and Egress: TG\/WG Development<br \/>2022-03-11<br \/><\/td><td>-<\/td><\/tr><tr><td>1575<\/td><td>Change Defined Term \"Barrier-free\" to \"Accessible\"<\/td><td>The proposed changes replace the term \"barrier-free\" by \"accessible\" in the NBC.<\/td><td>NBC25 Div.A 1.4.1.2.,<br \/>NBC25 Div.A 2.2.1.1.(1),<br \/>NBC25 Div.A 2.1.1.2.(5)<\/td><td>Use and Egress: TG\/WG Development<br \/>2019-04-24<br \/>Use and Egress: Review<br \/>2019-05-30<br \/>EC: Review &mdash; Editorial Revision\/Errata (No Public Review)<br \/>2019-07-11<br \/>EC: Review &mdash; Further Review<br \/>2019-12-13<br \/>EC: TG\/WG Development<br \/>2021-07-21<br \/>Draft<br \/>2025-02-27<br \/><\/td><td>2235, 2244<\/td><\/tr><tr><td>1572<\/td><td>Tactile attention indicator surfaces (TAIS) for exit Stairs<\/td><td>The change proposed location where TAIS shall be installed in exit stairs.<\/td><td>NBC25 Div.B 3.3.1.19.<\/td><td>Use and Egress: TG\/WG Development<br \/>2019-05-07<br \/>Use and Egress: TG\/WG Development<br \/>2019-06-12<br \/>Use and Egress: Review &mdash; Further Review<br \/>2019-06-18<br \/>Use and Egress: TG\/WG Development<br \/>2022-11-07<br \/><\/td><td>-<\/td><\/tr><tr><td>1507<\/td><td>Minimum Cleanout Fitting Dimension <\/td><td>This proposed change sets the minimum dimension for cleanout fittings to be at least 4 in. in size for building drains that are at least 4 in. in size.<\/td><td>NPC25 Div.B 2.4.7.<\/td><td>HVAC and Plumbing: Draft<br \/>2019-02-28<br \/><\/td><td>1227<\/td><\/tr><tr><td>1393<\/td><td>Defined Term Storm Water<\/td><td>The proposed change would harmonize between the English and the French definition of the term storm water.<\/td><td>NPC25 Div.A 1.4.1.2.<\/td><td>-<\/td><td>1063<\/td><\/tr><tr><td>1389<\/td><td>Location of Drain Pipes<\/td><td>This proposed change requires that a drain pipe that is directly connected to multiple fixture outlet pipes or a fixture drain be located within a single room or suite. <\/td><td>NPC25 Div.B 2.4.2.3.<\/td><td>HVAC and Plumbing: Draft<br \/>2019-02-28<br \/>HVAC and Plumbing: Review &mdash; Recommended for Public Review<br \/>2019-04-17<br \/>HVAC and Plumbing: Review of PR Comments &mdash; Defer<br \/>2020-05-12<br \/>TG\/WG Development<br \/>2022-02-15<br \/>TG\/WG Development<br \/>2022-03-21<br \/>HVAC and Plumbing: Review &mdash; Withdrawn<br \/>2022-09-28<br \/><\/td><td>1187<\/td><\/tr><tr><td>1381<\/td><td>Drainage to Sumps by Gravity<\/td><td>The proposed change would prohibit the use of a sump or tank on piping that can drained by gravity.<\/td><td>NPC25 Div.B 2.4.6.3.<\/td><td>HVAC and Plumbing: TG\/WG Development<br \/>2018-09-12<br \/><\/td><td>1023<\/td><\/tr><tr><td>1367<\/td><td>Capability of Support<\/td><td>The proposed change would add clarification to the Sentence 2.3.4.1.(2)<\/td><td>-<\/td><td>HVAC and Plumbing: Draft<br \/>2018-07-16<br \/><\/td><td>1099<\/td><\/tr><tr><td>1077<\/td><td>Inspection, Testing and Maintenance<\/td><td>This proposed change clarifies that municipal hydrants are required to comply with the requirements for inspection, testing, and maintenance in accordance with Sentence 6.4.1.1.(1) of Division B of the NFC. <\/td><td>NFC25 Div.B 6.4.1.1.<\/td><td>Hazardous Materials and Activities: Review &mdash; Recommended for Public Review<br \/>2017-05-16<br \/>Pre-Public Review &mdash; Proceed<br \/>2017-10-26<br \/>Hazardous Materials and Activities: Review of PR Comments &mdash; Defer<br \/>2018-05-28<br \/><\/td><td>1043<\/td><\/tr><tr><td>805<\/td><td>Replace CSA A82.31 with ASTM C840 on Gypsum Board Installation<\/td><td>This proposed change replaces the reference to an outdated CSA standard with an up-to-date acceptable ASTM standard on gypsum board installation and makes Part 5, Part 9 and Appendix D consistent.<\/td><td>NBC25 Div.B 9.29.5.1.(2),<br \/>NBC25 Div.B 9.10.9.2.(5),<br \/>NBC25 Div.B 9.10.12.4.(3),<br \/>NBC25 Div.B 9.10.14.5.(8),<br \/>NBC25 Div.B 9.10.14.5.(12),<br \/>NBC25 Div.B 9.10.15.5.(7),<br \/>NBC25 Div.B 9.10.15.5.(11)<\/td><td>Housing and Small Buildings: TG\/WG Development<br \/>2013-10-21<br \/>Housing and Small Buildings: Review &mdash; Deferred<br \/>2013-11-20<br \/>Fire Protection: Review<br \/>2014-04-29<br \/><\/td><td>-<\/td><\/tr><tr><td>456<\/td><td>Harmonization of Application of National Model Codes<\/td><td>This proposed change harmonizes the application statements of the National Fire Code and the National Building Code by adding the defined term \"alteration\" to the National Fire Code and rewording the application statement of the NFC to include the new defined term. <\/td><td>NFC25 Div.A 1.1.,<br \/>NFC25 Div.A 1.4.1.2.<\/td><td>Hazardous Materials and Activities: Draft<br \/>2013-04-17<br \/>Hazardous Materials and Activities: Draft<br \/>2014-04-07<br \/>Review &mdash; Deferred<br \/>2020-03-27<br \/><\/td><td>-<\/td><\/tr><tr><td>311<\/td><td>Door Closers for Use with Swinging Doors<\/td><td>This proposed change introduces the reference to the ULC-S133, \"Tests for Door Closers Intended for Use with Swinging Doors\" for self-closing devices on foors in fire separations.<\/td><td>NBC25 Div.B 3.1.8.13.,<br \/>NBC25 Div.B 9.10.13.10.<\/td><td>Fire Protection: Draft<br \/>2013-04-23<br \/><\/td><td>357<\/td><\/tr><tr><td>164<\/td><td>Combustible Dust<\/td><td>This CCR clarifies the design of systems and structures where combustible dust is produced in quantities or concentrations that create an explosion or fire hazard exist. The proposal replaces Articles 5.3.1.4. through 5.3.1.10. with references to applicable NFPA Standards.<\/td><td>NFC25 Div.B 5.3.1.<\/td><td>Hazardous Materials and Activities: Review &mdash; Deferred<br \/>2012-06-13<br \/>Hazardous Materials and Activities: Review &mdash; Deferred<br \/>2016-10-18<br \/><\/td><td>674<\/td><\/tr><\/tbody><\/table>\n\n\n\n\n\n","protected":false},"excerpt":{"rendered":"<p>Once a code change request becomes a minor or CBHCC approved task, it transitions to a proposed change that follows the path outlined in the code development process. This proposed change tracking database can be used by code change request proponents to follow the progress of proposed changes for a task linked to their code change request. Information in the database can be accessed using the filter option or toggle arrows to sort by: Please direct any questions related to code change requests to CBHCC code change request. &nbsp;<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"class_list":["post-2511","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/2511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/comments?post=2511"}],"version-history":[{"count":11,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/2511\/revisions"}],"predecessor-version":[{"id":7311,"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/pages\/2511\/revisions\/7311"}],"wp:attachment":[{"href":"https:\/\/cbhcc-cchcc.ca\/en\/wp-json\/wp\/v2\/media?parent=2511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}